Case Study
Benefits of Transitioning from Manual Kanban to eKanban
           Major Medical Device Manufacturer




                                       July 2011
Building the Business Case for Change – How They Did It

 Manual Kanban vs. eKanban Process Assessment
 1. Created a flowchart (process map) of current
 state manual kanban processes.
 2. Conducted interviews with process subject
                                                                                   1. Draw
 matter experts (SME’s) and staff to validate the                                  Flowchart
 current-state process map and gather estimates
 of current performance characteristics.               6. Build Business Case,                 2. Interview SMEs &
                                                       Obtain Buy-in, Transition               Capture Metrics
 3. Analyzed the quantitative process
 performance metrics (i.e. Time, Cost, Resource
 Utilization, Service Level, etc.) required to
 support the manual kanban process                                                Rapid
                                                    5. Design                    Process           3. Analyze
 4. Identified, categorized and prioritized         Future-state                                   Performance
                                                    & Compare                  Assessment
 process/systems improvement opportunities
 enabled by transition to eKanban.
 5. Designed the future-state eKanban process
 and performed comparative analysis to current
 state.
                                                                               4. Capture
 6. Established business case, presented findings                              Improvement
 and recommendations to management, gained                                     Opportunities

 buy-in and support, implemented eKanban,
 audited new current-state and adjusted to
 achieve optimal performance.
Summarization of Benefits –
Directly attributable to transition from manual kanban to eKanban

              People                             Process                              System
Resource time reduced by 92%         Process time reduced by 92%         Implementation of closed-loop,
                                                                         electronic pull-based
                                                                         replenishment system
Resource cost reduced by 93%         Queue Time Eliminated               Extensive use of barcode
                                                                         technology
Headcount reduced by 50% -           Service level increased by 57%      Business rules and automated
reassigned to other areas                                                alerts linked to specific workflows
Significant improvement in buyer     Process simplified and automated.   Real-time updates on all material
and supplier collaboration           Went from 24 steps to 13 steps.     replenishment transactions
Transition from reactive to          Transition from open to closed-     Complete audit trails on all
proactive management                 loop material replenishment         material replenishment
                                     processes                           transactions
Single version of the truth on all   Stock-outs eliminated               Rapid deployment (90 days w/ERP
material replenishment                                                   Integration) and sub one year ROI
transactions
100% adoption by end-users &         Inventory trending down - $1M+      Low TCO
suppliers                            reduction in first six months


  3
Manual Kanban
Process Analysis




 4
Manual Kanban Process Observations


• Staffing Assumptions
     – 12 FTE Buyers, Burden Rate $28.00/Hr.
     – 6 FTE Material Handlers, Burden Rate $15.00/Hr.
• Process Observations
     – Average Manual Kanban Releases = ~400/Week
     – Kanban releases are 100% manual
     – Email, fax & phone are the primary means of communication with suppliers
     – Kanban card prep./management is labor intensive
     – Manual kanban process is open-loop
     – Limited capability to collaborate with suppliers
     – Multiple failure modes throughout process
     – Limited to no capability to track, measure and report on supplier
       performance
     – Reactive vs. proactive management system
 5
Manual Kanban Process Flow – Complex and Error Prone!

                                                            Complex Process Steps
                                           1.  Process Trigger: KRS Set-up & Management
                                           2.  Buyer establishes part classification „K‟, „R‟, „D‟
                                           3.  Buyer calculates bin size
                                           4.  Buyer creates Kanban Release Sheet „KRS‟
                                           5.  Buyer forwards „KRS‟ to WH Material Handler
                                           6.  Material Handler sets up bin “consumption and
                                               signal”
                                           7. Material Handler pull parts from consumption bin
                                           8. Decision: Bin Empty
                                           9. Material Handler Switches Consumption and Signal
                                               bin
                                           10. Decision: 2 Bin or ROP
                                           11. Material Handler Faxes to Buyer
                                           12. Material Handler Places original „KRS‟ in Pending
                                               Confirmation Bin
                                           13. Material Handler checks for received confirmation fax
                                           14. Supplier Reply in 24 Hrs.?
                                           15. Check due date & qty.
                                           16. Material Handler attaches copy to „KRS‟ and places
                                               in Buyer alert bin
                                           17. Material Handler files faxed copy in date slot of date
                                               sorter and „KRS‟ in consumption bin
                                           18. Material Handler monitors date sorter
                                           19. Decision: Part arrives on due date?
                                           20. Decision: Parts critical for line?
                                           21. Decision: Parts Qty. and Dock date correct?
                                           22. Material Handler transfers actual qty. and dock date
                                               to „KRS‟
                                           23. Material Handler sends all completed fax copies to
                                               Purchasing Support for entry into Supplier
                                               performance database
 6                                         24. Process End
Manual Kanban Process KPIs –
Per Manual Kanban Transaction



