SlideShare ist ein Scribd-Unternehmen logo
1 von 11
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Robust Production Management
Metrilogics
Front-line controls for bottom-line savings.
TM
SM
Module 10:
Small Warehouse Case Study
By Lance Latham
Senior Managing Partner
Performance Management Structure and Concepts:
Raw Performance Data by Individual Team Member
v Paid Time Off (Indirect Hrs.): Non-Chargeable Down Time, Vacation, Holiday,
Personal, Funeral/Disability
v Lost Time (Indirect Hrs.): Meetings, Projects, Running Reports, Ticket Closing,
Supervision, Training, Pallet Replenishment, Inventory Management, Inventory Consolidate, Other
Exception Time
v Completed direct task volumes: Receiving Putaways,
Pick/Pack Lines, Logistics Replenishment Cartons, Logistics Cycle
Count Locations, Shipping Cartons Packages
v Establishing hourly capacity task rates
Quality Work
(Earned
Credit Hrs.)
v Quality Data: Tracked thru various methods for Receiving, Pick/Pack and Shipping; not always
tracked to individual team members. Average across all data sources = approx. 99+%
v Work Time (Direct Hrs.):
Time spent completing task work*
v Loaded Hourly Salary: Includes base compensation + benefits + ER taxes
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
2
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Establishing Direct Task Capacity Rates (cont.)
In addition to the hands-on processing time incorporated into a given task’s
hourly capacity rate, other business-related time is also included:
v Task Preparation Time: Opening and reviewing relevant emails and reports; creating rows
and fields in tracking databases; printing and retrieving all necessary paperwork; checking out
equipment, retrieving necessary supplies (barcode labels, batteries, pens, skids, rolls of brown packing
paper, etc.); identifying and confirming replenishment needs by customer and warehouse location.
v Unavoidable Business-Related Interruption Time: Equipment glitches; working with
delivery drivers re. receipt of damaged material; asking / answering questions involving Warehouse
team members; supervisors and Client Services (verbally, via email or by phone); problem solving re.
location issues and / or material versions being picked or shipped.
v Work Station Clean-Up, Maintenance and Reporting Time: Disposing of excess
shrink wrap / packaging / erroneous labels; recycling workstation supplies; re-stacking empty skids
away from main floor area; keying data into systems (order info., time tracking, database fields,
confirmation emails to supervisors and Client Services).
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
5
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Analysis (cont.): Warehouse Performance* for Base Period
Spare Capacity
= Primary Area
of Opportunity
Secondary Area
of Opportunity
Associated
Opportunity
*Analysis per Metrilogics ‘White Box’ system, based on Warehouse time, task volume and payroll data for the 10/1/09 – 9/30/10 base period.
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
8
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Analysis (cont.):
Daily Receiving Putaway Units and Hours During Base Period
U
n
i
t
s
H
o
u
r
s
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
11
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Analysis (cont.):
Daily Logistics Cycle Count Locations and Hours During Base Period
U
n
i
t
s
H
o
u
r
s
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
14
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
2.) Distribute base period work volume across fewer Warehouse team members.
Recommendations:
Increasing Production Agility to Close Costly Performance “Gaps”
3.) Ensure adequate level of skills training across key tasks to maximize flexibility
and responsiveness of Warehouse team.
4.) Increase the level of management planning and coordination day by day and
hour by hour, via focused short interval scheduling techniques.
1.) Communicate hourly capacity rates for the 5 primary Warehouse activities,
and encourage Warehouse team members to achieve them.
5.) Provide weekly performance feedback to each Warehouse team member.
6.) Reward Warehouse team members for performance improvements and goal
achievements by implementing / reinstating a performance-based incentive
program.
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
17
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Recommendation #2:
Distribute Work Volume Across Fewer Warehouse Team Members
Before
FTE = 17.41
After
16,579.45 (61.34%)
1,559.59 (5.77%)
764.05 (Fixed)
4,201.04 (Variable)
4,965.09 (18.37%)
3,923.81 (14.52%)
27,027.94
Annual hours
by 10,569.53
(28.11%)
FTE = 12.99
= a need for approx.
13 FTE’s
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
20
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Recommendation #5:
Provide Weekly Performance Feedback to Warehouse Team Members
Goal: Reinforce performance focus among Warehouse team members at the individual
level.
v Management to provide one-on-one feedback to individual team members on a weekly basis re.:
o Quality / accuracy % for the week and year-to-date
o Productivity % for the week and year-to-date
o Cross-training skills changes for the week and year-to-date
v Management and team members to discuss performance successes achieved - or issues
encountered - for the most-recently concluded week.
v Management and team members to jointly make action plans for the following week, aimed at
improving quality/accuracy and productivity, as well as taking advantage of any cross-training
opportunities.*
v Implement a performance management system to facilitate ease of performance review and
communication between Warehouse management and team members.
* Subject to availability of anticipated work demand and Warehouse team attendance levels.
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
23
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
Manager
1st Shift Supv.
2nd Shift
Team Lead
Pick/Pack
Team Lead
Shipping
Team Lead
1
Logistics
1
Shipper
2
Receivers
4
Pickers
Post Project Benefits (cont.): Proposed Warehouse Org. Chart
Total proposed FTE complement = 13
4 from current 17 FTE level
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
26
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
1
Flevy (www.flevy.com) is the marketplace
for premium documents. These
documents can range from Business
Frameworks to Financial Models to
PowerPoint Templates.
Flevy was founded under the principle that
companies waste a lot of time and money
recreating the same foundational business
documents. Our vision is for Flevy to
become a comprehensive knowledge base
of business documents. All organizations,
from startups to large enterprises, can use
Flevy— whether it's to jumpstart projects, to
find reference or comparison materials, or
just to learn.
Contact Us
Please contact us with any questions you may have
about our company.
• General Inquiries
support@flevy.com
• Media/PR
press@flevy.com
• Billing
billing@flevy.com

