SlideShare ist ein Scribd-Unternehmen logo
1 von 52
Downloaden Sie, um offline zu lesen
Renderings by Michael Singer Studio
• City of Phoenix Staff
• Street Transportation Department, Office of Arts & Culture, Planning & Development
and Neighborhood Services
• Arizona Forward Members
• SRP & APS Staff
• Phase I Design Team & Artist
• Phases II Design Teams
Introductions
ReinventPHX
• Five transit oriented
development districts
• Two districts with the Grand
Canal: Uptown and Gateway
• Adopted policy plans for each
district
• Uptown TOD District
•Priority Development
Areas
• 7th Avenue & Grand Canal
node
• Central Avenue at Grand
Canal improvements
suggested as a catalyst
project
ReinventPHX
• Gateway TOD
District
•Priority
Development Areas
• Grand Canal Corridor
ReinventPHX
• Strategies and Action Items
•Pursue funding for Grand Canal trail enhancements
• Design work for crossings conducted during ReinventPHX
study/process
• Grant funding pursued using adopted policy plans as basis for
award
•Implement pedestrian and bicycle improvements to Grand
Canal
ReinventPHX
SRP Canals – Multiple Use
Multi-Use Trail System Status
61 miles complete.16 miles in
design/construction.
Recently Completed Canal Projects
Tempe Western Canal Trail Chandler Paseo Project: Galveston – Queen Creek
SRP Guidelines within Canals
20’
20’
50’
Unlimited
Canal and Power Clearance
Requirements
SRP/APS Equipment
APS Forestry & Special Programs
John Gauthier
Forestry Planner
Metro Division
602-371-5250
John.Gauthier@aps.co
m
APS Forestry & Special Programs
John Gauthier
Forestry Planner
Metro Division
602-371-5250
John.Gauthier@aps.co
m
• Phoenix is building a multi-use trail along the Grand Canal from Glendale to
Tempe
• Design underway East Segment (I-17 and Tempe)
• Construction (Phase I) begins early 2017
• Construction (Phase II) begins early 2018
• This presentation will cover the project and some of the opportunities
Grand Canalscape Overview
Grand Canalscape Goals
• Provide continuous multi-use trail along the Grand
Canal across Phoenix
•Trail
•Signalized street crossings
•Neighborhood connections
• Re-integrate canal into neighborhood activity
Canal Bank Trail
Multi-Use Trail 10 feet wide
PedestrianLighting
Traffic Signal HAWK PedestrianSignal
Signalized Crossings
Neighborhood Connections
Other Features
• Integrated public art
• Minimal landscaping
• Maintained by Street Transportation Dept.
• Patrolled by Phoenix Police
• Canal serviced by SRP & APS
East Segment I-17 to Tempe (Under design)
West Segment Glendale to Grand Avenue
(Under development)
Bethany Home Outfall Channel
(Path completed except path specific lighting)
Grand Canalscape Master Plan
Central Segment Bridging Grand Ave and I-
17
(Future Phase)
I-17	South	of	Indian	School	to	15th
Ave	North	of	Glenrosa (CD4)
Trail ends at existing bridge at 23rd Ave north of
Fairmount pending decision on future I-17 Bridge
North Bank
Trail
New RRFB
Crossing:
15th Ave s/o Roma
Phase	II	- TIGER
New HAWKS:
Indian School e/o 23rd Ave
19th Ave n/o Glenrosa
Future I-17
Bridge may be
on north or
south bank
Existing bridge 23rd Ave
north of Fairmount
15th	Ave	North	of	Glenrosa to	7th	
Street	North	of	Roma	(CD4)
New HAWKS: 7th Ave at Minnezona | 7th St n/o
Roma
Phase	I
Signal Modification:
Central s/o Coolidge
Neighborhood Connections
9th Ave & Hazelwood St
Alleys Neighborhood
Connection
3rd Ave at Existing
Bridge
7th	Street	North	of	Roma	to	Indian	
School	at	16th	Street	(CD4)RRFB crossing 12th
Street at Turney
High Visibility
crosswalk: Longview n/o
Roma
Enhanced crossing of Indian
School and 16th St (CMAQ
Grant)
Potential Bridge at 10th St &
Campbell
Neighborhood Connections
9th Street and 10th Street
Phase	I
Indian	School	at	16th	Street	to	
20th	Street	s/o	Osborn	(CD4)
Phase	II	- TIGER
New HAWKs:
Osborn w/o 20th St
20th St s/o Osborn
20th	Street	s/o	Osborn	to	24th	St	
s/o	Thomas	(CD4	&	8)
Phase	II	- TIGER
New HAWK:
Thomas e/o 20th St
24th St s/o Thomas
24th	St	s/o	Thomas	McDowell	w/o	
32nd	St	(CD8)
New HAWK:
McDowell w/o 32nd St
New RRFB:
Oak e/o 24th St
Phase	II	- TIGER
McDowell	w/o	32nd	St	to	Garfield	
and	36th	St	(CD8)
Phase	II	- TIGER
New HAWK:
32nd St s/o McDowell
New Bridge at Garfield
Phase	I
Phase	I
Phase	II	– TIGER	
Signal Modifications:
Van Buren and 40th St
Washington w/o 44th St
Garfield	and	36th	St	to	Washington	w/o	44th	St	(CD8)
Neighborhood
Connections
Garfield St at Bike Blvd
and McKinley at 36th St
Neighborhood
Connection
37th Street
Washington	w/o	44th	St	to	SR-202	(CD8)	|	Preferred	Alternative	– Assumes	rail	crossing	granted
Phase	II	- TIGER
Signal Modification:
44th St at Airport Park-n-Ride
New Bridge:
Pueblo Grande Museum
New RRFB:
48th St south of Washington
New Railroad
