Our energy demand increases each year as our population and economy grow - we are
using about 2% more energy each year. Making the most of our energy efficiency
opportunities means we can reduce this growth in energy demand.
Progress to date
The latest data shows that New Zealand's energy efficiency has been improving at 0.7%
per annum over the medium term from 1995 to 2007 (this includes the transport sector
and is similar to other OECD economies).
The energy efficiency improvement has helped offset energy demand growth. About 34%
of the increased demand for energy services was met through improvements in energy
efficiency.
Nearly two thirds of the efficiency gains came from the industrial and agricultural
sectors; the balance is spread across the commercial, residential and passenger transport
sectors.
EECA's energy efficiency and conservation programs contribute to this reduction in
energy use.
Energy efficiency gains come from:
 Improvements in technology
 Better systems and processes
 Better information
 Changing behavior
 Benefits from efficiency and conservation.
Energy efficiency delivers many benefits:
 Overall energy costs are more affordable for businesses and families
 Businesses are more productive with better international competitiveness
 We have a more secure electricity system
 We reduce our carbon emissions
 People are healthier from living in houses that are warmer and drier
 More jobs are created.
Law of conservation of energy
The nineteenth century law of conservation of energy is a law of physics. It states that
the total amount of energy in an isolated system remains constant over time. The total
energy is said to be conserved over time. For an isolated system, this law means that
energy can change its location within the system, and that it can change form within the
system, for instance chemical energy can become kinetic energy, but that energy can be
neither created nor destroyed. In the nineteenth century, mass and energy were
considered as being of quite different natures.
Since Albert Einstein's theory of special relativity showed that energy has an equivalent
mass (see mass in special relativity), and mass has an equivalent energy, one speaks of a
law of conservation of mass-energy as an updated version of the nineteenth century law.
All particles, both massive such as protons and massless such as photons, respectively
have energy and mass equivalents.
The total mass and the total energy of a system may both be respectively defined in
special relativity, but for each, its conservation law holds. Particles, both ponderable and
imponderable, are subject to inter conversions of form, in both creation and annihilation.
Nevertheless, in an isolated system, conservation of total energy and conservation of total
mass each holds as a separate law.
A consequence of the law of conservation of energy is that no intended "perpetual motion
machine" can perpetually deliver energy to its surroundings.
Energy Conservation, Alternative Fuels, Alternative Energy Strategies,
Green Buildings
Opportunities for energy conservation are increasingly available in almost every
application in any setting. Home, school, office, and industrial environments have all
benefited from cost-saving and energy-saving innovations. The advantages of energy
conservation have been quantified on the local level as tons of air-pollutants avoided and
dollars saved. Reduction in global greenhouse gas emissions are also quantified with the
benefit of reduced warming affect. Sites below provide a wealth of information useful in
the home and community, and sources for additional policy information, data on
technologies and how to order energy saving products.
On the community level opportunities for large scale energy saving applications may be
hindered by the up-front investment costs. These costs have been in many cases
subsidized through local energy utilities which have succeeded in the integration of
energy conservation into their rate base. For example, the Washington D.C. metro area,
the local utility PEPCO underwrote the cost of compact fluorescent bulbs for several
years. In other locations utilities have worked to provide interest subsidies for the
purchase of highly efficient household appliances, like refrigerators. These appliances
carry a higher purchase price, which may discourage buyers, but over the life of the
equipment will actually save money though reduce energy consumption. Subsidizing
interest payments bring the purchase price in line with conventional appliances.
Energy conservation legislation
Key Announcement
• The Government is introducing minimum energy management standards for large
energy users1 in the industry sector from FY2013. This includes i) the appointment of
energy managers, ii) reporting of energy use and iii) submission of energy efficiency
improvement plans for large energy users.
• Energy Efficiency-related legislation across various sectors will be consolidated in an
Energy Conservation Act that will be introduced in FY2013.
Objectives of Energy Conservation Act
• To help Singapore achieve the target of a 35% improvement in energy intensity by
2030, from 2005 levels.
• To improve the energy performance of companies and thus making them more
competitive in the global economy.
• To complement existing schemes and capability building programmes which provide
support for companies investing in energy efficiency.
• To ensure a co-ordinated approach to standards setting for energy efficiency across all
sectors.
Need to mandate energy management practices
• The most cost-effective way to improve energy efficiency in companies is to manage
energy use in the same rigour as how other resources such as labour and materials are
managed. Experiences of companies show that having processes and personnel in place
to ensure energy is used prudently, spot and rectify faults that result in energy wastage,
and monitor the effectiveness of EE improvement measures, can help achieve significant
cost savings. Effective energy management will also allow companies to better respond
to possible shifts in prices of energy and carbon in the future.
• In early 2009, MEWR and NEA consulted 16 large energy users from the wafer
fabrication, chemicals, electronics and pharmaceutical sectors, to better understand their
current energy management practices. The consultations surfaced a wide range of
practices.
• Mandating energy management practices will focus the companies’ attention on energy
issues, and complement existing schemes and capability building programmes which
provide support for companies investing in energy efficiency. Countries such as Japan,
Korea and Denmark already require such practices. The submission of plans will also
allow government to identify the gaps that need to be addressed, such as by reviewing
existing regulations, and enhancing existing or introducing new capability development
and financial assistance measures.
Impact of New Requirement on Industries
• The proposed mandatory energy management practices will affect companies that
consume more than 15 GWh of energy annually, or 1.29 ktoe of energy.
Need to Introduce an Energy Conservation Act
• Efforts to improve energy efficiency cuts across different sectors which are under the
authority of different government agencies. The current approach f implementing energy
efficiency requirements through a number of different Acts can be unwieldy. A new
Energy Conservation Act that consolidates all energy efficiency-related legislation in all
sectors will allow for a more co-ordinated approach to mandating energy efficiency
requirements.
• Establishing energy efficient standards across sectors under an Energy Conservation
Act will also send a strong signal to external parties that Singapore is serious in
undertaking mitigation actions to meet its international responsibilities.
Energy audit
Saving money on energy bills is attractive to businesses, industries, and individuals alike.
Customers, whose energy bills use up a large part of their income, and especially those
customers whose energy bills represent a substantial fraction of their company’s
operating costs, have a strong motivation to initiate and continue an on-going energy
cost-control program. No-cost or very low-cost operational changes can often save a
customer or an industry 10-20% on utility bills; capital cost programs with payback times
of two years or less can often save an additional 20-30%. In many cases these energy cost
control programs will also result in both reduced energy consumption and reduced
emissions of environmental pollutants.
The energy audit is one of the first tasks to be performed in the accomplishment of an
effective energy cost control program. An energy audit consists of a detailed examination
of how a facility uses energy, what the facility pays for that energy, and finally, a
recommended program for changes in operating practices or energy-consuming
equipment that will cost-effectively save dollars on energy bills. The energy audit is
sometimes called an energy survey or an energy analysis, so that it is not hampered with
the negative connotation of an audit in the sense of an IRS audit. The energy audit is a
positive experience with significant benefits to the business or individual, and the term
―audit‖ should be avoided if it clearly produces a negative image in the mind of a
particular business or individual.
An energy audit is an inspection, survey and analysis of energy flows for energy
conservation in a building, process or system to reduce the amount of energy input into
the system without negatively affecting the output.
ENERGY AUDITING SERVICES
Energy audits are performed by several different groups. Electric and gas utilities
throughout the country offer free residential energy audits. A utility’s residential energy
auditors analyze the monthly bills, inspect the construction of the dwelling unit, and
inspect all of the energy-consuming appliances in a house or an apartment. Ceiling and
wall insulation is measured, ducts are inspected, and appliances such as heaters, air
conditioners, water heaters, refrigerators, and freezers are examined, and the lighting
system is checked.
Some utilities also perform audits for their industrial and commercial customers. They
have professional engineers on their staff to perform the detailed audits needed by
companies with complex process equipment and operations. When utilities offer free or
low-cost energy audits for commercial customers, they usually only provide walk-
through audits rather than detailed audits. Even so, they generally consider lighting,
HVAC systems, water heating, insulation and some motors.
Objectives of Energy Audit
The Energy Audit provides the vital information base for overall energy conservation
program covering essentially energy utilization analysis and evaluation of energy
conservation measures. It aims at:
 Identifying the quality and cost of various energy inputs.
 Assessing present pattern of energy consumption in different cost centers of
operations.
 Relating energy inputs and production output.
 Identifying potential areas of thermal and electrical energy economy.
 Highlighting wastage’s in major areas.
 Fixing of energy saving potential targets for individual cost centers.
 Implementation of measures for energy conservation & realization of savings.
Energy management team
All the components of a comprehensive energy management program are depicted in
Figure 2-1. These components are the organizational structure, a policy, and plans for
audits, education, reporting, and strategy. It is hoped that by understanding the
fundamentals of managing energy, the energy manager can then adapt a good working
program to the existing organizational structure. Each component is discussed in detail
below.
Organizational structure
The organizational chart for energy management shown in Figure 2-1 is generic. It must
be adapted to fit into an existing structure for each organization. For example, the
presidential block may be the general manager, and VP blocks may be division managers,
but the fundamental principles are the same. The main feature of the chart is the location
of the energy manager. This position should be high enough in the organizational
structure to have access to key players in management, and to have knowledge of current
events within the company. For example, the timing for presenting energy projects can be
critical. Funding availability and other management priorities should be known and
understood. The organizational level of the energy manager is also indicative of the
support management is willing to give to the position.
Energy Manager
One very important part of an energy management program is to have top management
support. More important, however, is the selection of the energy manager, who can
among other things secure this support. The person selected for this position should be
one with a vision of what managing energy can do for the company. Every successful
program has had this one thing in common—one person who is a shaker and mover that
makes things happen. The program is then built around this person.
There is a great tendency for the energy manager to become an energy engineer, or a
prima donna, and attempt to conduct the whole effort alone. Much has been
accomplished in the past with such individuals working alone, but for the long haul,
managing the program by involving everyone at the facility is much more productive and
permanent. Developing a working organizational structure may be the most important
thing an energy manager can do.
The role and qualifications of the energy manager have changed substantially in the past
few years, caused mostly by EPAC92 requiring certification of federal energy managers,
deregulation of the electric utility industry bringing both opportunity and uncertainty, and
by performance contracting requiring more business skills than engineering.
Requirements for an energy management are:
• Set up an Energy Management Plan
• Establish energy records
• Identify outside assistance
• Assess future energy needs
• Identify financing sources
• Make energy recommendations
• Implement recommendations
• Provide liaison for the energy commit
• Plan communication strategies
• Evaluate program effectiveness
Energy Team
The coordinators shown in Figure 2-1 represent the energy management team within one
given organizational structure, such as one company within a corporation. This group is
the core of the program. The main criteria for membership should be an indication of
interest. There should be a representative from the administrative group such as
accounting or purchasing, someone from facilities and/or maintenance, and a
representative from each major department.
This energy team of coordinators should be appointed for a specific time period, such as
one year. Rotation can then bring new people with new ideas, can provide a mechanism
for tactfully removing non-performers, and involve greater numbers of people in the
program in a meaningful way.
Coordinators should be selected to supplement skills lacking in the energy manager since,
as pointed out above, it is unrealistic to think one energy manager can have all the
qualifications outlined. So, total skills needed for the team, including the energy manager
may be defined as follows:
• Have enough technical knowledge within the group to either understand the technology
used by the organization, or be trainable in that technology.
• Have knowledge of potential new technology that may be applicable to the program.
• Have planning skills that will help establish the organizational structure, plan energy
surveys, determine educational needs, and develop a strategic energy management plan.
• Understand the economic evaluation system used by the organization, particularly
payback and life cycle cost analysis.
• Have good communication and motivational skills since energy management involves
everyone within the organization.
Energy audit instrument
The requirement for an energy audit such as identification and quantification of energy
necessitates measurements; these measurements require the use of instruments. These
instruments must be portable, durable, easy to operate and relatively inexpensive. The
parameters generally monitored during energy audit may include the following:
Basic Electrical Parameters in AC &DC systems – Voltage (V), Current (I), Power factor,
Active power (kW), apparent power (demand) (kVA), Reactive power (kVAr), Energy
consumption (kWh), Frequency (Hz), Harmonics, etc.
Parameters of importance other than electrical such as temperature & heat flow, radiation,
air and gas flow, liquid flow, revolutions per minute (RPM), air velocity, noise and
vibration, dust concentration, Total Dissolved Solids (TDS), pH, moisture content,
relative humidity, flue gas analysis – CO2, O2, CO, SOx, NOx, combustion efficiency
etc.
Key instruments for energy audit are listed below
 Tape Measures
The most basic measuring device needed is the tape measure. A 25-foot tape measure l"
wide and a 100 foot tape measure are used to check the dimensions of walls, ceilings,
windows and distances between pieces of equipment for purposes such as determining
the length of a pipe for transferring waste heat from one piece of equipment to the other.
 Lightmeter
One simple and useful instrument is the lightmeter which is used to measure illumination
levels in facilities. A lightmeter that reads in foot candles allows direct analysis of
lighting systems and comparison with recommended light levels specified by the
Illuminating Engineering Society. A small lightmeter that is portable and can fit into a
pocket is the most useful. Many areas in buildings and plants are still significantly over
lighted, and measuring this excess illumination then allows the auditor to recommend a
reduction in lighting levels through lamp removal programs or by replacing inefficient
lamps with high efficiency lamps that may not supply the same amount of illumination as
the old inefficient lamps.
 Thermometers
Several thermometers are generally needed to measure temperatures in offices and other
worker areas, and to measure the temperature of operating equipment Knowing process
temperatures allows the auditor to determine process equipment efficiencies, and also to
identify waste heat sources for potential heat recovery programs. Inexpensive electronic
thermometers with interchangeable probes are now available to measure temperatures in
both these areas. Some common types include an immersion probe, a surface temperature
probe, and a radiation shielded probe for measuring true air temperature. Other types of
infra-red thermometers and thermographic equipment are also available. An infrared
―gun‖ is valuable for measuring temperatures of steam lines that are not readily reached
without a ladder.
 Voltmeter
An inexpensive voltmeter is useful for determining operating voltages on electrical
equipment and especially useful when the nameplate has worn off of a piece of
equipment or is otherwise unreadable or missing. The most versatile instrument is a
combined volt-ohm-ammeter with a clamp-on feature for measuring currents in
conductors that are easily accessible. This type of multimeter is convenient and relatively
inexpensive. Any newly purchased voltmeter, or multimeter, should be a true RMS meter
for greatest accuracy where harmonics might be involved.
 Wattmeter/Power Factor Meter
A portable hand-held wattmeter and power factor meter is very handy for determining the
power consumption and power factor of individual motors and other inductive devices.
This meter typically has a clamp-on feature which allows an easy connection to the
current-carrying conductor, and has probes for voltage connections. Any newly
purchased wattmeter or power factor meter should be a true RMS meter for greatest
accuracy where harmonics might be involved.
 Combustion Analyzer
Combustion analyzers are portable devices capable of estimating the combustion
efficiency of furnaces, boilers, or other fossil fuel burning machines. Two types are
available: digital analyzers and manual combustion analysis kits. Digital combustion
analysis equipment performs the measurements and reads out in percent combustion
efficiency. These instruments are fairly complex and expensive.
The manual combustion analysis kits typically require multiple measurements including
exhaust stack: temperature, oxygen content, and carbon dioxide content. The efficiency
of the combustion process can be calculated after determining these parameters. The
manual process is lengthy and is frequently subject to human error.
 Airflow Measurement Devices
Measuring air flow from heating, air conditioning or ventilating ducts, or from other
sources of air flow is one of the energy auditor’s tasks. Airflow measurement devices can
be used to identify problems with air flows, such as whether the combustion air flow into
a gas heater is correct. Typical airflow measuring devices include a velometer, an
anemometer, or an airflow hood.
 Fuel Efficiency Monitor
This measures oxygen and temperature of the flue gas. Calorific values of common fuels
are fed into the microprocessor which calculates the combustion efficiency.
 Pitot tube and manometer:
Air velocity in ducts can be measured using a pitot tube and inclined manometer for
further calculation of flows.
 Lux meters:
Illumination levels are measured with a lux meter. It consists of a photo cell which senses
the light output, converts to electrical impulses which are calibrated as lux.
HVAC
Introduction
The mechanical heating or cooling load in a building is dependent upon the various heat
gains and losses experienced by the building including solar and internal heat gains and
heat gains or losses due to transmission through the building envelope and infiltration (or
ventilation) of outside air. The primary purpose of the heating, ventilating, and air-
conditioning (HVAC) system in a building is to regulate the dry-bulb air temperature,
humidity and air quality by adding or removing heat energy. Due to the nature of the
energy forces which play upon the building and the various types of mechanical systems
which can be used in non-residential buildings, there is very little relationship between
the heating or cooling load and the energy consumed by the HVAC system.
Human Thermal Comfort
The ultimate objective of any heating, cooling and ventilating system is typically to
maximize human thermal comfort. Due to the prevalence of simple thermostat control
systems for residential and small-scale commercial HVAC systems, it is often believed
that human thermal comfort is a function solely, or at least primarily, of air temperature.
But this is not the case.
Human thermal comfort is actually maximized by establishing a heat balance between the
