SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Quality Assuring the Scottish
Baccalaureate
Inter-disciplinary Project
Matthew McCullagh
Quality Manager
Introduction
 Collaborative approach to quality assurance of the
Baccalaureate IPs.
 IPs are internally assessed, graded and quality assured
by centres and their partners.
 Grading decisions are then externally verified by SQA
External Verifiers (EVs).
 An important feature of this external verification process
is dialogue between centre representatives and EVs
during a Quality Forum event.
Overview of Quality Assurance
Processes
The following stages are involved in the quality
assurance of the IP:
 Internal quality assurance by centres
 The Quality Forum event
 The Central Verification event
 Post-central verification procedures
Internal Quality Assurance by Centres
Purpose
The purpose of internal quality assurance is to ensure, as
far as possible, that:
 all those involved in delivering and assessing the IP in
your centre develop a common and appropriate
understanding of the national standards.
 the templates and candidate guidance are capable of
generating sufficient evidence
 all those involved in assessing the IP in your centre have
made grading decisions for all candidates in line with the
national standard.
Internal Quality Assurance Models
Effective internal quality assurance model will normally
involve the following:
 a standardisation process
 verification of the templates and candidate guidance you
are going to use with candidates
 verification of internal assessment decisions
The Quality Forum event
Purpose
The purpose of the Quality Forum is to give your centre’s
representative opportunities to:
 outline assessment and internal quality assurance
processes used in your centre, and learn about those
used in other centres.
 develop their understanding of the national standards of
competence for the IP share examples of good practice,
and alternative approaches to the delivery and
development of the IP.
Preparation for the Quality Forum event
Your centre representative will need to gather the five
pieces of mandatory evidence for each candidate
selected:
 the candidate's project proposal
 the candidate's project plan
 the assessor's record of the candidate's presentation of
his/her project findings/product.
 the candidate's evaluation of the project
 the candidate's evaluation of his/her generic and
cognitive skills development.
 plus the checklist
along with the associated assessor comments.
The Quality Forum Event - Roles
The role of your centre representative is to:
 bring the mandatory evidence for all candidates who
have been identified for sampling to the event, along with
related assessor comments.
 outline the internal IP assessment and quality assurance
processes used in your centre.
 participate in a peer review of a small selection of
candidate evidence from other centres
 feedback to all colleagues in your centre following the
event.
The Quality Forum Event - Roles
The role of the EV is to:
 record information about each centre’s internal quality
assurance processes
 assist centre representatives during the peer review
process
 identify examples of good practice in the assessment of
generic and cognitive skills, and/or internal quality
assurance
 support centre representatives in developing their
understanding of the national standard of competence
for the IP
The Quality Forum Event - Roles
The role of the QEM
The role of the QEM is to chair the event.
They will ensure that:
 the forum starts and finishes on time, following the stated
agenda
 all participants are clear about their roles and the stages
of the event
 all centre representatives have an equal opportunity to
provide information and discuss evidence in relation to
their candidates’ IPs
 the event is conducted in a supportive and professional
manner throughout.
The Quality Forum Event - Format
The Quality Forum will be a half-day event with a fixed
agenda.
09.30 Registration and tea/coffee
10.00 Welcome and introductions
10.05 Outline of internal assessment and quality
assurance processes by centre reps
11.15 Peer review session
12.25 Sharing good practice
12.55 Next stages in IP quality assurance process
13.00 Close
What Happens after the Quality Forum?
The purposes of post-Quality Forum procedures
are to:
 externally verify centre grading decisions at a
central verification event – Central Verification
 inform centres of the results of external
verification – Central Verification Reports
 ensure all outstanding issues are fully resolved
to allow certification to take place on time.
Possible Outcomes of External
Verification
There are three possible outcomes of IP
external verification. These are:
 Accepted
 Advised to Review Assessment Decision/s
 Not Accepted
Key Dates and Timings
 26th March - confirmation of date and venue
Quality Forum
 9th April - confirmation of candidate sample
selected
 12-13th May - Quality Forum events
 14-15th May - Central verification event
 19th May - EV reports received by centres
 4th June - All outstanding issues resolved
A Final Note……….
SQA will value feedback from all centres involved
in delivering and assessing the IP. At the end of
the quality assurance process you will be asked
to send feedback on you and your centre’s
experiences this year. However, feedback from
centres is also welcome at any stage in the
processes and will be used to inform evaluation
of the IP, its assessment and quality assurance
processes.
Any Questions?

