ANNUAL REPORT Fiscal Year 2018
www.fairfaxcounty.gov/landdevelopment
A Fairfax County, Va., publication | September 2017
Fairfax County is committed to nondiscrimination on the basis of disability in all county
programs, services and activities. Reasonable accommodations will be provided upon
request. For information, call 703-324-1780.
As members of the Land Development Services team, we accomplish our mission by embracing our
values in a work environment that protects the health and well-being of each other and the public.
Facilitate the safe and sustainable building of our communities.
Be the best partner in creating a thriving Fairfax County.
Values
Empowerment Accountability Collaboration
Respect Safety Integrity
Trust and support
employees to lead and
make decisions that
align with our mission
Fulfill your obligations
and expect others to do
the same
Work together towards
a common goal and
support innovation
Consistently
demonstrate
honesty, sincerity,
openness and moral
uprightness
Value others by
demonstrating fairness,
appreciation and
understanding
Adhere to safe working
practices on and off
the job
Vision
Mission
Page 3LDS FY18 ANNUAL REPORT
Table of Contents
4		 A Word from the Director
5		 New Construction in Fairfax
6		 Measuring Time to Market
		- Residential Additions
		 - Single Family Homes
		 - Tenant Improvements
		 - Commercial Multi-Use Buildings
	 	 - Residential Infill Plan Approvals
                        - Major Site Plan Approvals
16	 	 Building & Trade Permits	
18		 Building & Site Inspections	
19		 Elevators/Escalators & Critical Structures
20		 Resources Overview		
22		 Environmental Outlook	
Back page	 The Future ... PLUS and ePlans
Page 4 LDS FY18 ANNUAL REPORT
A Word from the Director
In fiscal year 2018 (July 1, 2017-June 30, 2018), Land Development Services (LDS)
continued to improve the speed, consistency and predictability of the development
review process in Fairfax County.
LDS has been intensely focused on creating a new, more transparent way of
measuring what we do and how we do it. For the past several years, we have
measured mainly volumetrics – how much we have accomplished. On their own,
those numbers are staggering, as seen in the pages that follow. In FY18, LDS issued
over 63,000 building and trade permits and reviewed nearly $2 billion worth of
construction. This was all done with a staff of 286 employees.
As impressive as those statistics are, we are now asking ourselves and our customers: How well do we deliver our
services? How does our process affect a project’s “time to market?” To do this, we focused on what LDS can control
during the process:
1.	 The site plan and permit process.
2.	 The building plan and permit process.
3.	 And the construction process through inspections.
These areas are where our speed and high quality reviews are of paramount importance to the time to market. As
we mine our data, we can quickly target areas that need improvement. In addition, LDS is moving to electronic plan
review and, in 2020, launching an entirely new online permitting system, which will provide better, real-time metrics.
These improvements will help to streamline the review process. LDS strives to be the best possible partner in the
development process, while facilitating the safe and sustainable building of our communities.
William D. Hicks, P.E.
Director, Fairfax County Land Development Services
Page 5LDS FY18 ANNUAL REPORT
New Construction in Fairfax
132Bonded public
improvements
completed
$1.9 billionEstimated value of residential and commercial construction in FY18
$52.5 millionTotal amount of bonds released
5,284 New dwelling units constructed
(Single family homes, townhouses and multi-family units)
745Number of new addresses
added in Fairfax County
New commercial buildings completed
55
Page 6 LDS FY18 ANNUAL REPORT
Measuring Time to Market
Fairfax County and the building industry work in partnership throughout the life of a development
project. To strengthen that partnership, LDS has developed a definition of time to market that
measures the speed and efficiency of county review time and customer response time. For our
customers, the time it takes to deliver a product to market is their bottom line – whether it is a family
home, a new restaurant or a major mixed-use development.
The core site and building plan categories used to track time-to-market performance are:
•	 Residential Additions
•	 Tenant Improvements
•	 Single Family Homes