crossing
Washington	w/o	44th	St	to	SR-202	(CD8)	Alternate	2	– Assumes	Rail	Crossing	Denied	
Phase	II	- TIGER
New RRFB:
48th St south of Washington
Bike lanes cross tracks at
existing crossing
New bike lanes on 48th St
Washington to Grand Canal
Signal Modification:
48th St and Washington
Path leaves canal at
existing signal west
of 44th Street and
Washington and ties
into existing on-
street bike lanes.
SR-202	to	Tempe	(CD8)
Future Tempe Railroad
crossing project
Trail Terminates at Tempe border.
Coordination will be required with
Tempe on signing
Phase	II	- TIGER
Project Details
Trail Length | 10.6 miles
District 4 5.6 miles
District 8 5.0 miles
Signal Modifications | 5
Phase I 1 Phase II 4
New HAWK Signals | 10
Phase I 2 Phase II 8
New RRFB Crossings | 3
Phase I 2 Phase II 1
New High Visibility Crossings | 1
Currently planned Phase I Neighborhood
Connections (8 in Total):
Uptown:
• 9th Avenue
• Hazelwood
Street
• 3rd Avenue
• 8th Place
• 9th Street
• 10th Street
Gateway:
• 36th Street
• 37th Street
Please utilize an
interactive center to
assist the City in
determining the best
future neighborhood
connections for both
Phase I and Phase II!
ConstraintsOpportunities | Constraints
High Levels of Public Support
• Desire to improve utility & perceived safety of canal
banks
Neighborhood Connections
• Eight connections included in Phase I
• Potential future projects include:
• Phoenix Indian Medical Center Fitness Trail at 14th Street
& Glenrosa Ave
• Pocket park at 31st St & McDowell Road
• Safe Routes to School project between Creighton
Elementary School and Oak St
• Mountain Park Health Center connection
• Pueblo Grande Museum connection
Central Avenue Signal Modifications
• Requires modification to Light Rail guide-way
Union Pacific Railroad Crossing
• New crossing permit needed for tracks at Pueblo
Grande Museum
• Requires closing two existing crossings for one new
crossing permit
Environmental Considerations
• Many archeological & historic sites located along canal
requiring archeological monitoring and recovery plans.
Phase I Typical Sections
Base Project Features:
• Concrete pathway
• Lighting
• Landscaping
• Public Art
Density/Frequency of lighting and
landscaping along the canal heavily
dependent on the various constraints
depicted in the section view.
Phase I Typical Sections
Minimal Constraints –
“Best Case Scenario”
for Lighting &
Landscaping:
Phase I Typical Sections
R/W Constraints – “Worst
Case Scenario” for
Lighting & Landscaping:
Sample Pathway Section
Landscaping – Plant List
Integrated Art – Phase I
Integrated Art – Phase I
Integrated Art – Phase I
Integrated Art – Phase I
Future Phase I/Phase II Projects
The City will seek additional funding for future
projects (i.e. bridge crossings and
neighborhood connections) within the Phase I and
Phase II project limits. Funding sources include, but are
not limited to: Community Development Block Grant
(CDBG), Gila River Indian Community Grant,
National Endowment for the Arts - ArtPlace Grants and
many more!
Phase I Bridge Crossings
Potential future bridge crossing locations (dependent on
resolution of existing site constraints):
• East of Central Avenue (Brophy – Central)
• 10th Street
• 14th Street
Please utilize an
interactive center to
assist the City in
determining the best
future bridge crossing
locations for both Phase I
and Phase II! Existing 3rd Avenue Bridge Crossing
East of Central Avenue – Brophy to
Central Connection
Proposed “Arch to Arch”
Connection
N
10th Street
N
14th Street
N
CDGB Requirements
Requirements:
• Must serve low-income areas
• Must be open and available to all residents of the area
• Must be a stand-alone project
• Environmental review
• Davis Bacon and RelatedActs
• Open and competitive procurement of lowest-priced qualified contractor
CDGB Ineligible Uses & Funding
Availability
Ineligible Uses:
• Maintenance costs
• Purchase of land
• Staff costs
• ‘Phases’ of an ongoing project
Funding Availability:
• Competitive, application process
• Limited funds available
• 2017/18 funding available July 2017
• Work with assigned Neighborhood
Specialist to submit an application
Sample CDBG Project Photos
Phase I & Phase II Schedule/Budget
Summaries:
For more information
Project Website: http://grandcanalscape.com
Project Hotline: 623-825-3444
Kerry Wilcoxon – City of Phoenix
Street Transportation Department
602-262-4613 or
kerry.wilcoxon@phoenix.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards PresentationAISC/NSBA
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technicalBrendan O'Connor
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalBrendan O'Connor
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meetingknelischer
 
