SlideShare ist ein Scribd-Unternehmen logo
1 von 201
DRAFT REPORT
“PRE-FEASIBILITY OF TOURISM PROMOTIONAL PROJECTS”
Submitted to:
Tourism Corporation Khyber Pakhtunkhwa
Prepared by:
ABAD Associates Pvt. Ltd.
Kumrat Valley: The Hidden Paradise
Broghil Valley: The Valley of Lakes
Golen Gol: The valley of towering hills
Miranjani: The Highest Peak in Galiyat
Dagri Bangla: heaven for trekkers/campers.
Beer Gali (Swabi)
WHAT IS TOURISM?
Tourism is an industry that drives people to travel for recreation and leisure. The
growth of tourism has had a dramatic effect on many countries, not just
economically, but also environmentally and socially.
IMPORTANCE OF TOURISM?
Purpose of This Study.
To strengthen the position of all 6 no of sites as a premier
tourism destination for desired target market through new
development, improvement, effective promotion, and efficient
distribution of tourism products and services.
To stimulate long-term tourism-related businesses and
economic development as well as resource sustainability in all
the sites.
To provide a comprehensive guideline for various
stakeholders in all sites, (city government, local businesses, and
residents) to strengthen the community through tourism.
Objectives of This Study.
To Explore the Tourism Potential of the Proposed 6 Sites.
To Protect the Natural Environment and Beauty of the Proposed 6
Sites.
To Boost the local Economy.
1. Employment
2. Increased Spending in the Local Community
3. Infrastructure
4. Social advantages
5. Environmental Advantages
6. Opportunities
To Promote Tourism as Business.
KUMRAT VALLEY:
The Hidden Paradise Tourists Spot
KUMRAT VALLEY:
The Hidden Paradise Tourists Spot
Kumrat is a valley in the Upper Dir District, Khyber Pakhtunkhwa province, of
Pakistan. It is one of the scenic valleys of Khyber Pakhtunkhwa, and a picturesque spot
for travelers.
GEOGRAPHY & CLIMATE:
Kumrat valley is located in the foothills of Hindu Kush mountains range, surrounded
by Chitral to the north, Kalam Swat valley to the east, Ayun valley Chitral to the west
& Lower Dir to the south.
The weather of Kumrat valley is alpine climatic in nature and mild cool summers are
common throughout the area, with an average temperature ranges from 20 °C to 25 °C.
While in winter the temperature is very low due to heavy snow fall i.e. is 3 to 11 feet and
the temperature ranges from -4 °C to -10 °C. The maximum rain fall is 255 mm and
minimum is 100 mm.
FLORA & FAUNA:
Diverse species of grasses and trees are found in Kumrat valley. In trees Deodar, Cheer,
Kail, Fir Spruce, Chalghoza, Pines, Oak, and Alpine pastures are covering huge area of
the land in the form of forest.
while in fauna, Brown Bears, Snow Leopards, Monkeys, Porcupines, Ibex, Markhor,
Musk, Deer, Jackals, Chakores and Monal Pheasants etc
ACCESS:
Kumrat Valley can be accessed by road from Peshawar as well as the Capital
Islamabad through Upper Dir. The distance by road is 296 kilometers from Peshawar
and 410 kilometers from Islamabad. The second possible access route is through Utror
(Kalam) but the road condition is not good there.
ACCESS TO KUMRAT VALLLEY FROM PESHAWAR:
ROUTE & DIRECTION:
Day 1: Peshawar to Upper Dir (Car, Jeep) 7 hours’ travel
Day 2: Upper Dir to Kumrat (4x4 only) 6 hours’ travel
Day 3: Explored Kumrat up to Khazaan Kot Full day
Day 4: Explored Kumrat up to Badgoi Top Full day
Day 5: Explored Jazz Banda Full day
Day 6: Back to Peshawar
SNAPS OF THE KUMRAT VALLEY:
The unseen beauty of Kumrat valley, a hidden paradise for tourists.
JAZZ BANDA:
SNAPS OF JAZZ BANDA:
Katora lake water fall Jazz banda water fall
Katora lake jazz banda/Jazz banda Dand
Bara Dand Lake I & II at jazz banda
Tourist Attracting Spots At and Nearby to Kumrat
Valley:
1.Kumrat valley
2.Khazaan kot/Dojangay
3.Shazor lake/Dand
4.Jazz banda
5.Katora lake/jazz banda Dand
6.Bara Dand lake I & II jazz banda
7.Badgoi top/Badgoi pass
Current Tourism Activities And Facilities:
 Summer Retreat spot
 Camping
 Trout Fishing
 Hiking and Trekking
 Jashn-e-Kumrat
Lack of Amenities/Short Comings for the promotion of Tourism
at Kumrat are.
 Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone.
 Electricity and Sui Gas.
 Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).
 Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.
 Commercial Areas/Shops/Fuel pump.
 Health center/Health Facility.
 Public Parks & Public Toilets.
 Playgrounds for Games/Competitions at Jashne Kumrat.
 Road Side Rest Area Spots/Benches along the Road.
 Tourist Information/Guiding Center/Administration.
 Security Check Posts/Police Post.
 Solid Waste Collection and Dumping/Dust Bins.
Existing Road condition at Kumrat Only 4x4 vehicles can Travel to Kumrat
Connecting Bridges & Road condition
Cricket on the road instead of playgroundNo facility along the roadside
Difficult and hard Track
Towards Jazz Banda
Proposed Activities, Suggestions & Recommendations.
After studying the area in detail and doing the area survey, following are the
suggestions & recommendations to improve the existing facilities and proposed
new activities to promote tourism in the area and facilitate the tourist.
PROPOSAL 1
PROJECT PROPOSED ACTIVITIES WITH CHIRLIFT SCHEME:
 
ADMINISTRATION 2 NOs @2000     SFT
CHAIRLIFT AT JAZZ BANDA  @4.5 KM
BASE AND TOP STATION @20,000  SFT
PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT
RESTURANTS 4 NOs @40,000  SFT
HOTEL @20,000  SFT
HOTEL FOR FAMILIES @20,000  SFT
COMMERCIAL AREA @5000     SFT
FOOD COURTS @20 NOs
CAMPING PODS @30 NOs
BAR. B. Q. SPOTS @10 NOs
PROPOSAL 1
PROJECT PROPOSED ACTIVITIES WITH CHIRLIFT SCHEME:
 
PUBLIC PARK @70,000  SFT
CAPMING POINTS FOR TENTS @2 NOs
MASTER PLAN DEVELOPMENT @263 KANALS
OPEN AIR THEATHER @10000 SFT
FINSHING POINTS @15 NOs
SPORTS ACTIVITIES @6   NOs
JEEP TRACK & BYCYCLE TRACK @15 KMs
JASHN-E-KUMRAT GROUND @64 KANALS
MOSQUE @3000 SFT
SOLID WASTE COLLECTION UNIT @3000 SFT
FIRST AID ROOM @400   SFT
PUBLIC TOILETS 12 UNITS @4800 SFT
SECURITY POST 3 NOs @300   SFT
TOURIST FACILITATION CENTER @1000 SFT
PARKING  @300 VEHICLES
MICRO POWER GENRATION UNIT @1 NO
PROPOSAL 1
PROJECT FINANCIAL DATA:
 
ADMINISTRATION 2 NOs @2000     SFT =08   Millions 
CHAIRLIFT AT JAZZ BANDA  @4.5 KM =950 Millions
BASE AND TOP STATION @20,000  SFT =80   Millions
PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT =50   Millions
RESTURANTS 4 NOs @40,000  SFT =130 Millions 
HOTEL @20,000  SFT =90   Millions
HOTEL FOR FAMILIES @20,000  SFT =140 Millions
COMMERCIAL AREA @10,000  SFT = 20  Millions
FOOD COURTS @20 NOs = 12  Millions
CAMPING PODS @30 NOs = 30  Millions
BAR. B. Q. SPOTS @10 NOs = 05  Millions
MASTER PLAN DEVELOPMENT @263 KANALS = 50  Millions
OPEN AIR THEATHER @10000 SFT = 10  Millions
FINSHING POINTS @15 NOs = 15  Millions
SPORTS ACTIVITIES @6   NOs = 20  Millions
JEEP TRACK & BYCYCLE TRACK @15 KMs = 25  Millions
JASHN-E-KUMRAT GROUND @64 KANALS = 30  Millions
MOSQUE @3000 SFT = 04  Millions
SOLID WASTE COLLECTION UNIT @3000 SFT = 05  Millions
FIRST AID ROOM @400   SFT = 01  Millions
PUBLIC TOILETS 12 UNITS @4800 SFT = 10  Millions
SECURITY POST 3 NOs @300   SFT = 03  Millions
TOURIST FACILITATION CENTER @1000 SFT = 04  Millions
PARKING  @300 VEHICLES = 10  Millions
MICRO POWER GENRATION UNIT @1 NO = 50  Millions
 
GRAND TOTAL = Rs 1771.00 Millions
TOTAL INVESTMENT = Rs 1771.00 Millions
 
TOTAL REVENUE @ 100 % OPERATIONAL = Rs 255.6 Millions
(800 visitors per day during 7 months season average revenue of   Rs.1500 per person 
[800 x 213 x 1500])
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 178.92 Millions
Operating Costs:
Salaries (including Mgt, Admin & Support Staff)  = Rs 14, 50,000 Per Month
Utilities, Depreciation & Misc.           = Rs 4, 50,000 per Month
Total per month = Rs 19,00,000/-
Say, Rs 1,14,00,000/- per Season
Total Seasonal Operating Cost = Rs 11.4 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 178.92 Millions
Deduction of Income Taxes @ 35%: = Rs 62.62 Millions
Deduction of Operational Costs: = Rs 11.40 Millions
Deduction of Annul Lease amount = Rs 15.00 Millions
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 89.90 millions
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency:  = 5 %
Payback Period @ 70 % Operational Efficiency: = Approx. 19.7 years.
PROPOSAL 2
PROJECT FINANCIAL DATA:
 
ADMINISTRATION 2 NOs @2000     SFT =08   Millions 
PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT =50   Millions
RESTURANTS 4 NOs @40,000  SFT =130 Millions 
HOTEL @20,000  SFT =90   Millions
HOTEL FOR FAMILIES @20,000  SFT =140 Millions
COMMERCIAL AREA @10,000  SFT = 20  Millions
FOOD COURTS @20 NOs = 12  Millions
CAMPING PODS @30 NOs = 30  Millions
BAR. B. Q. SPOTS @10 NOs = 05  Millions
PUBLIC PARK @70,000  SFT = 10  Millions
CAPMING POINTS FOR TENTS @2 NOs = 09  Millions
MASTER PLAN DEVELOPMENT @263 KANALS = 50  Millions
OPEN AIR THEATHER @10000 SFT = 10  Millions
FINSHING POINTS @15 NOs = 15  Millions
SPORTS ACTIVITIES @6   NOs = 20  Millions
JEEP TRACK & BYCYCLE TRACK @15 KMs = 25  Millions
JASHN-E-KUMRAT GROUND @64 KANALS = 30  Millions
MOSQUE @3000 SFT = 04  Millions
SOLID WASTE COLLECTION UNIT @3000 SFT = 05  Millions
FIRST AID ROOM @400   SFT = 01  Millions
PUBLIC TOILETS 12 UNITS @4800 SFT = 10  Millions
SECURITY POST 3 NOs @300   SFT = 03  Millions
TOURIST FACILITATION CENTER @1000 SFT = 04  Millions
PARKING  @300 VEHICLES = 10  Millions
MICRO POWER GENRATION UNIT @1 NO = 50  Millions
 
GRAND TOTAL = Rs 741.00 Millions
TOTAL INVESTMENT = Rs 741.00 Millions
 
TOTAL REVENUE @ 100 % OPERATIONAL = Rs 170.4 Millions
(800 visitors per day during 7 months season average revenue of   Rs.1000 per person 
[800 x 213 x 1000])
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 119.28 Millions
Operating Costs:
Salaries (including Mgt, Admin & Support Staff)  = Rs 11, 50,000 Per Month
Utilities, Depreciation & Misc.           = Rs 3, 50,000 per Month
Total per month = Rs 15,00,000/-
Say, Rs 1,14,00,000/- per Season
Total Seasonal Operating Cost = Rs 10.5 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 119.28 Millions
Deduction of Income Taxes @ 35%: = Rs 41.74 Millions
Deduction of Operational Costs: = Rs 10.5 Millions
Deduction of Annul Lease amount = Rs 12.00 Millions
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 55.04 millions
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency:  = 7.42 %
Payback Period @ 70 % Operational Efficiency: = Approx. 13.46 years.
Broghil Valley:
The land of Peace, Harmony and Traditions……
The Valley of Lakes
Broghil Valley: The land of Peace, Harmony and Traditions……
The Valley of Lakes
Broghil Valley is a valley & national park located in the upper northern
reaches Chitral District, of Pakhtunkhwa, Pakistan. It is located close to
the Afghan-Pakistan border.
GEOGRAPHY & CLIMATE:
Broghil valley is located at a distance of 250 km from main Chitral town. Towards the
north, the valley is connected with famous Wakhan strip of Afghanistan through the
famous “Broghil Pass”. Another important pass “Darwaza” connects Broghil with
Afghanistan in the northwest. Broghil pass. In the southeast direction, the valley is
connected with Yasin valley of Gilgit-Baltistan region via Darkot Pass. Towards east, the
valley joins the Qurumbar valley through famous Qurumbar pass towards Ghizer district of
Gilgit-Baltistan. In the south, Broghil joins the main valley of Yarkhun towards Mastuj and
Chitral town.
Broghil valley has harsh climate. It is freezing cold during winter. While in summer (July
to the end of September) the weather remains mild to cold. Temperature often remains
below freezing point during the winter spell. Precipitation is mainly received in snow form
from October to the end of May. Summer rains are scanty
FLORA & FAUNA:
Broghil Valley is homeland of ibex, wolves, snow leopards, white and brown
bears, fox, rabbits, marmots and many more wild animals. The bird species are,
hawks, eagles, falcons are found in the high mountains, while pheasants,
partridges, hoopoes, larks, sparrows, quails, doves, swallow starlings,
nightingales, crows and vultures. The Broghil valley is of high importance in
maintaining a great diversity of wetlands including high altitude alpine lakes and
ponds, peat lands areas, alpine pastures, riparian areas, Birch, Salix and Juniper
forests and riparian vegetation.
ACCESS:
Broghil valley is located at a distance of 250 km from main Chitral town. Total
distance from Peshawar to Broghil through Chitral-Mastuj road is 576 Km. the
distance from Peshawar to Chitral can be covered by a Car or Jeep but from
Chitral city onwards you will need 4x4 jeep up to Broghil valley. The jeep can
lead you to the Kishmanjah village of Broghil. From there you have to onwards
by foot or horse can be hired locally.
Route & Direction:
Day 1: Peshawar to Upper Dir (Car, Jeep) 7 hours’ travel
Day 2: Upper Dir to Mastuj (4x4 only) 11 hours’ travel
Day 3: Mastuj to Lasht (4x4 only) 9 hours’ travel
Day 4: Lasht to Broghil Valley (4x4 only) 3 hours’ travel
Day 5: Explored Broghil Valley Full day
Day6: Back to Peshawar
ACCESS TO BROGHIL VALLEY FROM PESHAWAR:
CURRENT TOURISM ACTIVITIES AND FACILITIES:
Sport Events Held During Broghil Festival
1.Buz Kashi
2.Yak Polo
3.Yak Race
4.Polo
5.Horse Race
6.Mountain Marathon
7.Tug of War
8.Mountain Football
9.Women Horse and Yak race
10.Paragliding by Paraglide Association team
Cultural Activities of Broghil Festival
1.Wakhi Music with Daaf and flute
2.Women traditional songs, dance with cultural dress
3.Wakhi Traditional items, handicrafts, utensils etc display by Women folk
4.Wakhi Foods Display by Wakhi women folk
SNAPS OF THE BROGHIL VALLEY:
Karamber Lake: King of lakes, the mighty Karambar Lake.
Tourists Attracting Spots in and Nearby to Broghil
Valley.
Some famous spots to explore around Broghil are:
1.Showrsheer
2.Lashkargaz
3.Swinj
4.Sohktarabad
5.Chittiboi Glacier
6.Irgoth
7.Mitrandas
8.Gakuch
9.Garam chashma kashmanja
10.Broghil Pass
11.Karamber Lake
12.Chikaar
13.Darkot Pass
14.Darkot Glacier
Lack of Amenities/Short Comings for the promotion of Tourism at
Broghil are:
 Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone .
 Electricity and Sui Gas.
 Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).
 Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.
 Commercial Areas/Shops/Fuel pump.
 Health center/Health Facility.
 Public Parks & Public Toilets.
 Playgrounds for Games/Competitions at Jashne Broghil.
 Road Side Rest Area Spots/Benches along the Road.
 Tourist Information/Guiding Center/Administration.
 Solid Waste Collection and Dumping/Dust Bins.
Jashne Broghil site, with No Proper Gaming
Plots,seating Space & Public Toilets
No Suitable Space for Performing Arts
Existing Road Condition on the way to Broghil
Existing Bridge on river Chitral at Broghil Site
Existing Spectators Seating Spaces at Jashne Broghil Gaming Site
Proposed Activities, Suggestions & Recommendations.
After studying the area in detail and doing the area survey, following are the
suggestions & recommendations to improve the existing facilities and proposed
new activities to promote tourism in the area and facilitate the tourist.
PROJECT PROPOSED ACTIVITIES:
 
ADMINISTRATION @2000     SFT
RESTURANT  @10,000  SFT
JASHNE-E-BROGHIL GROUND @50,000  SFT
PAVALLION @10,000  SFT
PEDESTRIAN BRIDGE @30 FEET LONG
COMMERCIAL AREA @5000     SFT
FOOD COURTS @10 NOs
CAMPING PODS @20 NOs
PUBLIC PARK @10,000  SFT
CAPMING POINTS FOR TENTS @3 NOs
MASTER PLAN DEVELOPMENT @24 KANALS
MOSQUE @3000 SFT
SOLID WASTE COLLECTION UNIT @3000 SFT
FIRST AID ROOM @400   SFT
PUBLIC TOILETS @600   SFT
SECURITY POST @100   SFT
PARKING  @ 70 VEHICLES
MICRO POWER GENRATION UNIT @1 NO
PROJECT FINANCIAL DATA:
 
ADMINISTRATION @2000     SFT = 08 Millions
RESTURANT  @10,000  SFT = 50 Millions
JASHNE-E-BROGHIL GROUND @50,000  SFT = 10 Millions
PAVALLION @10,000  SFT = 20 Millions
PEDESTRIAN BRIDGE @30 FEET LONG = 10 Millions
COMMERCIAL AREA @5000     SFT = 08 Millions
FOOD COURTS @10 NOs = 05 Millions
CAMPING PODS @20 NOs = 20 Millions
PUBLIC PARK @10,000  SFT = 15 Millions
CAPMING POINTS FOR TENTS @3 NOs = 10 Millions
MASTER PLAN DEVELOPMENT @24 KANALS = 12 Millions
MOSQUE @3000 SFT = 08 Millions
SOLID WASTE COLLECTION UNIT @3000 SFT = 02 Millions
FIRST AID ROOM @400   SFT = 01 Millions
PUBLIC TOILETS @600   SFT = 04 Millions
SECURITY POST @200   SFT = 02 Millions
PARKING  @ 70 VEHICLES = 06 Millions
MICRO POWER GENRATION UNIT @1 NO = 50  Millions
 
GRAND TOTAL = Rs 241.00 Millions
TOTAL INVESTMENT = Rs 241.00 Millions
TOTAL REVENUE @ 100 % OPERATIONAL = Rs 68.62 Millions
(250 visitors per day during 6 months season average revenue of   Rs.1500 per person 
[250 x 183 x 1500])
                                                                                                                                                                                    
                                       
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 48.03 Millions
Operating Costs:
Salaries (including Mgt, Admin & Support Staff)  = Rs 5, 50,000 Per Month
Utilities, Depreciation & Misc.           = Rs 1, 50,000 per Month
Total per month = Rs 7,00,000/-
Say, Rs 42,00,000/- per Season
Total Seasonal Operating Cost = Rs 04.20 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 48.03 Millions
Deduction of Income Taxes @ 35%: = Rs 16.81 Millions
Deduction of Operational Costs: = Rs 04.20 Millions
Deduction of Annul Lease amount = Rs 01.00 Millions
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 26.02 millions
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency:  = 10.79 %
Payback Period @ 70 % Operational Efficiency: = Approx. 9.26 years.
Golen Gol Valley:
With towering hills on all four sides, Golen is a picturesque valley.
Golen Gol Valley:
With towering hills on all four sides, Golen is a picturesque valley.
Golen Gol is a valley situated at Chitral district, Golen Gol is a left bank tributary
of Mastuj River and originates from glaciers namely Lohigal and Shachiokoh.
GEOGRAPHY & CLIMATE:
Golen Gol Valley is on the right side on main Chitral-Mastuj road. The valley is surround by
high mountains. A narrow road, better hills and afterword’s a lush green valley with stream
waters and green fields.
Broghil valley has harsh climate. It is freezing cold during winter. While in summer (July to
the end of September) the weather remains mild to cold. Temperature often remains below
freezing point during the winter spell. Precipitation is mainly received in snow form from
October to the end of May. Summer rains are inadequate.
ACCESS:
Golen Gol is about 380 kilometers from Islamabad, about 25 km from Chitral city
and about 365 km from provincial capital Peshawar.
The site is easily accessible from Chitral town with a travel of 1.5 hours in car or
jeep to Golen Gol. The whole narrow valley can be explored with help of 4x4
vehicles to reach to the end of the valley.
ACCESS TO GOLEN GOL VALLEY FROM
PESHAWAR:
Route & Direction:
Route & Direction:
Day 1: Peshawar to Chitral (Car, Jeep) 10 hours’ travel
Day 2: Chitral to Golen Gol Valley (4x4 only) 3.5 hours’ travel
Day 3: Explored Golen Gol Valley Full day
Day 4: Back to Peshawar
CURRENT TOURISM ACTIVITIES AND FACILITIES:
One of the beautiful valleys for tourist in Chitral district Golen is the
nearest available Fresh Trout Fish spot in Chitral where you can
easily find Trout Fish in stream waters as well as:
Trout Fish Farms
Fresh Water Streams
Mixed Forest and Vast Pastures
Camping, Fishing, Trekking, Hiking.
SNAPS OF THE GOLEN GOL VALLEY:
Lack of Amenities/Short Comings for the promotion of Tourism
at Gollen Gol are.
 New Tourist site with no facilities.
 Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone .
 Electricity and Sui Gas.
 Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).
 Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.
 Commercial Areas/Shops/Fuel pump.
 Health center/Health Facility.
 Public Parks & Public Toilets.
 Road Side Rest Area Spots/Benches along the Road.
 Tourist Information/Guiding Center/Administration.
 Solid Waste Collection and Dumping/Dust Bins.
Existing Road Condition on the way to Valley
PROJECT PROPOSED ACTIVITIES:
 
ADMINISTRATION @2000     SFT
RESTURANT  @10,000  SFT
HOTEL @20,000  SFT
COMMERCIAL AREA @5000     SFT
FOOD COURTS @10 NOs
CAMPING PODS @24 NOs
BAR. B. Q. SPOTS @2 NOs
PUBLIC PARK @60,000  SFT
CAPMING POINTS FOR TENTS @3 NOs
MASTER PLAN DEVELOPMENT @72 KANALS
OPEN AIR THEATHER @10000 SFT
FINSHING POINTS @15 NOs
SPORTS ACTIVITIES @6   NOs
MOSQUE @3000 SFT
SOLID WASTE COLLECTION UNIT @3000 SFT
FIRST AID ROOM @400   SFT
PUBLIC TOILETS @600   SFT
SECURITY POST @100   SFT
PARKING  @ 70 VEHICLES
PROJECT FINANCIAL DATA:
 