occupant and his or her environment. Since the body can exchange heat energy with its
environment by conduction, convection and radiation, it is necessary to look at the factors
which affect these heat transfer processes along with the body’s ability to cool itself by
the evaporation of perspiration.
All living creatures generate heat by burning food, a process known as metabolism. Only
20 percent of food energy is converted into useful work; the remainder must be dissipated
as heat. This helps explain why we remain comfortable in an environment substantially
cooler than our internal temperature of nearly 100°F (37°C).
HVAC system type
The energy efficiency of systems used to heat and cool buildings varies widely but is
generally a function of the details of the system organization. On the most simplistic level
the amount of energy consumed is a function of the source of heating or cooling energy,
the amount of energy consumed in distribution, and whether the working fluid is
simultaneously heated and cooled. System efficiency is also highly dependent upon the
directness of control, which can sometimes overcome system inefficiency.
HVAC system types can be typically classified according to their energy efficiency as
highly efficient, moderately efficient or generally inefficient. This terminology indicates
only the comparative energy consumption of typical systems when compared to each
other. Using these terms, those system types classified as generally inefficient will result
in high energy bills for the building in which they are installed, while an equivalent
building with a system classified as highly efficient will usually have lower energy bills.
However, it is important to recognize that there is a wide range of efficiencies within
each category, and that a specific energy-efficient example of a typically inefficient
system might have lower energy bills than the least efficient example of a moderately, or
even highly efficient type of system.
Figure 10.2 shows the relative efficiency of the more commonly used types of HVAC
systems discussed below. The range of actual energy consumption for each system type is
a function of other design variables including how the system is configured and installed
in a particular building as well as how it is controlled and operated.
Energy conservation apportunity
The ultimate objective of any energy management program is the identification of energy
conservation opportunities (ECO’s) which can be implemented to produce a cost saving.
However, it is important to recognize that the fundamental purpose of an HVAC system
is to provide human thermal comfort, or the equivalent environmental conditions for
some specific process. It is therefore necessary to examine each ECO in the context of its
effect on indoor air quality, humidity and thermal comfort standards, air velocity and
ventilation requirements, and requirements for air pressurization.
Thermal Comfort, Air Quality and Airflow
It is not wise to undertake modifications of an HVAC system to improve energy
efficiency without considering the effects on thermal comfort, air quality, and airflow
requirements.
Thermal Comfort
One of the most serious errors which can be made in modifying HVAC systems is to
equate a change in dry bulb air temperature with energy conservation. It is worthwhile to
recall that dry bulb air temperature is not the most significant determinant of thermal
comfort during either the heating season or cooling season.
Since thermal comfort in the cooling season is most directly influenced by air motion
cooling energy requirements can be reduced by increasing airflow and/or air motion in
occupied spaces without decreasing dry bulb air temperature. During the heating season
thermal comfort is most strongly influenced by radiant heating. Consequently, changes
from forced-air heating to radiant heating can improve thermal comfort while decreasing
heat energy requirements.
The total energy, or enthalpy, associated with a change in environmental conditions
includes both sensible heat and latent heat. Sensible heat is the heat energy required to
increase dry bulb temperature. The heat energy associated with a change in moisture
content of air is known as latent heat. (See Figure 10.12)
Changes in HVAC system design or operation which reduce sensible heating or cooling
requirements may increase latent heating or cooling energy which off- sets any energy
conservation advantage. This is particularly true of economizer cycles (ß10.5.5). The use
of cool, but humid outside air in an economizer can actually increase energy consumption
if dehumidification requirements are increased. For this reason, the only reliable type of
economizer control is enthalpy control which prevents the economizer from operating
when latent cooling requirements exceed the savings in sensible cooling.
Air velocity and air flow
The evaluation of energy conservation opportunities often neglects previously established
requirements for air velocity and airflow. As discussed above, the volume of air supplied
and its velocity have a profound influence on human thermal comfort. ECO’s which
reduce airflow can inadvertently decrease thermal comfort. Even more important, airflow
cannot be reduced below the volume of outdoor air required by codes for ventilation.
The design of an all-air or air-water HVAC system is much more complex that just
providing a supply air duct and thermostat for each space. The completed system must be
balanced to assure adequate airflow to each space, not only to offset the thermal loads,
but also to provide the appropriate pressurization of the space.
It is a common practice for supply air to exceed return air in selected spaces to create
positive pressurization, which minimizes infiltration and prevents the intrusion of odors
and other contaminants from adjacent spaces. Similarly, negative pressurization can be
achieved by designing exhaust or return airflow to exceed supply air requirements in
order to maintain a sterile field or to force contaminants to be exhausted. Any alterations
in air supply or return requirements upset the relationship between supplies and return
airflows requiring that the system be rebalanced.
Indoor Air Quality
Another factor which is often neglected in the application of ECO’s is the effect of
system changes on indoor air quality. Indoor air quality requirements are most commonly
met with ventilation and filtration provided by an all-air or air-water HVAC system.
When outdoor air quantities are altered significantly, the effect on indoor air quality is
unknown and must be determined.
In a polluted environment, increasing outdoor air volume, for example with an
economizer cycle, either increases filtration requirements or results in a deterioration of
indoor air quality. On the other hand, reducing airflow to conditioned spaces due, for
example, to a conversion to a variable air volume system, reduces the filtration of
recycled indoor air which can likewise produce a reduction in air quality.
Cooling equipment
The most common process for producing cooling is vapor-compression refrigeration,
which essentially moves heat from a controlled environment to a warmer, uncontrolled
environment through the evaporation of a refrigerant which is driven through the
refrigeration cycle by a compressor.
Vapor compression refrigeration machines are typically classified according to the
method of operation of the compressor. Small air-to-air units most commonly employ a
reciprocating compressor which is combined with an air-cooled condenser to form a
condensing unit. This is used in conjunction with a direct-expansion (DX) evaporator coil
placed within the air-handling unit.
Cooling systems for large non-residential buildings typically employ chilled water as the
medium which transfers heat from occupied spaces to the outdoors through the use of
chillers and cooling towers.
Building envelope
Building ―Envelope‖ generally refers to those building components that enclose
conditioned spaces and through which thermal energy is transferred to or from the
outdoor environment. The thermal energy transfer rate is generally referred to as ―heat
loss‖ when we are trying to maintain an indoor temperature that is greater than the
outdoor temperature. The thermal energy transfer rate is referred to as ―heat gain‖ when
we are trying to maintain an indoor temperature that is lower than the outdoor
temperature.
Ultimately the success of any facility-wide energy management program requires an
accurate assessment of the performance of the building envelope. This is true even when
no envelope-related improvements are anticipated. Without a good understanding of how
the envelope performs, a complete understanding of the interactive relationships of
lighting and mechanical systems cannot be obtained.
In addition to a good understanding of basic principles, seasoned engineers and analysts
have become aware of additional issues that have a significant impact upon their ability
to accurately assess the performance of the building envelope.
1. The actual conditions under which products and components are installed, compared to
how they are depicted on architectural drawings.
2. The impact on performance of highly conductive elements within the building
envelope; and
3. The extent to which the energy consumption of a building is influenced by the outdoor
weather conditions, a characteristic referred to as thermal mass.
Unit 2
Demand side management
As with other developing countries the Pacific Island Countries (PICs) have experienced
significant increase in electricity demand and as a result greater emphasis is now being
placed on DSM and energy conservation activities. Most PICs are reliant on imported
fossil fuel for electricity generation and are more vulnerable to the impacts of high oil
prices. DSM offers significant benefits to PIC utilities, their customers and the PIC
economies. From a utility perspective, in addition to reducing supply costs, DSM benefits
also includes deferral of capital expenditure on generation, transmission and distribution
facilities, improved system load factor, better customer relations and better data for load
forecasting and system planning.
Utilities have several options of improving system efficiency and these are summarized
in below
Defination and rationale
Changing electricity markets in the developing and the developed countries face several
challenges, largely due to the uncertainties in the load growth, higher investments
required in capacity addition, declining fuel sources and its associated environmental
costs. Tariff changes due to the changing regulatory stands also affect the ability of
utilities to service its customer base. The concept of Demand-Side Management (DSM)
was developed in response to the potential problems of global warming and the need for
sustainable development, and the recognition that improved energy efficiency represents
the most cost-effective option to reduce the impacts of these problems.
DSM refers to cooperative activities between the utility and its customers (sometimes
with the assistance of third parties such as energy services companies and various trade
allies) to implement options for increasing the efficiency of energy utilization, with
resulting benefits to the customer, utility, and society as a whole. Benefits of the DSM
initiatives are diverse, as outlined in Table 2.1 below.
DSM Planning and Implementation
DSM programs are utility and customer specific. Figure 2.1 describes various steps
involved in implementing a DSM programme.
Step 1: Load Research
This stage in the DSM implementation will typically assess the customer base, tariff, load
profile on an hourly basis and will identify the sectors contributing to the load shape. This
step will also identify the tariff classes in the utility, current recovery from different
sectors and current subsidy offered to different sectors.
Step 2: Define Load-shape Objectives
Based on the results of the load research in the utility, DSM engineers will define the
load shape objectives for the current situation. Various load-shape objectives - Peak
Clipping (reduction in the peak demand), Valley Filling (increased demand at off-peak),
Load Shifting (demand shifting to non-peak period), and Load Building (increased
demand) are possible. These are represented in Figure 2.2.
Step 3: Assess Programme Implementation Strategies
This step will identify the end-use applications that can be potentially targeted to reduce
peak demand, specifically in sectors with higher subsidies. This step will also carry out a
detailed benefit-cost analysis for the end-users and the utilities, including analysis on
societal as well as environmental benefits.
Step 4: Implementation -Implementation stage will design the programme for specific
end-use applications, will promote the programme to the target audience through
marketing approaches such as advertising, bills and inserts, and focused group meetings
as in case of the industrial sector.
Step 5: Monitoring and Evaluation -This step will track the programme design and
implementation and will compare the same with proposed DSM goal set by the utility. A
detailed benefit-cost analysis in this case will include identifying the avoided supply cost
for the utility vis-à-vis the total programme cost for the utilities and benefits to the
participants including the reduced bills or incentives to the end-users.
Applicable DSM Programs
The UNDP Power Sector Project (1993-1996) identified nine DSM programs that would
be applicable for the Pacific Islands. The proposed programs were:
• Compact Fluorescent Lamp (CFL) Programme
• High Efficiency Fluorescent Lighting Programme
• Refrigerator Labelling and Standards Programme
• Air Conditioner Labelling and Standards Programme
• Commercial Refrigeration Equipment Maintenance Programme
• Air Conditioner Equipment Maintenance Programme
• Interruptible Rates for Large Customers
• Energy Audit Programme for Large Customers
• Air Conditioner Timer Control Programme
Based on international experience other applicable programs include:
• Municipal Water Pumping Programme
• Street-lighting Programme
• Solar Hot Water Programme
• Time-of-Use Tariffs for Industrial and Commercial customers
Why promote DSM
Various reasons are put forward for promoting or undertaking DSM. For example,DSM
may be aimed at addressing the following issues (University of Warwick,REEEP, 2005):
 Cost reduction—many DSM and energy efficiency efforts have been introduced
in the context of integrated resource planning and aimed at reducing total costs of
meeting energy demand;
 Environmental and social improvement—energy efficiency and DSM may be
pursued to achieve environmental and/or social goals by reducing energy use,
leading to reduced greenhouse gas emissions;
 Reliability and network issues—ameliorating and/or averting problems in the
electricity network through reducing demand in ways which maintain system
reliability in the immediate term and over the longer term defer the need for
network augmentation;
 Improved markets—short-term responses to electricity market conditions
(―demand response‖), particularly by reducing load during periods of high market
prices caused by reduced generation or network capacity.
An energy customer may have many reasons for selecting a certain DSM activity.
Generally these would be economic, environmental, marketing or regulatory. The above
points are expressed in a slightly different way (Satish Saini, 2004), where it is argued
that the benefits of DSM to consumers, enterprises, utilities and society can be realized
through:
 Reductions in customer energy bills;
 Reductions in the need for new power plant, transmission and distribution
networks;
 Stimulation of economic development;
 Creation of long-term jobs due to new innovations and technologies;
 Increases in the competitiveness of local enterprises;
 Reduction in air pollution;
 Reduced dependency on foreign energy sources;
 Reductions in peak power prices for electricity.
Unit 3
ABSTRACT
Shunt capacitor banks are used to improve the quality of the electrical supply and the
efficient operation of the power system. Studies show that a flat voltage profile on the
system can significantly reduce line losses. Shunt capacitor banks are relatively
inexpensive and can be easily installed anywhere on the network. The protection of shunt
capacitor bank includes: a) protection against internal bank faults and faults that occur
inside the capacitor unit; and, b) protection of the bank against system disturbances.
INTRODUCTION Shunt capacitor banks (SCB) are mainly installed to provide
capacitive reactive compensation power factor correction. The use of SCBs has increased
because they are relatively inexpensive, easy and quick to install and can be deployed
virtually anywhere in the network. Its installation has other beneficial effects on the
system such as: improvement of the voltage at the load, better voltage regulation (if they
were adequately designed), reduction of losses and reduction or postponement of
investments in transmission.
The main disadvantage of SCB is that its reactive power output is proportional to the
square of the voltage and consequently when the voltage is low and the system need them
most, they are the least efficient.
THE CAPACITOR UNIT AND BANK CONFIGURATIONS
2.1 The Capacitor Unit The capacitor unit, Fig. 1, is the building block of a shunt
capacitor bank. The capacitor unit is made up of individual capacitor elements, arranged
in parallel/ series connected groups, within a steel enclosure. The internal discharge
device is a resistor that reduces the unit residual voltage o 50V or less in 5 min. Capacitor
units are available in a variety of voltage ratings (240 V to 24940V) and sizes (2.5 kvar to
about 1000 kvar).
Capacitor unit capabilities
Relay protection of shunt capacitor banks requires some knowledge of the capabilities
and limitations of the capacitor unit and associated electrical equipment including:
individual capacitor unit, bank switching devices, fuses, voltage and current sensing
devices.
Capacitors are intended to be operated at or below their rated voltage and frequency as
they are very sensitive to these values; the reactive power generated by a capacitor is
proportional to both of them (kVar ≈ 2π f V 2). The IEEE Std 18-1992 and Std 1036-
1992 specify the standard ratings of the capacitors designed for shunt connection to ac
systems and also provide application guidelines.
These standards stipulate that:
a) Capacitor units should be capable of continuous operation up to 110% of rated
terminal rms voltage and a crest voltage not exceeding 1.2 x √2 of rated rms voltage,
including harmonics but excluding transients. The capacitor should also be able to carry
135% of nominal current.
b) Capacitors units should not give less than 100% nor more than 115% of rated reactive
power at rated sinusoidal voltage and frequency.
c) Capacitor units should be suitable for continuous operation at up to 135%of rated
reactive power caused by the combined effects of:
• Voltage in excess of the nameplate rating at fundamental frequency, but not over
110% of rated rms voltage.
• Harmonic voltages superimposed on the fundamental frequency.
• Reactive power manufacturing tolerance of up to 115% of rated reactive power.
2.2 Bank Configurations
The use of fuses for protecting the capacitor units and it location (inside the capacitor unit
on each element or outside the unit) is an important subject in the design of SCBs. They
also affect the failure mode of the capacitor unit and influence the design of the bank
protection. Depending on the application any of the following configurations are suitable
for shunt capacitor banks:
a) Externally Fused
An individual fuse, externally mounted between the capacitor unit and the capacitor bank
fuse bus, typically protects each capacitor unit. The capacitor unit can be designed for a
relatively high voltage because the external fuse is capable of interrupting a high-voltage
fault. Use of capacitors with the highest possible voltage rating will result in a capacitive
bank with the fewest number of series groups.
A failure of a capacitor element welds the foils together and short circuits the other
capacitor elements connected in parallel in the same group. The remaining capacitor
elements in the unit remain in service with a higher voltage across them than before the
failure and an increased in capacitor unit current. If a second element fails the process
repeats itself resulting in an even higher voltage for the remaining elements. Successive
failures within the same unit will make the fuse to operate, disconnecting the capacitor
unit and indicating the failed one.
Externally fused SCBs are configured using one or more series groups of parallel-
connected capacitor units per phase (Fig. 2). The available unbalance signal level
decreases as the number of series groups of capacitors is increased or as the number of
capacitor units in parallel per series group is increased. However, the kiloVar rating of
the individual capacitor unit may need to be smaller because a minimum number of
parallel units are required to allow the bank to remain in service with one fuse or unit out.
b) Internally Fused
Each capacitor element is fused inside the capacitor unit. The fuse is a simple piece of
wire enough to limit the current and encapsulated in a wrapper able to withstand the heat
produced by the arc. Upon a capacitor element failure, the fuse removes the affected
element only. The other elements, connected in parallel in the same group, remain in
service but with a slightly higher voltage across them.
Fig. 3 illustrates a typical capacitor bank utilizing internally fused capacitor units. In
general, banks employing internally fused capacitor units are configured with fewer
capacitor units in parallel and more series groups of units than are used in banks
employing externally fused capacitor units. The capacitor units are normally large
because a complete unit is not expected to fail.
c) Fuseless Shunt Capacitor Banks
The capacitor units for fuseless capacitor banks are identical to those for externally fused
described above. To form a bank, capacitor units are connected in series strings between
phase and neutral, shown in Fig. 4.
The protection is based on the capacitor elements (within the unit) failing in a shorted
mode, short- circuiting the group. When the capacitor element fails it welds and the
capacitor unit remains in service. The voltage across the failed capacitor element is then
shared among all the remaining capacitor element groups in the series. For example, is
there are 6 capacitor units in series and each unit has 8 element groups in series there is a
total of 48 element groups in series. If one capacitor element fails, the element is
