SlideShare ist ein Scribd-Unternehmen logo
1 von 26
Using Data to Improve
Customer Service Resolution
             using RAMM GIS

Presented by Simon Gough (Roading Asset Manager)

        Acknowledgements to my co-writer:
    Hilton Ward (Roading Engineering Assistant)
Roading Operations Excellence

 Customer Service        Decision Making

                      Knowledge Retention &
Quality Management
                            Sharing

  Data & Analysis        Supported Team


           Technology & Systems
What Did We Use?
Street View and Aerials
Roading Assets
Culverts, Cesspits   Signs      Traffic Signals
Forward Works Programme
Maintenance Contract Dispatches
Contract Areas
Improving CRM Resolution

REAL CRM EXAMPLES
“Kamo Rd is the worst in town. It’s full of
   potholes between Mains Ave and King St”
‱ Checked Maintenance History
‱ Checked work programmed to be done
Checked the Forward Works Programme for Major Works


                      Informed caller that
                      resurfacing is planned for
                      this summer.
“Your culvert is blocked and causing my
driveway to scour”
Identified the culvert in RAMM GIS while on the phone
Unable to see as it was completely covered with metal.




  Resent to CRM to contractor to remedy accompanied with a picture
  from Street View.
“The water coming from your road is
causing sewage to flood over my lawn”
Use Street View to Understand the
            Customer
“It is ages since the contractors graded
and repaired the potholes!”
“Can WDC install a new Give Way sign at
     Ted Erceg Rd? There never has been one.”




RAMM Shows that
we should have one
there. So did Street
View
“Why is the Council not maintaining
my road?”




Roading to move asset Icon
in RAMM to correct position
Make more Data Available

Improve the Use of the Tool

Help Customer Services
The Benefits




               Improved Quality
               Improved Efficiency
Thank You

Weitere Àhnliche Inhalte

Ähnlich wie Using Data to Improve Customer Service

Rims forum 2013 using data to improve customer service - simon gough whanga...
Rims forum 2013   using data to improve customer service - simon gough whanga...Rims forum 2013   using data to improve customer service - simon gough whanga...
Rims forum 2013 using data to improve customer service - simon gough whanga...
INGENIUMrims
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEY
Sanjay Jha
 
Road and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RBRoad and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RB
Mark Mann
 
3G Geomatics Inc--Herold-V5
3G Geomatics Inc--Herold-V53G Geomatics Inc--Herold-V5
3G Geomatics Inc--Herold-V5
Jim Cheng YC
 
KARJER Mining Fleet Management System
KARJER Mining Fleet Management SystemKARJER Mining Fleet Management System
KARJER Mining Fleet Management System
bvintl
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
Barun Chatterjee
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
Brad Wilson
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
RONIEE Sparks
 
Unique methods of GIS analysis for transportation 2010
Unique methods of GIS analysis for transportation 2010Unique methods of GIS analysis for transportation 2010
Unique methods of GIS analysis for transportation 2010
Andrew Harrison
 
Aldridge asset and infrastrcuture mobile mapping
Aldridge asset and infrastrcuture mobile mappingAldridge asset and infrastrcuture mobile mapping
Aldridge asset and infrastrcuture mobile mapping
GeCo in the Rockies
 
JeremyHaydenSSSI
JeremyHaydenSSSIJeremyHaydenSSSI
JeremyHaydenSSSI
Jeremy Hayden
 
Vopak 3D Mapping
Vopak 3D MappingVopak 3D Mapping
Vopak 3D Mapping
Colin Pittman
 
Laser Scanning SOQ.PDF
Laser Scanning SOQ.PDFLaser Scanning SOQ.PDF
Laser Scanning SOQ.PDF
Venugopal Raju
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
Trailnet
 

Ähnlich wie Using Data to Improve Customer Service (20)

Rims forum 2013 using data to improve customer service - simon gough whanga...
Rims forum 2013   using data to improve customer service - simon gough whanga...Rims forum 2013   using data to improve customer service - simon gough whanga...
Rims forum 2013 using data to improve customer service - simon gough whanga...
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEY
 
Road and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RBRoad and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RB
 
3G Geomatics Inc--Herold-V5
3G Geomatics Inc--Herold-V53G Geomatics Inc--Herold-V5
3G Geomatics Inc--Herold-V5
 