ADMINISTRATION @2000     SFT = 08 Millions 
RESTURANT  @10,000  SFT = 40  Millions
HOTEL @20,000  SFT =120 Millions
COMMERCIAL AREA @5000     SFT = 10  Millions
FOOD COURTS @10 NOs = 05  Millions
CAMPING PODS @24 NOs = 24  Millions
BAR. B. Q. SPOTS @2 NOs = 02  Millions
PUBLIC FAMILY PARK @60,000  SFT = 10  Millions
CAPMING POINTS FOR TENTS @3 NOs = 03  Millions
MASTER PLAN DEVELOPMENT @72 KANALS = 25  Millions
OPEN AIR THEATHER @10000 SFT = 10  Millions
FINSHING POINTS @15 NOs = 05  Millions
SPORTS ACTIVITIES @6   NOs = 10  Millions
MOSQUE @3000 SFT = 04  Millions
SOLID WASTE COLLECTION UNIT @3000 SFT = 03  Millions
FIRST AID ROOM @400   SFT = 0.5 Millions
PUBLIC TOILETS @600   SFT = 7.5 Millions
SECURITY POST @100   SFT = 01  Millions
PARKING  @ 70 VEHICLES = 06  Millions
 
GRAND TOTAL = Rs 294.00 Millions
TOTAL INVESTMENT = Rs 294.00 Millions
TOTAL REVENUE @ 100 % OPERATIONAL = Rs 131.76 Millions
(450 visitors per day during 8 months season average revenue of   Rs.1200 per person 
[450 x 244 x 1200])
                                                                                                                                                                                  
                                         
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 92.32 Millions
Operating Costs:
Salaries (including Mgt, Admin & Support Staff)  = Rs 7, 50,000 Per Month
Utilities, Depreciation & Misc.           = Rs 2, 50,000 per Month
Total per month = Rs 10,00,000/-
Say, Rs 80,00,000/- per Season
Total Seasonal Operating Cost = Rs 08 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 92.32 Millions
Deduction of Income Taxes @ 35%: = Rs 32.31 Millions
Deduction of Operational Costs: = Rs 08.00 Millions
Deduction of Annul Lease amount = Rs 07.20 Millions
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 44.81 millions
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency: = 15.24 %
Payback Period @ 70 % Operational Efficiency: = Approx. 6.5 years.
Miranjani (Nathia gali):
The Highest Peak in Galiyat
Miranjani (Nathia gali): The Highest Peak in
Galiyat
Miranjani is the highest peak, at 2,992 meters (9,816 ft) in elevation, of Abbottabad 
District in the Khyber Pakhtunkhwa Province of Pakistan. It is located in the Namli Maira 
area, in Ayubia National Park, in the western Himalayan range.
Nathia gali, a heaven on earth is known for its scenic beauty, it is situated only 35 Km 
drive away from both Murree and Abbottabad. A Picturesque Town of Pakistan Nathia gali 
is the most picturesque hill station in the Pakistan. From Nathia gali to Miranjani (2960 
meters high) is a track of near about 10km ascend and 10km for back. it’s a one day track 
which is very beautiful. it’s a jungle track. 
Geography & Climate:
Miranjani is a hill top in Nathia gali. From Nathia gali to Miranjani (2960 meters high) is a 
track of near about 10km ascend and 10km for back. it’s a one day track which is very 
beautiful. it’s a jungle track. 
The weather of Nathia gali remains cool, pleasant and foggy in summers (1 May to 31 
August). During the monsoon season (1 July to 16 September), rain is expected almost 
every day. Cold winds start to chill the weather in autumn. winters (1 November to 28 
February) are very cold and chilly. In December and January, heavy snowfall occurs here. 
The weather remains cold in spring. Here most comfortable weather is the summer season.
Access:
Miranjani can be access from Nathia gali through trekking by foot or a ride by horse. From 
Nathia gali to Miranjani (2960 meters high) is a track of near about 10km ascend and 10km 
for back.
 Nathia gali can be accessed by road from Peshawar as well as the Capital Islamabad. The 
distance by road is 233 kilometers from Peshawar and 84 kilometers from Islamabad.
Route & Direction:
Day 1: Peshawar to Nathia Gali (Car, Jeep) 5.5 hours’ travel
Day 2: Nathia Gali to Miranjani 3 hours’ trekking one way
Day 3: Back to Peshawar
Current Tourism Activities and Facilities:
Miranjani is a hill top where most of the tourist came for a day trip of trekking from Nathia 
gali to Miranjani and back to Nathia gali for night. Here one can find lush green mountains 
covered with thick forest and snow caped, Miranjani top is mixed of forest and vast Pastures 
where  local  animal  graze  all  day.  These  beautiful  pastures  are  green  grass  fields  having 
different types of natural grown flowers and small shrubs.
Lack of Amenities/Short Comings for the promotion of Tourism
at Meranjani are.
 Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone.
 Electricity and Sui Gas.
 Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).
 Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.
 Commercial Areas/Shops/Fuel pump.
 Health center/Health Facility.
 Public Parks & Public Toilets.
 Playgrounds for Games/Competitions at Jashne Kumrat.
 Road Side Rest Area Spots/Benches along the Road.
 Tourist Information/Guiding Center/Administration.
 Security Check Posts/Police Post.
 Solid Waste Collection and Dumping/Dust Bins.
PROJECT PROPOSED ACTIVITIES:
RESTURANT @10,000 SFT
CAFÉ @3,000 SFT
CAMPING PODS @14 NOs
VIEWING POINTS @ 5000 SFT
PUBLIC PARK @ 30,000 SFT
CAPMING POINTS FOR TENTS @ 3 NOs
MASTER PLAN DEVELOPMENT @ 12 KANALS
WATER RESERVIOUR @ 3000 SFT
COMPLETE TRACK DEVELOPMENT @ 10 KM
SOLID WASTE COLLECTION UNIT @ 3000 SFT
FIRST AID ROOM @ 400 SFT
PUBLIC TOILETS @ 600 SFT
SECURITY POST @ 100 SFT
POWER GENRATOR @ 1 NO
PROJECT FINANCIAL DATA:
RESTURANT @10,000 SFT = 40 Millions
CAFÉ @3,000 SFT = 12 Millions
CAMPING PODS @14 NOs = 14 Millions
VIEWING POINTS @ 5000 SFT = 05 Millions
PUBLIC PARK @ 30,000 SFT = 10 Millions
CAPMING POINTS FOR TENTS @ 3 NOs = 05 Millions
MASTER PLAN DEVELOPMENT @ 12 KANALS = 10 Millions
WATER RESERVIOUR @ 3000 SFT = 10 Millions
COMPLETE TRACK DEVELOPMENT @ 10 KM = 25 Millions
SOLID WASTE COLLECTION UNIT @ 3000 SFT = 03 Millions
FIRST AID ROOM @ 400 SFT = 0.5 Millions
PUBLIC TOILETS @ 600 SFT = 05 Millions
SECURITY POST @ 100 SFT = 01 Millions
POWER GENRATOR @ 1 NO = 7.5 Millions
GRAND TOTAL = 148.00 Millions
TOTAL INVESTMENT = 148.00 Million
TOTAL REVENUE @ 100 % OPERATIONAL = 68.62 Million
(500 visitors per day during 6 months season average revenue of Rs.750 per person
[500 x 183 x 750])
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = 48.00 Million
Operating Costs:
Salaries (including Mgt, Admin & Support Staff) = Rs 7, 00,000 Per Month
Utilities, Depreciation & Misc. = Rs 2, 00,000 per Month
Total per month = Rs 9, 00,000/-
Say, Rs 54,00,000/- per Season
Total Seasonal Operating Cost = Rs 5.4 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 48.00 million
Deduction of Income Taxes @ 35%: = Rs 16.80 million
Deduction of Operational Costs: = Rs 05.40 million
Deduction of Annul Lease amount = Rs 02.00 million
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 23.70 million
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency: = 16 %
Payback Period @ 70 % Operational Efficiency: = Approx. 6 years.
Dagri Bangla:
a heaven for trekkers/campers
Dagri Bangla: a heaven for trekkers/campers
Trek from Thandiani to Nathia gali is one of the most popular weekend treks of the Galiyat 
area. This is the trek on which many people mark the beginning of their camping/trekking 
life. Birangali village is around 7-8 km from Thandiani. The track that leads to it mainly 
involve descends. There is a fresh water stream at 5 minutes’ walk down the hill from the 
rest house. There are also a few shops in Biran gali village where basic items are available. 
Dagri rest house is at an elevation of 2720 meters whose main structure was damaged in the 
earthquake. The track from Biran gali to Dagri is around 15-16km and involves mainly 
ascend. The dense Quercus (burongi) forest of this area is the main charm of this whole trek. 
With some of the trees hundreds of years old. If the weather is clear, Dagri also offers an 
awesome sunset view. Fresh water is available at 15 minutes’ walk from the rest house 
towards Northwest.
Geography & Climate:
Dagri Naka is a mountainous area in Galiyat region Khyber Pakhtunkhwa, Pakistan located 
between the trek of Thandiani and Nathia gali at 2720 meters or 8924 feet above sea level. 
Dagri(also called Dugri) means “The home of leopards” in the local language.
The peaceful area is covered with beautiful landscape. In case the weather is clear, Dagri 
provides a scenic sunset viewpoint. The region is covered with pine trees, which adds to its 
natural beauty. The area is known to have the most dense pine forest in the Galiyat region. 
Dagri is surrounded by subtropical evergreen forest.
Access:
Dagri Mid-way stop between Nathia 
Gali To Thandiani Pine Forest Track. 
One of the most beautiful pine forest 
track in northern areas of Pakistan. 
Trek Length:
Thandiani to Berin gali  = 8Km.
Berin gali to Dagri Bangla  = 13Km.
Dagri Bangla to Miranjani  = 10Km.
Miranjanai to Nathia gali  = 9Km.
Route & Direction:
Route 1: 
Day 1: Peshawar to Nathia Gali (Car, Jeep) 5.5 hours’ travel
Day 2: Nathia Gali to Dagri Forest through Miranjani 7 hours’ trekking 
Day 3: Explored Dagri Forest and back to Nathia Gali 7 hours’ trekking
Day 4: Back to Peshawar
Route 2: 
Day 1: Peshawar to Thandiani (Car, Jeep) 5.5 hours’ travel
Day 2: Thandiani to Dagri Forest via Berin gali 6 hours’ trekking 
Day 3: Dagri Forest to Nathia Gali via Miranjani 7 hours’ trekking
Day 4: Back to Peshawar
Current Tourism Activities and Facilities:
This Trek is one of the most popular weekend treks. This is the trek on which many people 
mark the beginning of their camping / trekking life. Dagri forest is the best place for forest 
camping, Tourist visit the area for trekking and camping. 
PROJECT PROPOSED ACTIVITIES:
RENOVATION OF EXISTING REST HOUSE @ 1 N0
RENOVATION OF EXISTING SIDE BLOCK @ 1 N0
RESTURANT @10,000 SFT
CAMPING PODS @14 NOs
BAR. B. Q. SPOTS @ 2 NOs
PUBLIC PARK @ 35,000 SFT
CAPMING POINTS FOR TENTS @ 3 NOs
MASTER PLAN DEVELOPMENT @ 15.5 KANALS
WATER RESERVIOUR @ 3000 SFT
COMPLETE TRACK DEVELOPMENT @ 10 KM
GAZEBOS & SHEDS @ 12 NOs
SOLID WASTE COLLECTION UNIT @ 3000 SFT
FIRST AID ROOM @ 400 SFT
PUBLIC TOILETS @ 600 SFT
SECURITY POST @ 100 SFT
POWER GENRATOR @ 1 NO
PROJECT FINANCIAL DATA:
RENOVATION OF EXISTING REST HOUSE @ 1 N0 = 5 Millions
RENOVATION OF EXISTING SIDE BLOCK @ 1 N0 = 2 Millions
RESTURANT @10,000 SFT = 50 Millions
CAMPING PODS @14 NOs = 14 Millions
BAR. B. Q. SPOTS @ 2 NOs = 06 Millions
PUBLIC PARK @ 35,000 SFT = 10 Millions
CAPMING POINTS FOR TENTS @ 3 NOs = 06 Millions
MASTER PLAN DEVELOPMENT @ 15.5 KANALS = 13 Millions
WATER RESERVIOUR @ 3000 SFT = 10 Millions
COMPLETE TRACK DEVELOPMENT @ 22 KM = 15 Millions
GAZEBOS & SHEDS @ 12 NOs = 08 Millions
SOLID WASTE COLLECTION UNIT @ 3000 SFT = 03 Millions
FIRST AID ROOM @ 400 SFT = 0.5 Millions
PUBLIC TOILETS @ 600 SFT = 05 Millions
SECURITY POST @ 100 SFT = 01 Millions
POWER GENRATOR @ 1 NO = 7.5 Millions
GRAND TOTAL = 156.00 Millions
TOTAL INVESTMENT = 156.00 Million
TOTAL REVENUE @ 100 % OPERATIONAL = 54.90 Million
(300 visitors per day during 6 months season average revenue of Rs.1000 per person
[300 x 183 x 1000])
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = 38.43 Million
Operating Costs:
Salaries (including Mgt, Admin & Support Staff) = Rs 5, 00,000 Per Month
Utilities, Depreciation & Misc. = Rs 1, 00,000 per Month
Total per month = Rs 6, 00,000/-
Say, Rs 36,00,000/- per Season
Total Seasonal Operating Cost = Rs 3.6 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 38.43 million
Deduction of Income Taxes @ 35%: = Rs 13.45 million
Deduction of Operational Costs: = Rs 03.60 million
Deduction of Annul Lease amount = Rs 02.00 million
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 19.38 million
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency: = 12.42 %
Payback Period @ 70 % Operational Efficiency: = Approx. 8 years.
Beer Galai (Swabi):
Beer Galai (Swabi):
Beer Galai have low heighted mountains with lush green fields and small trees.
GEOGRAPHY & CLIMATE:
Beer Galai also known as Pir Galai is a beautiful hill top in Swabi district. Mahaban Hill in 
Gadoon has a scenic beauty. The Pir Galai resort is located here, 5,300 feet (1,600 m) above 
sea level. From here, one can see Manshera, Buner and Kaghan Hills.
Pir Galai site is mountainous terrain with lush green hills of low altitude ranges from 3500 
feet to 5,500 feet above the sea level. The weather of the area is cold in winter and have 
snow fall on mountains top for few weeks, while in summers the days are hot and at night the 
weather is moderate with cool breeze.
ACCESS:
Pir Galai is at a travel distance of 3 hours and 30 minutes from Peshawar and 
Islamabad.
Total distance from Peshawar to Pir galai is 151 Km.
Route & Direction:
Route & Direction:
Day 1: Peshawar to Beer Gali (Car, Jeep) 5 hours’ travel
Day 2:  Back to Peshawar
ACCESS TO BEER GALAI FROM
PESHAWAR:
CURRENT TOURISM ACTIVITIES AND FACILITIES:
This site has attraction for the local tourist in weekends and people visit the site to 
enjoy the greenery of the site on different picnic spots.
Lots of visitors visit Beer Galai specially in Eid days, this site is famous among the 
local community people from District Swabi and Mardan. Main activities on the 
site are:
Day camping
Bone fire
BBQ events
Family and Friend Picnic spots
SNAPS OF BEER GALAI SWABI:
BEER GALAI at Winter:
PROJECT PROPOSED ACTIVITIES:
 
ADMINISTRATION @2000     SFT
RESTURANT  @10,000  SFT
CAFÉ @5,000    SFT
COMMERCIAL AREA @5000     SFT
GAZEBOS  @15 NOs
PICNIC SPOTS, COOKING POINTS @05 NOS
PUBLIC PARK @10,000  SFT
CHILDREN PLAY AREA @10,000  SFT
MASTER PLAN DEVELOPMENT @48 KANALS
SOLID WASTE COLLECTION UNIT @3000 SFT
FIRST AID ROOM @400   SFT
PUBLIC TOILETS @600   SFT
SECURITY POST @100   SFT
PARKING  @ 40 VEHICLES
PROJECT FINANCIAL DATA:
 
ADMINISTRATION @2000     SFT = 05  Millions 
RESTURANT  @10,000  SFT = 20  Millions
CAFÉ @5,000    SFT = 10  Millions
COMMERCIAL AREA @5000     SFT = 7.5 Millions
GAZEBOS  @15 NOs = 12  Millions
PICNIC SPOTS, COOKING POINTS @05 NOS = 2.5 Millions
PUBLIC PARK @10,000  SFT = 05  Millions
CHILDREN PLAY AREA @10,000  SFT = 15  Millions
MASTER PLAN DEVELOPMENT @48 KANALS= 10  Millions
SOLID WASTE COLLECTION UNIT @3000 SFT = 01  Millions
FIRST AID ROOM @400   SFT = 0.5 Millions
PUBLIC TOILETS @600   SFT = 05 Millions
SECURITY POST @100   SFT = 01 Millions
PARKING  @ 40 VEHICLES = 05 Millions
 
GRAND TOTAL = Rs 99.5 Millions
TOTAL INVESTMENT = Rs 99.5 Millions
TOTAL REVENUE @ 100 % OPERATIONAL = Rs 36.5 Millions
(200 visitors per day during 12 months season average revenue of   Rs.500 per person 
[200 x 365 x 500])
                                                                                                                                                                                      
                                     
TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 25.55 Millions
Operating Costs:
Salaries (including Mgt, Admin & Support Staff)  = Rs 5, 00,000 Per Month
Utilities, Depreciation & Misc.           = Rs 1, 00,000 per Month
Total per month = Rs 6,00,000/-
Say, Rs 72,00,000/- per Season
Total Seasonal Operating Cost = Rs 7.2 Million
PROJECT FINANCIAL DATA:
Total Income@ 70 % Operational Efficiency: = Rs 25.55 Millions
Deduction of Income Taxes @ 35%: = Rs 08.94 millions
Deduction of Operational Costs: = Rs 07.20 millions
Deduction of Annul Lease amount = Rs 02.50 millions
_______________________________________________________________
Net Income after Tax deduction & Operating Cost: = Rs 6.91 millions
ESTIMATED RATIOS:
Return on Investment @ 70 % Operational Efficiency:  = 6.94 %
Payback Period @ 70 % Operational Efficiency: = Approx. 14 years.
OTHER PROPOSED ACTIVITIES DRAWINGS:
PROPOSED ACTIVITIES IMAGES:
ADMINISTRATION
CHAIRLIFT BASE AND TOP STATION
HOTEL, RESTURANTS & FOOD COURTS
CAMPING PODS
COMMERCIAL AREAS:
Gazebos:
Public Parks:
Public Spaces:
Fishing Decks:
Hiking Tracks:
mountain biking
Racing Events:
CAMPING PODS
CAMPING PODS
END OF
PRESENTATION:

Weitere ähnliche Inhalte

Was ist angesagt?

Quran Intro Mind Map.pdf
Quran Intro Mind Map.pdfQuran Intro Mind Map.pdf
Quran Intro Mind Map.pdfAbdulMohammed92
 
Islamic Book in English: Madani Qaida
Islamic Book in English: Madani QaidaIslamic Book in English: Madani Qaida
Islamic Book in English: Madani QaidaIslamic Library
 
Collection of durood sharief english, arabic translation and transliteration
Collection of durood sharief english, arabic translation and transliterationCollection of durood sharief english, arabic translation and transliteration
Collection of durood sharief english, arabic translation and transliterationzakir2012
 
Battle of badr_Islamic history
Battle of badr_Islamic historyBattle of badr_Islamic history
Battle of badr_Islamic historyAziz Ansari
 
Promotion of Himachal Tourism
Promotion of Himachal TourismPromotion of Himachal Tourism
Promotion of Himachal TourismNeha Ralli
 
Battle of Badr: History and Lessons
Battle of Badr: History and LessonsBattle of Badr: History and Lessons
Battle of Badr: History and LessonsMuQeet
 
The Quran PowerPoint.ppt
The Quran PowerPoint.pptThe Quran PowerPoint.ppt
The Quran PowerPoint.pptMaymunaZahid
 

Was ist angesagt? (10)

Quran Intro Mind Map.pdf
Quran Intro Mind Map.pdfQuran Intro Mind Map.pdf
Quran Intro Mind Map.pdf
 
Islamic Book in English: Madani Qaida
Islamic Book in English: Madani QaidaIslamic Book in English: Madani Qaida
Islamic Book in English: Madani Qaida
 
Collection of durood sharief english, arabic translation and transliteration
Collection of durood sharief english, arabic translation and transliterationCollection of durood sharief english, arabic translation and transliteration
Collection of durood sharief english, arabic translation and transliteration
 
Battle of badr_Islamic history
Battle of badr_Islamic historyBattle of badr_Islamic history
Battle of badr_Islamic history
 
Promotion of Himachal Tourism
Promotion of Himachal TourismPromotion of Himachal Tourism
Promotion of Himachal Tourism
 
Chastity
ChastityChastity
Chastity
 
Battle of Badr: History and Lessons
Battle of Badr: History and LessonsBattle of Badr: History and Lessons
Battle of Badr: History and Lessons
 
The Quran PowerPoint.ppt
The Quran PowerPoint.pptThe Quran PowerPoint.ppt
The Quran PowerPoint.ppt
 
Methods Of Dakwah(5)
Methods Of Dakwah(5)Methods Of Dakwah(5)
Methods Of Dakwah(5)
 
Tabook
TabookTabook
Tabook
 

Andere mochten auch

1. Para qué la evaluación sobre educación en museos
1. Para qué la evaluación sobre educación en museos1. Para qué la evaluación sobre educación en museos
1. Para qué la evaluación sobre educación en museosMuseo del Oro Colombia
 
Djj,hf;tybt
Djj,hf;tybtDjj,hf;tybt
Djj,hf;tybtAnetNim
 
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lci
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lciEl guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lci
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lciUEN DR. FORTUNATO ORELLANA
 
Secuencia didáctica celestia
Secuencia didáctica celestiaSecuencia didáctica celestia
Secuencia didáctica celestiaelizabethriera
 
List of events 2008 2016
List of events 2008   2016List of events 2008   2016
List of events 2008 2016hayat alishah
 
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...ZSL Biodiversity & Palm Oil Platform
 
Establishment of playground in khyber pakhtunkhwa on need
Establishment of playground in khyber pakhtunkhwa on needEstablishment of playground in khyber pakhtunkhwa on need
Establishment of playground in khyber pakhtunkhwa on needhayat alishah
 
Русскии свадебный обряд (2008 год)
Русскии свадебный обряд (2008 год)Русскии свадебный обряд (2008 год)
Русскии свадебный обряд (2008 год)Балтийская Муза
 
Close-up look at the Potential of Female Entrepreneurs in Canada
Close-up look at the Potential of Female Entrepreneurs in CanadaClose-up look at the Potential of Female Entrepreneurs in Canada
Close-up look at the Potential of Female Entrepreneurs in CanadaRuta Aidis
 
Прайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыПрайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыVladyslava Rykova
 
Introduction to physics
Introduction to physicsIntroduction to physics
Introduction to physicsmrmbasso
 

Andere mochten auch (20)

Vocalize-marketing plan for an app
Vocalize-marketing plan for an appVocalize-marketing plan for an app
Vocalize-marketing plan for an app
 
1. Para qué la evaluación sobre educación en museos
1. Para qué la evaluación sobre educación en museos1. Para qué la evaluación sobre educación en museos
1. Para qué la evaluación sobre educación en museos
 
Djj,hf;tybt
Djj,hf;tybtDjj,hf;tybt
Djj,hf;tybt
 
Natureview farm
Natureview farmNatureview farm
Natureview farm
 
Los Principios del Reino de los Cielos
Los Principios del Reino de los CielosLos Principios del Reino de los Cielos
Los Principios del Reino de los Cielos
 
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lci
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lciEl guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lci
El guard+ìan de los libros version infantil remodelada nov 2015 susy 3412lci
 
Analsis de sistemas
Analsis de sistemasAnalsis de sistemas
Analsis de sistemas
 
Biswadeepaka Tripathy my new CV
Biswadeepaka Tripathy my new CVBiswadeepaka Tripathy my new CV
Biswadeepaka Tripathy my new CV
 
Secuencia didáctica celestia
Secuencia didáctica celestiaSecuencia didáctica celestia
Secuencia didáctica celestia
 
Segundo periodo
Segundo periodoSegundo periodo
Segundo periodo
 
List of events 2008 2016
List of events 2008   2016List of events 2008   2016
List of events 2008 2016
 
Chapter 2has
Chapter 2hasChapter 2has
Chapter 2has
 
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...
Session 5-2-kerry-ten-kate-the-challenges-of-compensating-for-impacts-on-ecos...
 
Establishment of playground in khyber pakhtunkhwa on need
Establishment of playground in khyber pakhtunkhwa on needEstablishment of playground in khyber pakhtunkhwa on need
Establishment of playground in khyber pakhtunkhwa on need
 
Bl fam 239011
Bl fam 239011Bl fam 239011
Bl fam 239011
 
Русскии свадебный обряд (2008 год)
Русскии свадебный обряд (2008 год)Русскии свадебный обряд (2008 год)
Русскии свадебный обряд (2008 год)
 
Close-up look at the Potential of Female Entrepreneurs in Canada
Close-up look at the Potential of Female Entrepreneurs in CanadaClose-up look at the Potential of Female Entrepreneurs in Canada
Close-up look at the Potential of Female Entrepreneurs in Canada
 
Прайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыПрайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работы
 
Introduction to physics
Introduction to physicsIntroduction to physics
Introduction to physics
 
All about me
All about meAll about me
All about me
 

Ähnlich wie Draft report presentation

Destination nainital
Destination nainitalDestination nainital
Destination nainitalsanna1
 
Presentation of Kuchchaweli
Presentation of Kuchchaweli Presentation of Kuchchaweli
Presentation of Kuchchaweli BOISriLanka
 
Presentation kuchchaweli
Presentation kuchchaweli Presentation kuchchaweli
Presentation kuchchaweli BOISriLanka
 
Sun Interantional Event - Discover South Africa Presentation
Sun Interantional Event - Discover South Africa PresentationSun Interantional Event - Discover South Africa Presentation
Sun Interantional Event - Discover South Africa Presentationsun2010
 
Nanital by Lalit kumar ,Maharshi Dayanand University, Rohtak
Nanital by Lalit kumar ,Maharshi Dayanand University, RohtakNanital by Lalit kumar ,Maharshi Dayanand University, Rohtak
Nanital by Lalit kumar ,Maharshi Dayanand University, RohtakLalit Rava
 
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Galala University
 
tourism product development
tourism product developmenttourism product development
tourism product developmentMd Ikbal Hussain
 
Pakistan for Tourism
Pakistan for TourismPakistan for Tourism
Pakistan for TourismMudassar Lone
 
Sustainable Rural Tourism:Mizoram, India
Sustainable Rural Tourism:Mizoram, IndiaSustainable Rural Tourism:Mizoram, India
Sustainable Rural Tourism:Mizoram, IndiaDhiraj Salhotra
 
Metro Mart November 2013
Metro Mart November 2013Metro Mart November 2013
Metro Mart November 2013ONE ROOF INDIA
 
Managing The Physical Environment 2 1200425132497774 3
Managing The Physical Environment 2 1200425132497774 3Managing The Physical Environment 2 1200425132497774 3
Managing The Physical Environment 2 1200425132497774 3whiskeyhj
 
Stc investment projects 2006 for secy tourism
Stc investment projects 2006 for secy tourismStc investment projects 2006 for secy tourism
Stc investment projects 2006 for secy tourismhayat alishah
 
1.-San-Vicente-Master-Plan-by-Palafox.pdf
1.-San-Vicente-Master-Plan-by-Palafox.pdf1.-San-Vicente-Master-Plan-by-Palafox.pdf
1.-San-Vicente-Master-Plan-by-Palafox.pdfElisaEscobar21
 

Ähnlich wie Draft report presentation (20)

Destination nainital
Destination nainitalDestination nainital
Destination nainital
 
Presentation of Kuchchaweli
Presentation of Kuchchaweli Presentation of Kuchchaweli
Presentation of Kuchchaweli
 
Presentation kuchchaweli
Presentation kuchchaweli Presentation kuchchaweli
Presentation kuchchaweli
 
Sun Interantional Event - Discover South Africa Presentation
Sun Interantional Event - Discover South Africa PresentationSun Interantional Event - Discover South Africa Presentation
Sun Interantional Event - Discover South Africa Presentation
 
Nanital by Lalit kumar ,Maharshi Dayanand University, Rohtak
Nanital by Lalit kumar ,Maharshi Dayanand University, RohtakNanital by Lalit kumar ,Maharshi Dayanand University, Rohtak
Nanital by Lalit kumar ,Maharshi Dayanand University, Rohtak
 
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
 
About Uttrakhand
About UttrakhandAbout Uttrakhand
About Uttrakhand
 
TAMILNADU TOURISM 2020
TAMILNADU TOURISM 2020TAMILNADU TOURISM 2020
TAMILNADU TOURISM 2020
 
Project Soulitude
Project SoulitudeProject Soulitude
Project Soulitude
 
tourism product development
tourism product developmenttourism product development
tourism product development
 
Beach devlopment
Beach devlopmentBeach devlopment
Beach devlopment
 
Pakistan for Tourism
Pakistan for TourismPakistan for Tourism
Pakistan for Tourism
 
KASHMIR TOURISM
KASHMIR TOURISMKASHMIR TOURISM
KASHMIR TOURISM
 
GEOGRAPHY.docx
GEOGRAPHY.docxGEOGRAPHY.docx
GEOGRAPHY.docx
 
Sustainable Rural Tourism:Mizoram, India
Sustainable Rural Tourism:Mizoram, IndiaSustainable Rural Tourism:Mizoram, India
Sustainable Rural Tourism:Mizoram, India
 
Metro Mart November 2013
Metro Mart November 2013Metro Mart November 2013
Metro Mart November 2013
 
Managing The Physical Environment 2 1200425132497774 3
Managing The Physical Environment 2 1200425132497774 3Managing The Physical Environment 2 1200425132497774 3
Managing The Physical Environment 2 1200425132497774 3
 
Stc investment projects 2006 for secy tourism
Stc investment projects 2006 for secy tourismStc investment projects 2006 for secy tourism
Stc investment projects 2006 for secy tourism
 
1.-San-Vicente-Master-Plan-by-Palafox.pdf
1.-San-Vicente-Master-Plan-by-Palafox.pdf1.-San-Vicente-Master-Plan-by-Palafox.pdf
1.-San-Vicente-Master-Plan-by-Palafox.pdf
 
Nepal adventure tour (6 nights 7 days)
Nepal adventure tour (6 nights 7 days)Nepal adventure tour (6 nights 7 days)
Nepal adventure tour (6 nights 7 days)
 

Mehr von hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

Mehr von hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Kürzlich hochgeladen

Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsVICTOR MAESTRE RAMIREZ
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxdolaknnilon
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfchwongval
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]📊 Markus Baersch
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 

Kürzlich hochgeladen (20)

Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business Professionals
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptx
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdf
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 

Draft report presentation

  • 1. DRAFT REPORT “PRE-FEASIBILITY OF TOURISM PROMOTIONAL PROJECTS” Submitted to: Tourism Corporation Khyber Pakhtunkhwa Prepared by: ABAD Associates Pvt. Ltd.
  • 2. Kumrat Valley: The Hidden Paradise Broghil Valley: The Valley of Lakes Golen Gol: The valley of towering hills Miranjani: The Highest Peak in Galiyat Dagri Bangla: heaven for trekkers/campers. Beer Gali (Swabi)
  • 3. WHAT IS TOURISM? Tourism is an industry that drives people to travel for recreation and leisure. The growth of tourism has had a dramatic effect on many countries, not just economically, but also environmentally and socially.
  • 5. Purpose of This Study. To strengthen the position of all 6 no of sites as a premier tourism destination for desired target market through new development, improvement, effective promotion, and efficient distribution of tourism products and services. To stimulate long-term tourism-related businesses and economic development as well as resource sustainability in all the sites. To provide a comprehensive guideline for various stakeholders in all sites, (city government, local businesses, and residents) to strengthen the community through tourism.
  • 6. Objectives of This Study. To Explore the Tourism Potential of the Proposed 6 Sites. To Protect the Natural Environment and Beauty of the Proposed 6 Sites. To Boost the local Economy. 1. Employment 2. Increased Spending in the Local Community 3. Infrastructure 4. Social advantages 5. Environmental Advantages 6. Opportunities To Promote Tourism as Business.
  • 7. KUMRAT VALLEY: The Hidden Paradise Tourists Spot
  • 8. KUMRAT VALLEY: The Hidden Paradise Tourists Spot Kumrat is a valley in the Upper Dir District, Khyber Pakhtunkhwa province, of Pakistan. It is one of the scenic valleys of Khyber Pakhtunkhwa, and a picturesque spot for travelers.
  • 9. GEOGRAPHY & CLIMATE: Kumrat valley is located in the foothills of Hindu Kush mountains range, surrounded by Chitral to the north, Kalam Swat valley to the east, Ayun valley Chitral to the west & Lower Dir to the south. The weather of Kumrat valley is alpine climatic in nature and mild cool summers are common throughout the area, with an average temperature ranges from 20 °C to 25 °C. While in winter the temperature is very low due to heavy snow fall i.e. is 3 to 11 feet and the temperature ranges from -4 °C to -10 °C. The maximum rain fall is 255 mm and minimum is 100 mm.
  • 10. FLORA & FAUNA: Diverse species of grasses and trees are found in Kumrat valley. In trees Deodar, Cheer, Kail, Fir Spruce, Chalghoza, Pines, Oak, and Alpine pastures are covering huge area of the land in the form of forest. while in fauna, Brown Bears, Snow Leopards, Monkeys, Porcupines, Ibex, Markhor, Musk, Deer, Jackals, Chakores and Monal Pheasants etc
  • 11. ACCESS: Kumrat Valley can be accessed by road from Peshawar as well as the Capital Islamabad through Upper Dir. The distance by road is 296 kilometers from Peshawar and 410 kilometers from Islamabad. The second possible access route is through Utror (Kalam) but the road condition is not good there.
  • 12. ACCESS TO KUMRAT VALLLEY FROM PESHAWAR:
  • 13. ROUTE & DIRECTION: Day 1: Peshawar to Upper Dir (Car, Jeep) 7 hours’ travel Day 2: Upper Dir to Kumrat (4x4 only) 6 hours’ travel Day 3: Explored Kumrat up to Khazaan Kot Full day Day 4: Explored Kumrat up to Badgoi Top Full day Day 5: Explored Jazz Banda Full day Day 6: Back to Peshawar
  • 14. SNAPS OF THE KUMRAT VALLEY: The unseen beauty of Kumrat valley, a hidden paradise for tourists.
  • 15.
  • 16.
  • 18. SNAPS OF JAZZ BANDA:
  • 19. Katora lake water fall Jazz banda water fall
  • 20. Katora lake jazz banda/Jazz banda Dand Bara Dand Lake I & II at jazz banda
  • 21. Tourist Attracting Spots At and Nearby to Kumrat Valley: 1.Kumrat valley 2.Khazaan kot/Dojangay 3.Shazor lake/Dand 4.Jazz banda 5.Katora lake/jazz banda Dand 6.Bara Dand lake I & II jazz banda 7.Badgoi top/Badgoi pass Current Tourism Activities And Facilities:  Summer Retreat spot  Camping  Trout Fishing  Hiking and Trekking  Jashn-e-Kumrat
  • 22. Lack of Amenities/Short Comings for the promotion of Tourism at Kumrat are.  Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone.  Electricity and Sui Gas.  Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).  Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.  Commercial Areas/Shops/Fuel pump.  Health center/Health Facility.  Public Parks & Public Toilets.  Playgrounds for Games/Competitions at Jashne Kumrat.  Road Side Rest Area Spots/Benches along the Road.  Tourist Information/Guiding Center/Administration.  Security Check Posts/Police Post.  Solid Waste Collection and Dumping/Dust Bins.
  • 23. Existing Road condition at Kumrat Only 4x4 vehicles can Travel to Kumrat
  • 24. Connecting Bridges & Road condition
  • 25. Cricket on the road instead of playgroundNo facility along the roadside
  • 26.
  • 27. Difficult and hard Track Towards Jazz Banda
  • 28. Proposed Activities, Suggestions & Recommendations. After studying the area in detail and doing the area survey, following are the suggestions & recommendations to improve the existing facilities and proposed new activities to promote tourism in the area and facilitate the tourist. PROPOSAL 1 PROJECT PROPOSED ACTIVITIES WITH CHIRLIFT SCHEME:   ADMINISTRATION 2 NOs @2000     SFT CHAIRLIFT AT JAZZ BANDA  @4.5 KM BASE AND TOP STATION @20,000  SFT PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT RESTURANTS 4 NOs @40,000  SFT HOTEL @20,000  SFT HOTEL FOR FAMILIES @20,000  SFT COMMERCIAL AREA @5000     SFT FOOD COURTS @20 NOs CAMPING PODS @30 NOs BAR. B. Q. SPOTS @10 NOs
  • 29. PROPOSAL 1 PROJECT PROPOSED ACTIVITIES WITH CHIRLIFT SCHEME:   PUBLIC PARK @70,000  SFT CAPMING POINTS FOR TENTS @2 NOs MASTER PLAN DEVELOPMENT @263 KANALS OPEN AIR THEATHER @10000 SFT FINSHING POINTS @15 NOs SPORTS ACTIVITIES @6   NOs JEEP TRACK & BYCYCLE TRACK @15 KMs JASHN-E-KUMRAT GROUND @64 KANALS MOSQUE @3000 SFT SOLID WASTE COLLECTION UNIT @3000 SFT FIRST AID ROOM @400   SFT PUBLIC TOILETS 12 UNITS @4800 SFT SECURITY POST 3 NOs @300   SFT TOURIST FACILITATION CENTER @1000 SFT PARKING  @300 VEHICLES MICRO POWER GENRATION UNIT @1 NO
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. PROPOSAL 1 PROJECT FINANCIAL DATA:   ADMINISTRATION 2 NOs @2000     SFT =08   Millions  CHAIRLIFT AT JAZZ BANDA  @4.5 KM =950 Millions BASE AND TOP STATION @20,000  SFT =80   Millions PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT =50   Millions RESTURANTS 4 NOs @40,000  SFT =130 Millions  HOTEL @20,000  SFT =90   Millions HOTEL FOR FAMILIES @20,000  SFT =140 Millions COMMERCIAL AREA @10,000  SFT = 20  Millions FOOD COURTS @20 NOs = 12  Millions CAMPING PODS @30 NOs = 30  Millions BAR. B. Q. SPOTS @10 NOs = 05  Millions MASTER PLAN DEVELOPMENT @263 KANALS = 50  Millions OPEN AIR THEATHER @10000 SFT = 10  Millions FINSHING POINTS @15 NOs = 15  Millions SPORTS ACTIVITIES @6   NOs = 20  Millions JEEP TRACK & BYCYCLE TRACK @15 KMs = 25  Millions
  • 44. JASHN-E-KUMRAT GROUND @64 KANALS = 30  Millions MOSQUE @3000 SFT = 04  Millions SOLID WASTE COLLECTION UNIT @3000 SFT = 05  Millions FIRST AID ROOM @400   SFT = 01  Millions PUBLIC TOILETS 12 UNITS @4800 SFT = 10  Millions SECURITY POST 3 NOs @300   SFT = 03  Millions TOURIST FACILITATION CENTER @1000 SFT = 04  Millions PARKING  @300 VEHICLES = 10  Millions MICRO POWER GENRATION UNIT @1 NO = 50  Millions   GRAND TOTAL = Rs 1771.00 Millions TOTAL INVESTMENT = Rs 1771.00 Millions   TOTAL REVENUE @ 100 % OPERATIONAL = Rs 255.6 Millions (800 visitors per day during 7 months season average revenue of   Rs.1500 per person  [800 x 213 x 1500])
  • 45. TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 178.92 Millions Operating Costs: Salaries (including Mgt, Admin & Support Staff)  = Rs 14, 50,000 Per Month Utilities, Depreciation & Misc.           = Rs 4, 50,000 per Month Total per month = Rs 19,00,000/- Say, Rs 1,14,00,000/- per Season Total Seasonal Operating Cost = Rs 11.4 Million PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 178.92 Millions Deduction of Income Taxes @ 35%: = Rs 62.62 Millions Deduction of Operational Costs: = Rs 11.40 Millions Deduction of Annul Lease amount = Rs 15.00 Millions _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 89.90 millions ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency:  = 5 % Payback Period @ 70 % Operational Efficiency: = Approx. 19.7 years.
  • 46. PROPOSAL 2 PROJECT FINANCIAL DATA:   ADMINISTRATION 2 NOs @2000     SFT =08   Millions  PARKS AT BASE, TOP STATION JAZZ BANDA @40,000  SFT =50   Millions RESTURANTS 4 NOs @40,000  SFT =130 Millions  HOTEL @20,000  SFT =90   Millions HOTEL FOR FAMILIES @20,000  SFT =140 Millions COMMERCIAL AREA @10,000  SFT = 20  Millions FOOD COURTS @20 NOs = 12  Millions CAMPING PODS @30 NOs = 30  Millions BAR. B. Q. SPOTS @10 NOs = 05  Millions PUBLIC PARK @70,000  SFT = 10  Millions CAPMING POINTS FOR TENTS @2 NOs = 09  Millions MASTER PLAN DEVELOPMENT @263 KANALS = 50  Millions OPEN AIR THEATHER @10000 SFT = 10  Millions FINSHING POINTS @15 NOs = 15  Millions SPORTS ACTIVITIES @6   NOs = 20  Millions JEEP TRACK & BYCYCLE TRACK @15 KMs = 25  Millions JASHN-E-KUMRAT GROUND @64 KANALS = 30  Millions
  • 47. MOSQUE @3000 SFT = 04  Millions SOLID WASTE COLLECTION UNIT @3000 SFT = 05  Millions FIRST AID ROOM @400   SFT = 01  Millions PUBLIC TOILETS 12 UNITS @4800 SFT = 10  Millions SECURITY POST 3 NOs @300   SFT = 03  Millions TOURIST FACILITATION CENTER @1000 SFT = 04  Millions PARKING  @300 VEHICLES = 10  Millions MICRO POWER GENRATION UNIT @1 NO = 50  Millions   GRAND TOTAL = Rs 741.00 Millions TOTAL INVESTMENT = Rs 741.00 Millions   TOTAL REVENUE @ 100 % OPERATIONAL = Rs 170.4 Millions (800 visitors per day during 7 months season average revenue of   Rs.1000 per person  [800 x 213 x 1000])
  • 48. TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 119.28 Millions Operating Costs: Salaries (including Mgt, Admin & Support Staff)  = Rs 11, 50,000 Per Month Utilities, Depreciation & Misc.           = Rs 3, 50,000 per Month Total per month = Rs 15,00,000/- Say, Rs 1,14,00,000/- per Season Total Seasonal Operating Cost = Rs 10.5 Million PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 119.28 Millions Deduction of Income Taxes @ 35%: = Rs 41.74 Millions Deduction of Operational Costs: = Rs 10.5 Millions Deduction of Annul Lease amount = Rs 12.00 Millions _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 55.04 millions ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency:  = 7.42 % Payback Period @ 70 % Operational Efficiency: = Approx. 13.46 years.
  • 49. Broghil Valley: The land of Peace, Harmony and Traditions…… The Valley of Lakes
  • 50. Broghil Valley: The land of Peace, Harmony and Traditions…… The Valley of Lakes Broghil Valley is a valley & national park located in the upper northern reaches Chitral District, of Pakhtunkhwa, Pakistan. It is located close to the Afghan-Pakistan border.