shortened and the voltage on the remaining elements is 48/47 or about a 2% increase in
the voltage. The capacitor bank continues in service; however, successive failures of
elements will lead to the removal of the bank.
The fuseless design is not usually applied for system voltages less than about 34.5 kV.
The reason is that there shall be more than 10 elements in series so that the bank does not
have to be removed from service for the failure of one element because the voltage across
the remaining elements would increase by a factor of about E (E – 1), where E is the
number of elements in the string.
The discharge energy is small because no capacitor units are connected directly in
parallel. Another advantage of fuseless banks is that the unbalance protection does not
have to be delayed to coordinate with the fuses.
d) Unfused Shunt Capacitor Banks
Contrary to the fuseless configuration, where the units are connected in series, the
unfused shunt capacitor bank uses a series/parallel connection of the capacitor units. The
unfused approach would normally be used on banks below 34.5 kV, where series strings
of capacitor units are not practical, or on higher voltage banks with modest parallel
energy. This design does not require as many capacitor units in parallel as an externally
fused bank.
CAPACITOR BANK DESIGN
The protection of shunt capacitor banks requires understanding the basics of capacitor
bank design and capacitor unit connections. Shunt capacitors banks are arrangements of
series/ paralleled connected units. Capacitor units connected in paralleled make up a
group and series connected groups form a single-phase capacitor bank.
As a general rule, the minimum number of units connected in parallel is such that
isolation of one capacitor unit in a group should not cause a voltage unbalance sufficient
to place more than 110% of rated voltage on the remaining capacitors of the group.
Equally, the minimum number of series connected groups is that in which the complete
bypass of the group does not subject the others remaining in service to a permanent
overvoltage of more than 110%.
The maximum number of capacitor units that may be placed in parallel per group is
governed by a different consideration. When a capacitor bank unit fails, other capacitors
in the same parallel group contain some amount of charge. This charge will drain off as a
high frequency transient current that flows through the failed capacitor unit and its fuse.
The fuse holder and the failed capacitor unit should withstand this discharge transient.
The discharge transient from a large number of paralleled capacitors can be severe
enough to rupture the failed capacitor unit or the expulsion fuse holder, which may result
in damage to adjacent units or cause a major bus fault within the bank. To minimize the
probability of failure of the expulsion fuse holder, or rupture of the capacitor case, or
both, the standards impose a limit to the total maximum energy stored in a paralleled
connected group to 4659 kVar. In order not to violate this limit, more capacitor groups of
a lower voltage rating connected in series with fewer units in parallel per group may be a
suitable solution. However, this may reduce the sensitivity of the unbalance detection
scheme. Splitting the bank into 2 sections as a double Y may be the preferred solution
and may allow for better unbalance detection scheme. Another possibility is the use of
current limiting fuses.
The optimum connection for a SCB depends on the best utilization of the available
voltage ratings of capacitor units, fusing, and protective relaying. Virtually all substation
banks are connected wye. Distribution capacitor banks, however, may be connected wye
or delta. Some banks use an H configuration on each of the phases with a current
transformer in the connecting branch to detect the unbalance.
CAPACITOR BANK PROTECTION
The protection of SCB’s involves: a) protection of the bank against faults occurring
within the bank including those inside the capacitor unit; and, b) protection of the bank
against system disturbances and faults.
The protection selected for a capacitor bank depends on bank configuration, whether or
not the capacitor bank is grounded and the system grounding.
Capacitor Unbalance Protection
The protection of shunt capacitor banks against internal faults involves several protective
devices/ elements in a coordinated scheme. Typically, the protective elements found in a
SCB for internal faults are: individual fuses (not discuss in this paper), unbalance
protection to provide alarm/ trip and overcurrent elements for bank fault protection.
Removal of a failed capacitor element or unit by its fuse results in an increase in voltage
across the remaining elements/ units causing an unbalance within the bank. A continuous
overvoltage (above 1.1pu) on any unit shall be prevented by means of protective
relaysthat trip the bank. Unbalance protection normally senses changes associated with
the failure of a capacitor elemenor unit and removes the bank from service when the
resulting overvoltage becomes excessive on the remaining healthy capacitor units.
Unbalance protection normally provides the primary protection for arcing faults within a
capacitorbank and other abnormalities that may damage capacitor elements/ units. Arcing
faults may cause substantial damage in a small fraction of a second. The unbalance
protection should haveminimum intentional delay in order to minimize the amount of
damage to the bank in the event ofexternal arcing.
In most capacitor banks an external arc within the capacitor bank does not result in
enough change in the phase current to operate the primary fault protection (usually an
overcurrent relay)The sensitivity requirements for adequate capacitor bank protection for
this condition may be verdemanding, particularly for SBC with many series groups. The
need for sensitive resulted in the development of unbalance protection where certain
voltages or currents parameters of the capacitor bank are monitored and compared to the
bank balance conditions.
Capacitor unbalance protection is provided in many different ways, depending on the
capacitor bank arrangement and grounding. A variety of unbalance protection schemes
are used for internally fused, externally fused, fuseless, or unfused shunt capacitor.
Unit-4
MOTOR EFFICIENCY
MOTOR:- An electric motor is an electromechanical device that converts electrical
energy into mechanical energy.
EFFICIENCY:- Efficiency in general describes the extent to which time or effort is
well used for the intended task or purpose. It is often used with the specific purpose of
relaying the capability of a specific application of effort to produce a specific outcome
effectively with a minimum amount or quantity of waste, expense, or unnecessary effort.
MOTOR EFFICIENCY:-In a perfect world, AC induction motors would operate at
100% efficiency – in other words, every kilowatt of power delivered to the motor
terminals would be converted to useful work at the motor shaft. However, in the real
world this is not the case. Only a percentage of the delivered power is converted to useful
work, and that percentage will vary. The efficiency is the ratio of power delivered by the
motor at the shaft to the power delivered to the motor at the terminals.
In general, AC motors operate most efficiently at around 75% of full rated load, with the
efficiency falling off only slightly until somewhere between 25% and 50% of full load,
where the efficiency begins to drop significantly. As a rule of thumb, the larger the
motor, the flatter this curve is, and the lower the load percentage has to drop before the
efficiency starts to drop. The efficiency curve for typical AC motors is shown below:
Most electric motors are designed to run at 50% to 100% of rated load. Maximum
efficiency is usually near 75% of rated load. Thus, a 10-horsepower (hp) motor has an
acceptable load range of 5 to 10 hp; peak efficiency is at 7.5 hp. A motor’s efficiency
tends to decrease dramatically below about 50% load. However, the range of good
efficiency varies with individual motors and tends to extend over a broader range for
larger motors. A motor is considered under loaded when it is in the range where
efficiency drops significantly with decreasing load. Power factor tends to drop off
sooner, but less steeply than efficiency, as load decreases.
Overloaded motors can overheat and lose efficiency. Many motors are designed with a
service factor that allows occasional overloading. Service factor is a multiplier that
indicates how much a motor can be overloaded under ideal ambient conditions. For
example, a 10-hp motor with a 1.15 service factor can handle an 11.5-hp load for short
periods of time without incurring significant damage. Although many motors have
service factors of 1.15, running the motor continuously above rated load reduces
efficiency and motor life. Never operate overloaded when voltage is below nominal or
when cooling is impaired by altitude, high ambient temperature, or dirty motor surfaces.
If your operation uses equipment with motors that operate for extended periods under
50% load, consider making modifications. Sometimes motors are oversized because they
must accommodate peak conditions, such as when a pumping system must satisfy
occasionally high demands. Options available to meet variable loads include two-speed
motors, adjustable speed drives, and load management strategies that maintain loads
within an acceptable range.
Determining if motors are properly loaded enables to make informed decisions about
when to replace motors and which replacements to choose. Measuring motor loads is
relatively quick and easy when we use the techniques discussed. We should perform a
motor load and efficiency analysis on all of your major working motors as part of our
preventative maintenance and energy conservation program.
Recommend that survey and test all motors operating over 1000 hours per year.
Using the analysis results, divide your motors into the following categories:
• Motors that are significantly oversized and under loaded—replace with more efficient,
properly sized models at the next opportunity, such as scheduled plant downtime.
• Motors that are moderately oversized and under loaded—replace with more efficient,
properly sized models when they fail.
• Motors that are properly sized but standard efficiency—replace most of these with
energy-efficient models when they fail. The cost effectiveness of an energy-efficient
motor purchase depends on the number of hours the motor is used, the price of electricity,
and the price premium of buying an energy-efficient motor.
Determining Motor Loads
 Input Power Measurements
When ―direct-read‖ power measurements are available, use them to estimate motor part-
load. With measuredparameters taken from hand-held instruments, you can use Equation
1 to calculate the three-phase input powerto the loaded motor. You can then quantify the
motor’s part-load by comparing the measured input power underload to the power
required when the motor operates at rated capacity.The relationship is shown in
Equation3.
 Line Current Measurements
The current load estimation method is recommended when only amperage measurements
are available. Theamperage draw of a motor varies approximately linearly with respect
to load, down to about 50% of full load. Below the 50% load point, due to reactive
magnetizing current requirements, power factor degradesand the amperage curve
becomes increasingly non-linear. In the low load region, current measurements are not a
useful indicator of load.
 The Slip Method
The slip method for estimating motor load is recommended when only operating speed
measurements are available.The synchronous speed of an induction motor depends on the
frequency of the power supply and on thenumber of poles for which the motor is wound.
The higher the frequency, the faster a motor runs. The more polesthe motor has, the
slower it runs. Table 1 indicates typical synchronous speeds
Determining Motor Efficiency
The NEMA definition of energy efficiency is the ratio of its useful power output to its
total power input and is usually expressed in percentage:-
By definition, a motor of a given rated horsepower is expected to deliver that quantity of
power in a mechanical form at the motor shaft. Figure is a graphical depiction of the
process of converting electrical energy to mechanical energy. Motor losses are the
difference between the input and output power. Once the motor efficiency has been
determined and the input power is known, you can calculate output power.
NEMA design A and B motors up to 500 hp in size are required to have a full-load
efficiency value (selected from a table of nominal efficiencies) stamped on the
nameplate. Most analyses of motor energy conservation savings assume that the existing
motor is operating at its nameplate efficiency. This assumption is reasonable above the
50% load point as motor efficiencies generally peak at around 3/4 load with performance
at 50% load almost identical to that at full load. Larger horsepower motors exhibit a
relatively flat efficiency curve down to 25% of full load.
It is more difficult to determine the efficiency of a motor that has been in service a long
time. It is not uncommon for the nameplate on the motor to be lost or painted over. In that
case, it is almost impossible to locate efficiency information. Also, if the motor has been
rewound, there is a probability that the motor efficiency has been reduced.
When nameplate efficiency is missing or unreadable, you must determine the efficiency
value at the operating load point for the motor. If available, record significant nameplate
data and contact the motor manufacturer. With the style, type, and serial number, the
manufacturer can identify approximately when the motor was manufactured. Often the
manufacturer will have historical records and can supply nominal efficiency values as a
function of load for a family of motors.
When the manufacturer cannot provide motor efficiency values, you may use estimates
from contains nominal efficiency values at full, 75%, 50%, and 25% load for typical
standard efficiency motors of various sizes and with synchronous speeds of 900, 1200,
1800, and 3600 rpm.
Three steps are used to estimate efficiency and load. First, use power, amperage, or slip
measurements to identify the load imposed on the operating motor. Second, obtain a
motor part-load efficiency value consistent with the approximated load either from the
manufacturer or by interpolating from the data supplied. Finally, if direct-read power
measurements are available, derive a revised load estimate using both the power
measurement at the motor terminals and the part-load efficiency value as shown:-
Power Factor: Instantaneous power is proportional to instantaneous voltage times
instantaneous current. AC voltage causes the current to flow in a sine wave replicating
the voltage wave.However, inductance in the motor windings somewhat delays current
flow, resulting in a phase shift. This transmits less net power than perfectly time-matched
voltage and current of the same RMS values. Power factor is the fraction of power
actually delivered in relation to the power that would be delivered by the same voltage
and current without the phase shift. Low power factor does not imply lost or wasted
power, just excess current. The energy associated with the excess current is alternately
stored in the windings’ magnetic field and regenerated back to the line with each AC
cycle. This exchange is called reactive power. Though reactive power is theoretically not
lost, the distribution system must be sized to accommodate it, which is a cost factor. To
reduce these costs, capacitors are used to ―correct‖ low power factor. Capacitors can be
thought of as electrical reservoirs to capture and reflect reactive power back to the motor.
RMS Voltage : AC voltage rises positive and falls negative 60 times per second, so how
do you state its value? Industry practice is to quote the RMS voltage. RMS is a value
70.7% of the peak positive voltage. An RMS voltage will produce exactly the same
heating rate in a resistive load as a DC voltage of the same value. RMS is the acronym
for the mathematical steps used in its derivation. Square the voltage at all moments in an
AC cycle, take the mean of these, and then take the square root of the mean. For reasons
lost in obscurity, the steps are stated in reverse sequence, Root Mean Square.
ENERGY EFFICIENT LIGHTING AND BARRIERS IN ITS
IMPLEMENTATION
Introduction: Energy management and cost reductions are key tools in strategic
planning. Energy costs now constitute a major component of operating funds. Thus,
energy conservation and efficiency improvement are key necessities for enhanced
productivity. Lighting in a typical telecom building constitutes about25% of the energy
bills. There is a considerable scope of reducing energy consumption through energy
efficient lighting schemes. However, the experience shows that there are barriers in
providing energy efficient lighting schemes due to high capital cost, lack of knowledge
and good quality products.
Measures for energy efficient and economic use of lighting: Measures
which can contribute for energy efficient and economic use of lighting are asunder:
(i) Segregation of general and task lighting.
(ii) Automatic switching On and Off of lighting by using sensors.
(iii) Maximum use of sunlight.
(iv) Light surrounding décor.
(v) Use of energy efficient lamps (HPMV, HPSV, CFL,Slimline tubes TL5 tubes
etc. etc).
(vi) Use of dimmers to reduce the intensity of artificial light as the sunlight is
used.
(vii) High efficiency luminors.
(viii) High frequency chokes.
ENERGY EFFICIENT LUMINOR:
The norms issued by the directorate specifically provides for use of 1X40watt mirror
optic fluroscent tubes fittings . It is seen that this luminor gives maximum lumens per
watt. Subsequent to the issue of norms, it is seen that M/S Asian Electronic Ltd. Have
come out with Asian E+ energy efficient tubelights, claiming reduction of about 45% in
lighting load. This tubelight can be retrofitted and also available with a optional demur
switch. These fixtures uses M/S Osram E5 lamps which has rates life of 18000 burning
hours as against 5000 burning hours for conventional fluroscent tubes.
ELECTRONIC CHOKES:
Even though it is established that high frequency electronic glass provides significant
savings in power, yet there has been a great amount of reluctance to use the same , due to
following reasons.
(i) High cost of good quality electronic
(ii) Generation of harmonics and humming sound by some of these electronic
chokes
(iii) Blowing of fuse provided in some of these chokes for protection of electronic
circuit. On experimental basis, these chokes have been used in some of the
exchanges and departmental complexes, with mixed results.
AUTOMATIC SWITCHING ON & OFF OF LIGHTING BY USING SENSORS:
In Telecom. Buildings, so far we have not used sensors for automatic switching ON &
OFF the lightings. The use of these sensors can provide substantial savings , as it is seen
that occupants of the building normally do not switch off the lighting, even when they are
away from their place of work. Similarly in some of the switch rooms, the lightings may
be ON even when nobody is working in the switch room. The movement sensors, in such
cases, can be effectively used to switch off the lighting for energy conservation. Dimmers
can also be used effectively to reduce the intesntiy of the light as the sunlight increases
during the day time.
DAYLIGHT: By suitable design of buildings / switch rooms, indirect sunlight can be
used. to provide illumination during day time, without increasing the heat load. This
has to be coordinated with the Architect. So that tailormade shafts or ducts can be
provided in abuilding to bring daylight as a source of lighting inside the building ,
thereby, minimizing need for aritificial lighting.
LIGHT SURROUNDING DÉCOR:The décor plays an important part in illumination
design. Light décor will require less lighting and thus, can contribute for energy saving.
This can be coordinated with the Architect.
USE OF ENERGY EFFICIENT LAMPS: The compact flursocent lamps instead of
incandescent lamps , in general area, will result in substantial energy conservations. The
lighting in general area inside a building is normally switched ON for maximum period
in the day and thus ,use of efficient lamps will definitely contribute in energy savings.
Similarly, slimline tubes (36watt) , and Asian E+ tube fittings with T5 lamp, can result
into substantial savings.
BARRIERS TO PROVIDE ENERGY EFFICIENT LIGHTING: The energy
efficient lighting is often a symbol for energy efficiency in general . However, it is seen
that practically there are number of barriers in providing energy efficient lighting.
(i) High capital cost- The energy efficient fixtures such as Asian E+ with T5
lamps , Electronic chokes, sensors and dimmers have high capital cost .
(ii) Lack of awareness – Some of the products which can contribute significantly
in improving lighting efficiency are not available in local markets resulting
into lack of awareness.
(iii) Availability of Quality products- There are not sufficient guarantees that
energy efficient accessories / fixtures will perform satisfactorily in the field
for their declared life. It is often seen that life of some of these products is
much less as compared to the declared life and it is a common knowledge that
electronic chokes do produce humming sound in many cases and requires
special setting for individual sets.
Light fixture
A light fixture, light fitting, or luminaire is an electrical device used to create artificial
light by use of an electric lamp. All light fixtures have a fixture body and a light socket to
hold the lamp and allow for its replacement. Fixtures may also have a switch to control
the light. Fixtures require an electrical connection to a power source; permanent lighting
may be directly wired, and moveable lamps have a plug. Light fixtures may also have
other features, such as reflectors for directing the light, an aperture (with or without a
lens), an outer shell or housing for lamp alignment and protection, and an electrical
ballast or power supply. A wide variety of special light fixtures are created for use in the
automotive lighting industry, aerospace, marine and medicine.
The use of the word "lamp" to describe light fixtures is common slang for an all-in-one
luminary unit, usually portable "fixtures" such as a table lamp or desk lamp (in contrast
to a true fixture, which is fixed in place with screws or some other semi-permanent
attachment). In technical terminology, a lamp is the light source, what is typically called
the light bulb.

