A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Contract No. CN17102040 and CN17102041
Project No. 1400055-2012 and 1400056-2012
VDOT Project No. 0050-029-280 and 0050-029-284
UPC No. 108499 and 108500
Providence District
Tax Map No. 50-3
February 5, 2020
Rt. 50 Sidewalk - Cedar Hill Road to Allen Street
Rt. 50 Sidewalk - Graham Road to Woodley Lane
Route 50 Sidewalk - Cedar Hill Road to Allen Street &
Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Project Details
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Route 50 Sidewalk – Cedar Hill Road to Allen Street and Graham Road to Woodley Lane project
was substantially completed on December 18, 2019. This project provided a 6-foot-wide concrete
sidewalk approximately 2,100 feet in length along Arlington Boulevard. The project includes new
curb & gutter, curb ramps, detectable warning surfaces, bus pad, median cut thru, storm drainage
improvements, asphalt paving, pavement markings, landscaping and related signage.
Benefits:
• Provides safe continuous pedestrian access walkway along the north side of Arlington Boulevard
from the Cedar Hill Road to Allen Street and along to the south side of Arlington Boulevard from
Graham Road to Woodley Lane.
Project Team:
• Department of Transportation (FCDOT) Project Manager: Seyed Nabavi
• DPWES - Utilities Design and Construction Division (UDCD) Project Engineer: Tom Cutler
• DPWES - Land Survey Branch (LSB): Chris Jenson, Greg Harper and Michael Perry.
• Consultant, Engineering & Inspection (CEI): Volkert, Inc. - Ben Lineberry, Will Selim
• Contractor: Arthur Construction Co., Inc. – Joe Aruajo and Nat Gomes
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Providence District, Tax Map No. 50-3
PROJECT LOCATION
PROJECT
LOCATION
Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Route 50 Sidewalk - Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Route 50 Sidewalk - Cedar Hill Road to Allen Street
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Removal of Existing Vegetation
Route 50 Sidewalk - Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
New Concrete Sidewalk and Landscape Planting
Before After
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham
Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Before After
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham
Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
David Beverly
 
Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020
Crosstown TO
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Crosstown TO
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
Crosstown TO
 

Was ist angesagt? (20)

Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
 
Central West Open House
Central West Open HouseCentral West Open House
Central West Open House
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly RoadDolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
 
Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Silverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection ImprovementsSilverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection Improvements
 
West Ox Road Walkway
West Ox Road WalkwayWest Ox Road Walkway
West Ox Road Walkway
 
Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019
 
Edsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian ImprovementsEdsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian Improvements
 
Substantial Completion - North West Street Sidewalk Improvements
Substantial Completion - North West Street Sidewalk ImprovementsSubstantial Completion - North West Street Sidewalk Improvements
Substantial Completion - North West Street Sidewalk Improvements
 
PowerPoint Westmoreland Street Bike Lanes - substantial completion
PowerPoint   Westmoreland Street Bike Lanes - substantial completionPowerPoint   Westmoreland Street Bike Lanes - substantial completion
PowerPoint Westmoreland Street Bike Lanes - substantial completion
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Kirby Road Sidewalk Improvements
Kirby Road Sidewalk ImprovementsKirby Road Sidewalk Improvements
Kirby Road Sidewalk Improvements
 
West works open house deck March 12 2020
West works open house deck   March 12 2020 West works open house deck   March 12 2020
West works open house deck March 12 2020
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 

Ähnlich wie Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane

Ähnlich wie Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane (20)

Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Route 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection ImprovementsRoute 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection Improvements
 
Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Hunter Village Drive Walkway from Wentworth Place to Flax Street
Hunter Village Drive Walkway from Wentworth Place to Flax StreetHunter Village Drive Walkway from Wentworth Place to Flax Street
Hunter Village Drive Walkway from Wentworth Place to Flax Street
 
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz RoadDolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
 
Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021Hayfield Road Pipe Conveyance System January 2021
Hayfield Road Pipe Conveyance System January 2021
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside Lane
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Old Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh PkwyOld Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh Pkwy
 
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
 
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Chichester Lane Sidewalk Improvements
Chichester Lane Sidewalk ImprovementsChichester Lane Sidewalk Improvements
Chichester Lane Sidewalk Improvements
 

Mehr von Fairfax County

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 

Kürzlich hochgeladen

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 

Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Contract No. CN17102040 and CN17102041 Project No. 1400055-2012 and 1400056-2012 VDOT Project No. 0050-029-280 and 0050-029-284 UPC No. 108499 and 108500 Providence District Tax Map No. 50-3 February 5, 2020 Rt. 50 Sidewalk - Cedar Hill Road to Allen Street Rt. 50 Sidewalk - Graham Road to Woodley Lane
  • 2. Route 50 Sidewalk - Cedar Hill Road to Allen Street & Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 3. Project Details Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: The Route 50 Sidewalk – Cedar Hill Road to Allen Street and Graham Road to Woodley Lane project was substantially completed on December 18, 2019. This project provided a 6-foot-wide concrete sidewalk approximately 2,100 feet in length along Arlington Boulevard. The project includes new curb & gutter, curb ramps, detectable warning surfaces, bus pad, median cut thru, storm drainage improvements, asphalt paving, pavement markings, landscaping and related signage. Benefits: • Provides safe continuous pedestrian access walkway along the north side of Arlington Boulevard from the Cedar Hill Road to Allen Street and along to the south side of Arlington Boulevard from Graham Road to Woodley Lane. Project Team: • Department of Transportation (FCDOT) Project Manager: Seyed Nabavi • DPWES - Utilities Design and Construction Division (UDCD) Project Engineer: Tom Cutler • DPWES - Land Survey Branch (LSB): Chris Jenson, Greg Harper and Michael Perry. • Consultant, Engineering & Inspection (CEI): Volkert, Inc. - Ben Lineberry, Will Selim • Contractor: Arthur Construction Co., Inc. – Joe Aruajo and Nat Gomes
  • 4. Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Providence District, Tax Map No. 50-3 PROJECT LOCATION PROJECT LOCATION
  • 5. Route 50 Sidewalk - Cedar Hill Road to Allen Street Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 6. Route 50 Sidewalk - Cedar Hill Road to Allen Street Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 7. Route 50 Sidewalk - Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 8. Route 50 Sidewalk - Cedar Hill Road to Allen Street Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Removal of Existing Vegetation
  • 9. Route 50 Sidewalk - Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch New Concrete Sidewalk and Landscape Planting
  • 10. Before After Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 11. Before After Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 12. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Route 50 Sidewalk - Cedar Hill Road to Allen Street and Graham Road to Woodley Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov