SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
H. Eric Davidson                                                                                               Project Manager
email: h.eric.davidson@gmail.com                                         Architect / Construction Manager / Owner’s Project Manager
phone: 443.875.2770




Profile:                                                                                             http://www.linkedin.com/in/hericdavidson

Bottom-line, performance-driven and versatile real estate development Project Management professional :
     Sound record of leading and managing successful development projects over the last 12 years: continually at-or-below budget, and on-or-
     ahead of schedule, and meeting-or-exceeding scope & quality expectations;

     Assumes principal/sole responsibility for project performance while effectively leading project teams with minimal individual authority;

     Proactively integrates inherently diverse agendas into consensus objectives shared by the entire project team and all stakeholders;

     Consummate breadth of Design, Construction & Development management experience characterized by comprehensive planning &
     oversight, thorough attention to detail and relevance, effective & insightful team building & process alignment, and proactive, innovative
     response & adaptations to project issues & changing conditions;

     Consistently meets and often exceeds stakeholder expectations of cost containment & profit, schedule management & recovery, design
     quality & fitness, end-user affirmation & satisfaction, ongoing risk & liability mitigation, operations suitability & savings, and general
     public/market acceptance.


Professional Experience:
St. Joe Company – premier residential resort real estate development and placemaking; Jacksonville, FL (2004-08)                     www.joe.com
Project Manager for Village Center – commercial entitlements & Town Center for WindMark Beach;
Asst. Project Manager for WindMark Beach – 1600 home resort development; including relocation of 4-mile section of state highway.

Village Center – 6 buildings developed concurrently, mixed-use including 2 restaurants, resort check-in building, sales center, town hall, fitness
center, market, community pool facility, condominiums. 100,000 sq. ft; $80 mil.                        www.windmarkbeach.com/villagecenter.htm

     Design and Program Innovation: Capital/operating cost feasibility of central plant cooling was proposed, evaluated, approved and built
     within the project budget. Design team advanced the plant concept from a mundane engineering imperative into a distinctive, iconic
     entry feature tower that efficiently preserved valuable land area and provided an artful element to the town center. A custom cooling
     tower was designed with low velocity fans to mitigate noise from traditional high velocity units, preserving a “dark, quiet sky” ethic of the
     rural locale. The “water tower” look reinforced a rural town aesthetic and removed the usual visual blight of “compressor farms.”

     Intrapreneurial Development: Effected 50% savings on cost and schedule for high-end furniture by engaging a company cypress lumber
     mill and local craftsmen to produce custom designs in lieu of specialty retail pieces – the results allowed St. Joe to promote the established
     architectural indigenous ethic of “Old Florida” “of this place” through its furniture as well as supporting local business and arts.

Southern Accents Magazine ShowHouse – crash internal program to budget, design, document and build a premier “Cracker Chic” style home
for Southern Accents Magazine. Published: June, 2006. 5,000 sf; $3.1 mil. http://www.joe.com/WindMark-Beach-Community/460-Property
_________________________________________________________________________________________________________
URS Construction Services – program manager for $1.5 bil. Public Schools initiative; San Diego, CA (2002-04)
Construction Manager for 3 concurrent renovation/addition projects in construction;
Program Manager for Relocatable Classrooms, 2600 units – upgrade evaluations, budgeting, construction and relocations.

     Process Innovation: Designed and implemented a custom FilePro database used on handheld computers to inventory, inspect, budget and
     track each relocatable classroom unit – effectively reducing the punch process by 50% in terms of manpower required for surveys and
     inspections by 50% while simultaneously cutting the overall evaluation schedule allocated by 50%.
_________________________________________________________________________________________________________
Hill Glazier Architects – resort hospitality design firm; Palo Alto, CA (1999-2001)
Director of Construction Services – recruited to facilitate the realignment of project teams with issues trending toward litigation.