Weitere ähnliche Inhalte

Was ist angesagt?

Energy Efficiency Economics
Energy Efficiency EconomicsEnergy Efficiency Economics
Energy Efficiency Economicsmaggiewinslow
 
China energy and environmental challenges
China energy and environmental challengesChina energy and environmental challenges
China energy and environmental challengesYibo Yang
 
Britishpsychologicalsociety
BritishpsychologicalsocietyBritishpsychologicalsociety
BritishpsychologicalsocietyAhmad Eid
 
The Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansThe Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansCenter for Sustainable Energy
 
Energy Efficiency Obligations – A Toolkit for success
Energy Efficiency Obligations – A Toolkit for successEnergy Efficiency Obligations – A Toolkit for success
Energy Efficiency Obligations – A Toolkit for successLeonardo ENERGY
 
Renewable energy initiative by govt
Renewable energy initiative by govtRenewable energy initiative by govt
Renewable energy initiative by govtSameer Kumar Rout
 
161 active ee-white-paper02_control
161 active ee-white-paper02_control161 active ee-white-paper02_control
161 active ee-white-paper02_controlKalyana Prasad N
 
Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities Arivalagan Arumugam
 
BEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesBEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesAshish Verma
 
IEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design SymposiumIEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design SymposiumSrija Kumar
 
Bureau energy efficiency
Bureau energy efficiencyBureau energy efficiency
Bureau energy efficiencyKaushal Gamit
 
Australian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesAustralian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesIEA DSM Implementing Agreement (IA)
 
Energy management services
Energy management servicesEnergy management services
Energy management servicesranipatil22
 
ADOPTING MEASURES TO REDUCE POWER OUTAGES
ADOPTING MEASURES TO REDUCE POWER OUTAGESADOPTING MEASURES TO REDUCE POWER OUTAGES
ADOPTING MEASURES TO REDUCE POWER OUTAGESelelijjournal
 
Energy Industry Act and RE in Thailand
Energy Industry Act and RE in ThailandEnergy Industry Act and RE in Thailand
Energy Industry Act and RE in Thailandelectricitygovernance
 

Was ist angesagt? (20)

Energy Efficiency Economics
Energy Efficiency EconomicsEnergy Efficiency Economics
Energy Efficiency Economics
 
China energy and environmental challenges
China energy and environmental challengesChina energy and environmental challenges
China energy and environmental challenges
 
Laura van wie panel 3 - moderator
Laura van wie   panel 3 - moderatorLaura van wie   panel 3 - moderator
Laura van wie panel 3 - moderator
 
Energy Optimization
Energy OptimizationEnergy Optimization
Energy Optimization
 
Britishpsychologicalsociety
BritishpsychologicalsocietyBritishpsychologicalsociety
Britishpsychologicalsociety
 
The Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansThe Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action Plans
 
Energy Efficiency Obligations – A Toolkit for success
Energy Efficiency Obligations – A Toolkit for successEnergy Efficiency Obligations – A Toolkit for success
Energy Efficiency Obligations – A Toolkit for success
 
Renewable energy initiative by govt
Renewable energy initiative by govtRenewable energy initiative by govt
Renewable energy initiative by govt
 
161 active ee-white-paper02_control
161 active ee-white-paper02_control161 active ee-white-paper02_control
161 active ee-white-paper02_control
 
Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities
 
BEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesBEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemes
 
Ict for green
Ict for greenIct for green
Ict for green
 
DSM & EE Initiatives at TPDDL
DSM & EE Initiatives at TPDDLDSM & EE Initiatives at TPDDL
DSM & EE Initiatives at TPDDL
 
IEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design SymposiumIEEE Systems and Information Engineering Design Symposium
IEEE Systems and Information Engineering Design Symposium
 
Bureau energy efficiency
Bureau energy efficiencyBureau energy efficiency
Bureau energy efficiency
 
Australian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management ActivitiesAustralian Energy Efficiency and Demand Side Management Activities
Australian Energy Efficiency and Demand Side Management Activities
 
Energy Management
Energy ManagementEnergy Management
Energy Management
 
Energy management services
Energy management servicesEnergy management services
Energy management services
 
ADOPTING MEASURES TO REDUCE POWER OUTAGES
ADOPTING MEASURES TO REDUCE POWER OUTAGESADOPTING MEASURES TO REDUCE POWER OUTAGES
ADOPTING MEASURES TO REDUCE POWER OUTAGES
 
Energy Industry Act and RE in Thailand
Energy Industry Act and RE in ThailandEnergy Industry Act and RE in Thailand
Energy Industry Act and RE in Thailand
 

Andere mochten auch

IT Recycling has Changed Forever!
IT Recycling has Changed Forever!IT Recycling has Changed Forever!
IT Recycling has Changed Forever!Garry Seaber
 
7 ideasin7minutes
7 ideasin7minutes7 ideasin7minutes
7 ideasin7minutesnrissas2
 
consumer behavior project on Big Bazaar
consumer behavior project on Big Bazaarconsumer behavior project on Big Bazaar
consumer behavior project on Big BazaarPrachi Shastri
 
Barnard Tutor Services
Barnard Tutor ServicesBarnard Tutor Services
Barnard Tutor ServicesShira Lerner
 
Marketing and social media campaign on chocolates
Marketing and social media campaign on chocolatesMarketing and social media campaign on chocolates
Marketing and social media campaign on chocolatesPrachi Shastri
 
IDBI Federal life insurance summer internship report
IDBI Federal life insurance summer internship reportIDBI Federal life insurance summer internship report
IDBI Federal life insurance summer internship reportPrachi Shastri
 
Fair and Handsome marketing project
Fair and Handsome marketing projectFair and Handsome marketing project
Fair and Handsome marketing projectPrachi Shastri
 
Taj Mahal Palace Hotel Service Marketing
Taj Mahal Palace Hotel Service MarketingTaj Mahal Palace Hotel Service Marketing
Taj Mahal Palace Hotel Service MarketingPrachi Shastri
 

Andere mochten auch (13)

Las plantas
Las plantasLas plantas
Las plantas
 
IT Recycling has Changed Forever!
IT Recycling has Changed Forever!IT Recycling has Changed Forever!
IT Recycling has Changed Forever!
 