            Key Performance Metrics
            Process Time per Execution                             18.39
            Duration                                               49.36
            Service Level                                            43%
            Takt                                                    5.63
            Arrival Rate Per Minute                                  0.2
            Arrival Rate per Wk - Releases / Week                 400.00
            Resource Cost                              $            7.25
            Hours Per Work Period                                     7.5
            Work Periods Per Day                                         1
            Days Per Week                                                5
            Time Units                                           Minutes
                       Time / Cost Per Manual Kanban Execution

  7
Manual Kanban Resource Time & Cost Analysis –
Per Manual Kanban Transaction




     Resources                    Probability-Weighted Statistics

                                     Process     Resource       Resource
     Resource                         Time         Time           Cost
     Buyer                              12.25          12.25 $         5.72
     Material Handler                    6.14           6.14 $         1.53
     Total                                             18.39 $         7.25
                                                     Resource Time & Cost
                                                 Per Manual Kanban Transaction
     Time Units are in Minutes




 8
Manual Kanban Resource Time & Cost Analysis –
Annualized (250 Production Days / 20,000 Manual Kanban Releases




 KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis

 Planning Period               250.00 Days
 Time in Planning Period   112,500.00 Mins
 Demand Node             Number of Items
 KRS Set-up & Management         20,000.00

 Resource                Productivity Factor   Available FTE's    Available Time   Required Time         Cost
 Buyer                                 0.75             12.00 1,350,000.00 Mins 237,777.78 Mins $ 110,962.96
 Material Handler                      0.75              6.00    675,000.00 Mins 163,651.11 Mins $ 40,912.78
 Total                                                         2,025,000.00 Mins 401,428.89 Mins $ 151,875.74

                                                                Annual Resource Time & Cost
                                                              Analysis to Support Manual Kanban



 9
Manual Kanban VA/NVA Analysis




                                Process Key:
                                White = VA Tasks
                                Red = NVA Tasks
                                Yellow = Failure Modes & Proposed
                                Solutions




 10
Manual Kanban Failure Modes & eKanban Solutions

  KRS Failure Modes                                   eKanban Solutions
  ~1 – 3% of the time the Material Handler            Ultriva’s Collaborative Electronic Kanban (CEK)
  would forget to fax kanban release to Supplier.     solution supports a closed-loop, pull-based
  This routinely resulted in stock-outs situations.   material replenishment process. Electronic
                                                      material replenishment signals are
                                                      automatically sent to supplier on scan of empty
                                                      bin.
  ~3% of the time the Material Handler would          CEK handles both blanket and discrete POs. For
  forget to fax ROP sheet to Buyer. Routinely         blanket POs, electronic material replenishment
  resulted in stock-outs.                             signals are automatically sent to suppliers on
                                                      scan of empty bin. For discrete POs, Buyers are
                                                      automatically notified to release a manual PO
                                                      on scan of empty bin.
  • Material Handler did not check to ensure due      Supplier specific ‘Business Rules’ w/ automated
  date and qty. were correct on kanban card.          Buyer & Supplier alerts established for each
  • Material Handler did not update supplier          material replenishment loop. Order qty./due
  confirmation info to on kanban release sheet.       date/receive qty./etc. confirmed on scan of
                                                      barcode label. Supplier performance metrics
                                                      updated with each scan.
  Material Handler did not notify Buyer of need       Automated notification to Buyer whenever an
  to create new PO for discrete orders.               Item reaches its ROP to release discrete PO.
  11
Manual Kanban Failure Modes & eKanban Solutions


  KRS Failure Modes                              eKanban Solution
  Suppliers claimed they did not receive the     Automatic alerting to both Buyer & Supplier
  kanban release fax.                            when Supplier does not acknowledge and
                                                 satisfy each electronic replenishment signal
                                                 within pre-determined time frames.
  Material Handler did not update kanban         Automated updates to CEK when receiving
  release sheet with actual qty./dock date       scans barcode label. Associated supplier
  impacting KPI tracking/reporting on supplier   KPIs automatically updated.
  performance.
  Unable to determine if part qty./dock date     Order qty., due date, actual received qty.
  correct.                                       and receive date automatically validated
                                                 upon scan of barcode label. Associated
                                                 supplier KPIs automatically updated.