Design of the Marmion Way Corridor
Design of the Marmion Way CorridorDesign of the Marmion Way Corridor
Design of the Marmion Way Corridorfredglick.1
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Toronto Public Consultation Unit
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingCirculateSD
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 
Oakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedOakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedC. Juliana Villabona
 
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements district5united
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station PresentationCirculateSD
 
Yates,Jimmy resume
Yates,Jimmy resume Yates,Jimmy resume
Yates,Jimmy resume Jimmy Yates
 

Was ist angesagt? (20)

Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 
Design of the Marmion Way Corridor
Design of the Marmion Way CorridorDesign of the Marmion Way Corridor
Design of the Marmion Way Corridor
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
ORahman-Resume
ORahman-ResumeORahman-Resume
ORahman-Resume
 
February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Oakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedOakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reduced
 
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 
Yates,Jimmy resume
Yates,Jimmy resume Yates,Jimmy resume
Yates,Jimmy resume
 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
 

Andere mochten auch

Central Park (NYC)
Central Park (NYC)Central Park (NYC)
Central Park (NYC)Armin Caldas
 
La bolla formativa in Italia
La bolla formativa in ItaliaLa bolla formativa in Italia
La bolla formativa in ItaliaFrancesca Coin
 
Microbial interactions between humans and the built environment (Lake Arrowhe...
Microbial interactions between humans and the built environment (Lake Arrowhe...Microbial interactions between humans and the built environment (Lake Arrowhe...
Microbial interactions between humans and the built environment (Lake Arrowhe...Roxana Hickey
 