•	 Commercial Multi-Use Buildings
Together, these 3,247 projects generated $32 million in fees for LDS and represented about $1.9 billion
in new real estate value in the county. The charts in the following pages reflect the time to market for
projects that were given final approval in FY 2018.
These plan reviews took place many months and, sometimes, even years before construction was
completed. These timeframes are noted in each chart and give a snapshot of what it took to bring these
project types to market in FY 2018. To get a sense of plan reviews that were completed during FY 2018
for construction that will be completed in future fiscal years, we also examined the site plan approval
process for major site plans and for residential infill lot grading plans. Not only does measuring site
plan review tell us the average review times, but it also shows the volume of development that is in the
pipeline.
How to read the charts: In each time-to-market chart, time is divided into the calendar days the plan was under
review by the county (green), and the calendar days the plan was in the hands of the customer (orange).
21 14
< 4,500
SF
PERMIT APPROVED
County Review Customer Review
Page 7LDS FY18 ANNUAL REPORT
Completed Residential Additions
Details
•	 637 Projects (19 with Site Plans)
•	 Avg. Time to Market: 18 days
•	 Avg. # of Submissions: 2
•	 Avg. Construction: 733 days
In FY 2018, LDS approved 637 residential additions permits ranging from sunrooms to
second-story additions to garages. Generally, these projects are relatively complex; the
category does not include simple finished basements or decks.
Within this group of projects, there were 19 (3 percent) that also required residential infill lot
grading plans because the project disturbed more than 2,500 square feet of land. Compared
to projects in this category approved in FY 2017, the building plan review time frame improved
by as much as seven days.
2Numberofsubmissions
theseprojectstypicallyneed
beforefinalapproval.
PlanReview
Page 8 LDS FY18 ANNUAL REPORT
Completed Single Family Homes
Details
•	 706 Projects (465 with Site Plans)
•	 Avg. Time to Market: 190 days
•	 Avg. # of Submissions: 2 site, 3 bldg
•	 Avg. Construction: 318 days
Of the 706 single family homes approved for occupancy in FY 2018, 465 (66 percent) had
accompanying site plans. The top bar in the chart above shows average site plan time-
to-market metrics for all homes that required site plans. Some of the building plans were
submitted as “masterfile plans,” which means builders had already received approval for
a standard home type. These projects tend to have a shorter time to market, because the
plans do not need to be reviewed again unless there are major changes.
PlanReview
10 25
28
20
110
11
20
16 3 55
44
0 50 100 150 200 250 300
Building
Site
# of CalendarDays
APPROVED
PERMIT PICKED UP
PERMIT ISSUED
APPROVED
Queue
Typicalprojects
require2siteplan
submittalsand3
buildingplansubmittals
beforeapproval.(Infills)
Page 9LDS FY18 ANNUAL REPORT
Completed Tenant Improvements
Details
TOTAL TENANT IMPROVEMENTS: 1,849
(Projects greater than 4,500 square feet)
•	 817 projects approved
•	 44 percent approved in one submission
(Projects less than 4,500 square feet)
•	 1,032 projects approved
•	 61 percent approved in one submission
Commercial tenant improvements include projects where a tenant reconfigures or updates an office, storefront, or restaurant
location. In FY2018, the “Fast-Track” program, which includes projects up to 4,500 square feet, met LDS’s goal of 15 days for
county review.  In 2019, with the launch of ePlans for these plan types, the threshold for electronically submitted Fast-Track
plans has increased from 4,500 to 10,000 square feet.
PlanReview
Fast-Track Non-Fast-Track
7
1
40
7
7
17
13
5
13
14
0 10 20 30 40 50 60 70 80 90
> 4,500
SF
< 4,500
SF
# of CalendarDays
PERMIT APPROVED
PERMIT PICKED UP
PERMIT APPROVED
PERMIT PICKED UP
Queue
Queue
61%ofallplanswereapproved
onthefirstsubmission
Fast-Track
Non-Fast-Track
Page 10 LDS FY18 ANNUAL REPORT
Completed Commercial Multi-Use Buildings
Details
•	 57 Projects
•	 Avg. Time to Market: 381 days
•	 Avg. # of Submissions: 2 (site), 2 (building)
•	 Avg. Construction: 469 days
PlanReview
8 75
60
34
176
20
28
11
139
0 50 100 150 200 250 300 350 400
Building
Site
# of CalendarDays
Queue
APPROVED
PERMIT PICKED UP
TO BONDS &
AGREEMENTS
APPROVED
Typicalmulti-useprojects
achieveapprovalby
2nd
submission.
Moresiteplan
detailsshown