Brm presentation
Brm presentationBrm presentation
Brm presentation
 
Las plantas
Las plantasLas plantas
Las plantas
 
10 Surprising Health Tips
10 Surprising Health Tips10 Surprising Health Tips
10 Surprising Health Tips
 
7 ideasin7minutes
7 ideasin7minutes7 ideasin7minutes
7 ideasin7minutes
 
Las plantas
Las plantasLas plantas
Las plantas
 
consumer behavior project on Big Bazaar
consumer behavior project on Big Bazaarconsumer behavior project on Big Bazaar
consumer behavior project on Big Bazaar
 
Barnard Tutor Services
Barnard Tutor ServicesBarnard Tutor Services
Barnard Tutor Services
 
Marketing and social media campaign on chocolates
Marketing and social media campaign on chocolatesMarketing and social media campaign on chocolates
Marketing and social media campaign on chocolates
 
IDBI Federal life insurance summer internship report
IDBI Federal life insurance summer internship reportIDBI Federal life insurance summer internship report
IDBI Federal life insurance summer internship report
 
Fair and Handsome marketing project
Fair and Handsome marketing projectFair and Handsome marketing project
Fair and Handsome marketing project
 
Taj Mahal Palace Hotel Service Marketing
Taj Mahal Palace Hotel Service MarketingTaj Mahal Palace Hotel Service Marketing
Taj Mahal Palace Hotel Service Marketing
 

Ähnlich wie Energy efficiency and coservation book

Energy Efficiency policy by IRFAN ANSARI
Energy Efficiency policy by IRFAN ANSARIEnergy Efficiency policy by IRFAN ANSARI
Energy Efficiency policy by IRFAN ANSARIIrfan Ansari
 
Guide for energy saving
Guide for energy savingGuide for energy saving
Guide for energy savingBhushan Pagar
 
ASOG's 2020 Working Papers on Energy
ASOG's 2020 Working Papers on EnergyASOG's 2020 Working Papers on Energy
ASOG's 2020 Working Papers on EnergyASEPCELLsProject
 
Presentation Demand Management
Presentation Demand ManagementPresentation Demand Management
Presentation Demand ManagementMaheshThombare9
 
energy assessments5
energy assessments5energy assessments5
energy assessments5Steve Tester
 
Energy efficiency presentation
Energy efficiency presentation Energy efficiency presentation
Energy efficiency presentation ibra1993
 
Energy conservation Act 2001.pptx
Energy conservation Act 2001.pptxEnergy conservation Act 2001.pptx
Energy conservation Act 2001.pptxssuserca5764
 
Supporting ‘Green’ electricity: Lessons learned from the Spanish Feed‐in tar...
Supporting ‘Green’ electricity:  Lessons learned from the Spanish Feed‐in tar...Supporting ‘Green’ electricity:  Lessons learned from the Spanish Feed‐in tar...
Supporting ‘Green’ electricity: Lessons learned from the Spanish Feed‐in tar...Gnera Energía y Tecnología
 
Designing a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsDesigning a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsSchneider Electric India
 
Adopting International Energy Management and Digital Transformation For Clean...
Adopting International Energy Management and Digital Transformation For Clean...Adopting International Energy Management and Digital Transformation For Clean...
Adopting International Energy Management and Digital Transformation For Clean...ssuser430c50
 
EM-PPTS.pptx
EM-PPTS.pptxEM-PPTS.pptx
EM-PPTS.pptxhodmech18
 
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET Journal
 
Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Prithu Sureka
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy OverviewJustin Bean
 
FS-MRE-ECM-Whitepaper-1016-REV2
FS-MRE-ECM-Whitepaper-1016-REV2FS-MRE-ECM-Whitepaper-1016-REV2
FS-MRE-ECM-Whitepaper-1016-REV2April Scarlett
 
The Economics of Transitioning to Renewable Energy Sources
The Economics of Transitioning to Renewable Energy SourcesThe Economics of Transitioning to Renewable Energy Sources
The Economics of Transitioning to Renewable Energy SourcesChristo Ananth
 
Energy Efficiency in Industrial Sectors: Future Directions
Energy Efficiency in Industrial Sectors: Future DirectionsEnergy Efficiency in Industrial Sectors: Future Directions
Energy Efficiency in Industrial Sectors: Future DirectionsChristo Ananth
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...noe21
 

Ähnlich wie Energy efficiency and coservation book (20)

Energy Efficiency policy by IRFAN ANSARI
Energy Efficiency policy by IRFAN ANSARIEnergy Efficiency policy by IRFAN ANSARI
Energy Efficiency policy by IRFAN ANSARI
 
Guide for energy saving
Guide for energy savingGuide for energy saving
Guide for energy saving
 
ASOG's 2020 Working Papers on Energy
ASOG's 2020 Working Papers on EnergyASOG's 2020 Working Papers on Energy
ASOG's 2020 Working Papers on Energy
 
Presentation Demand Management
Presentation Demand ManagementPresentation Demand Management
Presentation Demand Management
 
energy assessments5
energy assessments5energy assessments5
energy assessments5
 
Energy efficiency presentation
Energy efficiency presentation Energy efficiency presentation
Energy efficiency presentation
 
Energy conservation Act 2001.pptx
Energy conservation Act 2001.pptxEnergy conservation Act 2001.pptx
Energy conservation Act 2001.pptx
 
Supporting ‘Green’ electricity: Lessons learned from the Spanish Feed‐in tar...
Supporting ‘Green’ electricity:  Lessons learned from the Spanish Feed‐in tar...Supporting ‘Green’ electricity:  Lessons learned from the Spanish Feed‐in tar...
Supporting ‘Green’ electricity: Lessons learned from the Spanish Feed‐in tar...
 
Designing a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsDesigning a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildings
 
u1604
u1604u1604
u1604
 
Adopting International Energy Management and Digital Transformation For Clean...
Adopting International Energy Management and Digital Transformation For Clean...Adopting International Energy Management and Digital Transformation For Clean...
Adopting International Energy Management and Digital Transformation For Clean...
 
EM-PPTS.pptx
EM-PPTS.pptxEM-PPTS.pptx
EM-PPTS.pptx
 
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
 
Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)Project on energy audit (mahindra & mahindra)
Project on energy audit (mahindra & mahindra)
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy Overview
 
FS-MRE-ECM-Whitepaper-1016-REV2
FS-MRE-ECM-Whitepaper-1016-REV2FS-MRE-ECM-Whitepaper-1016-REV2
FS-MRE-ECM-Whitepaper-1016-REV2
 
The Economics of Transitioning to Renewable Energy Sources
The Economics of Transitioning to Renewable Energy SourcesThe Economics of Transitioning to Renewable Energy Sources
The Economics of Transitioning to Renewable Energy Sources
 
Energy Efficiency in Industrial Sectors: Future Directions
Energy Efficiency in Industrial Sectors: Future DirectionsEnergy Efficiency in Industrial Sectors: Future Directions
Energy Efficiency in Industrial Sectors: Future Directions
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...
Richard Cowart - Delivering Energy Efficiency on a Large Scale: Challenges an...
 

Kürzlich hochgeladen

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Kürzlich hochgeladen (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Energy efficiency and coservation book

