The primary goals of this project were to address public safety concerns, stabilize an eroded channel by using natural stream design techniques and promote the growth of native vegetation. The natural channel design techniques used, such as a reinforced bed mix riffle sections and step pools, reduce the flow velocity, provide stability, and enhance water quality along the streams leading to the Chesapeake Bay. The disturbed areas of the site were restored with native shrubs, plants and trees.
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Robey Avenue Outfall Restoration
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Robey Avenue Outfall Restoration
Project Number: SD-000031-223
District: Mason
Watershed: Accotink Creek
December 12, 2019
3. Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Project Details
Description:
The Robey Ave Outfall Restoration Project was substantially completed on June 13, 2019. The project consisted
of restoring 160 linear feet of eroded outfall channel located in the Accotink Watershed. The goals of the
project were to address public safety concerns, stabilize a deeply eroded channel by using natural channel
design techniques, provide enhanced water quality and promote reforestation with native forest and riparian
plantings.
Project Overview:
Restore the outfall channel with an imbricated rock step pool system and riffle sections constructed with
reinforced bed mix
Stabilize channel banks using coir matting and native vegetation
Revegetate disturbed areas with native plants, trees, and shrubs to promote reforestation
Provide a reduction of 7 lbs. of Total Phosphorous per year, 15 lbs. of Total Nitrogen per year and 2,452
lbs. of Total Suspended Solids per year
Project Team:
Project Manager: Jack Meritt, PE, Maintenance and Stormwater Management Division, DPWES
Project Engineer: Stephen Dombroski, Maintenance and Stormwater Management Division, DPWES
Project Inspector: Tom Cameron, Maintenance and Stormwater Management Division, DPWES
Project Design: Wetland Studies and Solutions, Inc.
Construction Contractor: Fort Myer Construction
Revegetation Contractor: GroundFX
3
4. Robey Avenue Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Project Location: Tax Map 059-3, Mason District
4