Weitere ähnliche Inhalte

Mehr von Flevy.com Best Practices

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf
Flevy.com Best Practices
 
Project Management for MBA (in French)
Project Management for MBA (in French)Project Management for MBA (in French)
Project Management for MBA (in French)
Flevy.com Best Practices
 
Customer-centric Culture
Customer-centric CultureCustomer-centric Culture
Customer-centric Culture
Flevy.com Best Practices
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
Flevy.com Best Practices
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
Flevy.com Best Practices
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
Flevy.com Best Practices
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
Flevy.com Best Practices
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
Flevy.com Best Practices
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
Flevy.com Best Practices
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
Flevy.com Best Practices
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
Flevy.com Best Practices
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
Flevy.com Best Practices
 

Mehr von Flevy.com Best Practices (20)

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf
 
Project Management for MBA (in French)
Project Management for MBA (in French)Project Management for MBA (in French)
Project Management for MBA (in French)
 
4 Stages of Disruption
4 Stages of Disruption4 Stages of Disruption
4 Stages of Disruption
 
Customer-centric Culture
Customer-centric CultureCustomer-centric Culture
Customer-centric Culture
 
[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors
 
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
 
[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization
 
[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
 

Kürzlich hochgeladen

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Kürzlich hochgeladen (20)

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Robust Production Management (RPM) Module 10: Small Warehouse Case Study

