Pike Branch Tributary at Ridgeview Park - October 2015
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Pike Branch Tributary
at Ridgeview Park
Stream Restoration Project
October 2015
3. Stormwater Planning Division
Social Goals
1. Maintain open dialog and share information.
2. Coordinate with all the stakeholders and the community.
3. Build partnerships with local organizations such as
homeowners associations.
4. Design Team – Stantec Consulting Services, Park Authority,
Utilities Design and Construction Division, and Stormwater
Planning Division.
3
4. Stormwater Planning Division
Stormwater Program Drivers
• Municipal Separate Storm Sewer Permit (MS-4)
• Chesapeake Bay Total Maximum Daily Loads (TMDL)
– Regulates amount of pollutants in waterways
• Other Local TMDLs
• Maintenance of Existing Facilities
• Dam Regulations
• Public Safety /Emergency Response
– Flooding
– Snow Removal
4
5. Cameron Run Watershed
• 33 sq. mi. in Fairfax County.
• 95% of watershed is
developed with a majority
of development occurring
before implementation of
modern stormwater
facilities.
• Cameron Run discharges
into the Potomac River.
• Project CA9203
5
http://www.fairfaxcounty.gov/dpwes/watersheds/cameronrun.htm
Stormwater Planning Division
6. Environmental Benefits
Improve watershed conditions and reduce downstream
impacts through….
Controlling quantity
Mitigate flooding where possible
Controlling velocity
Reduce erosion
Protect infrastructure
6Stormwater Planning Division
7. Stormwater Planning Division
Project Goals
Restore up to 3,300 feet of stream in Ridgeview Park and
surrounding properties
Stabilize streambed and banks
Reduces sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
7
8. Project Area Limits
8
Fort Hill Dr.
Ridge View Dr.
Duvawn St.
Red Wood Ln.
Approximate limits of disturbance
Stormwater Planning Division
27. Before and After Examples
27
Banks Park
April 2012 May 2015
Stormwater Planning Division
28. 28
Before and After Examples
Big Rocky Run II
April 2011 September 2015
Stormwater Planning Division
29. Stormwater Planning Division 29
Next Steps – Schedule
• Complete stream assessment – December 2015
• Conceptual design – April 2016
• Community meeting with concept design – May 2016
30. Online Resources
30
Stormwater Planning Division Website
http://www.fairfaxcounty.gov/dpwes/stormwater/
Fairfax County Watershed Planning
http://www.fairfaxcounty.gov/nvswcd/newsletter/planning.htm
Cameron Run Watershed Plan
http://www.fairfaxcounty.gov/dpwes/watersheds/cameronrun.htm
EPA Water Quality Laws & Regulations
http://www.epa.gov/water/laws.html
Stormwater Planning Division
31. Stormwater Planning Division
Contact Information
Contact Information
Design
Fred Wilkins – Project Manager
703-324-5189
Fred.Wilkins@fairfaxcounty.gov
Fairfax County Stormwater Planning Division
703-324-5500 TTY 711
12000 Government Center Parkway
Suite 449
Fairfax, Virginia 22035
www.fairfaxcounty.gov/publicworks/stormwater
To request this information in an alternate format call 703-324-5500, TTY 711