KARJER Mining Fleet Management System
KARJER Mining Fleet Management SystemKARJER Mining Fleet Management System
KARJER Mining Fleet Management System
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
 
Asset Inventory
Asset InventoryAsset Inventory
Asset Inventory
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Unique methods of GIS analysis for transportation 2010
Unique methods of GIS analysis for transportation 2010Unique methods of GIS analysis for transportation 2010
Unique methods of GIS analysis for transportation 2010
 
eBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdfeBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdf
 
Writing Successful GIS RFPs (2010)
Writing Successful GIS RFPs (2010)Writing Successful GIS RFPs (2010)
Writing Successful GIS RFPs (2010)
 
Aldridge asset and infrastrcuture mobile mapping
Aldridge asset and infrastrcuture mobile mappingAldridge asset and infrastrcuture mobile mapping
Aldridge asset and infrastrcuture mobile mapping
 
Using Data Management & 3D Data Visualization for More Complete CSMs and to S...
Using Data Management & 3D Data Visualization for More Complete CSMs and to S...Using Data Management & 3D Data Visualization for More Complete CSMs and to S...
Using Data Management & 3D Data Visualization for More Complete CSMs and to S...
 
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
 
JeremyHaydenSSSI
JeremyHaydenSSSIJeremyHaydenSSSI
JeremyHaydenSSSI
 
AE.pptx
AE.pptxAE.pptx
AE.pptx
 
Vopak 3D Mapping
Vopak 3D MappingVopak 3D Mapping
Vopak 3D Mapping
 
Laser Scanning SOQ.PDF
Laser Scanning SOQ.PDFLaser Scanning SOQ.PDF
Laser Scanning SOQ.PDF
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
 

Mehr von Simon Gough

Mehr von Simon Gough (20)

TSA Research Project Update
TSA Research Project UpdateTSA Research Project Update
TSA Research Project Update
 
Roading Efficiency Group (REG) Update
Roading Efficiency Group (REG) UpdateRoading Efficiency Group (REG) Update
Roading Efficiency Group (REG) Update
 
Putting dTIMS Outputs In Front of Asset Managers
Putting dTIMS Outputs In Front of Asset ManagersPutting dTIMS Outputs In Front of Asset Managers
Putting dTIMS Outputs In Front of Asset Managers
 
PaveState - Understanding the Structural State of Pavements and their Future ...
PaveState - Understanding the Structural State of Pavements and their Future ...PaveState - Understanding the Structural State of Pavements and their Future ...
PaveState - Understanding the Structural State of Pavements and their Future ...
 
NZTA Asset Management Audits Update
NZTA Asset Management Audits UpdateNZTA Asset Management Audits Update
NZTA Asset Management Audits Update
 
Ingenium IPWEA Proposal
Ingenium IPWEA ProposalIngenium IPWEA Proposal
Ingenium IPWEA Proposal
 
Infrastructure Decision Support (IDS) Update
Infrastructure Decision Support (IDS) UpdateInfrastructure Decision Support (IDS) Update
Infrastructure Decision Support (IDS) Update
 
Extracting Wealth From Works Management Data
Extracting Wealth From Works Management DataExtracting Wealth From Works Management Data
Extracting Wealth From Works Management Data
 
Economic Network Plan Prioritising Investment
Economic Network Plan Prioritising InvestmentEconomic Network Plan Prioritising Investment
Economic Network Plan Prioritising Investment
 
Auckland Transport Database Operations Manual
Auckland Transport Database Operations ManualAuckland Transport Database Operations Manual
Auckland Transport Database Operations Manual
 
Database Health Index
Database Health IndexDatabase Health Index
Database Health Index
 
Closing the Loop - Information Management Tools for Auckland Motorways
Closing the Loop - Information Management Tools for Auckland MotorwaysClosing the Loop - Information Management Tools for Auckland Motorways
Closing the Loop - Information Management Tools for Auckland Motorways
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Aspec Data Standards
Aspec Data StandardsAspec Data Standards
Aspec Data Standards
 
3D StreetCam
3D StreetCam3D StreetCam
3D StreetCam
 
Using Job Management Systems for Resurfacing Contracts
Using Job Management Systems for Resurfacing ContractsUsing Job Management Systems for Resurfacing Contracts
Using Job Management Systems for Resurfacing Contracts
 
