Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
October 2019
Piney Run at Lake Werowance
Stream Restoration Project
2. Stormwater Planning
Project Goals
Project Update
Proposed Conditions Example Graphics
Structure Examples
Site Walk with Stormwater Planning Division and Stantec, Inc.
Contact Information
2
Agenda
3. Stormwater Planning Division 3
Project Goals
• Restore approximately 3,500 feet of stream on Lake
Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream
system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through
the enhancements of existing wetland features within
the former lakebed
4. Stormwater Planning Division 4
Project Update
• The project is funded through the County Stormwater
Service District tax.
• The project is funded for design which is expected to be
completed by March 2020.
• Construction will begin summer 2020.
– Construction is estimated to be approximately 18
months.
– The construction estimate is $3.5 million.
6. Reference reach: Jefferies Branch (Loudoun County, Virginia)
• Geomorphologic ratios of this reference reach are the “blueprint” for the proposed design of
Piney Run
7. Urban reference reach: Neabsco Creek (Dale City, Virginia)
• Geomorphologic ratios of this urban reference reach are the “blueprint” for the proposed
design of Piney Run
8. Reference reach: Norton Prong (Spotsylvania County, Virginia)
• Geomorphologic ratios of this reference reach are the “blueprint” for the proposed design of
Piney Run
9. Project example: Goose Creek/Bolling Branch (Fauquier County, Virginia)
• Priority 1 restoration of Bolling Branch, 2 years after construction
33. Stormwater Planning Division 33
Contact Information
Contact Information
Design
Matthew Meyers– Project Manager
703-324-5651
Matthew.Meyers@fairfaxcounty.gov
Fairfax County Stormwater Planning Division
703-324-5500 TTY 711
12000 Government Center Parkway
Suite 449
Fairfax, Virginia 22035
www.fairfaxcounty.gov/dpwes/stormwater
To request this information in an alternate format call 703-324-5500, TTY 711