Afghanistan National Army Military Hospital
2. Afghanistan National Army Military Hospital
Renovation of the Afghanistan National Army Military Hospital
Location: Kabul, Afghanistan Project Description:
Project Start Date:: 01.10.2004 ! Renovation of existing Military Hospital in Kabul
Project Completion Date: : 01.04.2006 ! Project consists of patient care building, operationsz
Client: US Army building, kitchen, wastewater treatment, rehabilitation
building, polytechnic institute, morgue, engineering
offices, workshops, administration building
! Approximately 45,000 sqm construction area
2006
3.
4. 2/3
2008 Design/Build Communication Support Element Upgrade (CSE)
Element Upgrade (CSE)
Design/Build Communication Support
5. Design/Build Communication Support Element Upgrade (CSE)
Location: Kabul, Afghanistan
Project Start Date: : 11.01.2007
Project Completion Date: : 11.01.2008
Client: USACE Afghanistan Engineer District
Project Description:
This project consists of the design and construction of
upgrading an existing compound and new additions in
Kabul, Afghanistan. The work will take place on the existing
Compound. The purpose of this expansion is to support a
600-soldier Communications Support Element (CSE)
compound. Guard houses, maintenance buildings,
dormitory building, communication, training building and all
required utility works will be constructed.
6. 2/3
2008 Design/Build Communication Support Element Upgrade (CSE)
7. Air handling unit
Standard Accessories; Standard Series Optional Accessories;
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and
different productivity levels on demand. microprocessor control unit.
! 8 different models which provide required humidity
! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide
heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity.
range of 3000m³/h and 100.000 m³/h.
electrically heated; in cooling coils, 2 options: chilled
water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for
! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air.
structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board.
Rubber gaskets which reduce air leakage through
blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter
galvanized iron in a standard way.
! Fans; Statically and dynamically balanced aspirators
and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in
type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a
and high duct pressures,. standard way.
8. GÖNKA Afghanistan References
- Afghanistan National Army Military
Hospital
- Design/Build Communication Support
Element Upgrade (CSE)
- Qandahar Ana Brigade Project
Communication Building
- Contrack Int. Inc.
- U.S. Army Corps. - Afganistan
FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE
Sincan Organize Sanayi Nasimi Rayonu, .
Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7,
Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29
9. 2005 Qandahar Ana Brigade Project Communication Building
ANA Brigade Headquarters
construction begins in Farah
KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started
recently.
The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers.
General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important
step in the development of the ANA. “We are very happy to see the construction of a new base that will become one
of the most important in western Afghanistan.”
The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah
province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year.
Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn,
Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100
men in Qal-e Kah.
Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast
construction, a building method new to Afghanistan
Project Under Construction
Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area
of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a
required part of the contract.
The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters,
and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training
Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a
6MW prime power plant and electrical distribution system, and other buildings to serve the base.
2/3
10. Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6
Sincan / ANKARA / TURKEY Sincan Organize Sanayi Bölgesi
Tel :+90 312 267 09 90(pbx) Göktürk Caddesi No : 6
Fax:+90 312 267 09 93 Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx)
http://www.gonka.com.tr Fax:+90 312 267 09 93
e-mail: gonka@turk.net
http://www.gonka.com.tr
CUSTOMER METAG ÝNÞ. TÝC. A.Þ. e-mail: gonka@turk.net
JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING
CUSTOMER METAG ÝNÞ. TÝC. A.Þ.
EQUIP.NAME PRECISION AIR CONDITIONER JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING
MODEL GHP 160 S SERIAL NO 05/1006 EQUIP.NAME CONDENSER UNIT
SUPPLY FAN FLOW RATE 9.300 m³/h MODEL GHP 160 S SERIAL NO 05/1006
SUPPLY FAN TOTAL PRESSURE 30 mmSS CAPACITY 48,5 kW
MOTOR POWER 2.2 kW FAN BRAND ZIEHL-ABEGG
HEATING CAPACITY 15 kW OPERATING VOLTAGE 380V/3/50 Hz
COOLING CAPACITY 37.5 kW PRODUCTION DATE SEPTEMBER 2005
EXHAUST FAN FLOW RATE - QUALITY CONTROL DATE SEPTEMBER 2005
EXHAUST FAN TOTAL PRESSURE -
MOTOR POWER - TSEK
OPERATING VOLTAGE 380V/3/50 Hz KAZAKHSTAN
PRODUCTION DATE SEPTEMBER 2005
QUALITY CONTROL DATE SEPTEMBER 2005
TSEK
KAZAKHSTAN
11. Contrack Int. Inc.
Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93
http://www.gonka.com.tr
e-mail: gonka@turk.net
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
CUSTOMER CONTRACK INT. INC.
JOB NAME AFGANISTAN
EQUIP. NAME UNIT HEATER WITH AXIAL FAN
MODEL GTA 4 SERIAL NO 08/1001
AIR FLOWRATE 650 m3/h
HEATING POWER 5 kW
INLET AIR TEMPERATURE 18 °C
OUTLET AIR TEMPERATURE 39 °C
POWER INPUT 220V/50Hz
ELECTRIC MOTOR POWERR 66 W
COIL TYPE STEEL TUBE STEEL FIN
PRODUCTION DATE APRIL 2008
QUALITY CONTROL DATE APRIL 2008
TSEK
2008
2/3
12. 2/3