onpages14-15.
Page 11LDS FY18 ANNUAL REPORT
There was a 63 percent increase in the number of commercial multi-use buildings that received their final
inspection in FY 2018 compared to FY 2017. The county review time decreased 72 days (28 percent), with
95 percent completing the site plan review process within two submissions and 54 percent completing the
building plan review process within two submissions. Fifty-seven projects arrived on the market, including:
•	 Capital One Headquarters in Tysons.
•	 Inova Schar Cancer Institute.
•	 Apple Federal Credit Union.
•	 Chantilly Wegmans.
Page 12 LDS FY18 ANNUAL REPORT
Residential Infill Plan Approvals(Construction Pending)
1.4Averagenumberof
submissionsbefore
approval
Page 13LDS FY18 ANNUAL REPORT
Residential infill lots are parcels of land that are either surrounded by already-
developed parcels or part of a subdivision of land parcels. To build a new home on such
a lot, a residential infill plan must be reviewed and approved by the county. Often these
developments have sophisticated stormwater management requirements, as well as
erosion and sedimentation controls, to minimize any negative effects to the surrounding
environment. High quality submitted plans minimize review times. In contrast, poor quality
submissions increase review times.
Details
•	 557 Projects
•	 Avg. County Review: 29 days
•	 Avg. Customer Time: 57 days
•	 Avg. # of Submissions: 1.4
1 Submission,363,65%
2 Submissions,166,30%
3 Submissions,23,4%
4 Submissions,5,1%
FY 2018 INF Plans - # of Submissions to Approval
557 Total Plans
Page 14 LDS FY18 ANNUAL REPORT
Major Site Plan Approvals (DPE and non-D
(Construction Pending)
2Averagenumberof
submissionsbefore
approval
Page 15LDS FY18 ANNUAL REPORT
DPE)
Because major site plans are so complex, LDS has worked with industry to identify ways to expedite the
submission and review process. The Designated Plans Examiner (DPE) Peer Review Program, which leverages
a partnership with the Engineers and Surveyors Institute (ESI), provides a plan quality control review to ensure
high-quality submissions to LDS. As seen in the charts here, the DPE program results in a significant reduction
in the total time to market for major site plans. With few exceptions, the DPE program will result in plans being
approved within two submissions and with a 33 percent total reduction in review and comment time. The charts
here show the typical time to market for plans approved within two or three submissions.
Details
TOTAL MAJOR SITE PLANS APPROVED: 47
Designated Plan Examiner (DPE-Peer Review)
•	 35 Plans
•	 Avg. County Review: 78 days
•	 Avg. Customer Time: 194 days
•	 Avg. # of Submissions: 2
Non-DPE Peer Review
•	 12 Plans
•	 Avg. County Review: 95 days
•	 Avg. Customer Time: 310 days
•	 Avg. # of Submissions: 2.3
Page 16 LDS FY18 ANNUAL REPORT
Building & Trade Permits
63,224Total building and trade permits issued
(71.7% applied for online)
47,064Total trade permits issued
Electrical permits,
16,074
Mechanical permits,
7,573
Plumbing/gas permits,
13,075
Household
appliance
permits,10,342
Trade Permits By Type
Page 17LDS FY18 ANNUAL REPORT
16,160Building permits issued
14,517
15,523
15,034 15,112
15,494
16,160
FY13 FY14 FY15 FY16 FY17 FY18
Building Permits Issued
New commercial
buildings, 65
New residential
buildings, 1731
Alterationsto
existing
commercial
buildings, 4771
Alterationsto
existing residential
buildings, 9593
Page 18 LDS FY18 ANNUAL REPORT
159,090Building inspections conducted
Building & Site Inspections
44,196Site inspections conducted
150,877
148,587
156,331
153,055
158,289
159,090
142,000
144,000
146,000
148,000
150,000
152,000
154,000
156,000
158,000
160,000
FY13 FY14 FY15 FY16 FY17 FY18
# of Building Inspections
48,319
45,475
47,784
45,096
47,325
44,196
42,000
43,000
44,000
45,000
46,000
47,000
48,000
49,000
FY13 FY14 FY15 FY16 FY17 FY18
# of Site Inspections
Note:IntheFY17AnnualReport,FY17’ssiteinspectionnumberswerenotcorrect.IthasbeencorrectedinthisAnnualReport.
Page 19LDS FY18 ANNUAL REPORT
Elevators/Escalators
Critical Structures meetings: 439
Shop drawings reviewed: 1,667
Inspections performed: 10,651
# of elevators/escalators in Fairfax: 6,210
Permits issued for new elevators/escalators: 392
Total inspections performed: 16,087
Critical Structures
Critical Structures: Building projects that, for safety concerns,
require special inspections by a Registered Design Professional
retained by the owner. Most major commercial projects and multi-