  12
Collaborative Electronic Kanban
Process Analysis



 13
Collaborative Electronic Kanban Process Highlights


• Staffing Assumptions
      – 12 FTE Buyers, Burden Rate $28.00/Hr.
      – 6 FTE Material Handlers, Burden Rate $15.00/Hr.
• Process Observations
      – Average Manual Kanban Releases = ~400/Week
      – Kanban releases are 100% electronic
      – Electronic signals are the primary means of communicating demand to
        suppliers
      – One-time set-up of electronic kanban loops. System monitors and suggests
        resizing based on actual consumption patterns
      – All material replenishment processes are closed-loop
      – Real-time updates on material status based on barcode scans
      – Significant reduction in overhead support requirements
      – Actionable business intelligence on supplier performance
 14
Collaborative Electronic Kanban Process Flow –
Simplified & Automated


                                                    Simplified & Automated Process
                                                 1. Process Trigger: Release Electronic
                                                     Kanban Signal
                                                 2. Material Handler Scans Kanban Card
                                                 3. Email automatically sent to
                                                     Supplier/Buyer
                                                 4. Decision: P.O. Needed?
                                                 5. Decision: Supplier accepts within 24
                                                     hrs?
                                                 6. Order in Process at Supplier
                                                 7. Supplier Prints Kanban Label(s) &
                                                     Ships Part(s)
                                                 8. Decision: Goods Ship On-Time?
                                                 9. Decision: Goods In-Transit?
                                                 10. Receiving Scans Barcode Label to
                                                     Receive Goods
                                                 11. Decision: Are Goods Dock to Stock?
                                                 12. PointMan Automatically Updated to
                                                     Show Goods On-Hand
                                                 13. Process End
  15
Collaborative Electronic Kanban Process KPIs –
Per Manual Kanban Transaction


             Key Performance Metrics
             Process Time per Execution                          1.50
             Duration                                            1.75
             Highest Utilization                                   2%
             Service Level                                       100%
             Takt                                                6.92
             Arrival Rate                                         0.1
             Arrival Rate per Wk                               325.00
             Resource Cost Per Execution                  $      0.53
             Yield                                               100%
             Hours Per Work Period                                 7.5
             Work Periods Per Day                                     1
             Days Per Week                                            5
             Time Units                                       Minutes
                              Time / Cost Per KRS Execution

  16
Collaborative Electronic Kanban –
Process & Resource Time & Cost Analysis Per eKanban Transaction




      Resources                    Probability-Weighted Statistics

                                     Process      Resource       Resource
      Resource                        Time          Time           Cost
      Material Handler                   0.25       0.25        $       0.06
       Material Handler Scans Kanban Card0.25       0.25        $       0.06
      Buyer                              1.00       1.00        $       0.47
       Buyer Adds P.O.                   1.00       1.00        $       0.47
      Receiving Clerk                    0.25       0.25        $        -
       Receiving Scans Barcode Label to Receive Goods
                                         0.25       0.25        $        -
      Total                                         1.50        $       0.53
                                                      Resource Time & Cost
      Time Units are in Minutes                      Per eKanban Transaction




 17
Collaborative Electronic Kanban –
Annualized (250 Production Days / 20,000 eKanban Releases)




 Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis

 Planning Period                    250.00 Days
 Time in Planning Period        112,500.00 Mins
 Demand Node                  Number of Items
 Release Electronic Kanban Singal     16,250.00

 Resource                    Productivity Factor   Available FTE's      Available Time Required Time         Cost
 Material Handler                          0.75              6.00      675,000.00 Mins 5,416.67 Mins $ 1,354.17
 Buyer                                     0.75             12.00    1,350,000.00 Mins 21,666.67 Mins $ 10,111.11
 Receiving Clerk                           1.00              1.00      112,500.00 Mins 4,021.88 Mins $        -
 Total                                                               2,137,500.00 Mins 31,105.21 Mins $ 11,465.28
                                                                      Annual Resource Time & Cost
                                                                      Analysis to Support eKanban




 18
Manual Kanban vs. Collaboratively Electronic Kanban –
Process KPI Comparison Report
            KRS Pre Ultriva vs. Electronic Kanban Post Ultriva Process KPI Comparison Report

            Profile                     Current State    Future State
            Map Type                    Transactional    Transactional
                                        Buyer creates
                                        Kanban
                                        Release          Buyer Adds
            Bottleneck                  Sheet ‘KRS’      P.O.
            Arrival Rates Differ                 0.18            0.14
            Hours Per Work Period                  7.5             7.5
            Work Periods Per Day                     1               1
            Days Per Week                            5               5
            Activity Nodes                     34.00            13.00
            Start Nodes                          1.00            1.00
            End Nodes                            4.00            2.00
            Paths                              34.00             4.00

