Fairfax County's Stormwater Update
Stormwater Management
Stormwater Drivers
a) MS4 Permit
b) Chesapeake Bay Total Maximum
Daily Load (TMDL)
c) Local TMDL’s
d) Dam Safety Regulations
e) Maintenance of Existing Facilities
f) Public Safety/Emergency Response
2October 16, 2019
History of Stormwater Funding
$0.0
$10.0
$20.0
$30.0
$40.0
$50.0
$60.0
$70.0
$80.0
$90.0
$100.0
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
FY16
FY17
FY18
FY19
FY20
Budget Amounts
Millions
Operations (General Fund) Fringe (General Fund) Public Works Construction (Fund 308)
Operations, Fringe & Contributory (Fund 125) Operations (Fund 318) Penny Dedication (Fund 318)
Stormwater Service District (Fund 125)
Stormwater Management
Fairfax County's Stormwater Program
October 16, 2019
Stormwater Management
Fairfax County's Stormwater Program
4
(2%) NVSWCD, Occoquan Lab, Towns, $1.5
M
(9%) Stormwater Regulatory Programs,
$7.0 M
(11%) Dam Saftey and Facility
Rehabilitation, $9.0M
(31%) Streams and Water Quality, $25.4M
(10%) Conveyance Systems, $8.5M
(31%) Operations, $25.6M
(6%) Emergency and Flood Response,
$5.0M
31% Operations
31% Streams and
Water Quality
2% NVSWCD,
Labs, Towns6% Emergency &
Flood Response
Fiscal Year 2020 Budget
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
Regulatory
5October 16, 2019
• MS4 Permit Compliance
• Monitoring
• Industrial High Risk Runoff Inspection
• Illicit Discharge Response
• Outreach and Education
Grease Dumpster
Grease Overflow
66
Fairfax County's Stormwater Program
Conveyance System Rehabilitation
6
Large fracture and joint offset
Before
After
Conveyance System
• 1,300 miles of pipe
• 65,000 storm structures
• 7,000+ MS4 regulated outfalls
• 100+ miles of man-made channels (concrete, gabion, rip rap, etc.)
• 10+ miles restored streams (natural channel design)
Stormwater Management
Deteriorated and eroded outfall restored with step pool and riffle bed mix
October 16, 2019
Stormwater Management
Dam Safety and Facility Rehabilitation
7
Fairfax County's Stormwater Program
Typical State Dam Safety Regulation Requirements
Routine maintenance
• Annual inspections
• Inspections after major storm events
• Biannual inspections by a professional engineer (PE)
• Non-Routine maintenance
• Annual Emergency Action Plan (EAP) updates
• 6-year certification cycle (Virginia)
• Operation and Maintenance Plan
• Inundation area mapping
Maintenance of County’s flood warning system
October 16, 2019
Stormwater Facilities
• 2,200 Publically Owned SWM facilities
• 20 State Regulated Dams
• 4,800 Private SWM facilities
Stormwater Management
Fairfax County's Stormwater Program
Inventory of Stormwater Management Facilities
8
5,299
5,619
5,987
6,187
6,583
6,992
3,555
3,770
4,009 4,138
4,447
4,787
1,744 1,849 1,978 2,049 2,136 2,205
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
FY2014 FY2015 FY2016 FY2017 FY2018 FY2019
NO.OFFACILITIES
YEAR
Fairfax County Stormwater Management Facility Inventory
Total Private Public Linear (Total)
October 16, 2019
Stormwater Management 9
Fairfax County's Stormwater Program
Inventory of Stormwater Management Facilities
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
Dam Safety and Facility Rehabilitation
10October 16, 2019
Stormwater Facility Challenges
Before
After
Fairfax County's Stormwater Program
Stormwater Management
Dam Safety and Facility Rehabilitation
11
Sealed Porous Asphalt
Deteriorated Porous Concrete Replaced
with Porous Concrete Slabs
October 16, 2019
Stormwater Facility Challenges
Stormwater Management
Fairfax County's Stormwater Program
Emergency and Flood Response
12
• FEMA National Flood Insurance Program
• Community Rating System (CRS)
• Mitigate Structural Flooding
• Conveyance System Installation or Enhancement
• Overland Relief
• Voluntary Property Acquisition
• Minor enhancements
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
Streams and Water Quality Improvements
13
13
Wakefield Park Tributary
Accotink Creek WS
Public Safety Headquarters
Difficult Run WS
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
Stormwater Local Assistance Fund (SLAF)
14
14
Turkey Run at Truro
Accotink Creek, WS
October 16, 2019
County SLAF Awards
• Up to 50% matching funds from State
• 2014-2018
• $93 million budgeted for state wide projects
• 20 County Projects Awarded
• 4 Town of Vienna Projects Awarded
• $17.2 Million in SLAF Grant Awards to County
• $2.8 Million in SLAF Grant Awards to Town of Vienna
• FY 2019 $10 million available (Solicitation closes on
November 15, 2019)
Fairfax County's Stormwater Program
Stormwater Management
Project Selection and Prioritization
1. Project Selection Priority
a) Public Safety
b) Regulatory (MS4 Permit)
I. Chesapeake Bay TMDL
II. Local Stream TMDL’s
c) Community Needs
2. Existing Project Metrics
a) Cost Benefit Analysis
a) Overall
b) Trends
3. CIP Budget (Streams and Water Quality
program)
15October 16, 2019
Accotink Tributary at Danburry Forest
Accotink Creek WS
Fairfax County's Stormwater Program
Stormwater Management
Completed Facilities FY10-19
16October 16, 2019
Practices
Number
Installed TN TP TSS
Stream Restoration 41 $1,800 $6,290 $21
Pond Retrofits 56 $3,440 $35,800 $28
Infiltration Swales & Trenches 16 $11,100 $138,000 $191
Dry Swales 13 $6,130 $69,000 $92
Bioretention (Rain Gardens) 31 $8,100 $71,600 $95
Pervious Pavement 28 $25,800 $241,000 $305
Capital Cost ($/(lb/yr) )
Fairfax County's Stormwater Program
Stormwater Management
Progress Towards Chesapeake Bay TMDL
17October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management 18October 16, 2019
Looking Forward And On the Horizon
Changing
Regulatory World
Negotiation of
New MS4
Permit
Flood Mitigation
Changing
Weather Patterns
Greater
Advancement and
Use of Technology
Local Stream
TMDLs
Merging Similar
WW and STW
Functions
Stormwater
Runoff and Urban
Stream Standards
Fairfax County's Stormwater Program
Stormwater Management
Completed Stormwater Projects in Braddock District
Stream and Outfall Restoration
• Accotink Tributaries at Wakefield Park (2)
• Government Center Stream Restoration
• Long Branch @ Long Branch Falls Park
• Pohick Creek Tributary
• Pohick Creek @ Queen Victoria Court
• Rabbit Branch Tributary
• Turkey Run @ Truro Subdivision
Outfall Restoration
• Babson Court
• Inverchapel Road
• Lenox Drive
• Toll House Road
• Ulysses Court
Pond Retrofit
• Brentwood West
• Colony Park Drive
• Fairfax Landbay C Section 2, Pond B
• Herrity Building Wet Pond
• Marymeade Section 1 and 2
• Patriot Village
• University Square
• Village Park Sec 2B
19October 16, 2019
Pohick Creek @ Queen Victoria Court
Pohick WS
Fairfax County's Stormwater Program
Stormwater Management
Completed Stormwater Projects in Braddock District
PL-566 Dam Rehabilitation and Dredging
• Lake Barton
• Royal Lake
• Woodglen Lake
20October 16, 2019
Lake Barton Dredge
Royal Lake Dam Rehabilitation
Fairfax County's Stormwater Program
Stormwater Management
Lake Dredging
21October 16, 2019
Lake Barton Dredging
Pohick Creek WS
AfterBefore
Stormwater Management
Fairfax County's Stormwater Program
Stream Restorations
22
22
2019
One year after Construction
Before
Turkey Run at Truro
Accotink Creek WS
October 16, 2019
Stormwater Management
Fairfax County's Stormwater Program
Stream Restorations
23
23
AfterBefore
Long Branch Tributary at Long Branch Falls Park
Accotink WS
October 16, 2019
Stormwater Management
Fairfax County's Stormwater Program
Stream Restorations
24
24
AfterBefore
Pohick Creek Tributary at Queen Victoria
Pohick Creek WS
October 16, 2019
Stormwater Management
Fairfax County's Stormwater Program
Stream Restorations
25
25
2018
6 years after Construction
Before
Government Center Stream Restoration
Difficult Run WS
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
Outfall Restorations
26October 16, 2019
Toll House Road
Accotink Creek WS
AfterBefore
Fairfax County's Stormwater Program
Stormwater Management
Stormwater Retrofit
27October 16, 2019
Kings Park West
Accotink Creek WS
AfterBefore
Fairfax County's Stormwater Program
Stormwater Management
Stormwater Projects Currently in Construction in Braddock District
Stream and Outfall Restoration
• Flag Run @ Elgar Street (Braddock)
Pond Retrofit
• Government Center Pond
GSI/LID
• Herrity Building Concrete Fountain Replacement
28
Flag Run @ Elgar Street
Accotink Creek WS
October 16, 2019
Fairfax County's Stormwater Program
Stormwater Management
FY 2020 and Ongoing Design Projects in Braddock District
Stream and Outfall Restoration
• Accotink Creek at Wakefield Park*
• Accotink Tributary @ Danbury Forest
• Difficult Run Tributary @ Fairfax Govt.
Center
• Long Branch Stream Restoration
• Rabbit Branch Tributary @ Collingham Drive
• Long Branch Central Watershed
Management Area
Lake Dredge
• Lake Barton*
• Lake Accotink
* Scheduled for Construction in FY 2020
29
Long Branch Stream Restoration
Accotink Creek WS
October 16, 2019
DPWES Stormwater Planning Division
Long Branch Central Watershed Management Area
30
Long Branch Central Watershed Management Area
Long Branch Central Watershed
3.71 Square Miles - 8 Miles of Streams
Braddock Road
Little River Turnpike (236)
Capital
Betway (495)