     All target projects were successfully re-balanced and avoided litigation; with only two requiring global settlements with GC.
________________________________________________________________________________________________________
H. Eric Davidson                                                                                              Project Manager
email: h.eric.davidson@gmail.com                                        Architect / Construction Manager / Owner’s Project Manager
phone: 443.875.2770                                                                                                                 page 2 of 2




Beatty / Harvey / Fillat (JV) – Peter Fillat Architects www.pfarc.com – full services architectural firm; Baltimore, MD (1998 - 1999)
Associate Principal – recruited to facilitate the recovery of a major fast-track project over-budget and with the schedule in contention.

Waterfront Marriott on the Inner Harbor – 750 key hi-rise, 43,000 sf retail leasable, 600 car parking deck.

    Project Intervention – independently commissioned a quantity survey cost study on existing design; located contributing causes
    effectively; proffered cost-effective alternatives; established Owner, Project Manager and GC buy-in to redirect the project; effected the
    re-design trade-by-trade thru shop drawings, finish packages and subcontractor negotiations – project was completed substantially on-
    budget and on-time, with no litigation.
___________________________________________________________________________________________________________________
Jonathan Nehmer + Assoc. PC – turnkey Construction Project Management Services for hospitality; Rockville, MD (1994 - 1998)
Director of Architecture – directed the expansion of firm’s internal capacity to include A/E design & production directly for investment clients.

     Business Unit Development and Management – implemented firm’s expansion into architectural design and production and managed
     multiple teams concurrently – company revenues tripled within 2 years, while saving client investment groups up to 30% in overall design
     documentation fees during the same period.

    Representative Projects: Hershey Lodge and Convention Center, PA; Courtyard/Residence Inn Marriotts: Downtown Atlanta, Scranton,
    PA, Green Valley / Las Vegas, NV; Wyndham Hotels: Boston, MA, Lexington, KY
____________________________________________________________________________________________________________________
Olivola / Parker & Assoc. PC – commercial and Dept. of State planning and architecture; Alexandria, VA (1988 - 1994)
Associate Principal / Project Architect – liaison & dedicated support to external rainmakers; design & production project management.

     Representative Projects: Philippine Embassy, 1600 Mass. Ave, DC; Ford Motors Training Center, Chantilly, VA; Embassy Facilities:
     Moscow, Rome, Malawi, Vienna; 1724 F Street, DC;



Core Competencies:
     Pro forma:     Budgets –       Business Plan Alignment/Forecasting/Tracking, Phasing.
                    Schedule –      Master Project Scheduling, Construction & CPM development/analysis/tracking/recovery.
                    Scope –         Entitlements/Property Evaluation & Public Approvals; Programming, Systems Feasibility Development &
                                    Analysis; Cost/Benefit Analysis; RFQ / RFP Solicitation & Analysis; Contract Scoping & Negotiations;
                                    Marketing support, Insurer/Lender/Lease support.
     Design:        Master Planning, Systems and Component Refinement & Coordination, budget testing & confirmation, Code/ADA/LEED
                    compliance, document coordination & control, condominium documents
     Build:         Systems coordination & confirmation, constructability review, GC pricing & schedule review/analysis, value engineering
                    proposal & analysis, trade contract scoping & pricing evaluation, progress team meetings, payment application & approval,
                    punch lists, final permits & licenses, warranty packages & operations training.
     Sectors:       Hospitality - resort, hotel, restaurant
                    Commercial - Office, Retail, R&D, Training Centers
                    Government - Embassy and Intelligence Facilities
     Computer:      Office –        Word, Excel, Powerpoint, Publisher, Outlook; Adobe Pro
                    Schedule –      Suretrak, MS Project;
                    Database – Access, FilePro, Expedition;
                    Design –        AutoCad, SketchUp.



Credentials:                  B. Architecture / 1987 / Virginia Polytechnic Institute & State University
                              Reg. Architect / 1989 / Virginia

                    Board Director – St. Joe Co. WindMark Beach Design Review Board (2008 to present).
                    Board Chair – Port St. Joe Redevelopment Agency Design Review Board, FL (2007-2008). (Authored Bldg. Design Guidelines)
                    Board Director & Construction Chair – Habitat for Humanity of Gulf County, FL (2005-2007).