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)Jasper Moelker
 
Lithuania Park Of Architecture 18 03 10
Lithuania Park Of Architecture 18 03 10Lithuania Park Of Architecture 18 03 10
Lithuania Park Of Architecture 18 03 10marija
 
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)Jasper Moelker
 
Phân tích tình hình tài chính tại công ty cổ phần may thăng long
Phân tích tình hình  tài chính tại công ty cổ phần may thăng longPhân tích tình hình  tài chính tại công ty cổ phần may thăng long
Phân tích tình hình tài chính tại công ty cổ phần may thăng longhttps://www.facebook.com/garmentspace
 
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bình
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bìnhPhân tích tình hình tài chính công ty cổ phần chứng khoán hòa bình
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bìnhhttps://www.facebook.com/garmentspace
 

Andere mochten auch (11)

Central Park (NYC)
Central Park (NYC)Central Park (NYC)
Central Park (NYC)
 
La bolla formativa in Italia
La bolla formativa in ItaliaLa bolla formativa in Italia
La bolla formativa in Italia
 
Microbial interactions between humans and the built environment (Lake Arrowhe...
Microbial interactions between humans and the built environment (Lake Arrowhe...Microbial interactions between humans and the built environment (Lake Arrowhe...
Microbial interactions between humans and the built environment (Lake Arrowhe...
 
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)
CSI.SP: Introduction To Global Informality by Anthony Fuchs (18 Feb 2009)
 
Lithuania Park Of Architecture 18 03 10
Lithuania Park Of Architecture 18 03 10Lithuania Park Of Architecture 18 03 10
Lithuania Park Of Architecture 18 03 10
 
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)
CSI.SP: Researching Urban Informality by Kees Koonings (18 Mar 2009)
 
Leyenda 1
Leyenda 1Leyenda 1
Leyenda 1
 
Salar arizaro
Salar arizaroSalar arizaro
Salar arizaro
 
Evelyn tarea
Evelyn tareaEvelyn tarea
Evelyn tarea
 
Phân tích tình hình tài chính tại công ty cổ phần may thăng long
Phân tích tình hình  tài chính tại công ty cổ phần may thăng longPhân tích tình hình  tài chính tại công ty cổ phần may thăng long
Phân tích tình hình tài chính tại công ty cổ phần may thăng long
 
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bình
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bìnhPhân tích tình hình tài chính công ty cổ phần chứng khoán hòa bình
Phân tích tình hình tài chính công ty cổ phần chứng khoán hòa bình
 

Ähnlich wie Renderings and Details for Grand Canal Multi-Use Trail Project

State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Crosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14West Central Association
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
 
Marmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light RailMarmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light Railfredglick.1
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Studyrcox1963
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15Susan McCulloch
 
Huntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineHuntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineMatthew Crane
 

Ähnlich wie Renderings and Details for Grand Canal Multi-Use Trail Project (20)

State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
SMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMCSMART Plan Update to the Miami-Dade TMC
SMART Plan Update to the Miami-Dade TMC
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Marmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light RailMarmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light Rail
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Study
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Huntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineHuntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timeline
 

Kürzlich hochgeladen

Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 

Kürzlich hochgeladen (20)

Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 

Renderings and Details for Grand Canal Multi-Use Trail Project

  • 1. Renderings by Michael Singer Studio
  • 2. • City of Phoenix Staff • Street Transportation Department, Office of Arts & Culture, Planning & Development and Neighborhood Services • Arizona Forward Members • SRP & APS Staff • Phase I Design Team & Artist • Phases II Design Teams Introductions
  • 3. ReinventPHX • Five transit oriented development districts • Two districts with the Grand Canal: Uptown and Gateway • Adopted policy plans for each district
  • 4. • Uptown TOD District •Priority Development Areas • 7th Avenue & Grand Canal node • Central Avenue at Grand Canal improvements suggested as a catalyst project ReinventPHX
  • 5. • Gateway TOD District •Priority Development Areas • Grand Canal Corridor ReinventPHX
  • 6. • Strategies and Action Items •Pursue funding for Grand Canal trail enhancements • Design work for crossings conducted during ReinventPHX study/process • Grant funding pursued using adopted policy plans as basis for award •Implement pedestrian and bicycle improvements to Grand Canal ReinventPHX
  • 7. SRP Canals – Multiple Use
  • 8. Multi-Use Trail System Status 61 miles complete.16 miles in design/construction.
  • 9. Recently Completed Canal Projects Tempe Western Canal Trail Chandler Paseo Project: Galveston – Queen Creek
  • 10. SRP Guidelines within Canals 20’ 20’ 50’ Unlimited Canal and Power Clearance Requirements
  • 12. APS Forestry & Special Programs John Gauthier Forestry Planner Metro Division 602-371-5250 John.Gauthier@aps.co m
  • 13. APS Forestry & Special Programs John Gauthier Forestry Planner Metro Division 602-371-5250 John.Gauthier@aps.co m
  • 14. • Phoenix is building a multi-use trail along the Grand Canal from Glendale to Tempe • Design underway East Segment (I-17 and Tempe) • Construction (Phase I) begins early 2017 • Construction (Phase II) begins early 2018 • This presentation will cover the project and some of the opportunities Grand Canalscape Overview
  • 15. Grand Canalscape Goals • Provide continuous multi-use trail along the Grand Canal across Phoenix •Trail •Signalized street crossings •Neighborhood connections • Re-integrate canal into neighborhood activity
  • 16. Canal Bank Trail Multi-Use Trail 10 feet wide PedestrianLighting
  • 17. Traffic Signal HAWK PedestrianSignal Signalized Crossings
  • 19. Other Features • Integrated public art • Minimal landscaping • Maintained by Street Transportation Dept. • Patrolled by Phoenix Police • Canal serviced by SRP & APS
  • 20. East Segment I-17 to Tempe (Under design) West Segment Glendale to Grand Avenue (Under development) Bethany Home Outfall Channel (Path completed except path specific lighting) Grand Canalscape Master Plan Central Segment Bridging Grand Ave and I- 17 (Future Phase)
  • 21. I-17 South of Indian School to 15th Ave North of Glenrosa (CD4) Trail ends at existing bridge at 23rd Ave north of Fairmount pending decision on future I-17 Bridge North Bank Trail New RRFB Crossing: 15th Ave s/o Roma Phase II - TIGER New HAWKS: Indian School e/o 23rd Ave 19th Ave n/o Glenrosa Future I-17 Bridge may be on north or south bank Existing bridge 23rd Ave north of Fairmount
  • 22. 15th Ave North of Glenrosa to 7th Street North of Roma (CD4) New HAWKS: 7th Ave at Minnezona | 7th St n/o Roma Phase I Signal Modification: Central s/o Coolidge Neighborhood Connections 9th Ave & Hazelwood St Alleys Neighborhood Connection 3rd Ave at Existing Bridge
  • 23. 7th Street North of Roma to Indian School at 16th Street (CD4)RRFB crossing 12th Street at Turney High Visibility crosswalk: Longview n/o Roma Enhanced crossing of Indian School and 16th St (CMAQ Grant) Potential Bridge at 10th St & Campbell Neighborhood Connections 9th Street and 10th Street Phase I
  • 26. 24th St s/o Thomas McDowell w/o 32nd St (CD8) New HAWK: McDowell w/o 32nd St New RRFB: Oak e/o 24th St Phase II - TIGER
  • 28. Phase I Phase II – TIGER Signal Modifications: Van Buren and 40th St Washington w/o 44th St Garfield and 36th St to Washington w/o 44th St (CD8) Neighborhood Connections Garfield St at Bike Blvd and McKinley at 36th St Neighborhood Connection 37th Street
  • 29. Washington w/o 44th St to SR-202 (CD8) | Preferred Alternative – Assumes rail crossing granted Phase II - TIGER Signal Modification: 44th St at Airport Park-n-Ride New Bridge: Pueblo Grande Museum New RRFB: 48th St south of Washington New Railroad crossing