Burke Station Road
Project Location
DPWES Stormwater Planning Division
Project Overview
Project Goals:
• Achieve Long Branch Central
TMDL waste load reduction
requirements.
• Provide long-term stability
and have low maintenance.
• Improve water quality within
the Long Branch Central
watershed.
• Improve habitat and
environmental health
(ecological lift).
31
Failed Stream Bank: Long Branch near
Olde Creek Elementary School
Degraded Outfall: Long
Branch at Laurel Street
Long Branch Central Watershed Management Area
DPWES Stormwater Planning Division
Project Schedule
• Begin Assessment – Winter
2020
• Complete Restoration Work
Plan – Fall 2020
• Complete First Construction
Plans – Summer 2021
• Construction Begins – Fall
2021
• Construction Ongoing –
Through 2027
• Warranty, Monitoring and
Maintenance – 2022
through 2030
32
Long Branch Central Watershed Management Area
Massive Bank Erosion: Long Branch Tributary in Old Forge Park
Long Branch Central Watershed Management Area
DPWES Stormwater Planning Division 33
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Project Location
Lake Accotink
• Lake Accotink Drainage
Area 31 mi2
• Stream Length 60.5
miles
• Impervious Cover in
Watershed 30%
• Amount of Sediment
Trapped Each Year
~22,000 cubic yards
DPWES Stormwater Planning Division
• Remove ~350,000 cubic
yards of sediment in initial
dredge
• Pump sediment to
Wakefield Park to avoid
truck traffic in communities
• Process sediment in
Wakefield Park
• Truck sediment to disposal
sites
• Establish permanent dredge
program to maintain lake
depth
34
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Project Overview
DPWES Stormwater Planning Division
Project Schedule
35
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Sept, 2019 Advertised for Design Consultant - Complete
Sept 19, 2019 Public Master Plan Meeting – Complete
Oct 29, 2019 BOS Meeting Scope and Funding Strategy for Approval - Complete
Feb 28, 2020 Award Consultant Contract for Design & Permitting
March 31, 2020 Submit Request for VCWRLF Loan
June 30, 2020 Park Authority Complete Master Plan
Sept 30, 2020 State Approve VCWRLF Loan
Jan 31, 2021 Award Dredging Contract
March 1, 2022 Commence Dredging
March 1, 2025 Complete Dredging
March 1, 2029 Complete Permit Compliance Monitoring
Ongoing Maintain Sustained Dredging Program
DPWES Stormwater Planning Division
Lake Accotink Financing Options
36
Long Branch Central Watershed Management Area
Lake Accotink Dredging
• Virginia Clean Water Revolving Loan Fund (“Fund”)
• Department of Environmental Quality (DEQ) program administrator of the Fund; Virginia Resources
Authority (VRA) is financial manager of the Fund
• Base interest rate of 1% below municipal market rates
• County’s dedicated source of stormwater revenue ($3.25 per $100 of Assessed Value) provides for
an additional interest rate reduction of 1% below municipal market rates
• Flexibility in debt service repayment through project completion
• Loan would be subject to the approval of the State Water Control Board
• Full year debt service for the entire $30.5m estimated at $1.5M/year per current market conditions
• Anticipated debt service would begin in FY 2025/2026, and will be included in future STW service district
budgets
• On-Going Funding for Debt Repayment and Maintenance Dredging
• Fairfax County Stormwater Service District - About $3.5M/year
DPWES Stormwater Planning Division
Dredge Spoils Processing & Disposal
37
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Spoils Processing Methods
 Geotextile Fabric Dewatering System
 Mechanical Separators
Potential Regional Disposal Sites
 Loudoun Quarry (Sterling)
 Luck Stone Quary
DPWES Stormwater Planning Division
Local Spoils Disposal
38
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Wakefield – Dominion Right of
Way
 Recommended Location of Forebay
 Proximity to dewatering area
 Access through Braddock Road
 Maximum capacity 75,000 CY
Lake Accotink Park
 High Wetland Impacts
 Requires Access Upgrades
 Close Proximity to Residential
Community
 Not Recommended
DPWES Stormwater Planning Division
Potential Spoils Handling Locations
39
Long Branch Central Watershed Management Area
Lake Accotink Dredging
Potential Sites
 Dominion Right
of Way in
Wakefield Park
 Howrey Field
Park
 Forested Area
Near Area 2
Maintenance
Shop
Fairfax County Stormwater Program
DPWES Stormwater Management Program
Additional Information
40
For additional information
please contact
Charles Smith
703-324-2467, TTY 711
Charles.Smith@FairfaxCounty.gov
www.FairfaxCounty.gov/publicworks/stormwater

