This document outlines responsibilities for various parties in the building construction process. It defines key terms like construction, construction works, and construction site. The Ministry is responsible for issuing permits and ensuring compliance with spatial planning laws. The investor is responsible for obtaining necessary documents and preserving them as long as the building exists. The contractor must perform at least half the construction work and have various licenses and documents on site, like a construction diary and compliance evidence for products. The construction site must be marked with identifying information like the investor, designer, and permit details.
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
Building Construction 3. responsibilities of participants
1. Building Construction Technology I
PracticalSession no. 3
09.04.2012
Who is responsible for?
- Issuing a solution/permit forremoving buildings, ( The inspection ) *
- Administrative supervision over the implementation of the Law on Spatial Planning and
the regulations issued under that act, ( The Ministry ) *
- the legality of the actions of authorities and persons with public authorities relating to
the Spatial Planning and building, ( The Ministry ) *
- Running the Construction dairy, ( Site engineer assistant ) *
- Ensuring the needed machinery, ( the Contractor ) *
- Maintaining the building during its lifetime, (The Investor)
- Maintaining the building after its lifetime, (The customer )
- To give a report ( positive/negative ) on the condition of the building or its part and will
be responsible furthermore for it ( The Reviser )
- Suppling investors with all information about the defects and irregularities before the
construction phase ( The Supervisor )
- Determining whether the survey of the building done by the person authorized to
conducttasks ( The Supervisor )
- Determining whether the contractormeets the requirements for performing
construction activities ( The Supervisor )
- To design a project to comply with the building locationpermit, to meets the essential
requirements forthe building and tocomply withthe provisions of this Law and special
regulations. ( The Designer )
- Performing at least half the work necessary forconstruction and the building.
( The main Contractor )
- Remove all temporary structures before obtaining the use permit
( The Contractor )
- Make plan of common temporary and temporary work sites ( The Contractor )
- Mark the constructionsite with prescribed markings&signs ( The Contractor )
- Draw up a written declaration of executed worksand the building maintenance
conditions ( The Contractor )
- Obtaining usage permit forthe building ( The Investor )
- Preserving relevant documents and projects forthe constructionof with the
amendments marked and changes as long as building exists ( The Investor )
- Obtaining Survey project of the building until the start of construction works.
( The Investor )
2. Define the: *
- Construction: (objectcreated by constructing works, connected to ground, performed
from building products with common installations and equipment, or integrated
complex with facility or equipment as wellas technical - technological units or solo
installations connected to the ground. )
- Construction Works: (Performing constructionaland other works (preparation, land,
and structural, installation, finishing and mounting of construction products, plant or
equipment) with whichnew buildings are built, existing buildings are reconstructed,
removed or maintained. )
- Constructing: (the process of designing,
constructing, usage and removal of the construction (building), everything that is
related to the constructing of the new buildings can be applied in an appropiate way to
reconstructing, maintance and removal of the old buildings. )
- Construction site: (is a place,land or buildings (including other areas that are
temporarily occupied ) needed to execute the constructionworks or the application of
appropriate building technology and security, on which to build, reconstruct, remove or
perform maintenance workbuilding).
- Maintenance of buildings: (Performing constructional and other worksto preserve
the essential requirements of a building during its lifetime, withwhich does not change
the compliance with the conditions at the locationof the building in accordancewith
whichit is built.)
Construction site shall be marked with: (name 4 things or more) *
- Name of investors, the designer, contractorsand persons carrying out construction
supervision
- Name and type of buildings that is being built
- The name of the authority issuing the document upon whichto build
- Classification code, register number, date of issue and validity of the act upon which to
build
- An indication that it is a cultural property that is the national monument
Contractor on construction site must have: (name 8 things or more) *
- The decision on registration in courtregister, or craftslicense.
- Approval for performing the constructionand performance of and the contracton the
association contractorsunder special legislation.
- Act on appointment of chief site engineer, site engineer and works manager.
- Act on appointment of supervisor or principal supervisor.
- A decision on building conditions, confirmation of the main project, or construction
permit from the conceptual or main project.
3. - Performing projects with the opinion of chief designer of the project and certified by the
reviser that Requested it in a report on the controlof the main projects requested , for
the previously constructed part of the building , constructionand other works that are
in progress with all amendments.
- Reviser's report on completed inspection of the execution project if required.
Construction Diary.
- Evidenceof compliance forconstruction products installed.
- Evidenceof compliance by a special law for the installed equipment.
- Identifications of Compliance for certain parts of certain constructionessential.
- Special requirements according to law and quality evidence that is requested by the law,
special regulation or project to collectduring the execution of constructionwork and
other commitments and implementation of controlprocedures forthe previously
constructed part of the building and construction and other worksin progress.
- Survey projectof the buildings.
- Other documents, licenses and permits for whichspecial regulations stipulates that the
contractorafter the start of constructionof the building must have at the site.