Weitere ähnliche Inhalte

Was ist angesagt?

Resume11.2s
Resume11.2sResume11.2s
Resume11.2sri778
 
Resume Al Avila 2012
Resume Al Avila 2012Resume Al Avila 2012
Resume Al Avila 2012alavila
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project Historysgarrison1960
 
Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009drubinoff
 
Portfolio samples
Portfolio samplesPortfolio samples
Portfolio samplesabc
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 
Builders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RBuilders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RWilliam Fleck
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12cdelisi3386
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Ds Design Architects Brochure
Ds Design Architects BrochureDs Design Architects Brochure
Ds Design Architects Brochuredstockless
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 
16_0825 CRPR Booklet_WEB
16_0825 CRPR Booklet_WEB16_0825 CRPR Booklet_WEB
16_0825 CRPR Booklet_WEBCandice Bradley
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dpJonathan Hay
 
Fred Bonar, CV December 2015
Fred Bonar, CV December 2015Fred Bonar, CV December 2015
Fred Bonar, CV December 2015Fred N Bonar PE
 

Was ist angesagt? (20)

Resume11.2s
Resume11.2sResume11.2s
Resume11.2s
 
Christopher Buehler portfolio
Christopher Buehler portfolioChristopher Buehler portfolio
Christopher Buehler portfolio
 
Resume Al Avila 2012
Resume Al Avila 2012Resume Al Avila 2012
Resume Al Avila 2012
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project History
 
Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009
 
013112 mds resume9
013112 mds resume9013112 mds resume9
013112 mds resume9
 
Portfolio samples
Portfolio samplesPortfolio samples
Portfolio samples
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
RESUME
RESUMERESUME
RESUME
 
Builders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RBuilders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15R
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12
 
Karla Schweitzer Farrell, rla, aicp leep ap
Karla Schweitzer Farrell, rla, aicp leep apKarla Schweitzer Farrell, rla, aicp leep ap
Karla Schweitzer Farrell, rla, aicp leep ap
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Ds Design Architects Brochure
Ds Design Architects BrochureDs Design Architects Brochure
Ds Design Architects Brochure
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
Resume July 2016
Resume July 2016Resume July 2016
Resume July 2016
 
16_0825 CRPR Booklet_WEB
16_0825 CRPR Booklet_WEB16_0825 CRPR Booklet_WEB
16_0825 CRPR Booklet_WEB
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dp
 
Fred Bonar, CV December 2015
Fred Bonar, CV December 2015Fred Bonar, CV December 2015
Fred Bonar, CV December 2015
 

Ähnlich wie Resume

15_0222 Resume Development Manager
15_0222 Resume Development Manager15_0222 Resume Development Manager
15_0222 Resume Development ManagerGary Kobayashi
 
Johnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Servicestomsestak
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013Gail S. Brody
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction ManagerEarl Pritchard
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyremeganraem
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land developmentFernando Bravo, P.E., CFM
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land DevelopmentFernando Bravo, P.E., CFM
 
Ziad Roushdy (Resume + Projects)_2016
Ziad Roushdy (Resume + Projects)_2016Ziad Roushdy (Resume + Projects)_2016
Ziad Roushdy (Resume + Projects)_2016Ziad Roushdy
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 

Ähnlich wie Resume (20)

15_0222 Resume Development Manager
15_0222 Resume Development Manager15_0222 Resume Development Manager
15_0222 Resume Development Manager
 
Construction Project Manager_RE
Construction Project Manager_REConstruction Project Manager_RE
Construction Project Manager_RE
 
Christian Finn - Resume
Christian Finn - ResumeChristian Finn - Resume
Christian Finn - Resume
 
DJT Linkedin
DJT LinkedinDJT Linkedin
DJT Linkedin
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
Christian Finn October 09 Visual Resume
Christian Finn October  09 Visual ResumeChristian Finn October  09 Visual Resume
Christian Finn October 09 Visual Resume
 
Johnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clients
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Services
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013
 
Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction Manager
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyre
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development
 
