SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) (Architecture)
BUILDING TECHNOLOGY 1 [ARC3514 / ARC3512]
NAME: GERTRUDE LEE YUE SIEW
STUDENT ID: 0306265
TUTOR: MR ADIB RAMLI
TABLE OF CONTENT
1.0 INTRODUCTION
2.0 DESIGN MODIFICATION
2.1 FLOOR SYSTEM
2.1.1 PRECEDENT STUDIES
2.1.2 MATERIALS
2.1.3 ADVANTAGES & DISADVANTAGES
2.2 WALL SYSTEM
2.2.1 PRECEDENT STUDIES
2.2.2 MATERIALS
2.2.3 ADVANTAGES & DISADVANTAGES
2.3 ROOF SYSTEM
2.3.1 PRECEDENT STUDIES
2.3.2 MATERIALS
2.3.3 ADVANTAGES & DISADVANTAGES
2.4 BASEMENT
2.4.1 MATERIALS USED
3.0 WORKING DRAWINGS
4.0 REFERENCES
3
4-7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
33
1.0 INTRODUCTION
This project is about designing a Nature Appreciation Centre and it is located at Belum Rainforest Resort. The function of the Nature Appreciation Centre is to
allow visitors and tourists to experience and appreciated nature as Belum Rainforest is a forest reserve area. As for this module, we were required to bring this design project to
discuss with the lecturer on which portion of the building that can be utilized for this assignment. We are required to change the original construction systems and building materials,
to replace with a more complex construction system.
This project concentrates on the construction system of the building after a part of the building chosen. The types of construction system changes that are
suppose to be carried out are :-
i. Floor system
ii. Wall system
iii. Roof system
iv. Basement level (which is to be shown in the section)
Before picking out any construction system, we are required to conduct precedent studies regarding the construction system that is going to be applied to the building. We are also
required to provide detail description of all construction system used as well as analysis of the advantages and disadvantages of both existing systems and the new system proposed.
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 3
2.0 DESIGN MODIFICATION
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 4
As we were required to take out a part of the building and change the original construction systems and building materials, to replace with a more complex construction system, the
diagram below shows the original design and proposed design.
ORIGINAL FIRST FLOOR PLAN
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 5
PROPOSED FIRST FLOOR PLAN
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 6
ORIGINAL SECOND FLOOR PLAN
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 7
PROPOSED FIRST FLOOR PLAN
2.1 FLOOR SYSTEM
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 8
Floor system is one of the important structural element of a typical multi-storey building. A typical floor system is made up of beams, columns, floor slab and if it is on the ground floor,
there would be a foundation. As for my original design, the floor system that was used in my design is timber flooring. As for my proposed design, the floor system that was used in my
design is concrete hollow core slab.
Original design : Timber Flooring System Proposed design: Hollow Core Concrete Slab Floor System
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 9
2.1.1 PRECEDENT STUDIES
Building: Bergen Fire Station
Architects: Stein Halvorsen Arkitekter
Location : Bergen, Norway
This building is a curved shaped building as this follows the outer edge of the site in order to keep
the area as wide as possible. This also helps to create a dense screen against traffic and it helps
create sheltered space in front.
Concrete is the main material used for this building as this can be seen from the base as the entire
base is made of cast-on-site concrete. The secondary materials used are steel and aluminium.
The structural elements used to construct the floor system are steel structure and hollow core slab.
Figure 1 : Bergen Fire Station, Bergen
Source : http://www.archdaily.com/97807/bergen-fire-station-stein-
halvorsen-sivilarkitekter/
Figure 2 : Section of Bergen Fire Station, Bergen
Source : http://de.urbarama.com/project/main-fire-station-bergen
As can be seen from Figure 2, which is the section of the building, the floor system used is hollow
core slab supported by I-steel beam. Hollow core slab is also know as voided slab is one of the
typical floor systems used to construct floors in multi-storey building such as apartments.
Hollow core slab provides maximum structural efficiency with the use of concrete and at the same
time having low energy consumption. Hollow core slab is an ideal structural section as it also reduce
deadweight. It is also possible to be reuse and recycle which will help in less material wastage making
It environmental friendly.
Concrete is used to make hollow core slab. Concrete is a very versatile building material as it is
durable. Each floor units using hollow core floor system are averagely 1200mm wide and up to 20m
long. This is why hollow core floor system are normally used in buildings which has a larger span.