family residences are considered Critical Structures.
LDS Glossary
Page 20 LDS FY18 ANNUAL REPORT
Resources Overview
Turnover Rate
Approximately 58 positions were vacant at one point
during the year. LDS is addressing this by:
•	 Focusing on plan review and inspection workload.
•	 Offering competitive salary and benefit packages 	
	 within county guidelines.
•	 Providing funds and assistance for continuing 	 	
	 education and certifications.
20%
Expenditures
Expenditures include personnel ($31.2 million/80%); contracts,
utilities, training and other operating costs ($5.4 million/14%) and
an overhead rate for occupancy costs, interagency coordination and
county oversight ($2.2 million/6%).
Fees are the primary source of revenue for LDS and are based on
the costs required to perform our core services and to operate the
agency. This fee revenue can fluctuate each year depending on the
volume of plans submitted and permits issued.
$39,852,133
Revenue
$38,840,055
LDS’s cost recovery rate is determined by comparing the total annual expenditures
to the total annual revenue. This rate is used to determine how fees are calculated.
The Board of Supervisors’ target rate is 90 percent; however, LDS may exceed that
cost recovery rate based on the volume of permits and plans in a given year.
Revenue beyond the 90 percent cost recovery rate goes back into investing in LDS,
with a current focus on the department’s capital needs, primarily the PLUS online
permitting system (see back page).
103% Cost Recovery Rate
Page 21LDS FY18 ANNUAL REPORT
Inspectors’ Workload
120
Average number of inspections
per site inspector per month
LDS is currently reviewing industry standards and
appropriate resources to determine the right site
inspection workload and to clarify the need for
additional site inspectors.
In FY 2017, the county added four building inspector
positions to address workload that had tripled
national standards.
286
Number of Employees
96
Va. Dept. of Environmental Quality
Certifications
48
Professional Engineers
Va. Dept. of Housing and
Community Development
Certifications
574
4
Certified Flood Plain Managers
Page 22 LDS FY18 ANNUAL REPORT
Environmental Outlook
Acres of approved
land disturbance
960
Erosion and sediment
inspections performed
20,730
414Stormwater
inspections
performed
399Stormwater facilities
brought online, treating
676.1 acres
Land disturbing
activities approved
895
The Future ... PLUS and ePlans!
Fairfax County is developing a new online planning
and land use system, called PLUS, modeled on best
practices from around the country. The system will unify
siloed processes into a one-stop-shop customer service
portal for industry partners and the general public.
•	 The system will offer customers real-time status 		
	 updates and more transparency about their permit 		
	 applications and transactions.
•	 Meaningful metrics and flexible reporting will allow the 	
	 county to measure performance with greater accuracy 	
	 and speed.
•	 Geographic Information Systems (GIS) and electronic plan review
	 integration and modernized mobility platforms will greatly improve
	 workflow for customers and staff.
The PLUS project is a pivotal part of achieving goal three of the Economic
Success Strategy: Improving the speed, consistency and predictability of the
development review process.
The first phase of the system will go live in 2019, which will include food
establishment permits and other services offered by the Health Department.
The land use system is scheduled to go live in 2020. In 2021, a third phase
will wrap up, which will create extended functionality for proffer tracking and
Comprehensive Plan management.
ePlans in Fairfax
In early 2019, LDS launched
ePlans to all customers,
which turns plan review into a
completely paperless process.
To start, customers may submit
ePlans for Site Plans, Site Plan
Revisions, Minor Site Plans,
Minor Site Plan Revisions, New
Commercial Buildings, and
Interior Alterations of Existing
Commercial Structures.
A Fairfax County, Va. Publication | March 2019
If accommodations or alternate formats are needed, please call 703-324-1780, TTY 711
Contact LDS
•	 Permit Application Center, Site Application Center, Facilitation    
	 and Addressing Center, Bonds and Agreements: 703-222-0801
•	 Building Plan Review and Inspections: 703-631-5101
•	 Site Development and Inspections: 703-324-1720
•	 Director’s Office: 703-324-1780
TTY 711
www.fairfaxcounty.gov/landdevelopment

