Transmission & Distribution Overhead
Line Network Inspections and
Maintenance
• Dr Willie de Beer
• Independent Consultant
• South Africa
Presentation Overview
• Transmission & Distribution Lines in Context
• Overhead Line Planning & Design
• Managing Overhead Lines
– Legal and Regulatory
– Asset Strategy
– Maintenance Philosophy
– Technology Deployment
– Resource Requirement
• Future Perspective
Transmission & Distribution Lines
Context…1
• Globally the Electricity Supply Industry (ESI)
experience changes & challenges.
• Some of the ESI challenges includes, but are not
limited to:
– Investor requirements
– Shareholder expectations
– Customer expectations
– Business sustainability
– Capital investment requirements
– Operating costs
– Ageing assets
– Environmental requirements
Transmission & Distribution Lines
Context…2
• Transmission and Distribution overhead lines define
the utility footprint & opportunities.
• Overhead lines represent a substantial portion of the
utility asset value.
• The effective performance of the Transmission and
Distribution overhead lines significantly impacts on
the revenue earning capability of an electricity utility.
• The ESI is at risk where the focus is dominated by a
generation capacity concern without a holistic ESI
view.
• New market entrants are shaping tomorrow.
ESI Challenges
The “Five Big” Utility Challenges
Overhead Line Planning and Design
Transmission & Distribution
Interdependency
Source: Aurecon
Performance, Capacity & Ageing
Overhead Line Planning and Design…1
• Resource selection
– Relevant experience
– Understanding of the environment
• Future perspective
• Current asset performance
• Topography
• Line profiling & routing
• Structure design
• Foundation design
• Etc.
Overhead Line Planning and Design…2
• Infrastructure requirement
– New Infrastructure
– Planning for Renewal/Upgrading
– Replacement
• Asset life-cycle costs.
Overhead line indicative cost ratio
• While there are many factors such as the
operating voltage, structure selection,
foundation requirements, terrain, etc
influencing the cost of an overhead line, the
following reflects an indicative ratio:
– Foundation 25%
– Structure 30%
– Conductor 25%
– Hardware 10%
– Design, etc. 10%
Dominant Faults
Fault Transmission Distribution
Lightning related
Insulator related
Veld fires
Vegetation
Conductor
“clashing”
Connections
Pollution
Vandalism
Wildlife Related
Willie de Beer & Associates
Managing Overhead Lines…1
• Overhead lines form an integral part of the utility
asset base and must be managed as such.
• Procurement “errors,” ineffective line design and
bad construction cannot be corrected through
maintenance.
• Critical indicators:
– Line availability
– Line reliability
– Capacity/load transfer capability
– Technical losses
– Customer satisfaction
– Technical support
– Operating cost
Managing Overhead Lines…2
• Legal & Regulatory compliance
– Regulated business
– Health, Safety & Environmental compliance
• Asset management strategy
– Asset life cycle
• Design
• Specification
• Procurement
• Construction
• Commission
• Operate
• Retire
– Maintenance philosophy
• Frequency based vs predictive reliability/
performance based/etc.
Managing Overhead Lines…3
• Line working procedures.
• Performance monitoring, benchmarking &
reporting.
Basic Inspection Requirements
• Defined line inspection plan.
• Sound knowledge of the relevant overhead
lines, structures, components and route.
• Correct equipment to:
– Access
– Inspect
– Evaluate/Assess
– Communicate
– Record
• Knowledge of the relevant servitude/way leave
conditions.
Basic Maintenance Requirements…1
• Asset register.
• Network/plant location.
• Defined asset management strategy.
• Supporting line management & maintenance
plan.
• Emergency/restoration plan.
• Supporting budget.
• Pre-job assessment.
• Critical task assessment and procedures.
Basic Maintenance Requirements…2
• Line/structure specific task breakdown.
• Defined specialist tasks.
• Material, equipment, tools and skilled
resources to maintain what was
constructed.
• Sound understanding of the application of
project management principles.
Basic Maintenance Requirements…3
• Maintenance planning & execution must
be informed by:
– Legal, regulatory, health, safety and
environmental requirements
– Network performance statistics/reports
– Line inspection reports
– Selection of maintenance execution approach
• Effective recording.
Maintenance Prioritisation
• Legal and regulatory non-compliance.
• Probability of failure.
• Consequences of failure.
• Environmental, health and safety.
• Worst served customers/section/plant.
• Interruptions/100 customers.
• Faults/100 km.
• Customer hours lost.
Maintenance Recording
• It is essential to record factors such as:
– Reliability.
– Failure rates.
– Specific problems.
– Generic problems.
– Design issues.
– Environmental factors etc.
– Recommended next steps/corrective action.
• Date of maintenance.
• Maintenance executed.
Managing Overhead Lines through
Technology Deployment
• In most jurisdictions the demand for electricity is
creating an expansion of the transmission and
distribution footprint.
• Considering the complexity and cost to manage the
lines, technology deployment becomes a logic
choice.
• The benefits to be derived through technology
deployment includes:
– Real time information
– Ability to facilitate proactive asset management
– Optimised resource deployment
– Higher network availability
Subsidence Monitoring
Source: CSIR
Drone Inspection
Return on Asset
Source: SANEDI
Future Perspective…1
• Overhead Lines are here to stay.
• The assets are ageing and this aspect must be
taken into account in defining the asset
management strategy.
• Advanced technology deployment is required to
manage the overhead lines effectively.
• It is essential that overhead networks must
provide open access to IPP’s and prosumers.
• The future will dictate the need for unbundling of
the wires and energy component of the tariffs.
Future Perspective…2
• Considering the network loading, customer
expectations and revenue requirements; it is to be
expected that live/hot work will become the name
of the game.
• Advanced training and development of resources
will be required to satisfy the future skill set
requirements.
• Acquiring servitudes and way leaves will become
even more challenging.
Future Perspective…3
• The historic approach to the management of
transmission and distribution entities is at risk.
• Opportunity to leverage the overhead line
footprint to generate alternative revenue
streams.
• Leverage your overhead line knowledge in the
rate cases submission.
THANK YOU
Acknowledgement
• Aurecon
• Africoast
• Hawk 62
• CSIR
• SANEDI
• Willie de Beer and Associates

Weitere ähnliche Inhalte

Ähnlich wie RSA_PRESENTATION_Powerline Maintemance_Willie-De-Beer-.pdf

Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360Analyst Murex training
 
Improving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsImproving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsDatabricks
 
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid SensorsTollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid SensorsTollgrade Communications
 
CSA s250 Mapping of Underground Utility Infrastructure
CSA s250 Mapping of Underground Utility InfrastructureCSA s250 Mapping of Underground Utility Infrastructure
CSA s250 Mapping of Underground Utility InfrastructureBob Gaspirc
 
AITPM Risk and Governance
AITPM Risk and GovernanceAITPM Risk and Governance
AITPM Risk and GovernanceJumpingJaq
 
Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Faculty of Economics Ljubljana in Skopje
 
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATAENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATAwle-ss
 
Roof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsRoof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsBrhamesh Alipuria
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015Nathan Ting
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfbayu162365
 
O'Neil Technical Resume
O'Neil Technical ResumeO'Neil Technical Resume
O'Neil Technical Resumemonica o'neil
 
1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation1BBOX Value Proposition Presentation
1BBOX Value Proposition PresentationBrad Foster
 

Ähnlich wie RSA_PRESENTATION_Powerline Maintemance_Willie-De-Beer-.pdf (20)

Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360
 
PLS 2017: Technical Committee update
PLS 2017: Technical Committee updatePLS 2017: Technical Committee update
PLS 2017: Technical Committee update
 
Technical evaluation in cpv systems
Technical evaluation in cpv systemsTechnical evaluation in cpv systems
Technical evaluation in cpv systems
 
Improving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsImproving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT Analytics
 
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid SensorsTollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
 
CSA s250 Mapping of Underground Utility Infrastructure
CSA s250 Mapping of Underground Utility InfrastructureCSA s250 Mapping of Underground Utility Infrastructure
CSA s250 Mapping of Underground Utility Infrastructure
 
AITPM Risk and Governance
AITPM Risk and GovernanceAITPM Risk and Governance
AITPM Risk and Governance
 
MISO Info forum 072517
MISO Info forum 072517MISO Info forum 072517
MISO Info forum 072517
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...
 
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATAENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
ENTERPRISE ASSET MANAGEMENT SYSTEMS APPLICATION TO OPTIMIZE OILFIELD ASSET DATA
 
Roof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart gridsRoof top solar PV connected DC micro grids as smart grids
Roof top solar PV connected DC micro grids as smart grids
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015
 
NMRESGI_El Paso Electric Grid Modernization_Bukowski
NMRESGI_El Paso Electric Grid Modernization_BukowskiNMRESGI_El Paso Electric Grid Modernization_Bukowski
NMRESGI_El Paso Electric Grid Modernization_Bukowski
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
 
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
 
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
 
O'Neil Technical Resume
O'Neil Technical ResumeO'Neil Technical Resume
O'Neil Technical Resume
 
1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation
 

Kürzlich hochgeladen

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Kürzlich hochgeladen (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

