Building Construction Technology I
Practical Session no. 2
02.03.2012




Who appoints who?

   -   The Investor,                                                  (himself)
   -   The Designer,                                                  (The Investor)
   -   The main site Engineer,                                        (The Contractor)
   -   Project Manager / Manager of works,                            (The Investor)
   -   The Contractor,                                                (The Investor)
   -   The main Contractor,                                           (The Investor)
   -   The construction site workers,                                 (The Contractor)
   -   The Inspection,                                                (The Ministry)
   -   The Supervisor,                                                (The Investor)




Who is responsible for?

   -   To make the buildings comply with relevant regulations,         ( The Project Manager )
   -   Informing investors, building inspection and other of any deficiencies or irregularities
       before and during construction,                                 ( The Supervision Eng. )
   -   For the completeness and harmonization of works for mutual coherence of
       implementation the contractors,                                 ( The main site Eng. )
   -   Coordinating the implementation of regulations governing safety and health of workers
       during construction works,                                      ( The main site Eng. )
   -   Fencing / enclosing the construction site,                      ( The Contractor )
   -   Issuing building permits                                        ( The Ministry )
   -   Issuing a solution/permit for removing buildings,               ( The inspection )
   -   Administrative supervision over the implementation of the Law on Spatial Planning and
       the regulations issued under that act,                          ( The Ministry )
   -    the legality of the actions of authorities and persons with public authorities relating to
       the Spatial Planning and building,                              ( The Ministry )
   -   Running the Construction dairy,                                 ( Site engineer assistant )
   -   Ensuring the needed machinery,                                  ( the Contractor )
   -   Maintaining the building during its lifetime,                   (The Investor)
   -   Maintaining the building after its lifetime,                    (The customer )
Define the:

   -   Construction: (object created by constructing works, connected to ground, performed
       from building products with common installations and equipment, or integrated
       complex with facility or equipment as well as technical - technological units or solo
       installations connected to the ground. )
   -   Construction Works: (Performing constructional and other works (preparation, land,
       and structural, installation, finishing and mounting of construction products, plant or
       equipment) with which new buildings are built, existing buildings are reconstructed,
       removed or maintained. )
   -   Constructing: (the process of designing,
       constructing, usage and removal of the construction (building), everything that is
       related to the constructing of the new buildings can be applied in an appropiate way to
       reconstructing, maintance and removal of the old buildings. )
   -   Construction site: (is a place,land or buildings (including other areas that are
       temporarily occupied ) needed to execute the construction works or the application of
       appropriate building technology and security, on which to build, reconstruct, remove or
       perform maintenance work building).
   -   Maintenance of buildings: (Performing constructional and other works to preserve
       the essential requirements of a building during its lifetime, with which does not change
       the compliance with the conditions at the location of the building in accordance with
       which it is built.)




Put these actions in order:

   -   Working permit                                               (7)
   -   Conceptual project                                           (2)
   -   Execution project                                            (6)
   -   Urban permit                                                 (3)
   -   Use permit                                                   (9)
   -   Appointing the main construction site engineer               (8)
   -   Appointing the designer                                      (1)
   -   Appointing the contractor                                    (5)
   -   Main project                                                 (4)



Construction site shall be marked with: (name 4 things or more)

   -   Name of investors, the designer, contractors and persons carrying out construction
       supervision
   -   Name and type of buildings that is being built
   -   The name of the authority issuing the document upon which to build
-   Classification code, register number, date of issue and validity of the act upon which to
       build
   -   An indication that it is a cultural property that is the national monument



Contractor on construction site must have: (name 8 things or more)

   -   The decision on registration in court register, or crafts license.
   -   Approval for performing the construction and performance of and the contract on the
       association contractors under special legislation.
   -   Act on appointment of chief site engineer, site engineer and works manager.
   -   Act on appointment of supervisor or principal supervisor.
   -   A decision on building conditions, confirmation of the main project, or construction
       permit from the conceptual or main project.
   -   Performing projects with the opinion of chief designer of the project and certified by the
       reviser that Requested it in a report on the control of the main projects requested , for
       the previously constructed part of the building , construction and other works that are
       in progress with all amendments.
   -   Reviser's report on completed inspection of the execution project if required.
       Construction Diary.
   -   Evidence of compliance for construction products installed.
   -   Evidence of compliance by a special law for the installed equipment.
   -   Identifications of Compliance for certain parts of certain construction essential.
   -   Special requirements according to law and quality evidence that is requested by the law,
       special regulation or project to collect during the execution of construction work and
       other commitments and implementation of control procedures for the previously
       constructed part of the building and construction and other works in progress.
   -   Survey project of the buildings.
   -   Other documents, licenses and permits for which special regulations stipulates that the
       contractor after the start of construction of the building must have at the site.