Weitere ähnliche Inhalte

Ähnlich wie Land Development Services Annual Report FY2018

Roberts Carrie - Resume - March 2024.pdf
Roberts Carrie - Resume - March 2024.pdfRoberts Carrie - Resume - March 2024.pdf
Roberts Carrie - Resume - March 2024.pdf
CarrieRobertsRiveraC
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
charisellington63520
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
wlynn1
 
Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016
Aimee Chiore
 

Ähnlich wie Land Development Services Annual Report FY2018 (20)

Q1 2020-ltb-market-report
Q1 2020-ltb-market-reportQ1 2020-ltb-market-report
Q1 2020-ltb-market-report
 
Roberts Carrie - Resume - March 2024.pdf
Roberts Carrie - Resume - March 2024.pdfRoberts Carrie - Resume - March 2024.pdf
Roberts Carrie - Resume - March 2024.pdf
 
HCA North West Investment Partner Briefing - July 2017
HCA North West Investment Partner Briefing - July 2017HCA North West Investment Partner Briefing - July 2017
HCA North West Investment Partner Briefing - July 2017
 
TCG Construction Project Management
TCG Construction Project Management TCG Construction Project Management
TCG Construction Project Management
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
 
Q2 2019 Earnings Presentation
Q2 2019 Earnings PresentationQ2 2019 Earnings Presentation
Q2 2019 Earnings Presentation
 
August 2017 digital realty company overview
August 2017 digital realty company overview August 2017 digital realty company overview
August 2017 digital realty company overview
 
Brink's 4 q&amp;fy 2017 earnings slides final 02062018
Brink's 4 q&amp;fy 2017 earnings slides final 02062018Brink's 4 q&amp;fy 2017 earnings slides final 02062018
Brink's 4 q&amp;fy 2017 earnings slides final 02062018
 
ISG Network Services Assessment Overview
ISG Network Services Assessment OverviewISG Network Services Assessment Overview
ISG Network Services Assessment Overview
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
Noel R Resume Final.pdf
Noel R Resume Final.pdfNoel R Resume Final.pdf
Noel R Resume Final.pdf
 
Baml sept-2017
Baml sept-2017Baml sept-2017
Baml sept-2017
 
CLI 1Q17 Deck
CLI 1Q17 DeckCLI 1Q17 Deck
CLI 1Q17 Deck
 
Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016
 
slate-office-reit-q2-2022.pdf
slate-office-reit-q2-2022.pdfslate-office-reit-q2-2022.pdf
slate-office-reit-q2-2022.pdf
 
Marcus & Millichap / IPA Multifamily Forum: Dallas-Fort Worth
Marcus & Millichap / IPA Multifamily Forum: Dallas-Fort WorthMarcus & Millichap / IPA Multifamily Forum: Dallas-Fort Worth
Marcus & Millichap / IPA Multifamily Forum: Dallas-Fort Worth
 
C21SGRProjectPresentation
C21SGRProjectPresentationC21SGRProjectPresentation
C21SGRProjectPresentation
 
Wrk june 2017 investor presentation final
Wrk june 2017 investor presentation finalWrk june 2017 investor presentation final
Wrk june 2017 investor presentation final
 

Mehr von Fairfax County

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Kürzlich hochgeladen (20)

Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 

Land Development Services Annual Report FY2018

  • 1. ANNUAL REPORT Fiscal Year 2018 www.fairfaxcounty.gov/landdevelopment
  • 2. A Fairfax County, Va., publication | September 2017 Fairfax County is committed to nondiscrimination on the basis of disability in all county programs, services and activities. Reasonable accommodations will be provided upon request. For information, call 703-324-1780. As members of the Land Development Services team, we accomplish our mission by embracing our values in a work environment that protects the health and well-being of each other and the public. Facilitate the safe and sustainable building of our communities. Be the best partner in creating a thriving Fairfax County. Values Empowerment Accountability Collaboration Respect Safety Integrity Trust and support employees to lead and make decisions that align with our mission Fulfill your obligations and expect others to do the same Work together towards a common goal and support innovation Consistently demonstrate honesty, sincerity, openness and moral uprightness Value others by demonstrating fairness, appreciation and understanding Adhere to safe working practices on and off the job Vision Mission
  • 3. Page 3LDS FY18 ANNUAL REPORT Table of Contents 4 A Word from the Director 5 New Construction in Fairfax 6 Measuring Time to Market - Residential Additions - Single Family Homes - Tenant Improvements - Commercial Multi-Use Buildings - Residential Infill Plan Approvals - Major Site Plan Approvals 16 Building & Trade Permits 18 Building & Site Inspections 19 Elevators/Escalators & Critical Structures 20 Resources Overview 22 Environmental Outlook Back page The Future ... PLUS and ePlans
  • 4. Page 4 LDS FY18 ANNUAL REPORT A Word from the Director In fiscal year 2018 (July 1, 2017-June 30, 2018), Land Development Services (LDS) continued to improve the speed, consistency and predictability of the development review process in Fairfax County. LDS has been intensely focused on creating a new, more transparent way of measuring what we do and how we do it. For the past several years, we have measured mainly volumetrics – how much we have accomplished. On their own, those numbers are staggering, as seen in the pages that follow. In FY18, LDS issued over 63,000 building and trade permits and reviewed nearly $2 billion worth of construction. This was all done with a staff of 286 employees. As impressive as those statistics are, we are now asking ourselves and our customers: How well do we deliver our services? How does our process affect a project’s “time to market?” To do this, we focused on what LDS can control during the process: 1. The site plan and permit process. 2. The building plan and permit process. 3. And the construction process through inspections. These areas are where our speed and high quality reviews are of paramount importance to the time to market. As we mine our data, we can quickly target areas that need improvement. In addition, LDS is moving to electronic plan review and, in 2020, launching an entirely new online permitting system, which will provide better, real-time metrics. These improvements will help to streamline the review process. LDS strives to be the best possible partner in the development process, while facilitating the safe and sustainable building of our communities. William D. Hicks, P.E. Director, Fairfax County Land Development Services
  • 5. Page 5LDS FY18 ANNUAL REPORT New Construction in Fairfax 132Bonded public improvements completed $1.9 billionEstimated value of residential and commercial construction in FY18 $52.5 millionTotal amount of bonds released 5,284 New dwelling units constructed (Single family homes, townhouses and multi-family units) 745Number of new addresses added in Fairfax County New commercial buildings completed 55
  • 6. Page 6 LDS FY18 ANNUAL REPORT Measuring Time to Market Fairfax County and the building industry work in partnership throughout the life of a development project. To strengthen that partnership, LDS has developed a definition of time to market that measures the speed and efficiency of county review time and customer response time. For our customers, the time it takes to deliver a product to market is their bottom line – whether it is a family home, a new restaurant or a major mixed-use development. The core site and building plan categories used to track time-to-market performance are: • Residential Additions • Tenant Improvements • Single Family Homes • Commercial Multi-Use Buildings Together, these 3,247 projects generated $32 million in fees for LDS and represented about $1.9 billion in new real estate value in the county. The charts in the following pages reflect the time to market for projects that were given final approval in FY 2018. These plan reviews took place many months and, sometimes, even years before construction was completed. These timeframes are noted in each chart and give a snapshot of what it took to bring these project types to market in FY 2018. To get a sense of plan reviews that were completed during FY 2018 for construction that will be completed in future fiscal years, we also examined the site plan approval process for major site plans and for residential infill lot grading plans. Not only does measuring site plan review tell us the average review times, but it also shows the volume of development that is in the pipeline. How to read the charts: In each time-to-market chart, time is divided into the calendar days the plan was under review by the county (green), and the calendar days the plan was in the hands of the customer (orange). 21 14 < 4,500 SF PERMIT APPROVED County Review Customer Review