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 10
For my proposed design, for the floor system, I proposed hollow core concrete slab to replace the timber flooring. Hollow core
concrete slab floor system must have suitable materials and structural elements in order for the system to work well.
MATERIALS / STRUCTURAL
ELEMENTS
MANUFACTURER PROPERTIES
HOLLOW CORE CONCRETE
SLAB
SPC INDUSTRIES SDN
BHD
o Provides maximum structural efficiency with utilization of high
strength concrete
o Low material consumption
o Mainly used in buildings with larger span. E.g apartments,
hospitals schools
o Favourable cost rate and fast erection
I – STEEL BEAM BESTWELD STEEL
SYSTEM SDN BHD
o Resist shear forces
o Very efficient form for carrying bending and shear load
o Can be used as both beams and columns
2.1.2 MATERIALS / STRUCTURAL ELEMENTS
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 11
Original design : Timber floor system
2.1.3 ADVANTAGES AND DISADVANTAGES
ADVANTAGES DISADVANTAGES
 Good quality timber will last for decades  Will be damaged if exposed to excessive
moisture
 Easy to construct  Regular maintenance as to prevent termites
from attacking
 Cost efficient  Regular polishing every 3-4 years
 Good aesthetic
 Good sound absorber
Proposed design : Concrete hollow core floor system
ADVANTAGES DISADVANTAGES
 Has longitudinal core that helps reduce the
weight of the floor
 Health problem will be an issue if air supply is
not released from the duct as it has to be
cleaned from time to time
 Commonly used in large span building as it is
durable
 Handling and transporting. Being precast, it
will be heavy and fragile
 Excellent fire resistance
 High speed of erection as it is pre-cast
 High load capacity
Figure 3 : Timber Floor System
Source: www.dlsweb.rmit.edu.au
Figure 4 : Concrete Hollow Core Floor System
Source: hubhomedesign.com
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 12
Wall system is another important structural element of a typical multi-storey building. My original design of the space is actually timber wall façade and as for my proposed design of
the space, I decided to change it to glass curtain wall.
Original Design : Timber Façade Wall System
Original Design : Glass Curtain Wall System
2.2 WALL SYSTEM
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 13
2.2.1 PRECEDENT STUDIES
Building: Dolomites House
Architects: JM Architecture
Location : Dolomite Mountains, Italy
The existing building has a very large and high entry hall with rooms and it also allows users to
experience the space as it is necessary to walk through the entry hall in order to move around the
house. Clear glass envelope and gyp wall was inserted in order to separate one space from another
after the whole ground floor is being demolished
Figure 5 : Dolomites House, Dolomite Mountains, Italy
Source : http://www.archdaily.com/4806/dolomites-house-jm-
architecture/
The architect decided to replace the facades with glass
curtain wall to allow the maximum amount of light into the
room as before this they could not get enough light into
the house.The glass curtain wall used for this building has
the base and head of mullion flush with the floor and
ceiling.
Glass curtain wall is defined as thin, aluminium-framed
wall, containing in-fills of glass and it is attached to the
building structure. It also does not carry the weight of the
floor or roof. Glass curtain wall method of glazing allows
glass to be used in large uninterrupted areas creating
consistent attractive facades.
Figure 6 : Dolomites House, Dolomite Mountains, Italy
Source : http://www.archdaily.com/4806/dolomites-house-jm-
architecture/
Figure 7 : Detail Drawing of Curtain Wall Used at Dolomite House
Source : http://www.archdaily.com/4806/dolomites-house-jm-
architecture/
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 14
For my proposed design, for the wall system, I proposed glass curtain wall to replace the timber façade wall.
2.2.2 MATERIALS / STRUCTURAL ELEMENTS
MATERIALS / STRUCTURAL
ELEMENTS
MANUFACTURER PROPERTIES
ALUMINIUM FRAME
FUJISASH (M) SDN BHD
o It is light weight as it is averagely 50kg/m2 which helps to reduce
the weight of high rise building.
o It allows light to pass through, enabling the building to use
natural lighting in the day as their light sourceGLASS
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 15
Original design : Timber façade wall system
2.2.3 ADVANTAGES AND DISADVANTAGES
ADVANTAGES DISADVANTAGES
 Quick erection time  Additional design and engineering time
 Reduce site labour work  Will decay if exposed to excessive moisture and
termites
 Recyclable  Requires vigilant control to achieve fire rating
 Low embodied energy if constructed from local
timber
 Good sound absorber
Proposed design : Glass curtain wall system
ADVANTAGES DISADVANTAGES
 Light weight allowing it to reduce the weight of
high rise buildings
 When light penetrates through the glass curtain
