Diese Präsentation wurde erfolgreich gemeldet.
Die SlideShare-Präsentation wird heruntergeladen. ×

case study SCM 281221.pptx

Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Nächste SlideShare
Ad2 2009
Ad2 2009
Wird geladen in …3
×

Hier ansehen

1 von 3 Anzeige

Weitere Verwandte Inhalte

Ähnlich wie case study SCM 281221.pptx (20)

Aktuellste (20)

Anzeige

case study SCM 281221.pptx

  1. 1. AUTHOR Page No DIVISIO Page No SLIDE NO 1 DIVISION Sl No Task/ Project Title of the Issue / area of concern Brief of the issue/area of concern Action Taken / Status Implementation plan 1 Su-30- ROH Sister Division supplies Delayed supply affecting the quarterly task as well as cycle time of A/c. Participating divisions ike Lucknow, Korwa, Hyderabad are regularly requested to expedite supply and adhere to MAS for supply of aggregates/LRUs Nasik Division will ensure to supply Cat-Ds, five months in advance, to the respective sister divisions, with respect to the date of requirement. For the year 18-19, to meet requirement of 15 ac, IAF have been requested to get 5 sets of critical LRUs through IAF LTRA and IAF has conveyed in principle approval for meeting the requirement of 11th to 15th ac. Sister divisions to enter into LTRA for year 19-20.
  2. 2. AUTHOR Page No DIVISIO Page No SLIDE NO 2 DIVISION Sl No Task/ Project Title of the Issue / area of concern Brief of the issue/area of concern Action Taken / Status Implementation plan 2 Su-30-ROH capacity enhancem ent Indigenous development of Non Standard Equipment (NSE) by AURDC Out of 84 types of NSE for indigenous development of prototype, which are in process at different stage, 6 proposals have been returned back to AURDC with a direction to get the PNCs carried out by user division AURDC has forwarded the files to the division. The total activities involved for development and supply to be undertaken by AURDC including all commercial procedure and user division will execute for subsequent quantities. Direction to be given to AURDC to continue with the process of ordering for development orders.
  3. 3. AUTHOR Page No DIVISIO Page No SLIDE NO 3 DIVISION Sl No Task/ Project Title of the Issue / area of concern Brief of the issue/area of concern Action Taken / Status Implementati on plan 3 Su-30 ROH Cycle time reduction to 15 months from 22 months by 2020-21. Presently Division is engaged in enhancing the production rate as per task set by IAF and IAF is presently loading the aircraft considering the cycle time of 22 months Division has taken all necessary steps to achive cycle time of 15 months by 2020-21. This would be possible only on delivery of aggregates from Division of Accessory Complex with a cycle time of 4-5 months from the date of loading. IAF to induct aircraft progressively considering Cycle time of 15 months by 2019-20 onwards.

×