Weitere ähnliche Inhalte

Andere mochten auch

FORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGFORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGTANMAY SHETTY
 
FORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGFORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGTANMAY SHETTY
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 
Building Construction 6. intro to building materials
Building Construction 6. intro to building materialsBuilding Construction 6. intro to building materials
Building Construction 6. intro to building materialsHamdija Velagic
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldingsHamdija Velagic
 
Introduction to Arch Week 11
Introduction to Arch Week 11Introduction to Arch Week 11
Introduction to Arch Week 11Hamdija Velagic
 
demolition of building
demolition of buildingdemolition of building
demolition of buildingtushar garg
 
Introduction to Arch Week 14
Introduction to Arch Week 14Introduction to Arch Week 14
Introduction to Arch Week 14Hamdija Velagic
 
Introduction to Arch Week 13
Introduction to Arch Week 13Introduction to Arch Week 13
Introduction to Arch Week 13Hamdija Velagic
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffoldingHamdija Velagic
 
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)ArchiEducPH
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptVikrant Sharma
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materialsHamdija Velagic
 
Demolition of Structures.
Demolition of Structures.Demolition of Structures.
Demolition of Structures.Chintan Varia
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction siteHamdija Velagic
 

Andere mochten auch (20)

FORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGFORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERING
 
FORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERINGFORMWORK, SCAFFOLDING, CENTERING
FORMWORK, SCAFFOLDING, CENTERING
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Building technology part 3
Building technology part 3Building technology part 3
Building technology part 3
 
Building Construction 6. intro to building materials
Building Construction 6. intro to building materialsBuilding Construction 6. intro to building materials
Building Construction 6. intro to building materials
 
Fully Demolition
Fully Demolition Fully Demolition
Fully Demolition
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldings
 
Introduction to Arch Week 11
Introduction to Arch Week 11Introduction to Arch Week 11
Introduction to Arch Week 11
 
demolition of building
demolition of buildingdemolition of building
demolition of building
 
Introduction to Arch Week 14
Introduction to Arch Week 14Introduction to Arch Week 14
Introduction to Arch Week 14
 
Demolition
 Demolition Demolition
Demolition
 
Introduction to Arch Week 13
Introduction to Arch Week 13Introduction to Arch Week 13
Introduction to Arch Week 13
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffolding
 
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE ppt
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materials
 
Demolition of Structures.
Demolition of Structures.Demolition of Structures.
Demolition of Structures.
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction site
 
Building technology in construction intro
Building technology in construction introBuilding technology in construction intro
Building technology in construction intro
 
Demolition of building
Demolition of building Demolition of building
Demolition of building
 

Ähnlich wie Building Construction 2. rules and definition in construction

Ähnlich wie Building Construction 2. rules and definition in construction (20)

Building Plan Approvals.pptx
Building Plan Approvals.pptxBuilding Plan Approvals.pptx
Building Plan Approvals.pptx
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Construction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENTConstruction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENT
 
Apprisal of loan proposal .
Apprisal of loan proposal . Apprisal of loan proposal .
Apprisal of loan proposal .
 
Apprisal of Loan proposal
Apprisal of Loan proposal Apprisal of Loan proposal
Apprisal of Loan proposal
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
 
P introduction
P introductionP introduction
P introduction
 
Birhanu
BirhanuBirhanu
Birhanu
 
Ici individual
Ici individualIci individual
Ici individual
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex project
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
Tor afg road
Tor   afg roadTor   afg road
Tor afg road
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 

Mehr von Hamdija Velagic

Introduction to Arch List of potential questions
Introduction to Arch List of potential questionsIntroduction to Arch List of potential questions
Introduction to Arch List of potential questionsHamdija Velagic
 
Architecture form space order
Architecture form space orderArchitecture form space order
Architecture form space orderHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Hamdija Velagic
 
New Intro to Architecture Week 4
New Intro to Architecture Week 4New Intro to Architecture Week 4
New Intro to Architecture Week 4Hamdija Velagic
 
Building Construction 4. tender offer
Building Construction 4. tender offerBuilding Construction 4. tender offer
Building Construction 4. tender offerHamdija Velagic
 
Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Hamdija Velagic
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
1. Introduction to Project Management
1. Introduction to Project Management1. Introduction to Project Management
1. Introduction to Project ManagementHamdija Velagic
 

Mehr von Hamdija Velagic (13)

Introduction to Arch List of potential questions
Introduction to Arch List of potential questionsIntroduction to Arch List of potential questions
Introduction to Arch List of potential questions
 
Architecture form space order
Architecture form space orderArchitecture form space order
Architecture form space order
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]
 
New Intro to Architecture Week 4
New Intro to Architecture Week 4New Intro to Architecture Week 4
New Intro to Architecture Week 4
 