Weitere ähnliche Inhalte

Ähnlich wie Stormwater Presentation to Friends of Lake Accotink Park 12-2019

Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
 
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Fairfax County
 
Stormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaStormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaFairfax County
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingShaun Wilson
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFairfax County
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...Graeme Donaldson
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for websitepixellence
 
2016 COBI Budget in Brief (FINAL)
2016 COBI Budget in Brief (FINAL)2016 COBI Budget in Brief (FINAL)
2016 COBI Budget in Brief (FINAL)Jenna Boyd
 
Consent 301 Project Agreement with Natural Resources Conservation Service
Consent 301 Project Agreement with Natural Resources Conservation ServiceConsent 301 Project Agreement with Natural Resources Conservation Service
Consent 301 Project Agreement with Natural Resources Conservation ServiceVictoriaColangelo
 
The Rate Setting Process
The Rate Setting ProcessThe Rate Setting Process
The Rate Setting ProcessRishi Kumar
 
USACE Update - Colonel Lars Zetterstrom
USACE Update - Colonel Lars ZetterstromUSACE Update - Colonel Lars Zetterstrom
USACE Update - Colonel Lars ZetterstromTWCA
 
KEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for TexasKEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for TexasTWCA
 
Protecting Barnstable's Water Resources
Protecting Barnstable's Water ResourcesProtecting Barnstable's Water Resources
Protecting Barnstable's Water ResourcesCCIAOR
 
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...Econsult Solutions, Inc.
 
Kansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachKansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachMatt Unruh
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationFairfax County
 

Ähnlich wie Stormwater Presentation to Friends of Lake Accotink Park 12-2019 (20)

Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
Stormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaStormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, China
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public Funding
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for website
 
2016 COBI Budget in Brief (FINAL)
2016 COBI Budget in Brief (FINAL)2016 COBI Budget in Brief (FINAL)
2016 COBI Budget in Brief (FINAL)
 
Consent 301 Project Agreement with Natural Resources Conservation Service
Consent 301 Project Agreement with Natural Resources Conservation ServiceConsent 301 Project Agreement with Natural Resources Conservation Service
Consent 301 Project Agreement with Natural Resources Conservation Service
 
The Rate Setting Process
The Rate Setting ProcessThe Rate Setting Process
The Rate Setting Process
 
USACE Update - Colonel Lars Zetterstrom
USACE Update - Colonel Lars ZetterstromUSACE Update - Colonel Lars Zetterstrom
USACE Update - Colonel Lars Zetterstrom
 
KEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for TexasKEYNOTE: Director Kathleen Jackson, Water for Texas
KEYNOTE: Director Kathleen Jackson, Water for Texas
 
Protecting Barnstable's Water Resources
Protecting Barnstable's Water ResourcesProtecting Barnstable's Water Resources
Protecting Barnstable's Water Resources
 
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
Lauren Fahnestock: One Water: Challenges and Opportunities for Water Infrastr...
 
Session 2 presentation
Session 2 presentationSession 2 presentation
Session 2 presentation
 
Kansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachKansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional Approach
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream Restoration
 

Mehr von Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...robinsonayot
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptxEllen Book
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...Mark Jaeno P. Duyan
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxafzalulhoda98
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Hyderabad Escorts Agency
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...kumargunjan9515
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...Sareena Khatun
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...kumargunjan9515
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 

Kürzlich hochgeladen (20)

Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 

Stormwater Presentation to Friends of Lake Accotink Park 12-2019

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! December 19, 2019 Fairfax County's Stormwater Program Friends of Lake Accotink Park
  • 2. Fairfax County's Stormwater Update Stormwater Management Stormwater Drivers a) MS4 Permit b) Chesapeake Bay Total Maximum Daily Load (TMDL) c) Local TMDL’s d) Dam Safety Regulations e) Maintenance of Existing Facilities f) Public Safety/Emergency Response 2October 16, 2019
  • 3. History of Stormwater Funding $0.0 $10.0 $20.0 $30.0 $40.0 $50.0 $60.0 $70.0 $80.0 $90.0 $100.0 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 Budget Amounts Millions Operations (General Fund) Fringe (General Fund) Public Works Construction (Fund 308) Operations, Fringe & Contributory (Fund 125) Operations (Fund 318) Penny Dedication (Fund 318) Stormwater Service District (Fund 125) Stormwater Management Fairfax County's Stormwater Program October 16, 2019
  • 4. Stormwater Management Fairfax County's Stormwater Program 4 (2%) NVSWCD, Occoquan Lab, Towns, $1.5 M (9%) Stormwater Regulatory Programs, $7.0 M (11%) Dam Saftey and Facility Rehabilitation, $9.0M (31%) Streams and Water Quality, $25.4M (10%) Conveyance Systems, $8.5M (31%) Operations, $25.6M (6%) Emergency and Flood Response, $5.0M 31% Operations 31% Streams and Water Quality 2% NVSWCD, Labs, Towns6% Emergency & Flood Response Fiscal Year 2020 Budget October 16, 2019
  • 5. Fairfax County's Stormwater Program Stormwater Management Regulatory 5October 16, 2019 • MS4 Permit Compliance • Monitoring • Industrial High Risk Runoff Inspection • Illicit Discharge Response • Outreach and Education Grease Dumpster Grease Overflow
  • 6. 66 Fairfax County's Stormwater Program Conveyance System Rehabilitation 6 Large fracture and joint offset Before After Conveyance System • 1,300 miles of pipe • 65,000 storm structures • 7,000+ MS4 regulated outfalls • 100+ miles of man-made channels (concrete, gabion, rip rap, etc.) • 10+ miles restored streams (natural channel design) Stormwater Management Deteriorated and eroded outfall restored with step pool and riffle bed mix October 16, 2019
  • 7. Stormwater Management Dam Safety and Facility Rehabilitation 7 Fairfax County's Stormwater Program Typical State Dam Safety Regulation Requirements Routine maintenance • Annual inspections • Inspections after major storm events • Biannual inspections by a professional engineer (PE) • Non-Routine maintenance • Annual Emergency Action Plan (EAP) updates • 6-year certification cycle (Virginia) • Operation and Maintenance Plan • Inundation area mapping Maintenance of County’s flood warning system October 16, 2019 Stormwater Facilities • 2,200 Publically Owned SWM facilities • 20 State Regulated Dams • 4,800 Private SWM facilities
  • 8. Stormwater Management Fairfax County's Stormwater Program Inventory of Stormwater Management Facilities 8 5,299 5,619 5,987 6,187 6,583 6,992 3,555 3,770 4,009 4,138 4,447 4,787 1,744 1,849 1,978 2,049 2,136 2,205 - 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 NO.OFFACILITIES YEAR Fairfax County Stormwater Management Facility Inventory Total Private Public Linear (Total) October 16, 2019
  • 9. Stormwater Management 9 Fairfax County's Stormwater Program Inventory of Stormwater Management Facilities October 16, 2019
  • 10. Fairfax County's Stormwater Program Stormwater Management Dam Safety and Facility Rehabilitation 10October 16, 2019 Stormwater Facility Challenges Before After
  • 11. Fairfax County's Stormwater Program Stormwater Management Dam Safety and Facility Rehabilitation 11 Sealed Porous Asphalt Deteriorated Porous Concrete Replaced with Porous Concrete Slabs October 16, 2019 Stormwater Facility Challenges
  • 12. Stormwater Management Fairfax County's Stormwater Program Emergency and Flood Response 12 • FEMA National Flood Insurance Program • Community Rating System (CRS) • Mitigate Structural Flooding • Conveyance System Installation or Enhancement • Overland Relief • Voluntary Property Acquisition • Minor enhancements October 16, 2019
  • 13. Fairfax County's Stormwater Program Stormwater Management Streams and Water Quality Improvements 13 13 Wakefield Park Tributary Accotink Creek WS Public Safety Headquarters Difficult Run WS October 16, 2019
  • 14. Fairfax County's Stormwater Program Stormwater Management Stormwater Local Assistance Fund (SLAF) 14 14 Turkey Run at Truro Accotink Creek, WS October 16, 2019 County SLAF Awards • Up to 50% matching funds from State • 2014-2018 • $93 million budgeted for state wide projects • 20 County Projects Awarded • 4 Town of Vienna Projects Awarded • $17.2 Million in SLAF Grant Awards to County • $2.8 Million in SLAF Grant Awards to Town of Vienna • FY 2019 $10 million available (Solicitation closes on November 15, 2019)