  • 7. Page 7LDS FY18 ANNUAL REPORT Completed Residential Additions Details • 637 Projects (19 with Site Plans) • Avg. Time to Market: 18 days • Avg. # of Submissions: 2 • Avg. Construction: 733 days In FY 2018, LDS approved 637 residential additions permits ranging from sunrooms to second-story additions to garages. Generally, these projects are relatively complex; the category does not include simple finished basements or decks. Within this group of projects, there were 19 (3 percent) that also required residential infill lot grading plans because the project disturbed more than 2,500 square feet of land. Compared to projects in this category approved in FY 2017, the building plan review time frame improved by as much as seven days. 2Numberofsubmissions theseprojectstypicallyneed beforefinalapproval. PlanReview
  • 8. Page 8 LDS FY18 ANNUAL REPORT Completed Single Family Homes Details • 706 Projects (465 with Site Plans) • Avg. Time to Market: 190 days • Avg. # of Submissions: 2 site, 3 bldg • Avg. Construction: 318 days Of the 706 single family homes approved for occupancy in FY 2018, 465 (66 percent) had accompanying site plans. The top bar in the chart above shows average site plan time- to-market metrics for all homes that required site plans. Some of the building plans were submitted as “masterfile plans,” which means builders had already received approval for a standard home type. These projects tend to have a shorter time to market, because the plans do not need to be reviewed again unless there are major changes. PlanReview 10 25 28 20 110 11 20 16 3 55 44 0 50 100 150 200 250 300 Building Site # of CalendarDays APPROVED PERMIT PICKED UP PERMIT ISSUED APPROVED Queue Typicalprojects require2siteplan submittalsand3 buildingplansubmittals beforeapproval.(Infills)
  • 9. Page 9LDS FY18 ANNUAL REPORT Completed Tenant Improvements Details TOTAL TENANT IMPROVEMENTS: 1,849 (Projects greater than 4,500 square feet) • 817 projects approved • 44 percent approved in one submission (Projects less than 4,500 square feet) • 1,032 projects approved • 61 percent approved in one submission Commercial tenant improvements include projects where a tenant reconfigures or updates an office, storefront, or restaurant location. In FY2018, the “Fast-Track” program, which includes projects up to 4,500 square feet, met LDS’s goal of 15 days for county review. In 2019, with the launch of ePlans for these plan types, the threshold for electronically submitted Fast-Track plans has increased from 4,500 to 10,000 square feet. PlanReview Fast-Track Non-Fast-Track 7 1 40 7 7 17 13 5 13 14 0 10 20 30 40 50 60 70 80 90 > 4,500 SF < 4,500 SF # of CalendarDays PERMIT APPROVED PERMIT PICKED UP PERMIT APPROVED PERMIT PICKED UP Queue Queue 61%ofallplanswereapproved onthefirstsubmission Fast-Track Non-Fast-Track
  • 10. Page 10 LDS FY18 ANNUAL REPORT Completed Commercial Multi-Use Buildings Details • 57 Projects • Avg. Time to Market: 381 days • Avg. # of Submissions: 2 (site), 2 (building) • Avg. Construction: 469 days PlanReview 8 75 60 34 176 20 28 11 139 0 50 100 150 200 250 300 350 400 Building Site # of CalendarDays Queue APPROVED PERMIT PICKED UP TO BONDS & AGREEMENTS APPROVED Typicalmulti-useprojects achieveapprovalby 2nd submission. Moresiteplan detailsshown onpages14-15.
  • 11. Page 11LDS FY18 ANNUAL REPORT There was a 63 percent increase in the number of commercial multi-use buildings that received their final inspection in FY 2018 compared to FY 2017. The county review time decreased 72 days (28 percent), with 95 percent completing the site plan review process within two submissions and 54 percent completing the building plan review process within two submissions. Fifty-seven projects arrived on the market, including: • Capital One Headquarters in Tysons. • Inova Schar Cancer Institute. • Apple Federal Credit Union. • Chantilly Wegmans.
  • 12. Page 12 LDS FY18 ANNUAL REPORT Residential Infill Plan Approvals(Construction Pending) 1.4Averagenumberof submissionsbefore approval
  • 13. Page 13LDS FY18 ANNUAL REPORT Residential infill lots are parcels of land that are either surrounded by already- developed parcels or part of a subdivision of land parcels. To build a new home on such a lot, a residential infill plan must be reviewed and approved by the county. Often these developments have sophisticated stormwater management requirements, as well as erosion and sedimentation controls, to minimize any negative effects to the surrounding environment. High quality submitted plans minimize review times. In contrast, poor quality submissions increase review times. Details • 557 Projects • Avg. County Review: 29 days • Avg. Customer Time: 57 days • Avg. # of Submissions: 1.4 1 Submission,363,65% 2 Submissions,166,30% 3 Submissions,23,4% 4 Submissions,5,1% FY 2018 INF Plans - # of Submissions to Approval 557 Total Plans
  • 14. Page 14 LDS FY18 ANNUAL REPORT Major Site Plan Approvals (DPE and non-D (Construction Pending) 2Averagenumberof submissionsbefore approval
  • 15. Page 15LDS FY18 ANNUAL REPORT DPE) Because major site plans are so complex, LDS has worked with industry to identify ways to expedite the submission and review process. The Designated Plans Examiner (DPE) Peer Review Program, which leverages a partnership with the Engineers and Surveyors Institute (ESI), provides a plan quality control review to ensure high-quality submissions to LDS. As seen in the charts here, the DPE program results in a significant reduction in the total time to market for major site plans. With few exceptions, the DPE program will result in plans being approved within two submissions and with a 33 percent total reduction in review and comment time. The charts here show the typical time to market for plans approved within two or three submissions. Details TOTAL MAJOR SITE PLANS APPROVED: 47 Designated Plan Examiner (DPE-Peer Review) • 35 Plans • Avg. County Review: 78 days • Avg. Customer Time: 194 days • Avg. # of Submissions: 2 Non-DPE Peer Review • 12 Plans • Avg. County Review: 95 days • Avg. Customer Time: 310 days • Avg. # of Submissions: 2.3
  • 16. Page 16 LDS FY18 ANNUAL REPORT Building & Trade Permits 63,224Total building and trade permits issued (71.7% applied for online) 47,064Total trade permits issued Electrical permits, 16,074 Mechanical permits, 7,573 Plumbing/gas permits, 13,075 Household appliance permits,10,342 Trade Permits By Type
  • 17. Page 17LDS FY18 ANNUAL REPORT 16,160Building permits issued 14,517 15,523 15,034 15,112 15,494 16,160 FY13 FY14 FY15 FY16 FY17 FY18 Building Permits Issued New commercial buildings, 65 New residential buildings, 1731 Alterationsto existing commercial buildings, 4771 Alterationsto existing residential buildings, 9593
  • 18. Page 18 LDS FY18 ANNUAL REPORT 159,090Building inspections conducted Building & Site Inspections 44,196Site inspections conducted 150,877 148,587 156,331 153,055 158,289 159,090 142,000 144,000 146,000 148,000 150,000 152,000 154,000 156,000 158,000 160,000 FY13 FY14 FY15 FY16 FY17 FY18 # of Building Inspections 48,319 45,475 47,784 45,096 47,325 44,196 42,000 43,000 44,000 45,000 46,000 47,000 48,000 49,000 FY13 FY14 FY15 FY16 FY17 FY18 # of Site Inspections Note:IntheFY17AnnualReport,FY17’ssiteinspectionnumberswerenotcorrect.IthasbeencorrectedinthisAnnualReport.
  • 19. Page 19LDS FY18 ANNUAL REPORT Elevators/Escalators Critical Structures meetings: 439 Shop drawings reviewed: 1,667 Inspections performed: 10,651 # of elevators/escalators in Fairfax: 6,210 Permits issued for new elevators/escalators: 392 Total inspections performed: 16,087 Critical Structures Critical Structures: Building projects that, for safety concerns, require special inspections by a Registered Design Professional retained by the owner. Most major commercial projects and multi- family residences are considered Critical Structures. LDS Glossary
  • 20. Page 20 LDS FY18 ANNUAL REPORT Resources Overview Turnover Rate Approximately 58 positions were vacant at one point during the year. LDS is addressing this by: • Focusing on plan review and inspection workload. • Offering competitive salary and benefit packages within county guidelines. • Providing funds and assistance for continuing education and certifications. 20% Expenditures Expenditures include personnel ($31.2 million/80%); contracts, utilities, training and other operating costs ($5.4 million/14%) and an overhead rate for occupancy costs, interagency coordination and county oversight ($2.2 million/6%). Fees are the primary source of revenue for LDS and are based on the costs required to perform our core services and to operate the agency. This fee revenue can fluctuate each year depending on the volume of plans submitted and permits issued. $39,852,133 Revenue $38,840,055 LDS’s cost recovery rate is determined by comparing the total annual expenditures to the total annual revenue. This rate is used to determine how fees are calculated. The Board of Supervisors’ target rate is 90 percent; however, LDS may exceed that cost recovery rate based on the volume of permits and plans in a given year. Revenue beyond the 90 percent cost recovery rate goes back into investing in LDS, with a current focus on the department’s capital needs, primarily the PLUS online permitting system (see back page). 103% Cost Recovery Rate
  • 21. Page 21LDS FY18 ANNUAL REPORT Inspectors’ Workload 120 Average number of inspections per site inspector per month LDS is currently reviewing industry standards and appropriate resources to determine the right site inspection workload and to clarify the need for additional site inspectors. In FY 2017, the county added four building inspector positions to address workload that had tripled national standards. 286 Number of Employees 96 Va. Dept. of Environmental Quality Certifications 48 Professional Engineers Va. Dept. of Housing and Community Development Certifications 574 4 Certified Flood Plain Managers
  • 22. Page 22 LDS FY18 ANNUAL REPORT Environmental Outlook Acres of approved land disturbance 960 Erosion and sediment inspections performed 20,730 414Stormwater inspections performed 399Stormwater facilities brought online, treating 676.1 acres Land disturbing activities approved 895
  • 23. The Future ... PLUS and ePlans! Fairfax County is developing a new online planning and land use system, called PLUS, modeled on best practices from around the country. The system will unify siloed processes into a one-stop-shop customer service portal for industry partners and the general public. • The system will offer customers real-time status updates and more transparency about their permit applications and transactions. • Meaningful metrics and flexible reporting will allow the county to measure performance with greater accuracy and speed. • Geographic Information Systems (GIS) and electronic plan review integration and modernized mobility platforms will greatly improve workflow for customers and staff. The PLUS project is a pivotal part of achieving goal three of the Economic Success Strategy: Improving the speed, consistency and predictability of the development review process. The first phase of the system will go live in 2019, which will include food establishment permits and other services offered by the Health Department. The land use system is scheduled to go live in 2020. In 2021, a third phase will wrap up, which will create extended functionality for proffer tracking and Comprehensive Plan management. ePlans in Fairfax In early 2019, LDS launched ePlans to all customers, which turns plan review into a completely paperless process. To start, customers may submit ePlans for Site Plans, Site Plan Revisions, Minor Site Plans, Minor Site Plan Revisions, New Commercial Buildings, and Interior Alterations of Existing Commercial Structures.
  • 24. A Fairfax County, Va. Publication | March 2019 If accommodations or alternate formats are needed, please call 703-324-1780, TTY 711 Contact LDS • Permit Application Center, Site Application Center, Facilitation and Addressing Center, Bonds and Agreements: 703-222-0801 • Building Plan Review and Inspections: 703-631-5101 • Site Development and Inspections: 703-324-1720 • Director’s Office: 703-324-1780 TTY 711 www.fairfaxcounty.gov/landdevelopment