This project provided a six-foot-wide concrete sidewalk, approximately 2,100 feet in length, along Arlington Boulevard. The new sidewalk provides a safe, continuous walkway along the north side of Arlington Boulevard from the Cedar Hill Road to Allen Street and along to the south side of Arlington Boulevard from Graham Road to Woodley Lane. The project includes new curb and gutter, curb ramps, detectable warning surfaces, bus pad, median cut through, storm drainage improvements, asphalt paving, pavement markings, landscaping, and related signage.
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Contract No. CN17102040 and CN17102041
Project No. 1400055-2012 and 1400056-2012
VDOT Project No. 0050-029-280 and 0050-029-284
UPC No. 108499 and 108500
Providence District
Tax Map No. 50-3
February 5, 2020
Rt. 50 Sidewalk - Cedar Hill Road to Allen Street
Rt. 50 Sidewalk - Graham Road to Woodley Lane
2. Route 50 Sidewalk - Cedar Hill Road to Allen Street &
Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
3. Project Details
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Route 50 Sidewalk – Cedar Hill Road to Allen Street and Graham Road to Woodley Lane project
was substantially completed on December 18, 2019. This project provided a 6-foot-wide concrete
sidewalk approximately 2,100 feet in length along Arlington Boulevard. The project includes new
curb & gutter, curb ramps, detectable warning surfaces, bus pad, median cut thru, storm drainage
improvements, asphalt paving, pavement markings, landscaping and related signage.
Benefits:
• Provides safe continuous pedestrian access walkway along the north side of Arlington Boulevard
from the Cedar Hill Road to Allen Street and along to the south side of Arlington Boulevard from
Graham Road to Woodley Lane.
Project Team:
• Department of Transportation (FCDOT) Project Manager: Seyed Nabavi
• DPWES - Utilities Design and Construction Division (UDCD) Project Engineer: Tom Cutler
• DPWES - Land Survey Branch (LSB): Chris Jenson, Greg Harper and Michael Perry.
• Consultant, Engineering & Inspection (CEI): Volkert, Inc. - Ben Lineberry, Will Selim
• Contractor: Arthur Construction Co., Inc. – Joe Aruajo and Nat Gomes
4. Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Providence District, Tax Map No. 50-3
PROJECT LOCATION
PROJECT
LOCATION
5. Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
6. Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
7. Route 50 Sidewalk - Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
8. Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Removal of Existing Vegetation
9. Route 50 Sidewalk - Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
New Concrete Sidewalk and Landscape Planting
10. Before After
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham
Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
11. Before After
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham
Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
12. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov