Project M87
1. Project M87
• The Event Horizon Telescope (EHT) — a planet-scale
array of eight ground-based radio telescopes forged
through international collaboration — was designed
to capture images of a black hole.
• Since then we have been working on building
Automated Telescope Calibration software, and Mass
Calculation is next. Things have not gone very rosy so
far, and we need to again collaborate to get the entire
picture.
• We are keen to find out how we can get things done
without it taking an entire galactic year!
2. Let’s not waste time
• Divide yourselves in
groups of max 7 people
7. Changes
Everyone involved in Project 87 had a catch up. Together you
decided to implement the following changes:
• A cross functional Scrum team was formed consisting of:
- 5 development team members: Luke, Anakin, Ben, Rey, Qui-
Gon
- Scrum Master: Windu
- Product Owner: Leia
• Han and his colleagues implemented infrastructure as code and
self service infrastructure.
• Align the sprint cadence with the release window. Note: in the
future the team aims to release on demand so they are not
restricted to only release once a fortnight.
8. The hard reality
Your team has already run 8 sprints. The team is consistently
completing 1-3 Product Backlog Items per sprint. However,
things are not really flowing.
Each sprint, it seems that more and more Product Backlogs
Items are being carried over to the next sprint and you are
not sure what the underlying problem is.
The longer this goes on, the longer it seems to take before
Product Backlogs Items are done.
It seems like the mass blackhole functionality is falling in a
black hole!
In the last sprint retrospective your team agreed to focus on
flow and use flow based metrics to help you.