RSA_PRESENTATION_Powerline Maintemance_Willie-De-Beer-.pdf

  • 1. Transmission & Distribution Overhead Line Network Inspections and Maintenance • Dr Willie de Beer • Independent Consultant • South Africa
  • 2. Presentation Overview • Transmission & Distribution Lines in Context • Overhead Line Planning & Design • Managing Overhead Lines – Legal and Regulatory – Asset Strategy – Maintenance Philosophy – Technology Deployment – Resource Requirement • Future Perspective
  • 3. Transmission & Distribution Lines Context…1 • Globally the Electricity Supply Industry (ESI) experience changes & challenges. • Some of the ESI challenges includes, but are not limited to: – Investor requirements – Shareholder expectations – Customer expectations – Business sustainability – Capital investment requirements – Operating costs – Ageing assets – Environmental requirements
  • 4. Transmission & Distribution Lines Context…2 • Transmission and Distribution overhead lines define the utility footprint & opportunities. • Overhead lines represent a substantial portion of the utility asset value. • The effective performance of the Transmission and Distribution overhead lines significantly impacts on the revenue earning capability of an electricity utility. • The ESI is at risk where the focus is dominated by a generation capacity concern without a holistic ESI view. • New market entrants are shaping tomorrow.
  • 6. The “Five Big” Utility Challenges
  • 10. Overhead Line Planning and Design…1 • Resource selection – Relevant experience – Understanding of the environment • Future perspective • Current asset performance • Topography • Line profiling & routing • Structure design • Foundation design • Etc.
  • 11. Overhead Line Planning and Design…2 • Infrastructure requirement – New Infrastructure – Planning for Renewal/Upgrading – Replacement • Asset life-cycle costs.
  • 12. Overhead line indicative cost ratio • While there are many factors such as the operating voltage, structure selection, foundation requirements, terrain, etc influencing the cost of an overhead line, the following reflects an indicative ratio: – Foundation 25% – Structure 30% – Conductor 25% – Hardware 10% – Design, etc. 10%
  • 13. Dominant Faults Fault Transmission Distribution Lightning related Insulator related Veld fires Vegetation Conductor “clashing” Connections Pollution Vandalism Wildlife Related Willie de Beer & Associates
  • 14. Managing Overhead Lines…1 • Overhead lines form an integral part of the utility asset base and must be managed as such. • Procurement “errors,” ineffective line design and bad construction cannot be corrected through maintenance. • Critical indicators: – Line availability – Line reliability – Capacity/load transfer capability – Technical losses – Customer satisfaction – Technical support – Operating cost
  • 15. Managing Overhead Lines…2 • Legal & Regulatory compliance – Regulated business – Health, Safety & Environmental compliance • Asset management strategy – Asset life cycle • Design • Specification • Procurement • Construction • Commission • Operate • Retire – Maintenance philosophy • Frequency based vs predictive reliability/ performance based/etc.
  • 16. Managing Overhead Lines…3 • Line working procedures. • Performance monitoring, benchmarking & reporting.
  • 17. Basic Inspection Requirements • Defined line inspection plan. • Sound knowledge of the relevant overhead lines, structures, components and route. • Correct equipment to: – Access – Inspect – Evaluate/Assess – Communicate – Record • Knowledge of the relevant servitude/way leave conditions.
  • 18. Basic Maintenance Requirements…1 • Asset register. • Network/plant location. • Defined asset management strategy. • Supporting line management & maintenance plan. • Emergency/restoration plan. • Supporting budget. • Pre-job assessment. • Critical task assessment and procedures.
  • 19. Basic Maintenance Requirements…2 • Line/structure specific task breakdown. • Defined specialist tasks. • Material, equipment, tools and skilled resources to maintain what was constructed. • Sound understanding of the application of project management principles.
  • 20. Basic Maintenance Requirements…3 • Maintenance planning & execution must be informed by: – Legal, regulatory, health, safety and environmental requirements – Network performance statistics/reports – Line inspection reports – Selection of maintenance execution approach • Effective recording.
  • 21. Maintenance Prioritisation • Legal and regulatory non-compliance. • Probability of failure. • Consequences of failure. • Environmental, health and safety. • Worst served customers/section/plant. • Interruptions/100 customers. • Faults/100 km. • Customer hours lost.
  • 22. Maintenance Recording • It is essential to record factors such as: – Reliability. – Failure rates. – Specific problems. – Generic problems. – Design issues. – Environmental factors etc. – Recommended next steps/corrective action. • Date of maintenance. • Maintenance executed.
  • 23. Managing Overhead Lines through Technology Deployment • In most jurisdictions the demand for electricity is creating an expansion of the transmission and distribution footprint. • Considering the complexity and cost to manage the lines, technology deployment becomes a logic choice. • The benefits to be derived through technology deployment includes: – Real time information – Ability to facilitate proactive asset management – Optimised resource deployment – Higher network availability
  • 27. Future Perspective…1 • Overhead Lines are here to stay. • The assets are ageing and this aspect must be taken into account in defining the asset management strategy. • Advanced technology deployment is required to manage the overhead lines effectively. • It is essential that overhead networks must provide open access to IPP’s and prosumers. • The future will dictate the need for unbundling of the wires and energy component of the tariffs.
  • 28. Future Perspective…2 • Considering the network loading, customer expectations and revenue requirements; it is to be expected that live/hot work will become the name of the game. • Advanced training and development of resources will be required to satisfy the future skill set requirements. • Acquiring servitudes and way leaves will become even more challenging.
  • 29. Future Perspective…3 • The historic approach to the management of transmission and distribution entities is at risk. • Opportunity to leverage the overhead line footprint to generate alternative revenue streams. • Leverage your overhead line knowledge in the rate cases submission.
  • 31. Acknowledgement • Aurecon • Africoast • Hawk 62 • CSIR • SANEDI • Willie de Beer and Associates