wall in bad angle, it also can produce glare and
discomfort to the human eye
 Reduce the main structure and basis cost  It is not environmental friendly as it only
guarantee a life span of 20 years
 Reduce use of electricity as it allows light to
enter in to the building
 Light penetrating through causes heat increase
indoor
Figure 8: Timber Wall System
Source: www.britannica.com
Figure 9 : Glass Curtain Wall Detail
Source: www2.reynaers.com
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 16
Roof system is another important structural element of a typical multi-storey building. My original design for the roof is using timber truss with metal decking and as for my proposed
design,
Original Design : Timber Truss Roof
Original Design : Steel Truss Roof
2.3 ROOF SYSTEM
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 17
2.3.1 PRECEDENT STUDIES
Building: Matrikulasi Kolej
Location : Gopeng, Perka
Figure 10 : Matrikulasi Kolej, Gopeng, Perak
Source : www.panoramio.com
This building uses steel roof truss as their roof system . The architect of this building decide using steel
truss because the over exhaustion demand on timber has cause the timber roof truss construction to
grow scarce and steel truss is the best substitute as it is a galvanized based material and a very
enduring protection. As trusses supports the other construction elements of the roof such as roof
battens, it is durable and it is also light,
Figure 11 : Roof of Matrikulasi Kolej
Source : http://www.bestweld.com.my/projects/prj04.htm#sbernam
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 18
For my proposed design, for the wall system, I proposed steel truss roof to replace timber truss roof.
2.3.2 MATERIALS / STRUCTURAL ELEMENTS
MATERIALS / STRUCTURAL
ELEMENTS
MANUFACTURER PROPERTIES / FUNCTIONS
STEEL ROOF TRUSS
BESTWELD STEEL
SYSTEM SDN BHD
o Light weight
o Strong
o Non-combustible
o Termite proof
o High durability
o Resist shear force
METAL CLADDING
STEEL C-SHAPED BEAM
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 19
Original design : Timber truss roof
2.3.3 ADVANTAGES AND DISADVANTAGES
ADVANTAGES DISADVANTAGES
 Less expensive  Requires vigilant control to achieve fire rating
 More fire resistant compared to unprotected steel
beam
 Subject to rotten if exposed to elements such as
termites
 Design Flexibility  Will suffer damages if there is violent weather
 Good aesthetic
 Good sound absorber
Proposed design : Steel truss roof
ADVANTAGES DISADVANTAGES
 Light weight  Corrodes when exposed to air and water
 Less amount of money spend  More skilled labor
 Fire Resistant  Not sound absorbent
 Low Maintenance cost
Figure 12: Timber Truss Roof
Source: timberframehome.wordpress.com
Figure 13: Steel Truss Roof
Source: www.roofseal.com.my
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 20
Basement never existed in the original design. As for this proposed design, materials used for this basement is reinforced concrete.
2.4 BASEMENT
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 21
2.4.1 MATERIALS USED
3.0 WORKING DRAWINGS
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 22
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 23
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 24
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 25
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 26
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 27
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 28
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 29
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 30
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 31
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 32
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 33
4.0 REFERENCES
BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 33
10 Major Benefits of Wood Flooring, Compared to Other Forms of Flooring. (n.d.). Retrieved May 6, 2015, from http://www.whittlewoods.co.uk/benefits-of-
wooden-flooring
Bergen Fire station / Stein Halvorsen Arkitekter. (2010, December 26). Retrieved May 5, 2015, from http://www.archdaily.com/97807/bergen-fire-station-stein-
halvorsen-sivilarkitekter
Bestweld Steel System S/B. (n.d.). Retrieved May 6, 2015, from http://www.bestweld.com.my/products/index.htm
Dolomites House / JM Architecture. (2008, August 11). Retrieved May 6, 2015, from http://www.archdaily.com/4806/dolomites-house-jm-architecture/
Main Fire Station Bergen. (n.d.). Retrieved May 5, 2015, from http://de.urbarama.com/project/main-fire-station-bergen
Metric Concrete Industries. (n.d.). Retrieved May 5, 2015, from http://www.metric.com.my/content/hollow-core-slab.html#why-slab
The advantages and disadvantages of glass curtain wall by Shirley Hu. (n.d.). Retrieved May 6, 2015, from https://www.apsense.com/article/the-advantages-
and-disadvantages-of-glass-curtain-wall.html
Jm architecture. (n.d.). Retrieved May 5, 2015, from http://www.jma.it/jm-architecture-dolomites-house-description.html