  • 1. Copyright © 2005 Metrilogics, LLC. All rights reserved. Robust Production Management Metrilogics Front-line controls for bottom-line savings. TM SM Module 10: Small Warehouse Case Study By Lance Latham Senior Managing Partner
  • 2. Performance Management Structure and Concepts: Raw Performance Data by Individual Team Member v Paid Time Off (Indirect Hrs.): Non-Chargeable Down Time, Vacation, Holiday, Personal, Funeral/Disability v Lost Time (Indirect Hrs.): Meetings, Projects, Running Reports, Ticket Closing, Supervision, Training, Pallet Replenishment, Inventory Management, Inventory Consolidate, Other Exception Time v Completed direct task volumes: Receiving Putaways, Pick/Pack Lines, Logistics Replenishment Cartons, Logistics Cycle Count Locations, Shipping Cartons Packages v Establishing hourly capacity task rates Quality Work (Earned Credit Hrs.) v Quality Data: Tracked thru various methods for Receiving, Pick/Pack and Shipping; not always tracked to individual team members. Average across all data sources = approx. 99+% v Work Time (Direct Hrs.): Time spent completing task work* v Loaded Hourly Salary: Includes base compensation + benefits + ER taxes Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 2 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 3. Establishing Direct Task Capacity Rates (cont.) In addition to the hands-on processing time incorporated into a given task’s hourly capacity rate, other business-related time is also included: v Task Preparation Time: Opening and reviewing relevant emails and reports; creating rows and fields in tracking databases; printing and retrieving all necessary paperwork; checking out equipment, retrieving necessary supplies (barcode labels, batteries, pens, skids, rolls of brown packing paper, etc.); identifying and confirming replenishment needs by customer and warehouse location. v Unavoidable Business-Related Interruption Time: Equipment glitches; working with delivery drivers re. receipt of damaged material; asking / answering questions involving Warehouse team members; supervisors and Client Services (verbally, via email or by phone); problem solving re. location issues and / or material versions being picked or shipped. v Work Station Clean-Up, Maintenance and Reporting Time: Disposing of excess shrink wrap / packaging / erroneous labels; recycling workstation supplies; re-stacking empty skids away from main floor area; keying data into systems (order info., time tracking, database fields, confirmation emails to supervisors and Client Services). Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 5 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 4. Analysis (cont.): Warehouse Performance* for Base Period Spare Capacity = Primary Area of Opportunity Secondary Area of Opportunity Associated Opportunity *Analysis per Metrilogics ‘White Box’ system, based on Warehouse time, task volume and payroll data for the 10/1/09 – 9/30/10 base period. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 8 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 5. Analysis (cont.): Daily Receiving Putaway Units and Hours During Base Period U n i t s H o u r s Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 11 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 6. Analysis (cont.): Daily Logistics Cycle Count Locations and Hours During Base Period U n i t s H o u r s Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 14 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 7. 2.) Distribute base period work volume across fewer Warehouse team members. Recommendations: Increasing Production Agility to Close Costly Performance “Gaps” 3.) Ensure adequate level of skills training across key tasks to maximize flexibility and responsiveness of Warehouse team. 4.) Increase the level of management planning and coordination day by day and hour by hour, via focused short interval scheduling techniques. 1.) Communicate hourly capacity rates for the 5 primary Warehouse activities, and encourage Warehouse team members to achieve them. 5.) Provide weekly performance feedback to each Warehouse team member. 6.) Reward Warehouse team members for performance improvements and goal achievements by implementing / reinstating a performance-based incentive program. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 17 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 8. Recommendation #2: Distribute Work Volume Across Fewer Warehouse Team Members Before FTE = 17.41 After 16,579.45 (61.34%) 1,559.59 (5.77%) 764.05 (Fixed) 4,201.04 (Variable) 4,965.09 (18.37%) 3,923.81 (14.52%) 27,027.94 Annual hours by 10,569.53 (28.11%) FTE = 12.99 = a need for approx. 13 FTE’s Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 20 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 9. Recommendation #5: Provide Weekly Performance Feedback to Warehouse Team Members Goal: Reinforce performance focus among Warehouse team members at the individual level. v Management to provide one-on-one feedback to individual team members on a weekly basis re.: o Quality / accuracy % for the week and year-to-date o Productivity % for the week and year-to-date o Cross-training skills changes for the week and year-to-date v Management and team members to discuss performance successes achieved - or issues encountered - for the most-recently concluded week. v Management and team members to jointly make action plans for the following week, aimed at improving quality/accuracy and productivity, as well as taking advantage of any cross-training opportunities.* v Implement a performance management system to facilitate ease of performance review and communication between Warehouse management and team members. * Subject to availability of anticipated work demand and Warehouse team attendance levels. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 23 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 10. Manager 1st Shift Supv. 2nd Shift Team Lead Pick/Pack Team Lead Shipping Team Lead 1 Logistics 1 Shipper 2 Receivers 4 Pickers Post Project Benefits (cont.): Proposed Warehouse Org. Chart Total proposed FTE complement = 13 4 from current 17 FTE level Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM 26 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-10-small-warehouse-case-study-468
  • 11. 1 Flevy (www.flevy.com) is the marketplace for premium documents. These documents can range from Business Frameworks to Financial Models to PowerPoint Templates. Flevy was founded under the principle that companies waste a lot of time and money recreating the same foundational business documents. Our vision is for Flevy to become a comprehensive knowledge base of business documents. All organizations, from startups to large enterprises, can use Flevy— whether it's to jumpstart projects, to find reference or comparison materials, or just to learn. Contact Us Please contact us with any questions you may have about our company. • General Inquiries support@flevy.com • Media/PR press@flevy.com • Billing billing@flevy.com