RIMS Update - Best Practice: Traffic Count Estimation
RIMS Update - Best Practice: Traffic Count EstimationRIMS Update - Best Practice: Traffic Count Estimation
RIMS Update - Best Practice: Traffic Count Estimation
 
RIMS Update - Guideline for Pavement Strength Testing
RIMS Update - Guideline for Pavement Strength TestingRIMS Update - Guideline for Pavement Strength Testing
RIMS Update - Guideline for Pavement Strength Testing
 
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesRIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
 
RIMS Update - Best Practices for Roading Asset Managemment
RIMS Update - Best Practices for Roading Asset ManagemmentRIMS Update - Best Practices for Roading Asset Managemment
RIMS Update - Best Practices for Roading Asset Managemment
 

KĂŒrzlich hochgeladen

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

KĂŒrzlich hochgeladen (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 

Using Data to Improve Customer Service

Hinweis der Redaktion

  1. One of my main roles in for WDC is resolving customer issues related to Roading Why talk about it? It is a task that I sometimes struggle with (Click)
  2. * No way of relating all of this information together
  3. XPL View (Click)Google Maps (including Street View)(Click)Various spreadsheets and word documents from contractors and the roading team(Click)Phone people to find out information (Click)As you can see I have been all over the place[Next Slide] – Then along came RAMM GIS (Click)
  4. It has mapsIntuitive fast searching(Click)And Street View
  5. And Google aerials available from within RAMM GIS
  6. Cesspits / Culverts detail on mouse over Same for signs and other assets All assets can be displayed this way – Wish list – Not just Roading Assets.
  7. Forward works – Detail of type and dates
  8. Raised dispatches, completed and not completed by asset type. These now include the CRM number if there is oneDispatches are raised jobs – either from CRM, Contractor or Roading inspector – John Pattinson who drives our roads looking for faults. I can relate directly to a customer call back with regard to the CRM status – Dispatched or completed.
  9. That brings me back to the real world
  10. The black dots show maintenance dispatches completed.Also checked raised dispatches – not complete. John Pattinson - raising dispatches all the timeFrom the number displayed there is obviously a problemIf I ran the mouse over I would see that some have CRM numbers(Click)
  11. Mouse over and we can see what we know about this.“Informed caller that resurfacing is planned for this summer.”
  12. “Can you come and fix it!!!”* CRM request to clear a culvert in Beasley Road blocked with metal. Firstly the contractor sent to site to investigate Contractor couldn’t find it as it was buried with metal. Location details from a CRM can be quite vague or inaccurate. Can see that there is a 300mm culvertSo What is the problem? Called customer to ask what the problem really is. While on phone identified the asset record in RAMM GIS.Click[Next Page] – Also used Street View (with customer)
  13. Also confirmed location using Street View in liaison with customerRaised new job with contractor to fix appropriately.
  14. ‱ Had a big wet back in early August Called customer – Stormwater issue from a road culvert.‱ Flooding causing sewage from private system to overflow all over the property. View aerial – See green grass showing natural water flow.* View road culvert. 375mm
  15. Street view – With discussion on phone found that it has been privately piped from the other side of the fence. Explained private 200mm storm water pipe too small. Their responsibility to upgrade. [Click] - CRM closed no further action
  16. Checked Dispatches –Gray line and Dot – Unsealed roads. Informed customer – Re-metal and grade completed 31st July. Mouse over the gray dot shows that it was also re-graded on the 27th August
  17. Simple sign replacement process used – job raised for contractor to replace sign that used to be there. A new sign request is more involved so there is a saving here
  18. Called Customer to discuss their problemWhile your road looks similar, you live beyond the Maintenance End. (Click)Position identified using street viewIdentified Asset Data error – Council road shows up as going beyond the Maintenance End Sign (Add animation)
  19. Over the next 1 to 2 yearsLINZ Data: for example contour data topographical maps local featuresWDC - Corridor Access Requests (Trifecta) WDC Aerial Photography (3 waters, parks etc)Some Parks Assets and Contract boundariesData available to customer services.Marit on the team to help with RAMM and Data with god input and encouragement from Scott Verevis and Simon Gough.
  20. * Resolving issues from the desktop (reducing field work)* Resolving issues quicker with better information at hand* Improving the quality of the customer interactions* Overall that means better quality and efficiency