SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
© 2009 Mouchel. All rights reserved www.mouchel.com
“Grahame included for all
required works within the
tender documents and
planned all works to
minimise disruptions to
operations. We received no
complaints from the Police
Station and we received
regular updates to the
progress of the works, from
Grahame.
Ian McPherson
Senior Project Leader,
Metropolitan Police Service.
Client: Metropolitan Police Service
Value: £150,000
Date: May to July 2015
Services: Design and Contract Administration
Roof Replacement & internal remedial / refresh works
The challenge
Challenges faced during the roof
refurbishment and internal remedial works
included:
1. Live Environment: Undertaking
construction work with the end user in
occupation.
2. Reducing Impact: Preventing disruptions
to the continuous 24 hour Police Station,
operations / movements.
3. Security: Working in a Police Station with
‘severe status’ terror threat level.
4. Environmental: Adhering to the Met
Police policy to dispose / recycle of existing
roofing materials.
5. Clients Instruction: Undertaking roof
works with no roof scaffolding (tin hat).
6. Building Regulations: Achieving
thermal performance (0.18 W/m2K) of the
replaced roof, as stated in Part L of the
Building Regulations.
7. Existing Insurance: The existing edge
protection was insured and removal would
void the policy.
8. Site Constraints: Due to limited space
around the building and adjacent electrical
transformer and HVAC plant. These
constraints presented problems:
Mouchel undertook a measured and
condition survey and speedily produced a
specification / Tender Document / Pre
Construction Information that included: -
• The site set up and work area was
joined and was independent from the
Police Station. This contained the
Contractor’s welfare and storage and
directly addressed security issues.
• Deliveries to the site were planned
during less busy hours of the day. This
directly avoided impact on the Police
Station operations / movements (e.g.
shift changes).
The solution
Wembley Police Station
Gymnasium Building
Photo: Condition of existing roof before construction phase.
• Installing the Principal Contractor’s
site set up, as required under the
CDM Regulations 2015.
• Removal, storage and reinstatement
of 56 number solar panels.
• Design and erection of access
scaffolding.
The outcomes
• Recycling of existing roof materials and
waste transfer notes was incorporated
within the designers documents, as a
Contractor’s requirement. Building
Regulations was addressed by firstly:
extracting cores samples from the
existing roof to determine existing
construction. Secondly: undertaking a ‘U
Value’ calculation based on the existing
roof and proposed materials.
• A strategy was agreed with the
contractor to protect the exposed roof
during summer showers. This was a
minimal price option in comparison with
a tin hat option.
• Strict controls over the scaffolding
design and installation allowed for
access on to the roof, storage of 56
solar panels, maintaining a disabled
ramp access, prevention of falling items.
Fibreglass scaffold was used around the
electrical; transformer and HAVC plant.
• The original installer of the edge
protection was contacted and became a
nominated sub contractor. This ensured
no insurance breaches.
• Contractors Health & Safety documents
(Risk Assessments, Method Statements,
Construction Plan Plan) were sufficiently
developed before starting the works.
• A detailed programme was established
with the Contractor with weekly
meetings to monitor the progress and
quality and Health & Safety.
• Worked closely with the Facilities
Manager and Building Users to
determine the positions of services and
to agree site up.
• Due to effective micro planning,
controlling and speedily reacting to
variations the project was delivered on
time and within budget.
• The roof achieved current ‘U’ Values
(thermal performance) as stated in
Part L of the Building Regulations.
• The roof will achieve a 25 year
performance lifespan. In addition the
contractor provided a 20 year
insurance backed guarantee, as
specified.
• The existing edge protection insurance
remains valid.
• The commissioning and overhaul of
the solar panels are now providing free
energy to the Police Station.
• The Met Police recycling and disposal
policy was achieved.
• Feedback from the Client, Facilities
Manager and the End User was
extremely positive.
• Close liaisons with the FM and end
user ensured success of the project.
Photo: Soffit replacement and perimeter scaffolding.
Above Photos: Remedial works
included replacing damaged
areas and redecorations.
Above Photos: Internal water
ingress. Damage to walls and
ceiling.
The solution continued……
1. It was determined during the works
that the solar panels where never
commissioned. An additional remit with
costs were speedily produced and
approved by the Client.
2. During the works, the remedial works
were elaborated upon at the request of
the Client. An internal redecoration
scope document was speedily
produced and costs provided to the
Client.
3. Variations were dealt with speedily
during the works. Programme and cost
control was paramount.
4. Full replacement of the lightening
protection installation. An instruction
was speedily issued to the Contractor.
Variations
www.mouchel.com

Weitere ähnliche Inhalte

Was ist angesagt?

3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon3. Brochure Trilogy Swindon
3. Brochure Trilogy SwindonMatthew Warr
 
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris Anton
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris AntonHow Local Authorities can meet Net-Zero Carbon targets by 2030: Chris Anton
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris AntonIES VE
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...energytrustor
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen Music
 
Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)Steven Armstrong
 
JSModafferiResume 07.29.15
JSModafferiResume 07.29.15JSModafferiResume 07.29.15
JSModafferiResume 07.29.15James Modafferi
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016John Gantz
 
Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Scott Buckler
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshPavel Babincak
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)Pieter Venter
 
Hyflex - St Mary's College Testimonial
Hyflex - St Mary's College TestimonialHyflex - St Mary's College Testimonial
Hyflex - St Mary's College TestimonialJagjeet Singh Bath
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studiesgrahamelanders
 

Was ist angesagt? (17)

3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon
 
Pigott Construction Ltd
Pigott Construction LtdPigott Construction Ltd
Pigott Construction Ltd
 
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris Anton
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris AntonHow Local Authorities can meet Net-Zero Carbon targets by 2030: Chris Anton
How Local Authorities can meet Net-Zero Carbon targets by 2030: Chris Anton
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)
 
JSModafferiResume 07.29.15
JSModafferiResume 07.29.15JSModafferiResume 07.29.15
JSModafferiResume 07.29.15
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
 
Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
 
Ici final project
Ici final projectIci final project
Ici final project
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
 
Hyflex - St Mary's College Testimonial
Hyflex - St Mary's College TestimonialHyflex - St Mary's College Testimonial
Hyflex - St Mary's College Testimonial
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studies
 

Ähnlich wie Roof replacement and internal remedial works

Ähnlich wie Roof replacement and internal remedial works (20)

Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
17May_visit
17May_visit17May_visit
17May_visit
 
C V
C VC V
C V
 
BUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdfBUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdf
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
Cladding disrepair presentation
Cladding disrepair presentationCladding disrepair presentation
Cladding disrepair presentation
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
CV
CVCV
CV
 

Mehr von grahamelanders

Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 

Mehr von grahamelanders (11)

program
programprogram
program
 
Surrey education
Surrey educationSurrey education
Surrey education
 
Perth metro
Perth metroPerth metro
Perth metro
 
Upload
UploadUpload
Upload
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Upload
UploadUpload
Upload
 
PerthMetro Case Study
PerthMetro Case StudyPerthMetro Case Study
PerthMetro Case Study
 
PerthMetro case study
PerthMetro case studyPerthMetro case study
PerthMetro case study
 

Kürzlich hochgeladen

Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WIRetail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WILee & Associates of Madison, WI
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...asmaqueen5
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfkratirudram
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfVickyAulakh1
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)knoxdigital1
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfabbu831446
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...asmaqueen5
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdfManishSaxena95
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...ApartmentWala1
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN International Corp.
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ - Mainstreet Equity Corp.
 
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...asmaqueen5
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfabbu831446
 
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...asmaqueen5
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realtypunitranainchbrick02
 
Housing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptxHousing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptxcosmo-soil
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirementsmarketingkingdomofku
 
Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfsabhyara24
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdfManishSaxena95
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...ApartmentWala1
 

Kürzlich hochgeladen (20)

Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WIRetail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property Broadcast
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdf
 
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realty
 
Housing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptxHousing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptx
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdf
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
 

Roof replacement and internal remedial works

  • 1. © 2009 Mouchel. All rights reserved www.mouchel.com “Grahame included for all required works within the tender documents and planned all works to minimise disruptions to operations. We received no complaints from the Police Station and we received regular updates to the progress of the works, from Grahame. Ian McPherson Senior Project Leader, Metropolitan Police Service. Client: Metropolitan Police Service Value: £150,000 Date: May to July 2015 Services: Design and Contract Administration Roof Replacement & internal remedial / refresh works The challenge Challenges faced during the roof refurbishment and internal remedial works included: 1. Live Environment: Undertaking construction work with the end user in occupation. 2. Reducing Impact: Preventing disruptions to the continuous 24 hour Police Station, operations / movements. 3. Security: Working in a Police Station with ‘severe status’ terror threat level. 4. Environmental: Adhering to the Met Police policy to dispose / recycle of existing roofing materials. 5. Clients Instruction: Undertaking roof works with no roof scaffolding (tin hat). 6. Building Regulations: Achieving thermal performance (0.18 W/m2K) of the replaced roof, as stated in Part L of the Building Regulations. 7. Existing Insurance: The existing edge protection was insured and removal would void the policy. 8. Site Constraints: Due to limited space around the building and adjacent electrical transformer and HVAC plant. These constraints presented problems: Mouchel undertook a measured and condition survey and speedily produced a specification / Tender Document / Pre Construction Information that included: - • The site set up and work area was joined and was independent from the Police Station. This contained the Contractor’s welfare and storage and directly addressed security issues. • Deliveries to the site were planned during less busy hours of the day. This directly avoided impact on the Police Station operations / movements (e.g. shift changes). The solution Wembley Police Station Gymnasium Building Photo: Condition of existing roof before construction phase. • Installing the Principal Contractor’s site set up, as required under the CDM Regulations 2015. • Removal, storage and reinstatement of 56 number solar panels. • Design and erection of access scaffolding.
  • 2. The outcomes • Recycling of existing roof materials and waste transfer notes was incorporated within the designers documents, as a Contractor’s requirement. Building Regulations was addressed by firstly: extracting cores samples from the existing roof to determine existing construction. Secondly: undertaking a ‘U Value’ calculation based on the existing roof and proposed materials. • A strategy was agreed with the contractor to protect the exposed roof during summer showers. This was a minimal price option in comparison with a tin hat option. • Strict controls over the scaffolding design and installation allowed for access on to the roof, storage of 56 solar panels, maintaining a disabled ramp access, prevention of falling items. Fibreglass scaffold was used around the electrical; transformer and HAVC plant. • The original installer of the edge protection was contacted and became a nominated sub contractor. This ensured no insurance breaches. • Contractors Health & Safety documents (Risk Assessments, Method Statements, Construction Plan Plan) were sufficiently developed before starting the works. • A detailed programme was established with the Contractor with weekly meetings to monitor the progress and quality and Health & Safety. • Worked closely with the Facilities Manager and Building Users to determine the positions of services and to agree site up. • Due to effective micro planning, controlling and speedily reacting to variations the project was delivered on time and within budget. • The roof achieved current ‘U’ Values (thermal performance) as stated in Part L of the Building Regulations. • The roof will achieve a 25 year performance lifespan. In addition the contractor provided a 20 year insurance backed guarantee, as specified. • The existing edge protection insurance remains valid. • The commissioning and overhaul of the solar panels are now providing free energy to the Police Station. • The Met Police recycling and disposal policy was achieved. • Feedback from the Client, Facilities Manager and the End User was extremely positive. • Close liaisons with the FM and end user ensured success of the project. Photo: Soffit replacement and perimeter scaffolding. Above Photos: Remedial works included replacing damaged areas and redecorations. Above Photos: Internal water ingress. Damage to walls and ceiling. The solution continued…… 1. It was determined during the works that the solar panels where never commissioned. An additional remit with costs were speedily produced and approved by the Client. 2. During the works, the remedial works were elaborated upon at the request of the Client. An internal redecoration scope document was speedily produced and costs provided to the Client. 3. Variations were dealt with speedily during the works. Programme and cost control was paramount. 4. Full replacement of the lightening protection installation. An instruction was speedily issued to the Contractor. Variations www.mouchel.com