Diese Präsentation wurde erfolgreich gemeldet.
Wir verwenden Ihre LinkedIn Profilangaben und Informationen zu Ihren Aktivitäten, um Anzeigen zu personalisieren und Ihnen relevantere Inhalte anzuzeigen. Sie können Ihre Anzeigeneinstellungen jederzeit ändern.

Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov. 15, 2016

1.851 Aufrufe

Veröffentlicht am

Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov. 15, 2016

Veröffentlicht in: News & Politik
  • I'd advise you to use this service: ⇒ www.HelpWriting.net ⇐ The price of your order will depend on the deadline and type of paper (e.g. bachelor, undergraduate etc). The more time you have before the deadline - the less price of the order you will have. Thus, this service offers high-quality essays at the optimal price.
       Antworten 
    Sind Sie sicher, dass Sie …  Ja  Nein
    Ihre Nachricht erscheint hier
  • I'd advise you to use this service: ⇒ www.WritePaper.info ⇐ The price of your order will depend on the deadline and type of paper (e.g. bachelor, undergraduate etc). The more time you have before the deadline - the less price of the order you will have. Thus, this service offers high-quality essays at the optimal price.
       Antworten 
    Sind Sie sicher, dass Sie …  Ja  Nein
    Ihre Nachricht erscheint hier
  • You can hardly find a student who enjoys writing a college papers. Among all the other tasks they get assigned in college, writing essays is one of the most difficult assignments. Fortunately for students, there are many offers nowadays which help to make this process easier. The best service which can help you is ⇒ www.HelpWriting.net ⇐
       Antworten 
    Sind Sie sicher, dass Sie …  Ja  Nein
    Ihre Nachricht erscheint hier
  • Gehören Sie zu den Ersten, denen das gefällt!

Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov. 15, 2016

  1. 1. County of Fairfax, Virginia Scotts Run Trail Magarity Road to Colshire Meadow Drive Public Hearing Westgate Elementary School November 15, 2016 6:30 PM – 8:30 PM Presentation at 7:15 PM Department of Transportation Park Authority 1 A Joint Project by FCDOT and FCPA
  2. 2. County of Fairfax, Virginia Department of Transportation Park Authority 2 Introductions • Vanessa Aguayo, Project Coordinator Capital Projects and Traffic Engineering Division Department of Transportation • Liz Cronauer, Project Manager Planning and Development Division Fairfax County Park Authority
  3. 3. County of Fairfax, Virginia Department of Transportation Park Authority 3 Agenda • Welcome • Project Background • Design • Bridges • Project Schedule • Next Steps • Questions and Answers
  4. 4. County of Fairfax, Virginia Department of Transportation Park Authority 4 Project Background • Tysons Metrorail Station Access Management Study: – Vision: Walkable, bike-able urban community – Advisory group of residents, businesses, County staff – 4 public meetings – Online survey w/ 1,900 participants – 1 of 7 bike-pedestrian projects selected for funding – Plan adopted by BOS in 2011 • Purpose: Connect Pimmit Hills neighborhoods to McLean Metro Rail Station
  5. 5. County of Fairfax, Virginia Department of Transportation Park Authority 5 Design • 2,676 LF of 8’ wide asphalt trail • Two bridges: 90’ x 12’ and 50’ x 12’ • Marked crossing at Colshire Meadow Drive • Federal Funding- Updated project cost estimate: $2,500,000 • Meets ADA Guidelines for pedestrian access route: no slopes greater than 5%
  6. 6. County of Fairfax, Virginia Department of Transportation Park Authority 6 Design • Retain existing connection to Colonies Condominiums • Primarily on FC Park Authority property – some temporary and permanent easements needed on adjacent properties • Lighting: – Lighting design has not been completed – Compatible with designed trails in Tysons – Tysons standard fixtures will be used – Pedestrian scale 14’ -16’ poles
  7. 7. County of Fairfax, Virginia Department of Transportation Park Authority 7 Bridges • Trail will include two bridges • One 90’x12’ bridge crossing Scotts Run Stream • One 50’x12’ bridge will cross storm water outfall along west side of stream
  8. 8. County of Fairfax, Virginia Department of Transportation Park Authority 8 Project Schedule Project Concept- May 2012 Conceptual Alignment – Summer 2014 Design- On going Public Hearing- November 15, 2016 Environmental Work- Early 2017 Final Design – Spring 2017 Land Acquisition – Fall 2017 Project Construction – Summer 2018 Project Completion-Fall 2019 We are here
  9. 9. County of Fairfax, Virginia Department of Transportation Park Authority 9 Next Steps • Comments due by November 25, 2016 • Ways to get us your comments: 1. Tonight's meeting- Comment Box 2. Email: Elizabeth (Liz) Cronauer: Elizabeth.Cronauer@fairfaxcounty.gov 3. US Mail: 12055 Government Center Pkwy, Suite 406, Fairfax, VA 22035 Project Website Address: http://www.fairfaxcounty.gov/fcdot/pedestrian/scottsruntrail.htm
  10. 10. County of Fairfax, Virginia Department of Transportation Park Authority 10 Questions?

×