  • 1. Unit 1 Energy efficiency and conservation Our energy demand increases each year as our population and economy grow - we are using about 2% more energy each year. Making the most of our energy efficiency opportunities means we can reduce this growth in energy demand. Progress to date The latest data shows that New Zealand's energy efficiency has been improving at 0.7% per annum over the medium term from 1995 to 2007 (this includes the transport sector and is similar to other OECD economies). The energy efficiency improvement has helped offset energy demand growth. About 34% of the increased demand for energy services was met through improvements in energy efficiency. Nearly two thirds of the efficiency gains came from the industrial and agricultural sectors; the balance is spread across the commercial, residential and passenger transport sectors. EECA's energy efficiency and conservation programs contribute to this reduction in energy use. Energy efficiency gains come from:  Improvements in technology  Better systems and processes  Better information  Changing behavior  Benefits from efficiency and conservation.
  • 2. Energy efficiency delivers many benefits:  Overall energy costs are more affordable for businesses and families  Businesses are more productive with better international competitiveness  We have a more secure electricity system  We reduce our carbon emissions  People are healthier from living in houses that are warmer and drier  More jobs are created. Law of conservation of energy The nineteenth century law of conservation of energy is a law of physics. It states that the total amount of energy in an isolated system remains constant over time. The total energy is said to be conserved over time. For an isolated system, this law means that energy can change its location within the system, and that it can change form within the system, for instance chemical energy can become kinetic energy, but that energy can be neither created nor destroyed. In the nineteenth century, mass and energy were considered as being of quite different natures. Since Albert Einstein's theory of special relativity showed that energy has an equivalent mass (see mass in special relativity), and mass has an equivalent energy, one speaks of a law of conservation of mass-energy as an updated version of the nineteenth century law. All particles, both massive such as protons and massless such as photons, respectively have energy and mass equivalents. The total mass and the total energy of a system may both be respectively defined in special relativity, but for each, its conservation law holds. Particles, both ponderable and imponderable, are subject to inter conversions of form, in both creation and annihilation.
  • 3. Nevertheless, in an isolated system, conservation of total energy and conservation of total mass each holds as a separate law. A consequence of the law of conservation of energy is that no intended "perpetual motion machine" can perpetually deliver energy to its surroundings. Energy Conservation, Alternative Fuels, Alternative Energy Strategies, Green Buildings Opportunities for energy conservation are increasingly available in almost every application in any setting. Home, school, office, and industrial environments have all benefited from cost-saving and energy-saving innovations. The advantages of energy conservation have been quantified on the local level as tons of air-pollutants avoided and dollars saved. Reduction in global greenhouse gas emissions are also quantified with the benefit of reduced warming affect. Sites below provide a wealth of information useful in the home and community, and sources for additional policy information, data on technologies and how to order energy saving products. On the community level opportunities for large scale energy saving applications may be hindered by the up-front investment costs. These costs have been in many cases subsidized through local energy utilities which have succeeded in the integration of energy conservation into their rate base. For example, the Washington D.C. metro area, the local utility PEPCO underwrote the cost of compact fluorescent bulbs for several years. In other locations utilities have worked to provide interest subsidies for the purchase of highly efficient household appliances, like refrigerators. These appliances carry a higher purchase price, which may discourage buyers, but over the life of the equipment will actually save money though reduce energy consumption. Subsidizing interest payments bring the purchase price in line with conventional appliances.
  • 4. Energy conservation legislation Key Announcement • The Government is introducing minimum energy management standards for large energy users1 in the industry sector from FY2013. This includes i) the appointment of energy managers, ii) reporting of energy use and iii) submission of energy efficiency improvement plans for large energy users. • Energy Efficiency-related legislation across various sectors will be consolidated in an Energy Conservation Act that will be introduced in FY2013. Objectives of Energy Conservation Act • To help Singapore achieve the target of a 35% improvement in energy intensity by 2030, from 2005 levels. • To improve the energy performance of companies and thus making them more competitive in the global economy. • To complement existing schemes and capability building programmes which provide support for companies investing in energy efficiency. • To ensure a co-ordinated approach to standards setting for energy efficiency across all sectors. Need to mandate energy management practices • The most cost-effective way to improve energy efficiency in companies is to manage energy use in the same rigour as how other resources such as labour and materials are managed. Experiences of companies show that having processes and personnel in place to ensure energy is used prudently, spot and rectify faults that result in energy wastage, and monitor the effectiveness of EE improvement measures, can help achieve significant
  • 5. cost savings. Effective energy management will also allow companies to better respond to possible shifts in prices of energy and carbon in the future. • In early 2009, MEWR and NEA consulted 16 large energy users from the wafer fabrication, chemicals, electronics and pharmaceutical sectors, to better understand their current energy management practices. The consultations surfaced a wide range of practices. • Mandating energy management practices will focus the companies’ attention on energy issues, and complement existing schemes and capability building programmes which provide support for companies investing in energy efficiency. Countries such as Japan, Korea and Denmark already require such practices. The submission of plans will also allow government to identify the gaps that need to be addressed, such as by reviewing existing regulations, and enhancing existing or introducing new capability development and financial assistance measures. Impact of New Requirement on Industries • The proposed mandatory energy management practices will affect companies that consume more than 15 GWh of energy annually, or 1.29 ktoe of energy. Need to Introduce an Energy Conservation Act • Efforts to improve energy efficiency cuts across different sectors which are under the authority of different government agencies. The current approach f implementing energy efficiency requirements through a number of different Acts can be unwieldy. A new Energy Conservation Act that consolidates all energy efficiency-related legislation in all sectors will allow for a more co-ordinated approach to mandating energy efficiency requirements. • Establishing energy efficient standards across sectors under an Energy Conservation Act will also send a strong signal to external parties that Singapore is serious in undertaking mitigation actions to meet its international responsibilities.
  • 6. Energy audit Saving money on energy bills is attractive to businesses, industries, and individuals alike. Customers, whose energy bills use up a large part of their income, and especially those customers whose energy bills represent a substantial fraction of their company’s operating costs, have a strong motivation to initiate and continue an on-going energy cost-control program. No-cost or very low-cost operational changes can often save a customer or an industry 10-20% on utility bills; capital cost programs with payback times of two years or less can often save an additional 20-30%. In many cases these energy cost control programs will also result in both reduced energy consumption and reduced emissions of environmental pollutants. The energy audit is one of the first tasks to be performed in the accomplishment of an effective energy cost control program. An energy audit consists of a detailed examination of how a facility uses energy, what the facility pays for that energy, and finally, a recommended program for changes in operating practices or energy-consuming equipment that will cost-effectively save dollars on energy bills. The energy audit is sometimes called an energy survey or an energy analysis, so that it is not hampered with the negative connotation of an audit in the sense of an IRS audit. The energy audit is a positive experience with significant benefits to the business or individual, and the term ―audit‖ should be avoided if it clearly produces a negative image in the mind of a particular business or individual. An energy audit is an inspection, survey and analysis of energy flows for energy conservation in a building, process or system to reduce the amount of energy input into the system without negatively affecting the output. ENERGY AUDITING SERVICES Energy audits are performed by several different groups. Electric and gas utilities throughout the country offer free residential energy audits. A utility’s residential energy auditors analyze the monthly bills, inspect the construction of the dwelling unit, and
  • 7. inspect all of the energy-consuming appliances in a house or an apartment. Ceiling and wall insulation is measured, ducts are inspected, and appliances such as heaters, air conditioners, water heaters, refrigerators, and freezers are examined, and the lighting system is checked. Some utilities also perform audits for their industrial and commercial customers. They have professional engineers on their staff to perform the detailed audits needed by companies with complex process equipment and operations. When utilities offer free or low-cost energy audits for commercial customers, they usually only provide walk- through audits rather than detailed audits. Even so, they generally consider lighting, HVAC systems, water heating, insulation and some motors. Objectives of Energy Audit The Energy Audit provides the vital information base for overall energy conservation program covering essentially energy utilization analysis and evaluation of energy conservation measures. It aims at:  Identifying the quality and cost of various energy inputs.  Assessing present pattern of energy consumption in different cost centers of operations.  Relating energy inputs and production output.  Identifying potential areas of thermal and electrical energy economy.  Highlighting wastage’s in major areas.  Fixing of energy saving potential targets for individual cost centers.  Implementation of measures for energy conservation & realization of savings. Energy management team All the components of a comprehensive energy management program are depicted in Figure 2-1. These components are the organizational structure, a policy, and plans for audits, education, reporting, and strategy. It is hoped that by understanding the fundamentals of managing energy, the energy manager can then adapt a good working
  • 8. program to the existing organizational structure. Each component is discussed in detail below. Organizational structure The organizational chart for energy management shown in Figure 2-1 is generic. It must be adapted to fit into an existing structure for each organization. For example, the presidential block may be the general manager, and VP blocks may be division managers, but the fundamental principles are the same. The main feature of the chart is the location of the energy manager. This position should be high enough in the organizational structure to have access to key players in management, and to have knowledge of current events within the company. For example, the timing for presenting energy projects can be critical. Funding availability and other management priorities should be known and understood. The organizational level of the energy manager is also indicative of the support management is willing to give to the position.
  • 9. Energy Manager One very important part of an energy management program is to have top management support. More important, however, is the selection of the energy manager, who can among other things secure this support. The person selected for this position should be one with a vision of what managing energy can do for the company. Every successful program has had this one thing in common—one person who is a shaker and mover that makes things happen. The program is then built around this person. There is a great tendency for the energy manager to become an energy engineer, or a prima donna, and attempt to conduct the whole effort alone. Much has been accomplished in the past with such individuals working alone, but for the long haul, managing the program by involving everyone at the facility is much more productive and permanent. Developing a working organizational structure may be the most important thing an energy manager can do. The role and qualifications of the energy manager have changed substantially in the past few years, caused mostly by EPAC92 requiring certification of federal energy managers, deregulation of the electric utility industry bringing both opportunity and uncertainty, and by performance contracting requiring more business skills than engineering. Requirements for an energy management are: • Set up an Energy Management Plan • Establish energy records • Identify outside assistance • Assess future energy needs • Identify financing sources • Make energy recommendations
  • 10. • Implement recommendations • Provide liaison for the energy commit • Plan communication strategies • Evaluate program effectiveness Energy Team The coordinators shown in Figure 2-1 represent the energy management team within one given organizational structure, such as one company within a corporation. This group is the core of the program. The main criteria for membership should be an indication of interest. There should be a representative from the administrative group such as accounting or purchasing, someone from facilities and/or maintenance, and a representative from each major department. This energy team of coordinators should be appointed for a specific time period, such as one year. Rotation can then bring new people with new ideas, can provide a mechanism for tactfully removing non-performers, and involve greater numbers of people in the program in a meaningful way. Coordinators should be selected to supplement skills lacking in the energy manager since, as pointed out above, it is unrealistic to think one energy manager can have all the qualifications outlined. So, total skills needed for the team, including the energy manager may be defined as follows: • Have enough technical knowledge within the group to either understand the technology used by the organization, or be trainable in that technology. • Have knowledge of potential new technology that may be applicable to the program. • Have planning skills that will help establish the organizational structure, plan energy surveys, determine educational needs, and develop a strategic energy management plan.
  • 11. • Understand the economic evaluation system used by the organization, particularly payback and life cycle cost analysis. • Have good communication and motivational skills since energy management involves everyone within the organization. Energy audit instrument The requirement for an energy audit such as identification and quantification of energy necessitates measurements; these measurements require the use of instruments. These instruments must be portable, durable, easy to operate and relatively inexpensive. The parameters generally monitored during energy audit may include the following: Basic Electrical Parameters in AC &DC systems – Voltage (V), Current (I), Power factor, Active power (kW), apparent power (demand) (kVA), Reactive power (kVAr), Energy consumption (kWh), Frequency (Hz), Harmonics, etc. Parameters of importance other than electrical such as temperature & heat flow, radiation, air and gas flow, liquid flow, revolutions per minute (RPM), air velocity, noise and vibration, dust concentration, Total Dissolved Solids (TDS), pH, moisture content, relative humidity, flue gas analysis – CO2, O2, CO, SOx, NOx, combustion efficiency etc. Key instruments for energy audit are listed below  Tape Measures The most basic measuring device needed is the tape measure. A 25-foot tape measure l" wide and a 100 foot tape measure are used to check the dimensions of walls, ceilings, windows and distances between pieces of equipment for purposes such as determining the length of a pipe for transferring waste heat from one piece of equipment to the other.
  • 12.  Lightmeter One simple and useful instrument is the lightmeter which is used to measure illumination levels in facilities. A lightmeter that reads in foot candles allows direct analysis of lighting systems and comparison with recommended light levels specified by the Illuminating Engineering Society. A small lightmeter that is portable and can fit into a pocket is the most useful. Many areas in buildings and plants are still significantly over lighted, and measuring this excess illumination then allows the auditor to recommend a reduction in lighting levels through lamp removal programs or by replacing inefficient lamps with high efficiency lamps that may not supply the same amount of illumination as the old inefficient lamps.  Thermometers Several thermometers are generally needed to measure temperatures in offices and other worker areas, and to measure the temperature of operating equipment Knowing process temperatures allows the auditor to determine process equipment efficiencies, and also to identify waste heat sources for potential heat recovery programs. Inexpensive electronic thermometers with interchangeable probes are now available to measure temperatures in both these areas. Some common types include an immersion probe, a surface temperature probe, and a radiation shielded probe for measuring true air temperature. Other types of infra-red thermometers and thermographic equipment are also available. An infrared ―gun‖ is valuable for measuring temperatures of steam lines that are not readily reached without a ladder.  Voltmeter An inexpensive voltmeter is useful for determining operating voltages on electrical equipment and especially useful when the nameplate has worn off of a piece of equipment or is otherwise unreadable or missing. The most versatile instrument is a combined volt-ohm-ammeter with a clamp-on feature for measuring currents in conductors that are easily accessible. This type of multimeter is convenient and relatively
  • 13. inexpensive. Any newly purchased voltmeter, or multimeter, should be a true RMS meter for greatest accuracy where harmonics might be involved.  Wattmeter/Power Factor Meter A portable hand-held wattmeter and power factor meter is very handy for determining the power consumption and power factor of individual motors and other inductive devices. This meter typically has a clamp-on feature which allows an easy connection to the current-carrying conductor, and has probes for voltage connections. Any newly purchased wattmeter or power factor meter should be a true RMS meter for greatest accuracy where harmonics might be involved.  Combustion Analyzer Combustion analyzers are portable devices capable of estimating the combustion efficiency of furnaces, boilers, or other fossil fuel burning machines. Two types are available: digital analyzers and manual combustion analysis kits. Digital combustion analysis equipment performs the measurements and reads out in percent combustion efficiency. These instruments are fairly complex and expensive. The manual combustion analysis kits typically require multiple measurements including exhaust stack: temperature, oxygen content, and carbon dioxide content. The efficiency of the combustion process can be calculated after determining these parameters. The manual process is lengthy and is frequently subject to human error.  Airflow Measurement Devices Measuring air flow from heating, air conditioning or ventilating ducts, or from other sources of air flow is one of the energy auditor’s tasks. Airflow measurement devices can be used to identify problems with air flows, such as whether the combustion air flow into a gas heater is correct. Typical airflow measuring devices include a velometer, an anemometer, or an airflow hood.
  • 14.  Fuel Efficiency Monitor This measures oxygen and temperature of the flue gas. Calorific values of common fuels are fed into the microprocessor which calculates the combustion efficiency.  Pitot tube and manometer: Air velocity in ducts can be measured using a pitot tube and inclined manometer for further calculation of flows.  Lux meters: Illumination levels are measured with a lux meter. It consists of a photo cell which senses the light output, converts to electrical impulses which are calibrated as lux. HVAC Introduction The mechanical heating or cooling load in a building is dependent upon the various heat gains and losses experienced by the building including solar and internal heat gains and heat gains or losses due to transmission through the building envelope and infiltration (or ventilation) of outside air. The primary purpose of the heating, ventilating, and air- conditioning (HVAC) system in a building is to regulate the dry-bulb air temperature, humidity and air quality by adding or removing heat energy. Due to the nature of the energy forces which play upon the building and the various types of mechanical systems which can be used in non-residential buildings, there is very little relationship between the heating or cooling load and the energy consumed by the HVAC system. Human Thermal Comfort The ultimate objective of any heating, cooling and ventilating system is typically to maximize human thermal comfort. Due to the prevalence of simple thermostat control systems for residential and small-scale commercial HVAC systems, it is often believed