Weitere ähnliche Inhalte

Was ist angesagt?

Interior architecture
Interior architectureInterior architecture
Interior architecture
mrstore
 
Tropical architecture, AADI
Tropical architecture, AADITropical architecture, AADI
Tropical architecture, AADI
aalliance
 

Was ist angesagt? (20)

Structural glazing
Structural glazingStructural glazing
Structural glazing
 
Week 13 Post Modernism
Week 13 Post ModernismWeek 13 Post Modernism
Week 13 Post Modernism
 
SEMESTER 3 : DESIGN STUDIO MODULE OUTLINE
SEMESTER 3 : DESIGN STUDIO MODULE OUTLINESEMESTER 3 : DESIGN STUDIO MODULE OUTLINE
SEMESTER 3 : DESIGN STUDIO MODULE OUTLINE
 
Interior architecture
Interior architectureInterior architecture
Interior architecture
 
Akshra, Interior Design , Dezyne E'cole College.
 Akshra, Interior Design , Dezyne E'cole College.  Akshra, Interior Design , Dezyne E'cole College.
Akshra, Interior Design , Dezyne E'cole College.
 
NATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDYNATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDY
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Week 6 organization of form and space
Week 6 organization of form and spaceWeek 6 organization of form and space
Week 6 organization of form and space
 
Tropical architecture, AADI
Tropical architecture, AADITropical architecture, AADI
Tropical architecture, AADI
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Concepts in Architecture
Concepts in ArchitectureConcepts in Architecture
Concepts in Architecture
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
 
Architectural concepts
Architectural conceptsArchitectural concepts
Architectural concepts
 
case study of residential buildings
case study of residential buildingscase study of residential buildings
case study of residential buildings
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
 
Gehry's house
Gehry's houseGehry's house
Gehry's house
 
Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Timber flooring
Timber flooringTimber flooring
Timber flooring
 
Wooden partition & wall paneling
Wooden partition & wall paneling Wooden partition & wall paneling
Wooden partition & wall paneling
 

Ähnlich wie Building Technology 1

Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
Arthur Wilson
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
Quinn Liew
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
ong93
 

Ähnlich wie Building Technology 1 (20)

Project 1: Structural Design Post Mortem
Project 1: Structural Design Post MortemProject 1: Structural Design Post Mortem
Project 1: Structural Design Post Mortem
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
Btech
BtechBtech
Btech
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
A3 report
A3 reportA3 report
A3 report
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutions
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
Btech report
Btech reportBtech report
Btech report
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 

Mehr von Gertrude Lee (12)

Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Sypnosis- Theories of Architecture and Urbanism
Sypnosis- Theories of Architecture and UrbanismSypnosis- Theories of Architecture and Urbanism
Sypnosis- Theories of Architecture and Urbanism
 
Sypnosis - Theories of Architecture and Urbanism
Sypnosis - Theories of Architecture and UrbanismSypnosis - Theories of Architecture and Urbanism
Sypnosis - Theories of Architecture and Urbanism
 
Theories of Architecture and Urbanism project 1 part 1 stage 1
Theories of Architecture and Urbanism project 1 part 1 stage 1Theories of Architecture and Urbanism project 1 part 1 stage 1
Theories of Architecture and Urbanism project 1 part 1 stage 1
 
Theories of Architecture and Urbanism project 2 final
Theories of Architecture and Urbanism project 2 finalTheories of Architecture and Urbanism project 2 final
Theories of Architecture and Urbanism project 2 final
 
Theories of Architecture and Urbanism Summary (500 words)
Theories of Architecture and Urbanism Summary (500 words)Theories of Architecture and Urbanism Summary (500 words)
Theories of Architecture and Urbanism Summary (500 words)
 
Spiritual islamic architecture literature review
Spiritual islamic architecture literature reviewSpiritual islamic architecture literature review
Spiritual islamic architecture literature review
 
Building Services Project 1
Building Services Project 1Building Services Project 1
Building Services Project 1
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Asian Architecture Case Study Report
Asian Architecture Case Study ReportAsian Architecture Case Study Report
Asian Architecture Case Study Report
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

Kürzlich hochgeladen

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Kürzlich hochgeladen (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 

Building Technology 1

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) BUILDING TECHNOLOGY 1 [ARC3514 / ARC3512] NAME: GERTRUDE LEE YUE SIEW STUDENT ID: 0306265 TUTOR: MR ADIB RAMLI
  • 2. TABLE OF CONTENT 1.0 INTRODUCTION 2.0 DESIGN MODIFICATION 2.1 FLOOR SYSTEM 2.1.1 PRECEDENT STUDIES 2.1.2 MATERIALS 2.1.3 ADVANTAGES & DISADVANTAGES 2.2 WALL SYSTEM 2.2.1 PRECEDENT STUDIES 2.2.2 MATERIALS 2.2.3 ADVANTAGES & DISADVANTAGES 2.3 ROOF SYSTEM 2.3.1 PRECEDENT STUDIES 2.3.2 MATERIALS 2.3.3 ADVANTAGES & DISADVANTAGES 2.4 BASEMENT 2.4.1 MATERIALS USED 3.0 WORKING DRAWINGS 4.0 REFERENCES 3 4-7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 33
  • 3. 1.0 INTRODUCTION This project is about designing a Nature Appreciation Centre and it is located at Belum Rainforest Resort. The function of the Nature Appreciation Centre is to allow visitors and tourists to experience and appreciated nature as Belum Rainforest is a forest reserve area. As for this module, we were required to bring this design project to discuss with the lecturer on which portion of the building that can be utilized for this assignment. We are required to change the original construction systems and building materials, to replace with a more complex construction system. This project concentrates on the construction system of the building after a part of the building chosen. The types of construction system changes that are suppose to be carried out are :- i. Floor system ii. Wall system iii. Roof system iv. Basement level (which is to be shown in the section) Before picking out any construction system, we are required to conduct precedent studies regarding the construction system that is going to be applied to the building. We are also required to provide detail description of all construction system used as well as analysis of the advantages and disadvantages of both existing systems and the new system proposed. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 3
  • 4. 2.0 DESIGN MODIFICATION BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 4 As we were required to take out a part of the building and change the original construction systems and building materials, to replace with a more complex construction system, the diagram below shows the original design and proposed design. ORIGINAL FIRST FLOOR PLAN
  • 5. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 5 PROPOSED FIRST FLOOR PLAN
  • 6. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 6 ORIGINAL SECOND FLOOR PLAN
  • 7. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 7 PROPOSED FIRST FLOOR PLAN
  • 8. 2.1 FLOOR SYSTEM BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 8 Floor system is one of the important structural element of a typical multi-storey building. A typical floor system is made up of beams, columns, floor slab and if it is on the ground floor, there would be a foundation. As for my original design, the floor system that was used in my design is timber flooring. As for my proposed design, the floor system that was used in my design is concrete hollow core slab. Original design : Timber Flooring System Proposed design: Hollow Core Concrete Slab Floor System
  • 9. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 9 2.1.1 PRECEDENT STUDIES Building: Bergen Fire Station Architects: Stein Halvorsen Arkitekter Location : Bergen, Norway This building is a curved shaped building as this follows the outer edge of the site in order to keep the area as wide as possible. This also helps to create a dense screen against traffic and it helps create sheltered space in front. Concrete is the main material used for this building as this can be seen from the base as the entire base is made of cast-on-site concrete. The secondary materials used are steel and aluminium. The structural elements used to construct the floor system are steel structure and hollow core slab. Figure 1 : Bergen Fire Station, Bergen Source : http://www.archdaily.com/97807/bergen-fire-station-stein- halvorsen-sivilarkitekter/ Figure 2 : Section of Bergen Fire Station, Bergen Source : http://de.urbarama.com/project/main-fire-station-bergen As can be seen from Figure 2, which is the section of the building, the floor system used is hollow core slab supported by I-steel beam. Hollow core slab is also know as voided slab is one of the typical floor systems used to construct floors in multi-storey building such as apartments. Hollow core slab provides maximum structural efficiency with the use of concrete and at the same time having low energy consumption. Hollow core slab is an ideal structural section as it also reduce deadweight. It is also possible to be reuse and recycle which will help in less material wastage making It environmental friendly. Concrete is used to make hollow core slab. Concrete is a very versatile building material as it is durable. Each floor units using hollow core floor system are averagely 1200mm wide and up to 20m long. This is why hollow core floor system are normally used in buildings which has a larger span.
  • 10. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 10 For my proposed design, for the floor system, I proposed hollow core concrete slab to replace the timber flooring. Hollow core concrete slab floor system must have suitable materials and structural elements in order for the system to work well. MATERIALS / STRUCTURAL ELEMENTS MANUFACTURER PROPERTIES HOLLOW CORE CONCRETE SLAB SPC INDUSTRIES SDN BHD o Provides maximum structural efficiency with utilization of high strength concrete o Low material consumption o Mainly used in buildings with larger span. E.g apartments, hospitals schools o Favourable cost rate and fast erection I – STEEL BEAM BESTWELD STEEL SYSTEM SDN BHD o Resist shear forces o Very efficient form for carrying bending and shear load o Can be used as both beams and columns 2.1.2 MATERIALS / STRUCTURAL ELEMENTS
  • 11. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 11 Original design : Timber floor system 2.1.3 ADVANTAGES AND DISADVANTAGES ADVANTAGES DISADVANTAGES  Good quality timber will last for decades  Will be damaged if exposed to excessive moisture  Easy to construct  Regular maintenance as to prevent termites from attacking  Cost efficient  Regular polishing every 3-4 years  Good aesthetic  Good sound absorber Proposed design : Concrete hollow core floor system ADVANTAGES DISADVANTAGES  Has longitudinal core that helps reduce the weight of the floor  Health problem will be an issue if air supply is not released from the duct as it has to be cleaned from time to time  Commonly used in large span building as it is durable  Handling and transporting. Being precast, it will be heavy and fragile  Excellent fire resistance  High speed of erection as it is pre-cast  High load capacity Figure 3 : Timber Floor System Source: www.dlsweb.rmit.edu.au Figure 4 : Concrete Hollow Core Floor System Source: hubhomedesign.com
  • 12. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 12 Wall system is another important structural element of a typical multi-storey building. My original design of the space is actually timber wall façade and as for my proposed design of the space, I decided to change it to glass curtain wall. Original Design : Timber Façade Wall System Original Design : Glass Curtain Wall System 2.2 WALL SYSTEM
  • 13. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 13 2.2.1 PRECEDENT STUDIES Building: Dolomites House Architects: JM Architecture Location : Dolomite Mountains, Italy The existing building has a very large and high entry hall with rooms and it also allows users to experience the space as it is necessary to walk through the entry hall in order to move around the house. Clear glass envelope and gyp wall was inserted in order to separate one space from another after the whole ground floor is being demolished Figure 5 : Dolomites House, Dolomite Mountains, Italy Source : http://www.archdaily.com/4806/dolomites-house-jm- architecture/ The architect decided to replace the facades with glass curtain wall to allow the maximum amount of light into the room as before this they could not get enough light into the house.The glass curtain wall used for this building has the base and head of mullion flush with the floor and ceiling. Glass curtain wall is defined as thin, aluminium-framed wall, containing in-fills of glass and it is attached to the building structure. It also does not carry the weight of the floor or roof. Glass curtain wall method of glazing allows glass to be used in large uninterrupted areas creating consistent attractive facades. Figure 6 : Dolomites House, Dolomite Mountains, Italy Source : http://www.archdaily.com/4806/dolomites-house-jm- architecture/ Figure 7 : Detail Drawing of Curtain Wall Used at Dolomite House Source : http://www.archdaily.com/4806/dolomites-house-jm- architecture/
  • 14. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 14 For my proposed design, for the wall system, I proposed glass curtain wall to replace the timber façade wall. 2.2.2 MATERIALS / STRUCTURAL ELEMENTS MATERIALS / STRUCTURAL ELEMENTS MANUFACTURER PROPERTIES ALUMINIUM FRAME FUJISASH (M) SDN BHD o It is light weight as it is averagely 50kg/m2 which helps to reduce the weight of high rise building. o It allows light to pass through, enabling the building to use natural lighting in the day as their light sourceGLASS
  • 15. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 15 Original design : Timber façade wall system 2.2.3 ADVANTAGES AND DISADVANTAGES ADVANTAGES DISADVANTAGES  Quick erection time  Additional design and engineering time  Reduce site labour work  Will decay if exposed to excessive moisture and termites  Recyclable  Requires vigilant control to achieve fire rating  Low embodied energy if constructed from local timber  Good sound absorber Proposed design : Glass curtain wall system ADVANTAGES DISADVANTAGES  Light weight allowing it to reduce the weight of high rise buildings  When light penetrates through the glass curtain wall in bad angle, it also can produce glare and discomfort to the human eye  Reduce the main structure and basis cost  It is not environmental friendly as it only guarantee a life span of 20 years  Reduce use of electricity as it allows light to enter in to the building  Light penetrating through causes heat increase indoor Figure 8: Timber Wall System Source: www.britannica.com Figure 9 : Glass Curtain Wall Detail Source: www2.reynaers.com
  • 16. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 16 Roof system is another important structural element of a typical multi-storey building. My original design for the roof is using timber truss with metal decking and as for my proposed design, Original Design : Timber Truss Roof Original Design : Steel Truss Roof 2.3 ROOF SYSTEM
  • 17. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 17 2.3.1 PRECEDENT STUDIES Building: Matrikulasi Kolej Location : Gopeng, Perka Figure 10 : Matrikulasi Kolej, Gopeng, Perak Source : www.panoramio.com This building uses steel roof truss as their roof system . The architect of this building decide using steel truss because the over exhaustion demand on timber has cause the timber roof truss construction to grow scarce and steel truss is the best substitute as it is a galvanized based material and a very enduring protection. As trusses supports the other construction elements of the roof such as roof battens, it is durable and it is also light, Figure 11 : Roof of Matrikulasi Kolej Source : http://www.bestweld.com.my/projects/prj04.htm#sbernam
  • 18. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 18 For my proposed design, for the wall system, I proposed steel truss roof to replace timber truss roof. 2.3.2 MATERIALS / STRUCTURAL ELEMENTS MATERIALS / STRUCTURAL ELEMENTS MANUFACTURER PROPERTIES / FUNCTIONS STEEL ROOF TRUSS BESTWELD STEEL SYSTEM SDN BHD o Light weight o Strong o Non-combustible o Termite proof o High durability o Resist shear force METAL CLADDING STEEL C-SHAPED BEAM
  • 19. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 19 Original design : Timber truss roof 2.3.3 ADVANTAGES AND DISADVANTAGES ADVANTAGES DISADVANTAGES  Less expensive  Requires vigilant control to achieve fire rating  More fire resistant compared to unprotected steel beam  Subject to rotten if exposed to elements such as termites  Design Flexibility  Will suffer damages if there is violent weather  Good aesthetic  Good sound absorber Proposed design : Steel truss roof ADVANTAGES DISADVANTAGES  Light weight  Corrodes when exposed to air and water  Less amount of money spend  More skilled labor  Fire Resistant  Not sound absorbent  Low Maintenance cost Figure 12: Timber Truss Roof Source: timberframehome.wordpress.com Figure 13: Steel Truss Roof Source: www.roofseal.com.my
  • 20. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 20 Basement never existed in the original design. As for this proposed design, materials used for this basement is reinforced concrete. 2.4 BASEMENT
  • 21. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 21 2.4.1 MATERIALS USED
  • 22. 3.0 WORKING DRAWINGS BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 22
  • 23. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 23
  • 24. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 24
  • 25. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 25
  • 26. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 26
  • 27. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 27
  • 28. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 28
  • 29. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 29
  • 30. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 30
  • 31. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 31
  • 32. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 32
  • 33. BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 33
  • 34. 4.0 REFERENCES BUILDING TECHNOLOGY 1 [ARC 3514 / ARC 3512] 33 10 Major Benefits of Wood Flooring, Compared to Other Forms of Flooring. (n.d.). Retrieved May 6, 2015, from http://www.whittlewoods.co.uk/benefits-of- wooden-flooring Bergen Fire station / Stein Halvorsen Arkitekter. (2010, December 26). Retrieved May 5, 2015, from http://www.archdaily.com/97807/bergen-fire-station-stein- halvorsen-sivilarkitekter Bestweld Steel System S/B. (n.d.). Retrieved May 6, 2015, from http://www.bestweld.com.my/products/index.htm Dolomites House / JM Architecture. (2008, August 11). Retrieved May 6, 2015, from http://www.archdaily.com/4806/dolomites-house-jm-architecture/ Main Fire Station Bergen. (n.d.). Retrieved May 5, 2015, from http://de.urbarama.com/project/main-fire-station-bergen Metric Concrete Industries. (n.d.). Retrieved May 5, 2015, from http://www.metric.com.my/content/hollow-core-slab.html#why-slab The advantages and disadvantages of glass curtain wall by Shirley Hu. (n.d.). Retrieved May 6, 2015, from https://www.apsense.com/article/the-advantages- and-disadvantages-of-glass-curtain-wall.html Jm architecture. (n.d.). Retrieved May 5, 2015, from http://www.jma.it/jm-architecture-dolomites-house-description.html