Building Construction 4. tender offer
Building Construction 4. tender offerBuilding Construction 4. tender offer
Building Construction 4. tender offer
 
Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
Into. to Arch Week 3
Into. to Arch Week 3Into. to Arch Week 3
Into. to Arch Week 3
 
Into. to Arch Week 2
Into. to Arch Week 2Into. to Arch Week 2
Into. to Arch Week 2
 
1. Introduction to Project Management
1. Introduction to Project Management1. Introduction to Project Management
1. Introduction to Project Management
 

Kürzlich hochgeladen

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Kürzlich hochgeladen (20)

Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

Building Construction 2. rules and definition in construction

  • 1. Building Construction Technology I Practical Session no. 2 02.03.2012 Who appoints who? - The Investor, (himself) - The Designer, (The Investor) - The main site Engineer, (The Contractor) - Project Manager / Manager of works, (The Investor) - The Contractor, (The Investor) - The main Contractor, (The Investor) - The construction site workers, (The Contractor) - The Inspection, (The Ministry) - The Supervisor, (The Investor) Who is responsible for? - To make the buildings comply with relevant regulations, ( The Project Manager ) - Informing investors, building inspection and other of any deficiencies or irregularities before and during construction, ( The Supervision Eng. ) - For the completeness and harmonization of works for mutual coherence of implementation the contractors, ( The main site Eng. ) - Coordinating the implementation of regulations governing safety and health of workers during construction works, ( The main site Eng. ) - Fencing / enclosing the construction site, ( The Contractor ) - Issuing building permits ( The Ministry ) - Issuing a solution/permit for removing buildings, ( The inspection ) - Administrative supervision over the implementation of the Law on Spatial Planning and the regulations issued under that act, ( The Ministry ) - the legality of the actions of authorities and persons with public authorities relating to the Spatial Planning and building, ( The Ministry ) - Running the Construction dairy, ( Site engineer assistant ) - Ensuring the needed machinery, ( the Contractor ) - Maintaining the building during its lifetime, (The Investor) - Maintaining the building after its lifetime, (The customer )
  • 2. Define the: - Construction: (object created by constructing works, connected to ground, performed from building products with common installations and equipment, or integrated complex with facility or equipment as well as technical - technological units or solo installations connected to the ground. ) - Construction Works: (Performing constructional and other works (preparation, land, and structural, installation, finishing and mounting of construction products, plant or equipment) with which new buildings are built, existing buildings are reconstructed, removed or maintained. ) - Constructing: (the process of designing, constructing, usage and removal of the construction (building), everything that is related to the constructing of the new buildings can be applied in an appropiate way to reconstructing, maintance and removal of the old buildings. ) - Construction site: (is a place,land or buildings (including other areas that are temporarily occupied ) needed to execute the construction works or the application of appropriate building technology and security, on which to build, reconstruct, remove or perform maintenance work building). - Maintenance of buildings: (Performing constructional and other works to preserve the essential requirements of a building during its lifetime, with which does not change the compliance with the conditions at the location of the building in accordance with which it is built.) Put these actions in order: - Working permit (7) - Conceptual project (2) - Execution project (6) - Urban permit (3) - Use permit (9) - Appointing the main construction site engineer (8) - Appointing the designer (1) - Appointing the contractor (5) - Main project (4) Construction site shall be marked with: (name 4 things or more) - Name of investors, the designer, contractors and persons carrying out construction supervision - Name and type of buildings that is being built - The name of the authority issuing the document upon which to build
  • 3. - Classification code, register number, date of issue and validity of the act upon which to build - An indication that it is a cultural property that is the national monument Contractor on construction site must have: (name 8 things or more) - The decision on registration in court register, or crafts license. - Approval for performing the construction and performance of and the contract on the association contractors under special legislation. - Act on appointment of chief site engineer, site engineer and works manager. - Act on appointment of supervisor or principal supervisor. - A decision on building conditions, confirmation of the main project, or construction permit from the conceptual or main project. - Performing projects with the opinion of chief designer of the project and certified by the reviser that Requested it in a report on the control of the main projects requested , for the previously constructed part of the building , construction and other works that are in progress with all amendments. - Reviser's report on completed inspection of the execution project if required. Construction Diary. - Evidence of compliance for construction products installed. - Evidence of compliance by a special law for the installed equipment. - Identifications of Compliance for certain parts of certain construction essential. - Special requirements according to law and quality evidence that is requested by the law, special regulation or project to collect during the execution of construction work and other commitments and implementation of control procedures for the previously constructed part of the building and construction and other works in progress. - Survey project of the buildings. - Other documents, licenses and permits for which special regulations stipulates that the contractor after the start of construction of the building must have at the site.