  • 51. GEOGRAPHY & CLIMATE: Broghil valley is located at a distance of 250 km from main Chitral town. Towards the north, the valley is connected with famous Wakhan strip of Afghanistan through the famous “Broghil Pass”. Another important pass “Darwaza” connects Broghil with Afghanistan in the northwest. Broghil pass. In the southeast direction, the valley is connected with Yasin valley of Gilgit-Baltistan region via Darkot Pass. Towards east, the valley joins the Qurumbar valley through famous Qurumbar pass towards Ghizer district of Gilgit-Baltistan. In the south, Broghil joins the main valley of Yarkhun towards Mastuj and Chitral town. Broghil valley has harsh climate. It is freezing cold during winter. While in summer (July to the end of September) the weather remains mild to cold. Temperature often remains below freezing point during the winter spell. Precipitation is mainly received in snow form from October to the end of May. Summer rains are scanty
  • 52. FLORA & FAUNA: Broghil Valley is homeland of ibex, wolves, snow leopards, white and brown bears, fox, rabbits, marmots and many more wild animals. The bird species are, hawks, eagles, falcons are found in the high mountains, while pheasants, partridges, hoopoes, larks, sparrows, quails, doves, swallow starlings, nightingales, crows and vultures. The Broghil valley is of high importance in maintaining a great diversity of wetlands including high altitude alpine lakes and ponds, peat lands areas, alpine pastures, riparian areas, Birch, Salix and Juniper forests and riparian vegetation.
  • 53. ACCESS: Broghil valley is located at a distance of 250 km from main Chitral town. Total distance from Peshawar to Broghil through Chitral-Mastuj road is 576 Km. the distance from Peshawar to Chitral can be covered by a Car or Jeep but from Chitral city onwards you will need 4x4 jeep up to Broghil valley. The jeep can lead you to the Kishmanjah village of Broghil. From there you have to onwards by foot or horse can be hired locally. Route & Direction: Day 1: Peshawar to Upper Dir (Car, Jeep) 7 hours’ travel Day 2: Upper Dir to Mastuj (4x4 only) 11 hours’ travel Day 3: Mastuj to Lasht (4x4 only) 9 hours’ travel Day 4: Lasht to Broghil Valley (4x4 only) 3 hours’ travel Day 5: Explored Broghil Valley Full day Day6: Back to Peshawar
  • 54. ACCESS TO BROGHIL VALLEY FROM PESHAWAR:
  • 55. CURRENT TOURISM ACTIVITIES AND FACILITIES: Sport Events Held During Broghil Festival 1.Buz Kashi 2.Yak Polo 3.Yak Race 4.Polo 5.Horse Race 6.Mountain Marathon 7.Tug of War 8.Mountain Football 9.Women Horse and Yak race 10.Paragliding by Paraglide Association team Cultural Activities of Broghil Festival 1.Wakhi Music with Daaf and flute 2.Women traditional songs, dance with cultural dress 3.Wakhi Traditional items, handicrafts, utensils etc display by Women folk 4.Wakhi Foods Display by Wakhi women folk
  • 56. SNAPS OF THE BROGHIL VALLEY:
  • 57.
  • 58.
  • 59.
  • 60. Karamber Lake: King of lakes, the mighty Karambar Lake.
  • 61. Tourists Attracting Spots in and Nearby to Broghil Valley. Some famous spots to explore around Broghil are: 1.Showrsheer 2.Lashkargaz 3.Swinj 4.Sohktarabad 5.Chittiboi Glacier 6.Irgoth 7.Mitrandas 8.Gakuch 9.Garam chashma kashmanja 10.Broghil Pass 11.Karamber Lake 12.Chikaar 13.Darkot Pass 14.Darkot Glacier
  • 62. Lack of Amenities/Short Comings for the promotion of Tourism at Broghil are:  Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone .  Electricity and Sui Gas.  Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).  Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.  Commercial Areas/Shops/Fuel pump.  Health center/Health Facility.  Public Parks & Public Toilets.  Playgrounds for Games/Competitions at Jashne Broghil.  Road Side Rest Area Spots/Benches along the Road.  Tourist Information/Guiding Center/Administration.  Solid Waste Collection and Dumping/Dust Bins.
  • 63. Jashne Broghil site, with No Proper Gaming Plots,seating Space & Public Toilets
  • 64. No Suitable Space for Performing Arts
  • 65. Existing Road Condition on the way to Broghil
  • 66.
  • 67.
  • 68. Existing Bridge on river Chitral at Broghil Site
  • 69. Existing Spectators Seating Spaces at Jashne Broghil Gaming Site
  • 70. Proposed Activities, Suggestions & Recommendations. After studying the area in detail and doing the area survey, following are the suggestions & recommendations to improve the existing facilities and proposed new activities to promote tourism in the area and facilitate the tourist. PROJECT PROPOSED ACTIVITIES:   ADMINISTRATION @2000     SFT RESTURANT  @10,000  SFT JASHNE-E-BROGHIL GROUND @50,000  SFT PAVALLION @10,000  SFT PEDESTRIAN BRIDGE @30 FEET LONG
  • 71. COMMERCIAL AREA @5000     SFT FOOD COURTS @10 NOs CAMPING PODS @20 NOs PUBLIC PARK @10,000  SFT CAPMING POINTS FOR TENTS @3 NOs MASTER PLAN DEVELOPMENT @24 KANALS MOSQUE @3000 SFT SOLID WASTE COLLECTION UNIT @3000 SFT FIRST AID ROOM @400   SFT PUBLIC TOILETS @600   SFT SECURITY POST @100   SFT PARKING  @ 70 VEHICLES MICRO POWER GENRATION UNIT @1 NO
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79. PROJECT FINANCIAL DATA:   ADMINISTRATION @2000     SFT = 08 Millions RESTURANT  @10,000  SFT = 50 Millions JASHNE-E-BROGHIL GROUND @50,000  SFT = 10 Millions PAVALLION @10,000  SFT = 20 Millions PEDESTRIAN BRIDGE @30 FEET LONG = 10 Millions COMMERCIAL AREA @5000     SFT = 08 Millions FOOD COURTS @10 NOs = 05 Millions CAMPING PODS @20 NOs = 20 Millions PUBLIC PARK @10,000  SFT = 15 Millions CAPMING POINTS FOR TENTS @3 NOs = 10 Millions MASTER PLAN DEVELOPMENT @24 KANALS = 12 Millions MOSQUE @3000 SFT = 08 Millions SOLID WASTE COLLECTION UNIT @3000 SFT = 02 Millions FIRST AID ROOM @400   SFT = 01 Millions PUBLIC TOILETS @600   SFT = 04 Millions SECURITY POST @200   SFT = 02 Millions PARKING  @ 70 VEHICLES = 06 Millions MICRO POWER GENRATION UNIT @1 NO = 50  Millions   GRAND TOTAL = Rs 241.00 Millions
  • 80. TOTAL INVESTMENT = Rs 241.00 Millions TOTAL REVENUE @ 100 % OPERATIONAL = Rs 68.62 Millions (250 visitors per day during 6 months season average revenue of   Rs.1500 per person  [250 x 183 x 1500])                                                                                                                                                                                                                              TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 48.03 Millions Operating Costs: Salaries (including Mgt, Admin & Support Staff)  = Rs 5, 50,000 Per Month Utilities, Depreciation & Misc.           = Rs 1, 50,000 per Month Total per month = Rs 7,00,000/- Say, Rs 42,00,000/- per Season Total Seasonal Operating Cost = Rs 04.20 Million
  • 81. PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 48.03 Millions Deduction of Income Taxes @ 35%: = Rs 16.81 Millions Deduction of Operational Costs: = Rs 04.20 Millions Deduction of Annul Lease amount = Rs 01.00 Millions _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 26.02 millions ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency:  = 10.79 % Payback Period @ 70 % Operational Efficiency: = Approx. 9.26 years.
  • 82. Golen Gol Valley: With towering hills on all four sides, Golen is a picturesque valley.
  • 83. Golen Gol Valley: With towering hills on all four sides, Golen is a picturesque valley. Golen Gol is a valley situated at Chitral district, Golen Gol is a left bank tributary of Mastuj River and originates from glaciers namely Lohigal and Shachiokoh.
  • 84. GEOGRAPHY & CLIMATE: Golen Gol Valley is on the right side on main Chitral-Mastuj road. The valley is surround by high mountains. A narrow road, better hills and afterword’s a lush green valley with stream waters and green fields. Broghil valley has harsh climate. It is freezing cold during winter. While in summer (July to the end of September) the weather remains mild to cold. Temperature often remains below freezing point during the winter spell. Precipitation is mainly received in snow form from October to the end of May. Summer rains are inadequate.
  • 85. ACCESS: Golen Gol is about 380 kilometers from Islamabad, about 25 km from Chitral city and about 365 km from provincial capital Peshawar. The site is easily accessible from Chitral town with a travel of 1.5 hours in car or jeep to Golen Gol. The whole narrow valley can be explored with help of 4x4 vehicles to reach to the end of the valley.
  • 86. ACCESS TO GOLEN GOL VALLEY FROM PESHAWAR:
  • 87. Route & Direction: Route & Direction: Day 1: Peshawar to Chitral (Car, Jeep) 10 hours’ travel Day 2: Chitral to Golen Gol Valley (4x4 only) 3.5 hours’ travel Day 3: Explored Golen Gol Valley Full day Day 4: Back to Peshawar
  • 88. CURRENT TOURISM ACTIVITIES AND FACILITIES: One of the beautiful valleys for tourist in Chitral district Golen is the nearest available Fresh Trout Fish spot in Chitral where you can easily find Trout Fish in stream waters as well as: Trout Fish Farms Fresh Water Streams Mixed Forest and Vast Pastures Camping, Fishing, Trekking, Hiking.
  • 89. SNAPS OF THE GOLEN GOL VALLEY:
  • 90.
  • 91.
  • 92.
  • 93. Lack of Amenities/Short Comings for the promotion of Tourism at Gollen Gol are.  New Tourist site with no facilities.  Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone .  Electricity and Sui Gas.  Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).  Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.  Commercial Areas/Shops/Fuel pump.  Health center/Health Facility.  Public Parks & Public Toilets.  Road Side Rest Area Spots/Benches along the Road.  Tourist Information/Guiding Center/Administration.  Solid Waste Collection and Dumping/Dust Bins.
  • 94. Existing Road Condition on the way to Valley
  • 95. PROJECT PROPOSED ACTIVITIES:   ADMINISTRATION @2000     SFT RESTURANT  @10,000  SFT HOTEL @20,000  SFT COMMERCIAL AREA @5000     SFT FOOD COURTS @10 NOs CAMPING PODS @24 NOs BAR. B. Q. SPOTS @2 NOs PUBLIC PARK @60,000  SFT CAPMING POINTS FOR TENTS @3 NOs MASTER PLAN DEVELOPMENT @72 KANALS OPEN AIR THEATHER @10000 SFT FINSHING POINTS @15 NOs SPORTS ACTIVITIES @6   NOs MOSQUE @3000 SFT SOLID WASTE COLLECTION UNIT @3000 SFT FIRST AID ROOM @400   SFT PUBLIC TOILETS @600   SFT SECURITY POST @100   SFT PARKING  @ 70 VEHICLES
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101. PROJECT FINANCIAL DATA:   ADMINISTRATION @2000     SFT = 08 Millions  RESTURANT  @10,000  SFT = 40  Millions HOTEL @20,000  SFT =120 Millions COMMERCIAL AREA @5000     SFT = 10  Millions FOOD COURTS @10 NOs = 05  Millions CAMPING PODS @24 NOs = 24  Millions BAR. B. Q. SPOTS @2 NOs = 02  Millions PUBLIC FAMILY PARK @60,000  SFT = 10  Millions CAPMING POINTS FOR TENTS @3 NOs = 03  Millions MASTER PLAN DEVELOPMENT @72 KANALS = 25  Millions OPEN AIR THEATHER @10000 SFT = 10  Millions FINSHING POINTS @15 NOs = 05  Millions SPORTS ACTIVITIES @6   NOs = 10  Millions MOSQUE @3000 SFT = 04  Millions SOLID WASTE COLLECTION UNIT @3000 SFT = 03  Millions FIRST AID ROOM @400   SFT = 0.5 Millions PUBLIC TOILETS @600   SFT = 7.5 Millions SECURITY POST @100   SFT = 01  Millions PARKING  @ 70 VEHICLES = 06  Millions   GRAND TOTAL = Rs 294.00 Millions
  • 102. TOTAL INVESTMENT = Rs 294.00 Millions TOTAL REVENUE @ 100 % OPERATIONAL = Rs 131.76 Millions (450 visitors per day during 8 months season average revenue of   Rs.1200 per person  [450 x 244 x 1200])                                                                                                                                                                                                                              TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 92.32 Millions Operating Costs: Salaries (including Mgt, Admin & Support Staff)  = Rs 7, 50,000 Per Month Utilities, Depreciation & Misc.           = Rs 2, 50,000 per Month Total per month = Rs 10,00,000/- Say, Rs 80,00,000/- per Season Total Seasonal Operating Cost = Rs 08 Million
