Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Completed Project
2
Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Project Details
Description:
The Robey Ave Outfall Restoration Project was substantially completed on June 13, 2019. The project consisted
of restoring 160 linear feet of eroded outfall channel located in the Accotink Watershed. The goals of the
project were to address public safety concerns, stabilize a deeply eroded channel by using natural channel
design techniques, provide enhanced water quality and promote reforestation with native forest and riparian
plantings.
Project Overview:
 Restore the outfall channel with an imbricated rock step pool system and riffle sections constructed with
reinforced bed mix
 Stabilize channel banks using coir matting and native vegetation
 Revegetate disturbed areas with native plants, trees, and shrubs to promote reforestation
 Provide a reduction of 7 lbs. of Total Phosphorous per year, 15 lbs. of Total Nitrogen per year and 2,452
lbs. of Total Suspended Solids per year
Project Team:
 Project Manager: Jack Meritt, PE, Maintenance and Stormwater Management Division, DPWES
 Project Engineer: Stephen Dombroski, Maintenance and Stormwater Management Division, DPWES
 Project Inspector: Tom Cameron, Maintenance and Stormwater Management Division, DPWES
 Project Design: Wetland Studies and Solutions, Inc.
 Construction Contractor: Fort Myer Construction
 Revegetation Contractor: GroundFX
3
Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Project Location: Tax Map 059-3, Mason District
4
Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Pre-Construction Condition
5
Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Construction Photos
6
Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Before and After
7
Robey Avenue Outfall Restoration
Additional Information
8Stormwater/Maintenance and Stormwater Management Division
For additional information, please contact
Irene Haske
703-324-5821
Irene.Haske@fairfaxcounty.gov
www.fairfaxcounty.gov/publicworks

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Babson Court Outfall Restoration
Babson Court Outfall RestorationBabson Court Outfall Restoration
Babson Court Outfall Restoration
 
Lazy Creek Court Outfall Restoration
Lazy Creek Court Outfall RestorationLazy Creek Court Outfall Restoration
Lazy Creek Court Outfall Restoration
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement Project
 
Stone Mill Court Project Completion
Stone Mill Court Project CompletionStone Mill Court Project Completion
Stone Mill Court Project Completion
 
Indian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream RestorationIndian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream Restoration
 
Coon Branch at Annandale Community Park-Stream Restoration Project
Coon Branch at Annandale Community Park-Stream Restoration ProjectCoon Branch at Annandale Community Park-Stream Restoration Project
Coon Branch at Annandale Community Park-Stream Restoration Project
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Popes Head Creek at Brecon Ridge Resident Meeting
Popes Head Creek at Brecon Ridge Resident MeetingPopes Head Creek at Brecon Ridge Resident Meeting
Popes Head Creek at Brecon Ridge Resident Meeting
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 

Ähnlich wie Robey Avenue Outfall Restoration

Ähnlich wie Robey Avenue Outfall Restoration (20)

Ulysses Court Outfall Restoration
Ulysses Court Outfall RestorationUlysses Court Outfall Restoration
Ulysses Court Outfall Restoration
 
Shetland Court Outfall Restoration
Shetland Court Outfall RestorationShetland Court Outfall Restoration
Shetland Court Outfall Restoration
 
Launcelot Way Project Completion
Launcelot Way Project CompletionLauncelot Way Project Completion
Launcelot Way Project Completion
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21
 
Newington Commons Pond Improvement
Newington Commons Pond ImprovementNewington Commons Pond Improvement
Newington Commons Pond Improvement
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 
Crestmont circle outfall restoration
Crestmont circle outfall restorationCrestmont circle outfall restoration
Crestmont circle outfall restoration
 
Long Branch Tributary at Long Branch Falls Park
Long Branch Tributary at Long Branch Falls ParkLong Branch Tributary at Long Branch Falls Park
Long Branch Tributary at Long Branch Falls Park
 
Bentwood Court Bank Stabilization
Bentwood Court Bank StabilizationBentwood Court Bank Stabilization
Bentwood Court Bank Stabilization
 
Meadow Run Pond Improvement
Meadow Run Pond ImprovementMeadow Run Pond Improvement
Meadow Run Pond Improvement
 
Dead Run Drive Outfall Restoration
Dead Run Drive Outfall RestorationDead Run Drive Outfall Restoration
Dead Run Drive Outfall Restoration
 
Kaywood Place Storm Drainage Improvements
Kaywood Place Storm Drainage ImprovementsKaywood Place Storm Drainage Improvements
Kaywood Place Storm Drainage Improvements
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Rabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration ProjectRabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration Project
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Barton Hill Sediment Removal Project
Barton Hill Sediment Removal ProjectBarton Hill Sediment Removal Project
Barton Hill Sediment Removal Project
 
Midhill Place Outfall Restoration
Midhill Place Outfall RestorationMidhill Place Outfall Restoration
Midhill Place Outfall Restoration
 
Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021
 

Mehr von Fairfax County

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 

Kürzlich hochgeladen (20)

Climate Change
Climate ChangeClimate Change
Climate Change
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework  (SURRF)(1).pdfSustainable Recovery and Reconstruction Framework  (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 

Robey Avenue Outfall Restoration

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Robey Avenue Outfall Restoration Project Number: SD-000031-223 District: Mason Watershed: Accotink Creek December 12, 2019
  • 2. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Completed Project 2
  • 3. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Project Details Description: The Robey Ave Outfall Restoration Project was substantially completed on June 13, 2019. The project consisted of restoring 160 linear feet of eroded outfall channel located in the Accotink Watershed. The goals of the project were to address public safety concerns, stabilize a deeply eroded channel by using natural channel design techniques, provide enhanced water quality and promote reforestation with native forest and riparian plantings. Project Overview:  Restore the outfall channel with an imbricated rock step pool system and riffle sections constructed with reinforced bed mix  Stabilize channel banks using coir matting and native vegetation  Revegetate disturbed areas with native plants, trees, and shrubs to promote reforestation  Provide a reduction of 7 lbs. of Total Phosphorous per year, 15 lbs. of Total Nitrogen per year and 2,452 lbs. of Total Suspended Solids per year Project Team:  Project Manager: Jack Meritt, PE, Maintenance and Stormwater Management Division, DPWES  Project Engineer: Stephen Dombroski, Maintenance and Stormwater Management Division, DPWES  Project Inspector: Tom Cameron, Maintenance and Stormwater Management Division, DPWES  Project Design: Wetland Studies and Solutions, Inc.  Construction Contractor: Fort Myer Construction  Revegetation Contractor: GroundFX 3
  • 4. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Project Location: Tax Map 059-3, Mason District 4
  • 5. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Pre-Construction Condition 5
  • 6. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Construction Photos 6
  • 7. Robey Avenue Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Before and After 7
  • 8. Robey Avenue Outfall Restoration Additional Information 8Stormwater/Maintenance and Stormwater Management Division For additional information, please contact Irene Haske 703-324-5821 Irene.Haske@fairfaxcounty.gov www.fairfaxcounty.gov/publicworks