            Performance                 Current State    Future State     Difference % Difference
            Process Time                       18.39              1.50         (16.89)       -92%   I
            Required Resource Time             18.39              1.50         (16.89)       -92%   m
            Total Queue Time                   24.81              0.00         (24.81)      -100%   p
            Cycle Time                         43.19              1.50         (41.70)       -97%
                                                                                                    r
            Duration                           49.36              1.75         (47.61)       -96%
            Utilization                           89%                2%          -87%        -87%   o
            Service Level                         43%            100%             57%         57%   v
            Minimum WIP                          7.68             0.22          (7.46)       -97%   e
            Cost                         $        -       $        -       $      -    -
                                                                                                    m
            Resource Costs               $       7.25     $       0.53     $    (6.72)       -93%
            User Property Costs          $        -       $        -       $      -    -            e
            Total of All Costs           $       7.25     $       0.53     $    (6.72)       -93%   n
            Rolled Throughput Yield             100%             100%               0%         0%   t
            Time Units are in Minutes
  19
Manual Kanban vs. Collaborative Electronic Kanban –
Annualized Time & Cost Comparison Report

  KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis

  Planning Period               250.00 Days
  Time in Planning Period   112,500.00 Mins
  Demand Node             Number of Items
  KRS Set-up & Management         20,000.00

  Resource                  Productivity Factor     Available FTE's    Available Time   Required Time         Cost
  Buyer                                   0.75               12.00 1,350,000.00 Mins 237,777.78 Mins $ 110,962.96
  Material Handler                        0.75                6.00    675,000.00 Mins 163,651.11 Mins $ 40,912.78
  Total                                                             2,025,000.00 Mins 401,428.89 Mins $ 151,875.74

  Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis
                                                                          • $140K in labor savings
  Planning Period                    250.00 Days                      • Three FTE resources freed-up
  Time in Planning Period        112,500.00 Mins
                                                                          • Eliminated stock-outs
  Demand Node                 Number of Items
  Release Electronic Kanban Singal     16,250.00
                                                                               • Improved OTD
                                                                            • Reduced inventory
  Resource                    Productivity Factor   Available FTE's      Available Time Required Time         Cost
  Material Handler                          0.75              6.00      675,000.00 Mins 5,416.67 Mins $ 1,354.17
  Buyer                                     0.75             12.00    1,350,000.00 Mins 21,666.67 Mins $ 10,111.11
  Receiving Clerk                           1.00              1.00      112,500.00 Mins 4,021.88 Mins $        -
  Total
   20                                                                 2,137,500.00 Mins 31,105.21 Mins $ 11,465.28
Key Contact Information




           Frank Kapper
           Director of Sales
           Ultriva Inc.
           1601 South De Anza Blvd, Ste. 260
           Cupertino, CA 95014
           Ph: (408) 828-8454
           Email: frankk@ultriva.com
           Web: www.ultriva.com


  21

Weitere ähnliche Inhalte

Andere mochten auch

Buses for baseball
Buses for baseballBuses for baseball
Buses for baseballcsangeorzan
 
Media Evaluation
Media EvaluationMedia Evaluation
Media EvaluationDuffers22
 
College fair pictures
College fair picturesCollege fair pictures
College fair picturescsangeorzan
 
Presentació ppt mireia
Presentació ppt mireiaPresentació ppt mireia
Presentació ppt mireiamireia boiza
 
My Accounts
My AccountsMy Accounts
My Accounts15akhan
 

Andere mochten auch (6)

Buses for baseball
Buses for baseballBuses for baseball
Buses for baseball
 
Media Evaluation
Media EvaluationMedia Evaluation
Media Evaluation
 
ppt nireia
ppt nireiappt nireia
ppt nireia
 
College fair pictures
College fair picturesCollege fair pictures
College fair pictures
 
Presentació ppt mireia
Presentació ppt mireiaPresentació ppt mireia
Presentació ppt mireia
 
My Accounts
My AccountsMy Accounts
My Accounts
 

Ähnlich wie Case study benefits of transitioning from manual kanban to e kanban_major medical device mfg_jul11

Warehouse inventory system
Warehouse inventory systemWarehouse inventory system
Warehouse inventory systemreggea00
 
Purchasing Support for Manufacturing Transformation
Purchasing Support for Manufacturing TransformationPurchasing Support for Manufacturing Transformation
Purchasing Support for Manufacturing Transformationjeoff1
 
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...KPIT
 
Lean Distribution
Lean DistributionLean Distribution
Lean DistributionAL Systems
 
Mentoring LSS newsletter
Mentoring LSS newsletterMentoring LSS newsletter
Mentoring LSS newsletterrabaos
 
Practix032006
Practix032006Practix032006
Practix032006rakesh_pg
 
Adopting the Saas business model for Enterprise Telecom Service providers in ...
Adopting the Saas business model for Enterprise Telecom Service providers in ...Adopting the Saas business model for Enterprise Telecom Service providers in ...
Adopting the Saas business model for Enterprise Telecom Service providers in ...Najmuddin Jabalpurwala
 
Supplier quality-compliance
Supplier quality-complianceSupplier quality-compliance
Supplier quality-complianceMetricStream Inc
 
Manufacturing Design Change
Manufacturing Design ChangeManufacturing Design Change
Manufacturing Design ChangeRoy Lunsford
 
Lean Improvement Case Study 3
Lean Improvement Case Study 3Lean Improvement Case Study 3
Lean Improvement Case Study 3actionmaster007
 
Package validation white paper, 2009
Package validation white paper, 2009Package validation white paper, 2009
Package validation white paper, 2009Mikko Nikkanen
 
Pull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the SupplyPull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the Supplyarsin1975
 
Prodigo Webinar Series: Your eProcurement Playbook: 5 Must Have Strategies f...
Prodigo Webinar Series:  Your eProcurement Playbook: 5 Must Have Strategies f...Prodigo Webinar Series:  Your eProcurement Playbook: 5 Must Have Strategies f...
Prodigo Webinar Series: Your eProcurement Playbook: 5 Must Have Strategies f...Prodigo Solutions, LLC
 
Qms overview (laura)
Qms overview (laura)Qms overview (laura)
Qms overview (laura)Laura DeLea
 
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyBenchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyMichael Mikitka, CAE
 
When even armani is not right ,switch to boiler suit for survival.#supplychain
When even armani is not right ,switch to boiler suit for survival.#supplychain When even armani is not right ,switch to boiler suit for survival.#supplychain
When even armani is not right ,switch to boiler suit for survival.#supplychain Romesh Gupta
 

Ähnlich wie Case study benefits of transitioning from manual kanban to e kanban_major medical device mfg_jul11 (20)

Warehouse inventory system
Warehouse inventory systemWarehouse inventory system
Warehouse inventory system
 
Purchasing Support for Manufacturing Transformation
Purchasing Support for Manufacturing TransformationPurchasing Support for Manufacturing Transformation
Purchasing Support for Manufacturing Transformation
 
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...
Easing Reconciling Oracle Inventory and General Ledger with Simplified Proced...
 
BOC Service
BOC ServiceBOC Service
BOC Service
 
Lean Distribution
Lean DistributionLean Distribution
Lean Distribution
 
Mentoring LSS newsletter
Mentoring LSS newsletterMentoring LSS newsletter
Mentoring LSS newsletter
 
Practix032006
Practix032006Practix032006
Practix032006
 
Adopting the Saas business model for Enterprise Telecom Service providers in ...
Adopting the Saas business model for Enterprise Telecom Service providers in ...Adopting the Saas business model for Enterprise Telecom Service providers in ...
Adopting the Saas business model for Enterprise Telecom Service providers in ...
 
Supplier quality-compliance
Supplier quality-complianceSupplier quality-compliance
Supplier quality-compliance
 
Manufacturing Design Change
Manufacturing Design ChangeManufacturing Design Change
Manufacturing Design Change
 
Lean Improvement Case Study 3
Lean Improvement Case Study 3Lean Improvement Case Study 3
Lean Improvement Case Study 3
 
Package validation white paper, 2009
Package validation white paper, 2009Package validation white paper, 2009
Package validation white paper, 2009
 
Pull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the SupplyPull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the Supply
 
Prodigo Webinar Series: Your eProcurement Playbook: 5 Must Have Strategies f...
Prodigo Webinar Series:  Your eProcurement Playbook: 5 Must Have Strategies f...Prodigo Webinar Series:  Your eProcurement Playbook: 5 Must Have Strategies f...
Prodigo Webinar Series: Your eProcurement Playbook: 5 Must Have Strategies f...
 
WCM (World Class Manufacturing)
WCM (World Class Manufacturing)WCM (World Class Manufacturing)
WCM (World Class Manufacturing)
 
Chris_du_Plessis - CV
Chris_du_Plessis - CVChris_du_Plessis - CV
Chris_du_Plessis - CV
 
Qms overview (laura)
Qms overview (laura)Qms overview (laura)
Qms overview (laura)
 
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyBenchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
 
When even armani is not right ,switch to boiler suit for survival.#supplychain
When even armani is not right ,switch to boiler suit for survival.#supplychain When even armani is not right ,switch to boiler suit for survival.#supplychain
When even armani is not right ,switch to boiler suit for survival.#supplychain
 
Digital signature implementation
Digital signature implementationDigital signature implementation
Digital signature implementation
 

Kürzlich hochgeladen

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 

Kürzlich hochgeladen (20)

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

Case study benefits of transitioning from manual kanban to e kanban_major medical device mfg_jul11

  • 1. Case Study Benefits of Transitioning from Manual Kanban to eKanban Major Medical Device Manufacturer July 2011
  • 2. Building the Business Case for Change – How They Did It Manual Kanban vs. eKanban Process Assessment 1. Created a flowchart (process map) of current state manual kanban processes. 2. Conducted interviews with process subject 1. Draw matter experts (SME’s) and staff to validate the Flowchart current-state process map and gather estimates of current performance characteristics. 6. Build Business Case, 2. Interview SMEs & Obtain Buy-in, Transition Capture Metrics 3. Analyzed the quantitative process performance metrics (i.e. Time, Cost, Resource Utilization, Service Level, etc.) required to support the manual kanban process Rapid 5. Design Process 3. Analyze 4. Identified, categorized and prioritized Future-state Performance & Compare Assessment process/systems improvement opportunities enabled by transition to eKanban. 5. Designed the future-state eKanban process and performed comparative analysis to current state. 4. Capture 6. Established business case, presented findings Improvement and recommendations to management, gained Opportunities buy-in and support, implemented eKanban, audited new current-state and adjusted to achieve optimal performance.
  • 3. Summarization of Benefits – Directly attributable to transition from manual kanban to eKanban People Process System Resource time reduced by 92% Process time reduced by 92% Implementation of closed-loop, electronic pull-based replenishment system Resource cost reduced by 93% Queue Time Eliminated Extensive use of barcode technology Headcount reduced by 50% - Service level increased by 57% Business rules and automated reassigned to other areas alerts linked to specific workflows Significant improvement in buyer Process simplified and automated. Real-time updates on all material and supplier collaboration Went from 24 steps to 13 steps. replenishment transactions Transition from reactive to Transition from open to closed- Complete audit trails on all proactive management loop material replenishment material replenishment processes transactions Single version of the truth on all Stock-outs eliminated Rapid deployment (90 days w/ERP material replenishment Integration) and sub one year ROI transactions 100% adoption by end-users & Inventory trending down - $1M+ Low TCO suppliers reduction in first six months 3
  • 5. Manual Kanban Process Observations • Staffing Assumptions – 12 FTE Buyers, Burden Rate $28.00/Hr. – 6 FTE Material Handlers, Burden Rate $15.00/Hr. • Process Observations – Average Manual Kanban Releases = ~400/Week – Kanban releases are 100% manual – Email, fax & phone are the primary means of communication with suppliers – Kanban card prep./management is labor intensive – Manual kanban process is open-loop – Limited capability to collaborate with suppliers – Multiple failure modes throughout process – Limited to no capability to track, measure and report on supplier performance – Reactive vs. proactive management system 5
  • 6. Manual Kanban Process Flow – Complex and Error Prone! Complex Process Steps 1. Process Trigger: KRS Set-up & Management 2. Buyer establishes part classification „K‟, „R‟, „D‟ 3. Buyer calculates bin size 4. Buyer creates Kanban Release Sheet „KRS‟ 5. Buyer forwards „KRS‟ to WH Material Handler 6. Material Handler sets up bin “consumption and signal” 7. Material Handler pull parts from consumption bin 8. Decision: Bin Empty 9. Material Handler Switches Consumption and Signal bin 10. Decision: 2 Bin or ROP 11. Material Handler Faxes to Buyer 12. Material Handler Places original „KRS‟ in Pending Confirmation Bin 13. Material Handler checks for received confirmation fax 14. Supplier Reply in 24 Hrs.? 15. Check due date & qty. 16. Material Handler attaches copy to „KRS‟ and places in Buyer alert bin 17. Material Handler files faxed copy in date slot of date sorter and „KRS‟ in consumption bin 18. Material Handler monitors date sorter 19. Decision: Part arrives on due date? 20. Decision: Parts critical for line? 21. Decision: Parts Qty. and Dock date correct? 22. Material Handler transfers actual qty. and dock date to „KRS‟ 23. Material Handler sends all completed fax copies to Purchasing Support for entry into Supplier performance database 6 24. Process End
  • 7. Manual Kanban Process KPIs – Per Manual Kanban Transaction Key Performance Metrics Process Time per Execution 18.39 Duration 49.36 Service Level 43% Takt 5.63 Arrival Rate Per Minute 0.2 Arrival Rate per Wk - Releases / Week 400.00 Resource Cost $ 7.25 Hours Per Work Period 7.5 Work Periods Per Day 1 Days Per Week 5 Time Units Minutes Time / Cost Per Manual Kanban Execution 7
  • 8. Manual Kanban Resource Time & Cost Analysis – Per Manual Kanban Transaction Resources Probability-Weighted Statistics Process Resource Resource Resource Time Time Cost Buyer 12.25 12.25 $ 5.72 Material Handler 6.14 6.14 $ 1.53 Total 18.39 $ 7.25 Resource Time & Cost Per Manual Kanban Transaction Time Units are in Minutes 8
  • 9. Manual Kanban Resource Time & Cost Analysis – Annualized (250 Production Days / 20,000 Manual Kanban Releases KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis Planning Period 250.00 Days Time in Planning Period 112,500.00 Mins Demand Node Number of Items KRS Set-up & Management 20,000.00 Resource Productivity Factor Available FTE's Available Time Required Time Cost Buyer 0.75 12.00 1,350,000.00 Mins 237,777.78 Mins $ 110,962.96 Material Handler 0.75 6.00 675,000.00 Mins 163,651.11 Mins $ 40,912.78 Total 2,025,000.00 Mins 401,428.89 Mins $ 151,875.74 Annual Resource Time & Cost Analysis to Support Manual Kanban 9
  • 10. Manual Kanban VA/NVA Analysis Process Key: White = VA Tasks Red = NVA Tasks Yellow = Failure Modes & Proposed Solutions 10
  • 11. Manual Kanban Failure Modes & eKanban Solutions KRS Failure Modes eKanban Solutions ~1 – 3% of the time the Material Handler Ultriva’s Collaborative Electronic Kanban (CEK) would forget to fax kanban release to Supplier. solution supports a closed-loop, pull-based This routinely resulted in stock-outs situations. material replenishment process. Electronic material replenishment signals are automatically sent to supplier on scan of empty bin. ~3% of the time the Material Handler would CEK handles both blanket and discrete POs. For forget to fax ROP sheet to Buyer. Routinely blanket POs, electronic material replenishment resulted in stock-outs. signals are automatically sent to suppliers on scan of empty bin. For discrete POs, Buyers are automatically notified to release a manual PO on scan of empty bin. • Material Handler did not check to ensure due Supplier specific ‘Business Rules’ w/ automated date and qty. were correct on kanban card. Buyer & Supplier alerts established for each • Material Handler did not update supplier material replenishment loop. Order qty./due confirmation info to on kanban release sheet. date/receive qty./etc. confirmed on scan of barcode label. Supplier performance metrics updated with each scan. Material Handler did not notify Buyer of need Automated notification to Buyer whenever an to create new PO for discrete orders. Item reaches its ROP to release discrete PO. 11
  • 12. Manual Kanban Failure Modes & eKanban Solutions KRS Failure Modes eKanban Solution Suppliers claimed they did not receive the Automatic alerting to both Buyer & Supplier kanban release fax. when Supplier does not acknowledge and satisfy each electronic replenishment signal within pre-determined time frames. Material Handler did not update kanban Automated updates to CEK when receiving release sheet with actual qty./dock date scans barcode label. Associated supplier impacting KPI tracking/reporting on supplier KPIs automatically updated. performance. Unable to determine if part qty./dock date Order qty., due date, actual received qty. correct. and receive date automatically validated upon scan of barcode label. Associated supplier KPIs automatically updated. 12
  • 14. Collaborative Electronic Kanban Process Highlights • Staffing Assumptions – 12 FTE Buyers, Burden Rate $28.00/Hr. – 6 FTE Material Handlers, Burden Rate $15.00/Hr. • Process Observations – Average Manual Kanban Releases = ~400/Week – Kanban releases are 100% electronic – Electronic signals are the primary means of communicating demand to suppliers – One-time set-up of electronic kanban loops. System monitors and suggests resizing based on actual consumption patterns – All material replenishment processes are closed-loop – Real-time updates on material status based on barcode scans – Significant reduction in overhead support requirements – Actionable business intelligence on supplier performance 14