  • 103. PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 92.32 Millions Deduction of Income Taxes @ 35%: = Rs 32.31 Millions Deduction of Operational Costs: = Rs 08.00 Millions Deduction of Annul Lease amount = Rs 07.20 Millions _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 44.81 millions ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency: = 15.24 % Payback Period @ 70 % Operational Efficiency: = Approx. 6.5 years.
  • 104. Miranjani (Nathia gali): The Highest Peak in Galiyat
  • 105. Miranjani (Nathia gali): The Highest Peak in Galiyat
  • 109. Route & Direction: Day 1: Peshawar to Nathia Gali (Car, Jeep) 5.5 hours’ travel Day 2: Nathia Gali to Miranjani 3 hours’ trekking one way Day 3: Back to Peshawar
  • 111.
  • 112.
  • 113. Lack of Amenities/Short Comings for the promotion of Tourism at Meranjani are.  Infrastructure (Road & Footpath, Bridges, Sewerage & Sanitation, Telephone.  Electricity and Sui Gas.  Accommodation/Staying Facilities/Hotels for Tourists (Bachelors & Families).  Restaurants/Café/Coffee shop/Tuck Shops or Eating Places.  Commercial Areas/Shops/Fuel pump.  Health center/Health Facility.  Public Parks & Public Toilets.  Playgrounds for Games/Competitions at Jashne Kumrat.  Road Side Rest Area Spots/Benches along the Road.  Tourist Information/Guiding Center/Administration.  Security Check Posts/Police Post.  Solid Waste Collection and Dumping/Dust Bins.
  • 114.
  • 115.
  • 116. PROJECT PROPOSED ACTIVITIES: RESTURANT @10,000 SFT CAFÉ @3,000 SFT CAMPING PODS @14 NOs VIEWING POINTS @ 5000 SFT PUBLIC PARK @ 30,000 SFT CAPMING POINTS FOR TENTS @ 3 NOs MASTER PLAN DEVELOPMENT @ 12 KANALS WATER RESERVIOUR @ 3000 SFT COMPLETE TRACK DEVELOPMENT @ 10 KM SOLID WASTE COLLECTION UNIT @ 3000 SFT FIRST AID ROOM @ 400 SFT PUBLIC TOILETS @ 600 SFT SECURITY POST @ 100 SFT POWER GENRATOR @ 1 NO
  • 117.
  • 118.
  • 119.
  • 120.
  • 121.
  • 122. PROJECT FINANCIAL DATA: RESTURANT @10,000 SFT = 40 Millions CAFÉ @3,000 SFT = 12 Millions CAMPING PODS @14 NOs = 14 Millions VIEWING POINTS @ 5000 SFT = 05 Millions PUBLIC PARK @ 30,000 SFT = 10 Millions CAPMING POINTS FOR TENTS @ 3 NOs = 05 Millions MASTER PLAN DEVELOPMENT @ 12 KANALS = 10 Millions WATER RESERVIOUR @ 3000 SFT = 10 Millions COMPLETE TRACK DEVELOPMENT @ 10 KM = 25 Millions SOLID WASTE COLLECTION UNIT @ 3000 SFT = 03 Millions FIRST AID ROOM @ 400 SFT = 0.5 Millions PUBLIC TOILETS @ 600 SFT = 05 Millions SECURITY POST @ 100 SFT = 01 Millions POWER GENRATOR @ 1 NO = 7.5 Millions GRAND TOTAL = 148.00 Millions
  • 123. TOTAL INVESTMENT = 148.00 Million TOTAL REVENUE @ 100 % OPERATIONAL = 68.62 Million (500 visitors per day during 6 months season average revenue of Rs.750 per person [500 x 183 x 750]) TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = 48.00 Million Operating Costs: Salaries (including Mgt, Admin & Support Staff) = Rs 7, 00,000 Per Month Utilities, Depreciation & Misc. = Rs 2, 00,000 per Month Total per month = Rs 9, 00,000/- Say, Rs 54,00,000/- per Season Total Seasonal Operating Cost = Rs 5.4 Million
  • 124. PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 48.00 million Deduction of Income Taxes @ 35%: = Rs 16.80 million Deduction of Operational Costs: = Rs 05.40 million Deduction of Annul Lease amount = Rs 02.00 million _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 23.70 million ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency: = 16 % Payback Period @ 70 % Operational Efficiency: = Approx. 6 years.
  • 125. Dagri Bangla: a heaven for trekkers/campers
  • 126. Dagri Bangla: a heaven for trekkers/campers
  • 127. Trek from Thandiani to Nathia gali is one of the most popular weekend treks of the Galiyat  area. This is the trek on which many people mark the beginning of their camping/trekking  life. Birangali village is around 7-8 km from Thandiani. The track that leads to it mainly  involve descends. There is a fresh water stream at 5 minutes’ walk down the hill from the  rest house. There are also a few shops in Biran gali village where basic items are available.  Dagri rest house is at an elevation of 2720 meters whose main structure was damaged in the  earthquake. The track from Biran gali to Dagri is around 15-16km and involves mainly  ascend. The dense Quercus (burongi) forest of this area is the main charm of this whole trek.  With some of the trees hundreds of years old. If the weather is clear, Dagri also offers an  awesome sunset view. Fresh water is available at 15 minutes’ walk from the rest house  towards Northwest.
  • 128. Geography & Climate: Dagri Naka is a mountainous area in Galiyat region Khyber Pakhtunkhwa, Pakistan located  between the trek of Thandiani and Nathia gali at 2720 meters or 8924 feet above sea level.  Dagri(also called Dugri) means “The home of leopards” in the local language. The peaceful area is covered with beautiful landscape. In case the weather is clear, Dagri  provides a scenic sunset viewpoint. The region is covered with pine trees, which adds to its  natural beauty. The area is known to have the most dense pine forest in the Galiyat region.  Dagri is surrounded by subtropical evergreen forest.
  • 130. Route & Direction: Route 1:  Day 1: Peshawar to Nathia Gali (Car, Jeep) 5.5 hours’ travel Day 2: Nathia Gali to Dagri Forest through Miranjani 7 hours’ trekking  Day 3: Explored Dagri Forest and back to Nathia Gali 7 hours’ trekking Day 4: Back to Peshawar Route 2:  Day 1: Peshawar to Thandiani (Car, Jeep) 5.5 hours’ travel Day 2: Thandiani to Dagri Forest via Berin gali 6 hours’ trekking  Day 3: Dagri Forest to Nathia Gali via Miranjani 7 hours’ trekking Day 4: Back to Peshawar
  • 132.
  • 133.
  • 134.
  • 135. PROJECT PROPOSED ACTIVITIES: RENOVATION OF EXISTING REST HOUSE @ 1 N0 RENOVATION OF EXISTING SIDE BLOCK @ 1 N0 RESTURANT @10,000 SFT CAMPING PODS @14 NOs BAR. B. Q. SPOTS @ 2 NOs PUBLIC PARK @ 35,000 SFT CAPMING POINTS FOR TENTS @ 3 NOs MASTER PLAN DEVELOPMENT @ 15.5 KANALS WATER RESERVIOUR @ 3000 SFT COMPLETE TRACK DEVELOPMENT @ 10 KM GAZEBOS & SHEDS @ 12 NOs SOLID WASTE COLLECTION UNIT @ 3000 SFT FIRST AID ROOM @ 400 SFT PUBLIC TOILETS @ 600 SFT SECURITY POST @ 100 SFT POWER GENRATOR @ 1 NO
  • 136.
  • 137.
  • 138.
  • 139.
  • 140.
  • 141.
  • 142. PROJECT FINANCIAL DATA: RENOVATION OF EXISTING REST HOUSE @ 1 N0 = 5 Millions RENOVATION OF EXISTING SIDE BLOCK @ 1 N0 = 2 Millions RESTURANT @10,000 SFT = 50 Millions CAMPING PODS @14 NOs = 14 Millions BAR. B. Q. SPOTS @ 2 NOs = 06 Millions PUBLIC PARK @ 35,000 SFT = 10 Millions CAPMING POINTS FOR TENTS @ 3 NOs = 06 Millions MASTER PLAN DEVELOPMENT @ 15.5 KANALS = 13 Millions WATER RESERVIOUR @ 3000 SFT = 10 Millions COMPLETE TRACK DEVELOPMENT @ 22 KM = 15 Millions GAZEBOS & SHEDS @ 12 NOs = 08 Millions SOLID WASTE COLLECTION UNIT @ 3000 SFT = 03 Millions FIRST AID ROOM @ 400 SFT = 0.5 Millions PUBLIC TOILETS @ 600 SFT = 05 Millions SECURITY POST @ 100 SFT = 01 Millions POWER GENRATOR @ 1 NO = 7.5 Millions GRAND TOTAL = 156.00 Millions
  • 143. TOTAL INVESTMENT = 156.00 Million TOTAL REVENUE @ 100 % OPERATIONAL = 54.90 Million (300 visitors per day during 6 months season average revenue of Rs.1000 per person [300 x 183 x 1000]) TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = 38.43 Million Operating Costs: Salaries (including Mgt, Admin & Support Staff) = Rs 5, 00,000 Per Month Utilities, Depreciation & Misc. = Rs 1, 00,000 per Month Total per month = Rs 6, 00,000/- Say, Rs 36,00,000/- per Season Total Seasonal Operating Cost = Rs 3.6 Million
  • 144. PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 38.43 million Deduction of Income Taxes @ 35%: = Rs 13.45 million Deduction of Operational Costs: = Rs 03.60 million Deduction of Annul Lease amount = Rs 02.00 million _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 19.38 million ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency: = 12.42 % Payback Period @ 70 % Operational Efficiency: = Approx. 8 years.
  • 149. Route & Direction: Route & Direction: Day 1: Peshawar to Beer Gali (Car, Jeep) 5 hours’ travel Day 2:  Back to Peshawar ACCESS TO BEER GALAI FROM PESHAWAR:
  • 150. CURRENT TOURISM ACTIVITIES AND FACILITIES: This site has attraction for the local tourist in weekends and people visit the site to  enjoy the greenery of the site on different picnic spots. Lots of visitors visit Beer Galai specially in Eid days, this site is famous among the  local community people from District Swabi and Mardan. Main activities on the  site are: Day camping Bone fire BBQ events Family and Friend Picnic spots
  • 151.
  • 152. SNAPS OF BEER GALAI SWABI:
  • 153. BEER GALAI at Winter:
  • 154.
  • 155.
  • 156. PROJECT PROPOSED ACTIVITIES:   ADMINISTRATION @2000     SFT RESTURANT  @10,000  SFT CAFÉ @5,000    SFT COMMERCIAL AREA @5000     SFT GAZEBOS  @15 NOs PICNIC SPOTS, COOKING POINTS @05 NOS PUBLIC PARK @10,000  SFT CHILDREN PLAY AREA @10,000  SFT MASTER PLAN DEVELOPMENT @48 KANALS SOLID WASTE COLLECTION UNIT @3000 SFT FIRST AID ROOM @400   SFT PUBLIC TOILETS @600   SFT SECURITY POST @100   SFT PARKING  @ 40 VEHICLES
  • 157.
  • 158.
  • 159.
  • 160. PROJECT FINANCIAL DATA:   ADMINISTRATION @2000     SFT = 05  Millions  RESTURANT  @10,000  SFT = 20  Millions CAFÉ @5,000    SFT = 10  Millions COMMERCIAL AREA @5000     SFT = 7.5 Millions GAZEBOS  @15 NOs = 12  Millions PICNIC SPOTS, COOKING POINTS @05 NOS = 2.5 Millions PUBLIC PARK @10,000  SFT = 05  Millions CHILDREN PLAY AREA @10,000  SFT = 15  Millions MASTER PLAN DEVELOPMENT @48 KANALS= 10  Millions SOLID WASTE COLLECTION UNIT @3000 SFT = 01  Millions FIRST AID ROOM @400   SFT = 0.5 Millions PUBLIC TOILETS @600   SFT = 05 Millions SECURITY POST @100   SFT = 01 Millions PARKING  @ 40 VEHICLES = 05 Millions   GRAND TOTAL = Rs 99.5 Millions
  • 161. TOTAL INVESTMENT = Rs 99.5 Millions TOTAL REVENUE @ 100 % OPERATIONAL = Rs 36.5 Millions (200 visitors per day during 12 months season average revenue of   Rs.500 per person  [200 x 365 x 500])                                                                                                                                                                                                                              TOTAL REVENUE @ 70 % OPERATIONAL EFFICIENCY = Rs 25.55 Millions Operating Costs: Salaries (including Mgt, Admin & Support Staff)  = Rs 5, 00,000 Per Month Utilities, Depreciation & Misc.           = Rs 1, 00,000 per Month Total per month = Rs 6,00,000/- Say, Rs 72,00,000/- per Season Total Seasonal Operating Cost = Rs 7.2 Million
  • 162. PROJECT FINANCIAL DATA: Total Income@ 70 % Operational Efficiency: = Rs 25.55 Millions Deduction of Income Taxes @ 35%: = Rs 08.94 millions Deduction of Operational Costs: = Rs 07.20 millions Deduction of Annul Lease amount = Rs 02.50 millions _______________________________________________________________ Net Income after Tax deduction & Operating Cost: = Rs 6.91 millions ESTIMATED RATIOS: Return on Investment @ 70 % Operational Efficiency:  = 6.94 % Payback Period @ 70 % Operational Efficiency: = Approx. 14 years.
  • 164.
  • 165.
  • 166.
  • 167.
  • 168.
  • 169.
  • 170.
  • 171.
  • 172.
  • 173.
  • 174.
  • 175.
  • 176.
  • 177.
  • 178.
  • 179.
  • 180.
  • 181.
  • 182.
  • 183.
  • 184.
  • 185.
  • 186.