Weitere ähnliche Inhalte

Ähnlich wie QualityAssurance.ppt

CBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptxCBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptx
linetnafuna
 
A guide-to-internal-quality-assurance
A guide-to-internal-quality-assuranceA guide-to-internal-quality-assurance
A guide-to-internal-quality-assurance
Ibrahim Khleifat
 
Webinar-ISO-9001-Back-to-Basics-Internal-Auditing
Webinar-ISO-9001-Back-to-Basics-Internal-AuditingWebinar-ISO-9001-Back-to-Basics-Internal-Auditing
Webinar-ISO-9001-Back-to-Basics-Internal-Auditing
mufajzaposh
 
Curriculum Vitae - Albert Schutzler 01-June 2015
Curriculum Vitae - Albert Schutzler  01-June 2015Curriculum Vitae - Albert Schutzler  01-June 2015
Curriculum Vitae - Albert Schutzler 01-June 2015
Albert Schutzler
 
Quality Management
Quality ManagementQuality Management
Quality Management
Reyhaneh b
 

Ähnlich wie QualityAssurance.ppt (20)

Assessment Audits by WHO
Assessment Audits by WHOAssessment Audits by WHO
Assessment Audits by WHO
 
Online ISO 9001 Lead Auditor Training
Online ISO 9001 Lead Auditor TrainingOnline ISO 9001 Lead Auditor Training
Online ISO 9001 Lead Auditor Training
 
CBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptxCBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptx
 
Rashmi Nagaraja_QA
Rashmi Nagaraja_QA Rashmi Nagaraja_QA
Rashmi Nagaraja_QA
 
Professional Certification: Obtaining CMP Status
Professional Certification: Obtaining CMP StatusProfessional Certification: Obtaining CMP Status
Professional Certification: Obtaining CMP Status
 
CV-SBERA
CV-SBERACV-SBERA
CV-SBERA
 
A guide-to-internal-quality-assurance
A guide-to-internal-quality-assuranceA guide-to-internal-quality-assurance
A guide-to-internal-quality-assurance
 
Btec centre guide_to_internal_verification
Btec centre guide_to_internal_verificationBtec centre guide_to_internal_verification
Btec centre guide_to_internal_verification
 
Internal Audit Training with different .pptx
Internal Audit Training with different .pptxInternal Audit Training with different .pptx
Internal Audit Training with different .pptx
 
8.TYPES AND METHODS OF ASSESSMENT.pptx
8.TYPES AND METHODS OF ASSESSMENT.pptx8.TYPES AND METHODS OF ASSESSMENT.pptx
8.TYPES AND METHODS OF ASSESSMENT.pptx
 
Total quality management (tqm) final
Total quality management (tqm) finalTotal quality management (tqm) final
Total quality management (tqm) final
 
Mustafë Bislimi - Partner Program and Partner Level Scheme
Mustafë Bislimi - Partner Program and Partner Level SchemeMustafë Bislimi - Partner Program and Partner Level Scheme
Mustafë Bislimi - Partner Program and Partner Level Scheme
 
NABL accreditation
NABL accreditation NABL accreditation
NABL accreditation
 
Webinar-ISO-9001-Back-to-Basics-Internal-Auditing
Webinar-ISO-9001-Back-to-Basics-Internal-AuditingWebinar-ISO-9001-Back-to-Basics-Internal-Auditing
Webinar-ISO-9001-Back-to-Basics-Internal-Auditing
 
ANSI-IREC webinar 021413
ANSI-IREC webinar 021413ANSI-IREC webinar 021413
ANSI-IREC webinar 021413
 
Curriculum Vitae - Albert Schutzler 01-June 2015
Curriculum Vitae - Albert Schutzler  01-June 2015Curriculum Vitae - Albert Schutzler  01-June 2015
Curriculum Vitae - Albert Schutzler 01-June 2015
 
Enhancing Assurance - Value and Benefits of Assurance, Chris Scudamore, APM A...
Enhancing Assurance - Value and Benefits of Assurance, Chris Scudamore, APM A...Enhancing Assurance - Value and Benefits of Assurance, Chris Scudamore, APM A...
Enhancing Assurance - Value and Benefits of Assurance, Chris Scudamore, APM A...
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality management
 
Requirements Engineering: A Practicum
Requirements Engineering: A PracticumRequirements Engineering: A Practicum
Requirements Engineering: A Practicum
 
Quality Management
Quality ManagementQuality Management
Quality Management
 

Kürzlich hochgeladen

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Kürzlich hochgeladen (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 

QualityAssurance.ppt

  • 1. Quality Assuring the Scottish Baccalaureate Inter-disciplinary Project Matthew McCullagh Quality Manager
  • 2. Introduction  Collaborative approach to quality assurance of the Baccalaureate IPs.  IPs are internally assessed, graded and quality assured by centres and their partners.  Grading decisions are then externally verified by SQA External Verifiers (EVs).  An important feature of this external verification process is dialogue between centre representatives and EVs during a Quality Forum event.
  • 3. Overview of Quality Assurance Processes The following stages are involved in the quality assurance of the IP:  Internal quality assurance by centres  The Quality Forum event  The Central Verification event  Post-central verification procedures
  • 4. Internal Quality Assurance by Centres Purpose The purpose of internal quality assurance is to ensure, as far as possible, that:  all those involved in delivering and assessing the IP in your centre develop a common and appropriate understanding of the national standards.  the templates and candidate guidance are capable of generating sufficient evidence  all those involved in assessing the IP in your centre have made grading decisions for all candidates in line with the national standard.
  • 5. Internal Quality Assurance Models Effective internal quality assurance model will normally involve the following:  a standardisation process  verification of the templates and candidate guidance you are going to use with candidates  verification of internal assessment decisions
  • 6. The Quality Forum event Purpose The purpose of the Quality Forum is to give your centre’s representative opportunities to:  outline assessment and internal quality assurance processes used in your centre, and learn about those used in other centres.  develop their understanding of the national standards of competence for the IP share examples of good practice, and alternative approaches to the delivery and development of the IP.
  • 7. Preparation for the Quality Forum event Your centre representative will need to gather the five pieces of mandatory evidence for each candidate selected:  the candidate's project proposal  the candidate's project plan  the assessor's record of the candidate's presentation of his/her project findings/product.  the candidate's evaluation of the project  the candidate's evaluation of his/her generic and cognitive skills development.  plus the checklist along with the associated assessor comments.
  • 8. The Quality Forum Event - Roles The role of your centre representative is to:  bring the mandatory evidence for all candidates who have been identified for sampling to the event, along with related assessor comments.  outline the internal IP assessment and quality assurance processes used in your centre.  participate in a peer review of a small selection of candidate evidence from other centres  feedback to all colleagues in your centre following the event.
  • 9. The Quality Forum Event - Roles The role of the EV is to:  record information about each centre’s internal quality assurance processes  assist centre representatives during the peer review process  identify examples of good practice in the assessment of generic and cognitive skills, and/or internal quality assurance  support centre representatives in developing their understanding of the national standard of competence for the IP
  • 10. The Quality Forum Event - Roles The role of the QEM The role of the QEM is to chair the event. They will ensure that:  the forum starts and finishes on time, following the stated agenda  all participants are clear about their roles and the stages of the event  all centre representatives have an equal opportunity to provide information and discuss evidence in relation to their candidates’ IPs  the event is conducted in a supportive and professional manner throughout.
  • 11. The Quality Forum Event - Format The Quality Forum will be a half-day event with a fixed agenda. 09.30 Registration and tea/coffee 10.00 Welcome and introductions 10.05 Outline of internal assessment and quality assurance processes by centre reps 11.15 Peer review session 12.25 Sharing good practice 12.55 Next stages in IP quality assurance process 13.00 Close
  • 12. What Happens after the Quality Forum? The purposes of post-Quality Forum procedures are to:  externally verify centre grading decisions at a central verification event – Central Verification  inform centres of the results of external verification – Central Verification Reports  ensure all outstanding issues are fully resolved to allow certification to take place on time.
  • 13. Possible Outcomes of External Verification There are three possible outcomes of IP external verification. These are:  Accepted  Advised to Review Assessment Decision/s  Not Accepted
  • 14. Key Dates and Timings  26th March - confirmation of date and venue Quality Forum  9th April - confirmation of candidate sample selected  12-13th May - Quality Forum events  14-15th May - Central verification event  19th May - EV reports received by centres  4th June - All outstanding issues resolved
  • 15. A Final Note………. SQA will value feedback from all centres involved in delivering and assessing the IP. At the end of the quality assurance process you will be asked to send feedback on you and your centre’s experiences this year. However, feedback from centres is also welcome at any stage in the processes and will be used to inform evaluation of the IP, its assessment and quality assurance processes.