  • 15. Fairfax County's Stormwater Program Stormwater Management Project Selection and Prioritization 1. Project Selection Priority a) Public Safety b) Regulatory (MS4 Permit) I. Chesapeake Bay TMDL II. Local Stream TMDL’s c) Community Needs 2. Existing Project Metrics a) Cost Benefit Analysis a) Overall b) Trends 3. CIP Budget (Streams and Water Quality program) 15October 16, 2019 Accotink Tributary at Danburry Forest Accotink Creek WS
  • 16. Fairfax County's Stormwater Program Stormwater Management Completed Facilities FY10-19 16October 16, 2019 Practices Number Installed TN TP TSS Stream Restoration 41 $1,800 $6,290 $21 Pond Retrofits 56 $3,440 $35,800 $28 Infiltration Swales & Trenches 16 $11,100 $138,000 $191 Dry Swales 13 $6,130 $69,000 $92 Bioretention (Rain Gardens) 31 $8,100 $71,600 $95 Pervious Pavement 28 $25,800 $241,000 $305 Capital Cost ($/(lb/yr) )
  • 17. Fairfax County's Stormwater Program Stormwater Management Progress Towards Chesapeake Bay TMDL 17October 16, 2019
  • 18. Fairfax County's Stormwater Program Stormwater Management 18October 16, 2019 Looking Forward And On the Horizon Changing Regulatory World Negotiation of New MS4 Permit Flood Mitigation Changing Weather Patterns Greater Advancement and Use of Technology Local Stream TMDLs Merging Similar WW and STW Functions Stormwater Runoff and Urban Stream Standards
  • 19. Fairfax County's Stormwater Program Stormwater Management Completed Stormwater Projects in Braddock District Stream and Outfall Restoration • Accotink Tributaries at Wakefield Park (2) • Government Center Stream Restoration • Long Branch @ Long Branch Falls Park • Pohick Creek Tributary • Pohick Creek @ Queen Victoria Court • Rabbit Branch Tributary • Turkey Run @ Truro Subdivision Outfall Restoration • Babson Court • Inverchapel Road • Lenox Drive • Toll House Road • Ulysses Court Pond Retrofit • Brentwood West • Colony Park Drive • Fairfax Landbay C Section 2, Pond B • Herrity Building Wet Pond • Marymeade Section 1 and 2 • Patriot Village • University Square • Village Park Sec 2B 19October 16, 2019 Pohick Creek @ Queen Victoria Court Pohick WS
  • 20. Fairfax County's Stormwater Program Stormwater Management Completed Stormwater Projects in Braddock District PL-566 Dam Rehabilitation and Dredging • Lake Barton • Royal Lake • Woodglen Lake 20October 16, 2019 Lake Barton Dredge Royal Lake Dam Rehabilitation
  • 21. Fairfax County's Stormwater Program Stormwater Management Lake Dredging 21October 16, 2019 Lake Barton Dredging Pohick Creek WS AfterBefore
  • 22. Stormwater Management Fairfax County's Stormwater Program Stream Restorations 22 22 2019 One year after Construction Before Turkey Run at Truro Accotink Creek WS October 16, 2019
  • 23. Stormwater Management Fairfax County's Stormwater Program Stream Restorations 23 23 AfterBefore Long Branch Tributary at Long Branch Falls Park Accotink WS October 16, 2019
  • 24. Stormwater Management Fairfax County's Stormwater Program Stream Restorations 24 24 AfterBefore Pohick Creek Tributary at Queen Victoria Pohick Creek WS October 16, 2019
  • 25. Stormwater Management Fairfax County's Stormwater Program Stream Restorations 25 25 2018 6 years after Construction Before Government Center Stream Restoration Difficult Run WS October 16, 2019
  • 26. Fairfax County's Stormwater Program Stormwater Management Outfall Restorations 26October 16, 2019 Toll House Road Accotink Creek WS AfterBefore
  • 27. Fairfax County's Stormwater Program Stormwater Management Stormwater Retrofit 27October 16, 2019 Kings Park West Accotink Creek WS AfterBefore
  • 28. Fairfax County's Stormwater Program Stormwater Management Stormwater Projects Currently in Construction in Braddock District Stream and Outfall Restoration • Flag Run @ Elgar Street (Braddock) Pond Retrofit • Government Center Pond GSI/LID • Herrity Building Concrete Fountain Replacement 28 Flag Run @ Elgar Street Accotink Creek WS October 16, 2019
  • 29. Fairfax County's Stormwater Program Stormwater Management FY 2020 and Ongoing Design Projects in Braddock District Stream and Outfall Restoration • Accotink Creek at Wakefield Park* • Accotink Tributary @ Danbury Forest • Difficult Run Tributary @ Fairfax Govt. Center • Long Branch Stream Restoration • Rabbit Branch Tributary @ Collingham Drive • Long Branch Central Watershed Management Area Lake Dredge • Lake Barton* • Lake Accotink * Scheduled for Construction in FY 2020 29 Long Branch Stream Restoration Accotink Creek WS October 16, 2019
  • 30. DPWES Stormwater Planning Division Long Branch Central Watershed Management Area 30 Long Branch Central Watershed Management Area Long Branch Central Watershed 3.71 Square Miles - 8 Miles of Streams Braddock Road Little River Turnpike (236) Capital Betway (495) Burke Station Road Project Location