  • 15. that human thermal comfort is a function solely, or at least primarily, of air temperature. But this is not the case. Human thermal comfort is actually maximized by establishing a heat balance between the occupant and his or her environment. Since the body can exchange heat energy with its environment by conduction, convection and radiation, it is necessary to look at the factors which affect these heat transfer processes along with the body’s ability to cool itself by the evaporation of perspiration. All living creatures generate heat by burning food, a process known as metabolism. Only 20 percent of food energy is converted into useful work; the remainder must be dissipated as heat. This helps explain why we remain comfortable in an environment substantially cooler than our internal temperature of nearly 100°F (37°C). HVAC system type The energy efficiency of systems used to heat and cool buildings varies widely but is generally a function of the details of the system organization. On the most simplistic level the amount of energy consumed is a function of the source of heating or cooling energy, the amount of energy consumed in distribution, and whether the working fluid is simultaneously heated and cooled. System efficiency is also highly dependent upon the directness of control, which can sometimes overcome system inefficiency. HVAC system types can be typically classified according to their energy efficiency as highly efficient, moderately efficient or generally inefficient. This terminology indicates only the comparative energy consumption of typical systems when compared to each other. Using these terms, those system types classified as generally inefficient will result in high energy bills for the building in which they are installed, while an equivalent building with a system classified as highly efficient will usually have lower energy bills. However, it is important to recognize that there is a wide range of efficiencies within each category, and that a specific energy-efficient example of a typically inefficient system might have lower energy bills than the least efficient example of a moderately, or even highly efficient type of system.
  • 16. Figure 10.2 shows the relative efficiency of the more commonly used types of HVAC systems discussed below. The range of actual energy consumption for each system type is a function of other design variables including how the system is configured and installed in a particular building as well as how it is controlled and operated. Energy conservation apportunity The ultimate objective of any energy management program is the identification of energy conservation opportunities (ECO’s) which can be implemented to produce a cost saving. However, it is important to recognize that the fundamental purpose of an HVAC system is to provide human thermal comfort, or the equivalent environmental conditions for some specific process. It is therefore necessary to examine each ECO in the context of its
  • 17. effect on indoor air quality, humidity and thermal comfort standards, air velocity and ventilation requirements, and requirements for air pressurization. Thermal Comfort, Air Quality and Airflow It is not wise to undertake modifications of an HVAC system to improve energy efficiency without considering the effects on thermal comfort, air quality, and airflow requirements. Thermal Comfort One of the most serious errors which can be made in modifying HVAC systems is to equate a change in dry bulb air temperature with energy conservation. It is worthwhile to recall that dry bulb air temperature is not the most significant determinant of thermal comfort during either the heating season or cooling season. Since thermal comfort in the cooling season is most directly influenced by air motion cooling energy requirements can be reduced by increasing airflow and/or air motion in occupied spaces without decreasing dry bulb air temperature. During the heating season thermal comfort is most strongly influenced by radiant heating. Consequently, changes from forced-air heating to radiant heating can improve thermal comfort while decreasing heat energy requirements. The total energy, or enthalpy, associated with a change in environmental conditions includes both sensible heat and latent heat. Sensible heat is the heat energy required to increase dry bulb temperature. The heat energy associated with a change in moisture content of air is known as latent heat. (See Figure 10.12)
  • 18. Changes in HVAC system design or operation which reduce sensible heating or cooling requirements may increase latent heating or cooling energy which off- sets any energy conservation advantage. This is particularly true of economizer cycles (ß10.5.5). The use of cool, but humid outside air in an economizer can actually increase energy consumption if dehumidification requirements are increased. For this reason, the only reliable type of economizer control is enthalpy control which prevents the economizer from operating when latent cooling requirements exceed the savings in sensible cooling. Air velocity and air flow The evaluation of energy conservation opportunities often neglects previously established requirements for air velocity and airflow. As discussed above, the volume of air supplied and its velocity have a profound influence on human thermal comfort. ECO’s which reduce airflow can inadvertently decrease thermal comfort. Even more important, airflow cannot be reduced below the volume of outdoor air required by codes for ventilation.
  • 19. The design of an all-air or air-water HVAC system is much more complex that just providing a supply air duct and thermostat for each space. The completed system must be balanced to assure adequate airflow to each space, not only to offset the thermal loads, but also to provide the appropriate pressurization of the space. It is a common practice for supply air to exceed return air in selected spaces to create positive pressurization, which minimizes infiltration and prevents the intrusion of odors and other contaminants from adjacent spaces. Similarly, negative pressurization can be achieved by designing exhaust or return airflow to exceed supply air requirements in order to maintain a sterile field or to force contaminants to be exhausted. Any alterations in air supply or return requirements upset the relationship between supplies and return airflows requiring that the system be rebalanced. Indoor Air Quality Another factor which is often neglected in the application of ECO’s is the effect of system changes on indoor air quality. Indoor air quality requirements are most commonly met with ventilation and filtration provided by an all-air or air-water HVAC system. When outdoor air quantities are altered significantly, the effect on indoor air quality is unknown and must be determined. In a polluted environment, increasing outdoor air volume, for example with an economizer cycle, either increases filtration requirements or results in a deterioration of indoor air quality. On the other hand, reducing airflow to conditioned spaces due, for example, to a conversion to a variable air volume system, reduces the filtration of recycled indoor air which can likewise produce a reduction in air quality. Cooling equipment The most common process for producing cooling is vapor-compression refrigeration, which essentially moves heat from a controlled environment to a warmer, uncontrolled environment through the evaporation of a refrigerant which is driven through the refrigeration cycle by a compressor.
  • 20. Vapor compression refrigeration machines are typically classified according to the method of operation of the compressor. Small air-to-air units most commonly employ a reciprocating compressor which is combined with an air-cooled condenser to form a condensing unit. This is used in conjunction with a direct-expansion (DX) evaporator coil placed within the air-handling unit. Cooling systems for large non-residential buildings typically employ chilled water as the medium which transfers heat from occupied spaces to the outdoors through the use of chillers and cooling towers.
  • 21. Building envelope Building ―Envelope‖ generally refers to those building components that enclose conditioned spaces and through which thermal energy is transferred to or from the outdoor environment. The thermal energy transfer rate is generally referred to as ―heat loss‖ when we are trying to maintain an indoor temperature that is greater than the outdoor temperature. The thermal energy transfer rate is referred to as ―heat gain‖ when we are trying to maintain an indoor temperature that is lower than the outdoor temperature. Ultimately the success of any facility-wide energy management program requires an accurate assessment of the performance of the building envelope. This is true even when no envelope-related improvements are anticipated. Without a good understanding of how the envelope performs, a complete understanding of the interactive relationships of lighting and mechanical systems cannot be obtained. In addition to a good understanding of basic principles, seasoned engineers and analysts have become aware of additional issues that have a significant impact upon their ability to accurately assess the performance of the building envelope. 1. The actual conditions under which products and components are installed, compared to how they are depicted on architectural drawings. 2. The impact on performance of highly conductive elements within the building envelope; and 3. The extent to which the energy consumption of a building is influenced by the outdoor weather conditions, a characteristic referred to as thermal mass.
  • 22. Unit 2 Demand side management As with other developing countries the Pacific Island Countries (PICs) have experienced significant increase in electricity demand and as a result greater emphasis is now being placed on DSM and energy conservation activities. Most PICs are reliant on imported fossil fuel for electricity generation and are more vulnerable to the impacts of high oil prices. DSM offers significant benefits to PIC utilities, their customers and the PIC economies. From a utility perspective, in addition to reducing supply costs, DSM benefits also includes deferral of capital expenditure on generation, transmission and distribution facilities, improved system load factor, better customer relations and better data for load forecasting and system planning. Utilities have several options of improving system efficiency and these are summarized in below
  • 23. Defination and rationale Changing electricity markets in the developing and the developed countries face several challenges, largely due to the uncertainties in the load growth, higher investments required in capacity addition, declining fuel sources and its associated environmental costs. Tariff changes due to the changing regulatory stands also affect the ability of utilities to service its customer base. The concept of Demand-Side Management (DSM) was developed in response to the potential problems of global warming and the need for sustainable development, and the recognition that improved energy efficiency represents the most cost-effective option to reduce the impacts of these problems. DSM refers to cooperative activities between the utility and its customers (sometimes with the assistance of third parties such as energy services companies and various trade allies) to implement options for increasing the efficiency of energy utilization, with resulting benefits to the customer, utility, and society as a whole. Benefits of the DSM initiatives are diverse, as outlined in Table 2.1 below.
  • 24. DSM Planning and Implementation DSM programs are utility and customer specific. Figure 2.1 describes various steps involved in implementing a DSM programme.
  • 25. Step 1: Load Research This stage in the DSM implementation will typically assess the customer base, tariff, load profile on an hourly basis and will identify the sectors contributing to the load shape. This step will also identify the tariff classes in the utility, current recovery from different sectors and current subsidy offered to different sectors. Step 2: Define Load-shape Objectives Based on the results of the load research in the utility, DSM engineers will define the load shape objectives for the current situation. Various load-shape objectives - Peak Clipping (reduction in the peak demand), Valley Filling (increased demand at off-peak), Load Shifting (demand shifting to non-peak period), and Load Building (increased demand) are possible. These are represented in Figure 2.2.
  • 26. Step 3: Assess Programme Implementation Strategies This step will identify the end-use applications that can be potentially targeted to reduce peak demand, specifically in sectors with higher subsidies. This step will also carry out a detailed benefit-cost analysis for the end-users and the utilities, including analysis on societal as well as environmental benefits. Step 4: Implementation -Implementation stage will design the programme for specific end-use applications, will promote the programme to the target audience through marketing approaches such as advertising, bills and inserts, and focused group meetings as in case of the industrial sector. Step 5: Monitoring and Evaluation -This step will track the programme design and implementation and will compare the same with proposed DSM goal set by the utility. A detailed benefit-cost analysis in this case will include identifying the avoided supply cost for the utility vis-à-vis the total programme cost for the utilities and benefits to the participants including the reduced bills or incentives to the end-users.
  • 27.
  • 28. Applicable DSM Programs The UNDP Power Sector Project (1993-1996) identified nine DSM programs that would be applicable for the Pacific Islands. The proposed programs were: • Compact Fluorescent Lamp (CFL) Programme • High Efficiency Fluorescent Lighting Programme • Refrigerator Labelling and Standards Programme • Air Conditioner Labelling and Standards Programme • Commercial Refrigeration Equipment Maintenance Programme • Air Conditioner Equipment Maintenance Programme • Interruptible Rates for Large Customers • Energy Audit Programme for Large Customers • Air Conditioner Timer Control Programme Based on international experience other applicable programs include: • Municipal Water Pumping Programme • Street-lighting Programme • Solar Hot Water Programme • Time-of-Use Tariffs for Industrial and Commercial customers
  • 29. Why promote DSM Various reasons are put forward for promoting or undertaking DSM. For example,DSM may be aimed at addressing the following issues (University of Warwick,REEEP, 2005):  Cost reduction—many DSM and energy efficiency efforts have been introduced in the context of integrated resource planning and aimed at reducing total costs of meeting energy demand;  Environmental and social improvement—energy efficiency and DSM may be pursued to achieve environmental and/or social goals by reducing energy use, leading to reduced greenhouse gas emissions;  Reliability and network issues—ameliorating and/or averting problems in the electricity network through reducing demand in ways which maintain system reliability in the immediate term and over the longer term defer the need for network augmentation;  Improved markets—short-term responses to electricity market conditions (―demand response‖), particularly by reducing load during periods of high market prices caused by reduced generation or network capacity. An energy customer may have many reasons for selecting a certain DSM activity. Generally these would be economic, environmental, marketing or regulatory. The above points are expressed in a slightly different way (Satish Saini, 2004), where it is argued that the benefits of DSM to consumers, enterprises, utilities and society can be realized through:  Reductions in customer energy bills;  Reductions in the need for new power plant, transmission and distribution networks;  Stimulation of economic development;  Creation of long-term jobs due to new innovations and technologies;  Increases in the competitiveness of local enterprises;  Reduction in air pollution;  Reduced dependency on foreign energy sources;  Reductions in peak power prices for electricity.
  • 30. Unit 3 ABSTRACT Shunt capacitor banks are used to improve the quality of the electrical supply and the efficient operation of the power system. Studies show that a flat voltage profile on the system can significantly reduce line losses. Shunt capacitor banks are relatively inexpensive and can be easily installed anywhere on the network. The protection of shunt capacitor bank includes: a) protection against internal bank faults and faults that occur inside the capacitor unit; and, b) protection of the bank against system disturbances. INTRODUCTION Shunt capacitor banks (SCB) are mainly installed to provide capacitive reactive compensation power factor correction. The use of SCBs has increased because they are relatively inexpensive, easy and quick to install and can be deployed virtually anywhere in the network. Its installation has other beneficial effects on the system such as: improvement of the voltage at the load, better voltage regulation (if they were adequately designed), reduction of losses and reduction or postponement of investments in transmission. The main disadvantage of SCB is that its reactive power output is proportional to the square of the voltage and consequently when the voltage is low and the system need them most, they are the least efficient. THE CAPACITOR UNIT AND BANK CONFIGURATIONS 2.1 The Capacitor Unit The capacitor unit, Fig. 1, is the building block of a shunt capacitor bank. The capacitor unit is made up of individual capacitor elements, arranged in parallel/ series connected groups, within a steel enclosure. The internal discharge device is a resistor that reduces the unit residual voltage o 50V or less in 5 min. Capacitor units are available in a variety of voltage ratings (240 V to 24940V) and sizes (2.5 kvar to about 1000 kvar).
  • 31. Capacitor unit capabilities Relay protection of shunt capacitor banks requires some knowledge of the capabilities and limitations of the capacitor unit and associated electrical equipment including: individual capacitor unit, bank switching devices, fuses, voltage and current sensing devices. Capacitors are intended to be operated at or below their rated voltage and frequency as they are very sensitive to these values; the reactive power generated by a capacitor is proportional to both of them (kVar ≈ 2π f V 2). The IEEE Std 18-1992 and Std 1036- 1992 specify the standard ratings of the capacitors designed for shunt connection to ac systems and also provide application guidelines. These standards stipulate that: a) Capacitor units should be capable of continuous operation up to 110% of rated terminal rms voltage and a crest voltage not exceeding 1.2 x √2 of rated rms voltage, including harmonics but excluding transients. The capacitor should also be able to carry 135% of nominal current.
  • 32. b) Capacitors units should not give less than 100% nor more than 115% of rated reactive power at rated sinusoidal voltage and frequency. c) Capacitor units should be suitable for continuous operation at up to 135%of rated reactive power caused by the combined effects of: • Voltage in excess of the nameplate rating at fundamental frequency, but not over 110% of rated rms voltage. • Harmonic voltages superimposed on the fundamental frequency. • Reactive power manufacturing tolerance of up to 115% of rated reactive power. 2.2 Bank Configurations The use of fuses for protecting the capacitor units and it location (inside the capacitor unit on each element or outside the unit) is an important subject in the design of SCBs. They also affect the failure mode of the capacitor unit and influence the design of the bank protection. Depending on the application any of the following configurations are suitable for shunt capacitor banks: a) Externally Fused An individual fuse, externally mounted between the capacitor unit and the capacitor bank fuse bus, typically protects each capacitor unit. The capacitor unit can be designed for a relatively high voltage because the external fuse is capable of interrupting a high-voltage fault. Use of capacitors with the highest possible voltage rating will result in a capacitive bank with the fewest number of series groups. A failure of a capacitor element welds the foils together and short circuits the other capacitor elements connected in parallel in the same group. The remaining capacitor elements in the unit remain in service with a higher voltage across them than before the failure and an increased in capacitor unit current. If a second element fails the process
  • 33. repeats itself resulting in an even higher voltage for the remaining elements. Successive failures within the same unit will make the fuse to operate, disconnecting the capacitor unit and indicating the failed one. Externally fused SCBs are configured using one or more series groups of parallel- connected capacitor units per phase (Fig. 2). The available unbalance signal level decreases as the number of series groups of capacitors is increased or as the number of capacitor units in parallel per series group is increased. However, the kiloVar rating of the individual capacitor unit may need to be smaller because a minimum number of parallel units are required to allow the bank to remain in service with one fuse or unit out. b) Internally Fused Each capacitor element is fused inside the capacitor unit. The fuse is a simple piece of wire enough to limit the current and encapsulated in a wrapper able to withstand the heat produced by the arc. Upon a capacitor element failure, the fuse removes the affected
  • 34. element only. The other elements, connected in parallel in the same group, remain in service but with a slightly higher voltage across them. Fig. 3 illustrates a typical capacitor bank utilizing internally fused capacitor units. In general, banks employing internally fused capacitor units are configured with fewer capacitor units in parallel and more series groups of units than are used in banks employing externally fused capacitor units. The capacitor units are normally large because a complete unit is not expected to fail. c) Fuseless Shunt Capacitor Banks The capacitor units for fuseless capacitor banks are identical to those for externally fused described above. To form a bank, capacitor units are connected in series strings between phase and neutral, shown in Fig. 4. The protection is based on the capacitor elements (within the unit) failing in a shorted mode, short- circuiting the group. When the capacitor element fails it welds and the