  • 30. Washington w/o 44th St to SR-202 (CD8) Alternate 2 – Assumes Rail Crossing Denied Phase II - TIGER New RRFB: 48th St south of Washington Bike lanes cross tracks at existing crossing New bike lanes on 48th St Washington to Grand Canal Signal Modification: 48th St and Washington Path leaves canal at existing signal west of 44th Street and Washington and ties into existing on- street bike lanes.
  • 31. SR-202 to Tempe (CD8) Future Tempe Railroad crossing project Trail Terminates at Tempe border. Coordination will be required with Tempe on signing Phase II - TIGER
  • 32. Project Details Trail Length | 10.6 miles District 4 5.6 miles District 8 5.0 miles Signal Modifications | 5 Phase I 1 Phase II 4 New HAWK Signals | 10 Phase I 2 Phase II 8 New RRFB Crossings | 3 Phase I 2 Phase II 1 New High Visibility Crossings | 1 Currently planned Phase I Neighborhood Connections (8 in Total): Uptown: • 9th Avenue • Hazelwood Street • 3rd Avenue • 8th Place • 9th Street • 10th Street Gateway: • 36th Street • 37th Street Please utilize an interactive center to assist the City in determining the best future neighborhood connections for both Phase I and Phase II!
  • 33. ConstraintsOpportunities | Constraints High Levels of Public Support • Desire to improve utility & perceived safety of canal banks Neighborhood Connections • Eight connections included in Phase I • Potential future projects include: • Phoenix Indian Medical Center Fitness Trail at 14th Street & Glenrosa Ave • Pocket park at 31st St & McDowell Road • Safe Routes to School project between Creighton Elementary School and Oak St • Mountain Park Health Center connection • Pueblo Grande Museum connection Central Avenue Signal Modifications • Requires modification to Light Rail guide-way Union Pacific Railroad Crossing • New crossing permit needed for tracks at Pueblo Grande Museum • Requires closing two existing crossings for one new crossing permit Environmental Considerations • Many archeological & historic sites located along canal requiring archeological monitoring and recovery plans.
  • 34. Phase I Typical Sections Base Project Features: • Concrete pathway • Lighting • Landscaping • Public Art Density/Frequency of lighting and landscaping along the canal heavily dependent on the various constraints depicted in the section view.
  • 35. Phase I Typical Sections Minimal Constraints – “Best Case Scenario” for Lighting & Landscaping:
  • 36. Phase I Typical Sections R/W Constraints – “Worst Case Scenario” for Lighting & Landscaping:
  • 43. Future Phase I/Phase II Projects The City will seek additional funding for future projects (i.e. bridge crossings and neighborhood connections) within the Phase I and Phase II project limits. Funding sources include, but are not limited to: Community Development Block Grant (CDBG), Gila River Indian Community Grant, National Endowment for the Arts - ArtPlace Grants and many more!
  • 44. Phase I Bridge Crossings Potential future bridge crossing locations (dependent on resolution of existing site constraints): • East of Central Avenue (Brophy – Central) • 10th Street • 14th Street Please utilize an interactive center to assist the City in determining the best future bridge crossing locations for both Phase I and Phase II! Existing 3rd Avenue Bridge Crossing
  • 45. East of Central Avenue – Brophy to Central Connection Proposed “Arch to Arch” Connection N
  • 48. CDGB Requirements Requirements: • Must serve low-income areas • Must be open and available to all residents of the area • Must be a stand-alone project • Environmental review • Davis Bacon and RelatedActs • Open and competitive procurement of lowest-priced qualified contractor
  • 49. CDGB Ineligible Uses & Funding Availability Ineligible Uses: • Maintenance costs • Purchase of land • Staff costs • ‘Phases’ of an ongoing project Funding Availability: • Competitive, application process • Limited funds available • 2017/18 funding available July 2017 • Work with assigned Neighborhood Specialist to submit an application
  • 51. Phase I & Phase II Schedule/Budget Summaries:
  • 52. For more information Project Website: http://grandcanalscape.com Project Hotline: 623-825-3444 Kerry Wilcoxon – City of Phoenix Street Transportation Department 602-262-4613 or kerry.wilcoxon@phoenix.gov