  • 31. DPWES Stormwater Planning Division Project Overview Project Goals: • Achieve Long Branch Central TMDL waste load reduction requirements. • Provide long-term stability and have low maintenance. • Improve water quality within the Long Branch Central watershed. • Improve habitat and environmental health (ecological lift). 31 Failed Stream Bank: Long Branch near Olde Creek Elementary School Degraded Outfall: Long Branch at Laurel Street Long Branch Central Watershed Management Area
  • 32. DPWES Stormwater Planning Division Project Schedule • Begin Assessment – Winter 2020 • Complete Restoration Work Plan – Fall 2020 • Complete First Construction Plans – Summer 2021 • Construction Begins – Fall 2021 • Construction Ongoing – Through 2027 • Warranty, Monitoring and Maintenance – 2022 through 2030 32 Long Branch Central Watershed Management Area Massive Bank Erosion: Long Branch Tributary in Old Forge Park Long Branch Central Watershed Management Area
  • 33. DPWES Stormwater Planning Division 33 Long Branch Central Watershed Management Area Lake Accotink Dredging Project Location Lake Accotink • Lake Accotink Drainage Area 31 mi2 • Stream Length 60.5 miles • Impervious Cover in Watershed 30% • Amount of Sediment Trapped Each Year ~22,000 cubic yards
  • 34. DPWES Stormwater Planning Division • Remove ~350,000 cubic yards of sediment in initial dredge • Pump sediment to Wakefield Park to avoid truck traffic in communities • Process sediment in Wakefield Park • Truck sediment to disposal sites • Establish permanent dredge program to maintain lake depth 34 Long Branch Central Watershed Management Area Lake Accotink Dredging Project Overview
  • 35. DPWES Stormwater Planning Division Project Schedule 35 Long Branch Central Watershed Management Area Lake Accotink Dredging Sept, 2019 Advertised for Design Consultant - Complete Sept 19, 2019 Public Master Plan Meeting – Complete Oct 29, 2019 BOS Meeting Scope and Funding Strategy for Approval - Complete Feb 28, 2020 Award Consultant Contract for Design & Permitting March 31, 2020 Submit Request for VCWRLF Loan June 30, 2020 Park Authority Complete Master Plan Sept 30, 2020 State Approve VCWRLF Loan Jan 31, 2021 Award Dredging Contract March 1, 2022 Commence Dredging March 1, 2025 Complete Dredging March 1, 2029 Complete Permit Compliance Monitoring Ongoing Maintain Sustained Dredging Program
  • 36. DPWES Stormwater Planning Division Lake Accotink Financing Options 36 Long Branch Central Watershed Management Area Lake Accotink Dredging • Virginia Clean Water Revolving Loan Fund (“Fund”) • Department of Environmental Quality (DEQ) program administrator of the Fund; Virginia Resources Authority (VRA) is financial manager of the Fund • Base interest rate of 1% below municipal market rates • County’s dedicated source of stormwater revenue ($3.25 per $100 of Assessed Value) provides for an additional interest rate reduction of 1% below municipal market rates • Flexibility in debt service repayment through project completion • Loan would be subject to the approval of the State Water Control Board • Full year debt service for the entire $30.5m estimated at $1.5M/year per current market conditions • Anticipated debt service would begin in FY 2025/2026, and will be included in future STW service district budgets • On-Going Funding for Debt Repayment and Maintenance Dredging • Fairfax County Stormwater Service District - About $3.5M/year
  • 37. DPWES Stormwater Planning Division Dredge Spoils Processing & Disposal 37 Long Branch Central Watershed Management Area Lake Accotink Dredging Spoils Processing Methods  Geotextile Fabric Dewatering System  Mechanical Separators Potential Regional Disposal Sites  Loudoun Quarry (Sterling)  Luck Stone Quary
  • 38. DPWES Stormwater Planning Division Local Spoils Disposal 38 Long Branch Central Watershed Management Area Lake Accotink Dredging Wakefield – Dominion Right of Way  Recommended Location of Forebay  Proximity to dewatering area  Access through Braddock Road  Maximum capacity 75,000 CY Lake Accotink Park  High Wetland Impacts  Requires Access Upgrades  Close Proximity to Residential Community  Not Recommended
  • 39. DPWES Stormwater Planning Division Potential Spoils Handling Locations 39 Long Branch Central Watershed Management Area Lake Accotink Dredging Potential Sites  Dominion Right of Way in Wakefield Park  Howrey Field Park  Forested Area Near Area 2 Maintenance Shop
  • 40. Fairfax County Stormwater Program DPWES Stormwater Management Program Additional Information 40 For additional information please contact Charles Smith 703-324-2467, TTY 711 Charles.Smith@FairfaxCounty.gov www.FairfaxCounty.gov/publicworks/stormwater

Hinweis der Redaktion

  1. Construction: FY2018 = July 2018
  2. Construction: FY2018 = July 2018
  3. Construction: FY2018 = July 2018
  4. Construction: FY2018 = July 2018
  5. Construction: FY2018 = July 2018
  6. Construction: FY2018 = July 2018
  7. Construction: FY2018 = July 2018
  8. Construction: FY2018 = July 2018
  9. Construction: FY2018 = July 2018