  • 35. capacitor unit remains in service. The voltage across the failed capacitor element is then shared among all the remaining capacitor element groups in the series. For example, is there are 6 capacitor units in series and each unit has 8 element groups in series there is a total of 48 element groups in series. If one capacitor element fails, the element is shortened and the voltage on the remaining elements is 48/47 or about a 2% increase in the voltage. The capacitor bank continues in service; however, successive failures of elements will lead to the removal of the bank. The fuseless design is not usually applied for system voltages less than about 34.5 kV. The reason is that there shall be more than 10 elements in series so that the bank does not have to be removed from service for the failure of one element because the voltage across the remaining elements would increase by a factor of about E (E – 1), where E is the number of elements in the string. The discharge energy is small because no capacitor units are connected directly in parallel. Another advantage of fuseless banks is that the unbalance protection does not have to be delayed to coordinate with the fuses.
  • 36. d) Unfused Shunt Capacitor Banks Contrary to the fuseless configuration, where the units are connected in series, the unfused shunt capacitor bank uses a series/parallel connection of the capacitor units. The unfused approach would normally be used on banks below 34.5 kV, where series strings of capacitor units are not practical, or on higher voltage banks with modest parallel energy. This design does not require as many capacitor units in parallel as an externally fused bank. CAPACITOR BANK DESIGN The protection of shunt capacitor banks requires understanding the basics of capacitor bank design and capacitor unit connections. Shunt capacitors banks are arrangements of series/ paralleled connected units. Capacitor units connected in paralleled make up a group and series connected groups form a single-phase capacitor bank. As a general rule, the minimum number of units connected in parallel is such that isolation of one capacitor unit in a group should not cause a voltage unbalance sufficient to place more than 110% of rated voltage on the remaining capacitors of the group. Equally, the minimum number of series connected groups is that in which the complete bypass of the group does not subject the others remaining in service to a permanent overvoltage of more than 110%. The maximum number of capacitor units that may be placed in parallel per group is governed by a different consideration. When a capacitor bank unit fails, other capacitors in the same parallel group contain some amount of charge. This charge will drain off as a high frequency transient current that flows through the failed capacitor unit and its fuse. The fuse holder and the failed capacitor unit should withstand this discharge transient. The discharge transient from a large number of paralleled capacitors can be severe enough to rupture the failed capacitor unit or the expulsion fuse holder, which may result in damage to adjacent units or cause a major bus fault within the bank. To minimize the probability of failure of the expulsion fuse holder, or rupture of the capacitor case, or
  • 37. both, the standards impose a limit to the total maximum energy stored in a paralleled connected group to 4659 kVar. In order not to violate this limit, more capacitor groups of a lower voltage rating connected in series with fewer units in parallel per group may be a suitable solution. However, this may reduce the sensitivity of the unbalance detection scheme. Splitting the bank into 2 sections as a double Y may be the preferred solution and may allow for better unbalance detection scheme. Another possibility is the use of current limiting fuses. The optimum connection for a SCB depends on the best utilization of the available voltage ratings of capacitor units, fusing, and protective relaying. Virtually all substation banks are connected wye. Distribution capacitor banks, however, may be connected wye or delta. Some banks use an H configuration on each of the phases with a current transformer in the connecting branch to detect the unbalance. CAPACITOR BANK PROTECTION The protection of SCB’s involves: a) protection of the bank against faults occurring within the bank including those inside the capacitor unit; and, b) protection of the bank against system disturbances and faults. The protection selected for a capacitor bank depends on bank configuration, whether or not the capacitor bank is grounded and the system grounding. Capacitor Unbalance Protection The protection of shunt capacitor banks against internal faults involves several protective devices/ elements in a coordinated scheme. Typically, the protective elements found in a SCB for internal faults are: individual fuses (not discuss in this paper), unbalance protection to provide alarm/ trip and overcurrent elements for bank fault protection. Removal of a failed capacitor element or unit by its fuse results in an increase in voltage across the remaining elements/ units causing an unbalance within the bank. A continuous overvoltage (above 1.1pu) on any unit shall be prevented by means of protective relaysthat trip the bank. Unbalance protection normally senses changes associated with
  • 38. the failure of a capacitor elemenor unit and removes the bank from service when the resulting overvoltage becomes excessive on the remaining healthy capacitor units. Unbalance protection normally provides the primary protection for arcing faults within a capacitorbank and other abnormalities that may damage capacitor elements/ units. Arcing faults may cause substantial damage in a small fraction of a second. The unbalance protection should haveminimum intentional delay in order to minimize the amount of damage to the bank in the event ofexternal arcing. In most capacitor banks an external arc within the capacitor bank does not result in enough change in the phase current to operate the primary fault protection (usually an overcurrent relay)The sensitivity requirements for adequate capacitor bank protection for this condition may be verdemanding, particularly for SBC with many series groups. The need for sensitive resulted in the development of unbalance protection where certain voltages or currents parameters of the capacitor bank are monitored and compared to the bank balance conditions. Capacitor unbalance protection is provided in many different ways, depending on the capacitor bank arrangement and grounding. A variety of unbalance protection schemes are used for internally fused, externally fused, fuseless, or unfused shunt capacitor.
  • 39. Unit-4 MOTOR EFFICIENCY MOTOR:- An electric motor is an electromechanical device that converts electrical energy into mechanical energy. EFFICIENCY:- Efficiency in general describes the extent to which time or effort is well used for the intended task or purpose. It is often used with the specific purpose of relaying the capability of a specific application of effort to produce a specific outcome effectively with a minimum amount or quantity of waste, expense, or unnecessary effort. MOTOR EFFICIENCY:-In a perfect world, AC induction motors would operate at 100% efficiency – in other words, every kilowatt of power delivered to the motor terminals would be converted to useful work at the motor shaft. However, in the real world this is not the case. Only a percentage of the delivered power is converted to useful work, and that percentage will vary. The efficiency is the ratio of power delivered by the motor at the shaft to the power delivered to the motor at the terminals. In general, AC motors operate most efficiently at around 75% of full rated load, with the efficiency falling off only slightly until somewhere between 25% and 50% of full load, where the efficiency begins to drop significantly. As a rule of thumb, the larger the motor, the flatter this curve is, and the lower the load percentage has to drop before the efficiency starts to drop. The efficiency curve for typical AC motors is shown below:
  • 40. Most electric motors are designed to run at 50% to 100% of rated load. Maximum efficiency is usually near 75% of rated load. Thus, a 10-horsepower (hp) motor has an acceptable load range of 5 to 10 hp; peak efficiency is at 7.5 hp. A motor’s efficiency tends to decrease dramatically below about 50% load. However, the range of good efficiency varies with individual motors and tends to extend over a broader range for larger motors. A motor is considered under loaded when it is in the range where efficiency drops significantly with decreasing load. Power factor tends to drop off sooner, but less steeply than efficiency, as load decreases. Overloaded motors can overheat and lose efficiency. Many motors are designed with a service factor that allows occasional overloading. Service factor is a multiplier that indicates how much a motor can be overloaded under ideal ambient conditions. For example, a 10-hp motor with a 1.15 service factor can handle an 11.5-hp load for short periods of time without incurring significant damage. Although many motors have service factors of 1.15, running the motor continuously above rated load reduces efficiency and motor life. Never operate overloaded when voltage is below nominal or when cooling is impaired by altitude, high ambient temperature, or dirty motor surfaces. If your operation uses equipment with motors that operate for extended periods under 50% load, consider making modifications. Sometimes motors are oversized because they must accommodate peak conditions, such as when a pumping system must satisfy
  • 41. occasionally high demands. Options available to meet variable loads include two-speed motors, adjustable speed drives, and load management strategies that maintain loads within an acceptable range. Determining if motors are properly loaded enables to make informed decisions about when to replace motors and which replacements to choose. Measuring motor loads is relatively quick and easy when we use the techniques discussed. We should perform a motor load and efficiency analysis on all of your major working motors as part of our preventative maintenance and energy conservation program. Recommend that survey and test all motors operating over 1000 hours per year. Using the analysis results, divide your motors into the following categories: • Motors that are significantly oversized and under loaded—replace with more efficient, properly sized models at the next opportunity, such as scheduled plant downtime. • Motors that are moderately oversized and under loaded—replace with more efficient, properly sized models when they fail. • Motors that are properly sized but standard efficiency—replace most of these with energy-efficient models when they fail. The cost effectiveness of an energy-efficient motor purchase depends on the number of hours the motor is used, the price of electricity, and the price premium of buying an energy-efficient motor. Determining Motor Loads  Input Power Measurements When ―direct-read‖ power measurements are available, use them to estimate motor part- load. With measuredparameters taken from hand-held instruments, you can use Equation 1 to calculate the three-phase input powerto the loaded motor. You can then quantify the motor’s part-load by comparing the measured input power underload to the power
  • 42. required when the motor operates at rated capacity.The relationship is shown in Equation3.
  • 43.  Line Current Measurements The current load estimation method is recommended when only amperage measurements are available. Theamperage draw of a motor varies approximately linearly with respect to load, down to about 50% of full load. Below the 50% load point, due to reactive magnetizing current requirements, power factor degradesand the amperage curve becomes increasingly non-linear. In the low load region, current measurements are not a useful indicator of load.  The Slip Method The slip method for estimating motor load is recommended when only operating speed measurements are available.The synchronous speed of an induction motor depends on the frequency of the power supply and on thenumber of poles for which the motor is wound. The higher the frequency, the faster a motor runs. The more polesthe motor has, the slower it runs. Table 1 indicates typical synchronous speeds
  • 44. Determining Motor Efficiency The NEMA definition of energy efficiency is the ratio of its useful power output to its total power input and is usually expressed in percentage:- By definition, a motor of a given rated horsepower is expected to deliver that quantity of power in a mechanical form at the motor shaft. Figure is a graphical depiction of the process of converting electrical energy to mechanical energy. Motor losses are the difference between the input and output power. Once the motor efficiency has been determined and the input power is known, you can calculate output power. NEMA design A and B motors up to 500 hp in size are required to have a full-load efficiency value (selected from a table of nominal efficiencies) stamped on the nameplate. Most analyses of motor energy conservation savings assume that the existing motor is operating at its nameplate efficiency. This assumption is reasonable above the 50% load point as motor efficiencies generally peak at around 3/4 load with performance at 50% load almost identical to that at full load. Larger horsepower motors exhibit a relatively flat efficiency curve down to 25% of full load.
  • 45. It is more difficult to determine the efficiency of a motor that has been in service a long time. It is not uncommon for the nameplate on the motor to be lost or painted over. In that case, it is almost impossible to locate efficiency information. Also, if the motor has been rewound, there is a probability that the motor efficiency has been reduced. When nameplate efficiency is missing or unreadable, you must determine the efficiency value at the operating load point for the motor. If available, record significant nameplate data and contact the motor manufacturer. With the style, type, and serial number, the manufacturer can identify approximately when the motor was manufactured. Often the manufacturer will have historical records and can supply nominal efficiency values as a function of load for a family of motors. When the manufacturer cannot provide motor efficiency values, you may use estimates from contains nominal efficiency values at full, 75%, 50%, and 25% load for typical standard efficiency motors of various sizes and with synchronous speeds of 900, 1200, 1800, and 3600 rpm. Three steps are used to estimate efficiency and load. First, use power, amperage, or slip measurements to identify the load imposed on the operating motor. Second, obtain a motor part-load efficiency value consistent with the approximated load either from the manufacturer or by interpolating from the data supplied. Finally, if direct-read power measurements are available, derive a revised load estimate using both the power measurement at the motor terminals and the part-load efficiency value as shown:-
  • 46. Power Factor: Instantaneous power is proportional to instantaneous voltage times instantaneous current. AC voltage causes the current to flow in a sine wave replicating the voltage wave.However, inductance in the motor windings somewhat delays current flow, resulting in a phase shift. This transmits less net power than perfectly time-matched voltage and current of the same RMS values. Power factor is the fraction of power actually delivered in relation to the power that would be delivered by the same voltage and current without the phase shift. Low power factor does not imply lost or wasted power, just excess current. The energy associated with the excess current is alternately stored in the windings’ magnetic field and regenerated back to the line with each AC cycle. This exchange is called reactive power. Though reactive power is theoretically not lost, the distribution system must be sized to accommodate it, which is a cost factor. To reduce these costs, capacitors are used to ―correct‖ low power factor. Capacitors can be thought of as electrical reservoirs to capture and reflect reactive power back to the motor. RMS Voltage : AC voltage rises positive and falls negative 60 times per second, so how do you state its value? Industry practice is to quote the RMS voltage. RMS is a value 70.7% of the peak positive voltage. An RMS voltage will produce exactly the same heating rate in a resistive load as a DC voltage of the same value. RMS is the acronym for the mathematical steps used in its derivation. Square the voltage at all moments in an AC cycle, take the mean of these, and then take the square root of the mean. For reasons lost in obscurity, the steps are stated in reverse sequence, Root Mean Square. ENERGY EFFICIENT LIGHTING AND BARRIERS IN ITS IMPLEMENTATION Introduction: Energy management and cost reductions are key tools in strategic planning. Energy costs now constitute a major component of operating funds. Thus, energy conservation and efficiency improvement are key necessities for enhanced productivity. Lighting in a typical telecom building constitutes about25% of the energy bills. There is a considerable scope of reducing energy consumption through energy efficient lighting schemes. However, the experience shows that there are barriers in
  • 47. providing energy efficient lighting schemes due to high capital cost, lack of knowledge and good quality products. Measures for energy efficient and economic use of lighting: Measures which can contribute for energy efficient and economic use of lighting are asunder: (i) Segregation of general and task lighting. (ii) Automatic switching On and Off of lighting by using sensors. (iii) Maximum use of sunlight. (iv) Light surrounding décor. (v) Use of energy efficient lamps (HPMV, HPSV, CFL,Slimline tubes TL5 tubes etc. etc). (vi) Use of dimmers to reduce the intensity of artificial light as the sunlight is used. (vii) High efficiency luminors. (viii) High frequency chokes. ENERGY EFFICIENT LUMINOR: The norms issued by the directorate specifically provides for use of 1X40watt mirror optic fluroscent tubes fittings . It is seen that this luminor gives maximum lumens per watt. Subsequent to the issue of norms, it is seen that M/S Asian Electronic Ltd. Have come out with Asian E+ energy efficient tubelights, claiming reduction of about 45% in lighting load. This tubelight can be retrofitted and also available with a optional demur switch. These fixtures uses M/S Osram E5 lamps which has rates life of 18000 burning hours as against 5000 burning hours for conventional fluroscent tubes. ELECTRONIC CHOKES: Even though it is established that high frequency electronic glass provides significant savings in power, yet there has been a great amount of reluctance to use the same , due to following reasons.
  • 48. (i) High cost of good quality electronic (ii) Generation of harmonics and humming sound by some of these electronic chokes (iii) Blowing of fuse provided in some of these chokes for protection of electronic circuit. On experimental basis, these chokes have been used in some of the exchanges and departmental complexes, with mixed results. AUTOMATIC SWITCHING ON & OFF OF LIGHTING BY USING SENSORS: In Telecom. Buildings, so far we have not used sensors for automatic switching ON & OFF the lightings. The use of these sensors can provide substantial savings , as it is seen that occupants of the building normally do not switch off the lighting, even when they are away from their place of work. Similarly in some of the switch rooms, the lightings may be ON even when nobody is working in the switch room. The movement sensors, in such cases, can be effectively used to switch off the lighting for energy conservation. Dimmers can also be used effectively to reduce the intesntiy of the light as the sunlight increases during the day time. DAYLIGHT: By suitable design of buildings / switch rooms, indirect sunlight can be used. to provide illumination during day time, without increasing the heat load. This has to be coordinated with the Architect. So that tailormade shafts or ducts can be provided in abuilding to bring daylight as a source of lighting inside the building , thereby, minimizing need for aritificial lighting. LIGHT SURROUNDING DÉCOR:The décor plays an important part in illumination design. Light décor will require less lighting and thus, can contribute for energy saving. This can be coordinated with the Architect. USE OF ENERGY EFFICIENT LAMPS: The compact flursocent lamps instead of incandescent lamps , in general area, will result in substantial energy conservations. The lighting in general area inside a building is normally switched ON for maximum period
  • 49. in the day and thus ,use of efficient lamps will definitely contribute in energy savings. Similarly, slimline tubes (36watt) , and Asian E+ tube fittings with T5 lamp, can result into substantial savings. BARRIERS TO PROVIDE ENERGY EFFICIENT LIGHTING: The energy efficient lighting is often a symbol for energy efficiency in general . However, it is seen that practically there are number of barriers in providing energy efficient lighting. (i) High capital cost- The energy efficient fixtures such as Asian E+ with T5 lamps , Electronic chokes, sensors and dimmers have high capital cost . (ii) Lack of awareness – Some of the products which can contribute significantly in improving lighting efficiency are not available in local markets resulting into lack of awareness. (iii) Availability of Quality products- There are not sufficient guarantees that energy efficient accessories / fixtures will perform satisfactorily in the field for their declared life. It is often seen that life of some of these products is much less as compared to the declared life and it is a common knowledge that electronic chokes do produce humming sound in many cases and requires special setting for individual sets. Light fixture A light fixture, light fitting, or luminaire is an electrical device used to create artificial light by use of an electric lamp. All light fixtures have a fixture body and a light socket to hold the lamp and allow for its replacement. Fixtures may also have a switch to control the light. Fixtures require an electrical connection to a power source; permanent lighting may be directly wired, and moveable lamps have a plug. Light fixtures may also have other features, such as reflectors for directing the light, an aperture (with or without a lens), an outer shell or housing for lamp alignment and protection, and an electrical ballast or power supply. A wide variety of special light fixtures are created for use in the automotive lighting industry, aerospace, marine and medicine.
  • 50. The use of the word "lamp" to describe light fixtures is common slang for an all-in-one luminary unit, usually portable "fixtures" such as a table lamp or desk lamp (in contrast to a true fixture, which is fixed in place with screws or some other semi-permanent attachment). In technical terminology, a lamp is the light source, what is typically called the light bulb.