Ziad Roushdy (Resume + Projects)_2016
Ziad Roushdy (Resume + Projects)_2016Ziad Roushdy (Resume + Projects)_2016
Ziad Roushdy (Resume + Projects)_2016
 
Munk Resume KM 10-8-16 KM 2
Munk Resume KM 10-8-16 KM 2Munk Resume KM 10-8-16 KM 2
Munk Resume KM 10-8-16 KM 2
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
David Green_21-06-16
David Green_21-06-16David Green_21-06-16
David Green_21-06-16
 

Resume

  • 1. H. Eric Davidson Project Manager email: h.eric.davidson@gmail.com Architect / Construction Manager / Owner’s Project Manager phone: 443.875.2770 Profile: http://www.linkedin.com/in/hericdavidson Bottom-line, performance-driven and versatile real estate development Project Management professional : Sound record of leading and managing successful development projects over the last 12 years: continually at-or-below budget, and on-or- ahead of schedule, and meeting-or-exceeding scope & quality expectations; Assumes principal/sole responsibility for project performance while effectively leading project teams with minimal individual authority; Proactively integrates inherently diverse agendas into consensus objectives shared by the entire project team and all stakeholders; Consummate breadth of Design, Construction & Development management experience characterized by comprehensive planning & oversight, thorough attention to detail and relevance, effective & insightful team building & process alignment, and proactive, innovative response & adaptations to project issues & changing conditions; Consistently meets and often exceeds stakeholder expectations of cost containment & profit, schedule management & recovery, design quality & fitness, end-user affirmation & satisfaction, ongoing risk & liability mitigation, operations suitability & savings, and general public/market acceptance. Professional Experience: St. Joe Company – premier residential resort real estate development and placemaking; Jacksonville, FL (2004-08) www.joe.com Project Manager for Village Center – commercial entitlements & Town Center for WindMark Beach; Asst. Project Manager for WindMark Beach – 1600 home resort development; including relocation of 4-mile section of state highway. Village Center – 6 buildings developed concurrently, mixed-use including 2 restaurants, resort check-in building, sales center, town hall, fitness center, market, community pool facility, condominiums. 100,000 sq. ft; $80 mil. www.windmarkbeach.com/villagecenter.htm Design and Program Innovation: Capital/operating cost feasibility of central plant cooling was proposed, evaluated, approved and built within the project budget. Design team advanced the plant concept from a mundane engineering imperative into a distinctive, iconic entry feature tower that efficiently preserved valuable land area and provided an artful element to the town center. A custom cooling tower was designed with low velocity fans to mitigate noise from traditional high velocity units, preserving a “dark, quiet sky” ethic of the rural locale. The “water tower” look reinforced a rural town aesthetic and removed the usual visual blight of “compressor farms.” Intrapreneurial Development: Effected 50% savings on cost and schedule for high-end furniture by engaging a company cypress lumber mill and local craftsmen to produce custom designs in lieu of specialty retail pieces – the results allowed St. Joe to promote the established architectural indigenous ethic of “Old Florida” “of this place” through its furniture as well as supporting local business and arts. Southern Accents Magazine ShowHouse – crash internal program to budget, design, document and build a premier “Cracker Chic” style home for Southern Accents Magazine. Published: June, 2006. 5,000 sf; $3.1 mil. http://www.joe.com/WindMark-Beach-Community/460-Property _________________________________________________________________________________________________________ URS Construction Services – program manager for $1.5 bil. Public Schools initiative; San Diego, CA (2002-04) Construction Manager for 3 concurrent renovation/addition projects in construction; Program Manager for Relocatable Classrooms, 2600 units – upgrade evaluations, budgeting, construction and relocations. Process Innovation: Designed and implemented a custom FilePro database used on handheld computers to inventory, inspect, budget and track each relocatable classroom unit – effectively reducing the punch process by 50% in terms of manpower required for surveys and inspections by 50% while simultaneously cutting the overall evaluation schedule allocated by 50%. _________________________________________________________________________________________________________ Hill Glazier Architects – resort hospitality design firm; Palo Alto, CA (1999-2001) Director of Construction Services – recruited to facilitate the realignment of project teams with issues trending toward litigation. All target projects were successfully re-balanced and avoided litigation; with only two requiring global settlements with GC. ________________________________________________________________________________________________________