  • 15. Collaborative Electronic Kanban Process Flow – Simplified & Automated Simplified & Automated Process 1. Process Trigger: Release Electronic Kanban Signal 2. Material Handler Scans Kanban Card 3. Email automatically sent to Supplier/Buyer 4. Decision: P.O. Needed? 5. Decision: Supplier accepts within 24 hrs? 6. Order in Process at Supplier 7. Supplier Prints Kanban Label(s) & Ships Part(s) 8. Decision: Goods Ship On-Time? 9. Decision: Goods In-Transit? 10. Receiving Scans Barcode Label to Receive Goods 11. Decision: Are Goods Dock to Stock? 12. PointMan Automatically Updated to Show Goods On-Hand 13. Process End 15
  • 16. Collaborative Electronic Kanban Process KPIs – Per Manual Kanban Transaction Key Performance Metrics Process Time per Execution 1.50 Duration 1.75 Highest Utilization 2% Service Level 100% Takt 6.92 Arrival Rate 0.1 Arrival Rate per Wk 325.00 Resource Cost Per Execution $ 0.53 Yield 100% Hours Per Work Period 7.5 Work Periods Per Day 1 Days Per Week 5 Time Units Minutes Time / Cost Per KRS Execution 16
  • 17. Collaborative Electronic Kanban – Process & Resource Time & Cost Analysis Per eKanban Transaction Resources Probability-Weighted Statistics Process Resource Resource Resource Time Time Cost Material Handler 0.25 0.25 $ 0.06 Material Handler Scans Kanban Card0.25 0.25 $ 0.06 Buyer 1.00 1.00 $ 0.47 Buyer Adds P.O. 1.00 1.00 $ 0.47 Receiving Clerk 0.25 0.25 $ - Receiving Scans Barcode Label to Receive Goods 0.25 0.25 $ - Total 1.50 $ 0.53 Resource Time & Cost Time Units are in Minutes Per eKanban Transaction 17
  • 18. Collaborative Electronic Kanban – Annualized (250 Production Days / 20,000 eKanban Releases) Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis Planning Period 250.00 Days Time in Planning Period 112,500.00 Mins Demand Node Number of Items Release Electronic Kanban Singal 16,250.00 Resource Productivity Factor Available FTE's Available Time Required Time Cost Material Handler 0.75 6.00 675,000.00 Mins 5,416.67 Mins $ 1,354.17 Buyer 0.75 12.00 1,350,000.00 Mins 21,666.67 Mins $ 10,111.11 Receiving Clerk 1.00 1.00 112,500.00 Mins 4,021.88 Mins $ - Total 2,137,500.00 Mins 31,105.21 Mins $ 11,465.28 Annual Resource Time & Cost Analysis to Support eKanban 18
  • 19. Manual Kanban vs. Collaboratively Electronic Kanban – Process KPI Comparison Report KRS Pre Ultriva vs. Electronic Kanban Post Ultriva Process KPI Comparison Report Profile Current State Future State Map Type Transactional Transactional Buyer creates Kanban Release Buyer Adds Bottleneck Sheet ‘KRS’ P.O. Arrival Rates Differ 0.18 0.14 Hours Per Work Period 7.5 7.5 Work Periods Per Day 1 1 Days Per Week 5 5 Activity Nodes 34.00 13.00 Start Nodes 1.00 1.00 End Nodes 4.00 2.00 Paths 34.00 4.00 Performance Current State Future State Difference % Difference Process Time 18.39 1.50 (16.89) -92% I Required Resource Time 18.39 1.50 (16.89) -92% m Total Queue Time 24.81 0.00 (24.81) -100% p Cycle Time 43.19 1.50 (41.70) -97% r Duration 49.36 1.75 (47.61) -96% Utilization 89% 2% -87% -87% o Service Level 43% 100% 57% 57% v Minimum WIP 7.68 0.22 (7.46) -97% e Cost $ - $ - $ - - m Resource Costs $ 7.25 $ 0.53 $ (6.72) -93% User Property Costs $ - $ - $ - - e Total of All Costs $ 7.25 $ 0.53 $ (6.72) -93% n Rolled Throughput Yield 100% 100% 0% 0% t Time Units are in Minutes 19
  • 20. Manual Kanban vs. Collaborative Electronic Kanban – Annualized Time & Cost Comparison Report KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis Planning Period 250.00 Days Time in Planning Period 112,500.00 Mins Demand Node Number of Items KRS Set-up & Management 20,000.00 Resource Productivity Factor Available FTE's Available Time Required Time Cost Buyer 0.75 12.00 1,350,000.00 Mins 237,777.78 Mins $ 110,962.96 Material Handler 0.75 6.00 675,000.00 Mins 163,651.11 Mins $ 40,912.78 Total 2,025,000.00 Mins 401,428.89 Mins $ 151,875.74 Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis • $140K in labor savings Planning Period 250.00 Days • Three FTE resources freed-up Time in Planning Period 112,500.00 Mins • Eliminated stock-outs Demand Node Number of Items Release Electronic Kanban Singal 16,250.00 • Improved OTD • Reduced inventory Resource Productivity Factor Available FTE's Available Time Required Time Cost Material Handler 0.75 6.00 675,000.00 Mins 5,416.67 Mins $ 1,354.17 Buyer 0.75 12.00 1,350,000.00 Mins 21,666.67 Mins $ 10,111.11 Receiving Clerk 1.00 1.00 112,500.00 Mins 4,021.88 Mins $ - Total 20 2,137,500.00 Mins 31,105.21 Mins $ 11,465.28
  • 21. Key Contact Information Frank Kapper Director of Sales Ultriva Inc. 1601 South De Anza Blvd, Ste. 260 Cupertino, CA 95014 Ph: (408) 828-8454 Email: frankk@ultriva.com Web: www.ultriva.com 21