  • 2. H. Eric Davidson Project Manager email: h.eric.davidson@gmail.com Architect / Construction Manager / Owner’s Project Manager phone: 443.875.2770 page 2 of 2 Beatty / Harvey / Fillat (JV) – Peter Fillat Architects www.pfarc.com – full services architectural firm; Baltimore, MD (1998 - 1999) Associate Principal – recruited to facilitate the recovery of a major fast-track project over-budget and with the schedule in contention. Waterfront Marriott on the Inner Harbor – 750 key hi-rise, 43,000 sf retail leasable, 600 car parking deck. Project Intervention – independently commissioned a quantity survey cost study on existing design; located contributing causes effectively; proffered cost-effective alternatives; established Owner, Project Manager and GC buy-in to redirect the project; effected the re-design trade-by-trade thru shop drawings, finish packages and subcontractor negotiations – project was completed substantially on- budget and on-time, with no litigation. ___________________________________________________________________________________________________________________ Jonathan Nehmer + Assoc. PC – turnkey Construction Project Management Services for hospitality; Rockville, MD (1994 - 1998) Director of Architecture – directed the expansion of firm’s internal capacity to include A/E design & production directly for investment clients. Business Unit Development and Management – implemented firm’s expansion into architectural design and production and managed multiple teams concurrently – company revenues tripled within 2 years, while saving client investment groups up to 30% in overall design documentation fees during the same period. Representative Projects: Hershey Lodge and Convention Center, PA; Courtyard/Residence Inn Marriotts: Downtown Atlanta, Scranton, PA, Green Valley / Las Vegas, NV; Wyndham Hotels: Boston, MA, Lexington, KY ____________________________________________________________________________________________________________________ Olivola / Parker & Assoc. PC – commercial and Dept. of State planning and architecture; Alexandria, VA (1988 - 1994) Associate Principal / Project Architect – liaison & dedicated support to external rainmakers; design & production project management. Representative Projects: Philippine Embassy, 1600 Mass. Ave, DC; Ford Motors Training Center, Chantilly, VA; Embassy Facilities: Moscow, Rome, Malawi, Vienna; 1724 F Street, DC; Core Competencies: Pro forma: Budgets – Business Plan Alignment/Forecasting/Tracking, Phasing. Schedule – Master Project Scheduling, Construction & CPM development/analysis/tracking/recovery. Scope – Entitlements/Property Evaluation & Public Approvals; Programming, Systems Feasibility Development & Analysis; Cost/Benefit Analysis; RFQ / RFP Solicitation & Analysis; Contract Scoping & Negotiations; Marketing support, Insurer/Lender/Lease support. Design: Master Planning, Systems and Component Refinement & Coordination, budget testing & confirmation, Code/ADA/LEED compliance, document coordination & control, condominium documents Build: Systems coordination & confirmation, constructability review, GC pricing & schedule review/analysis, value engineering proposal & analysis, trade contract scoping & pricing evaluation, progress team meetings, payment application & approval, punch lists, final permits & licenses, warranty packages & operations training. Sectors: Hospitality - resort, hotel, restaurant Commercial - Office, Retail, R&D, Training Centers Government - Embassy and Intelligence Facilities Computer: Office – Word, Excel, Powerpoint, Publisher, Outlook; Adobe Pro Schedule – Suretrak, MS Project; Database – Access, FilePro, Expedition; Design – AutoCad, SketchUp. Credentials: B. Architecture / 1987 / Virginia Polytechnic Institute & State University Reg. Architect / 1989 / Virginia Board Director – St. Joe Co. WindMark Beach Design Review Board (2008 to present). Board Chair – Port St. Joe Redevelopment Agency Design Review Board, FL (2007-2008). (Authored Bldg. Design Guidelines) Board Director & Construction Chair – Habitat for Humanity of Gulf County, FL (2005-2007).