A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Dead Run Segments 2/3 Stream Restoration Project
Public Meeting
Dolley Madison Library
June 9, 2015
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Meeting Outline
2
• Project extent and timeline
• Response to issues raised
• Next Steps
• Outline of Potential Design Refinements
• Q&A
• Walk to site
Dead Run Segment 2/3 Stream Restoration Project
Project Limits
3
Segment 2 – McLean
Central Park
• 800 Linear Feet
• Completely in Park
• Starts below previously
restored section near
library
Segment 3 – Dead Run
Stream Valley Park
• 1,500 Linear Feet
• Extends to Churchill Road
• Residential lots along
Elizabeth Drive and Carol
Rayes Street
Stormwater Planning Division
Watershed Planning and Project Implementation
• Watershed Characterization
– Water Quality Monitoring
– Physical Stream Assessment
– Land Use Change
– Pollutant Loading
• Structural Project
– 25 year plan
• Non-Structural Practices
– Policy and Regulations
4
http://www.fairfaxcounty.gov/dpwes/watersheds/
Stormwater Planning Division
Watershed Planning and Project Implementation
• Dead Run has a drainage area
just over 3 mi2
• 24 priority projects identified
in the watershed
management plan
• Pond retrofits
• LID Stormwater Enhancements
• Stream Restoration
• Neighborhood Stormwater
Improvements
5
http://www.fairfaxcounty.gov/dpwes/stormwater/
projects/project_list.htm
Stormwater Planning Division
Stormwater Program Regulatory Drivers
• National Pollutant Discharge Elimination System (NPDES)
• Virginia Stormwater Management Program (VSMP)
– Municipal Separate Storm Sewer Permit (MS4)
– Includes watershed planning and project implementation
• Total Maximum Daily Loads (TMDLs)
– Chesapeake Bay
– Local Streams
– Establishes pollutant loading budget for a given impaired water
body to meet water quality standards
6
Stormwater Planning Division
Dead Run– Stream Conditions
7
Stormwater Planning Division
Dead Run – Stream Conditions
8
Fairfax County Annual Water Quality Report
• http://www.fairfaxcounty.gov/hd/streams/strannualrpt.htm
Virginia Department of Environmental Quality
• Water Quality Report (305b report)
• http://www.deq.virginia.gov/Programs/Water.aspx
U.S. Geological Survey
• Dead Run stream gage at Whann Avenue
• Fairfax County Water Resource Monitoring
• http://va.water.usgs.gov/fairfax/
Stormwater Planning Division
Dead Run Stream Restoration
Project Benefits and Goals:
• Improve water quality
– Reduce sediment and nutrient loads
• Stabilize stream banks to
– Reduce stream bank erosion
– Protect property
– Reduce tree loss
• Improve aquatic habitat
• Restore and enhance vegetated stream
buffer (riparian corridor)
Others:
• Reduce frequent flooding
9
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Project timeline
10
• Project initiated: Fall, 2013.
• Surveys and assessment completed: Winter, 2013
• Pre-concepts submitted: April, 2014
• First public meeting: April 23, 2014
• Field walk with FCPA, MTF, Urban Forestry: August 15, 2014
• Pre-concept revisions to minimize tree loss completed: February, 2015
• Second public meeting: February 18, 2015
• Revised concept plan with alternative access options for Segment 3
completed: May 12, 2015
• First field walk with community: May 19, 2015
• Second field walk with community: June 9, 2015
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Next steps: Task Force
• We recommend that a citizens task force (“Stream Team”) be convened in
coordination with Supervisor Foust’s office.
– The task force would be actively involved in revising the current concept plan to make sure
it was acceptable to the community:
– Clearly understand community goals and expectations
– Work with the design team to incorporate the community goals and establish a timeline
– Be able to convey the details of design constraints and tradeoffs to the community
– Attend design charette meetings
– Perform detailed review of concept plan revisions to make sure it met the community goals
before it is presented to the wider community
– Recommend up to 10 representatives from the community
• We will continue to receive comments on the current concept through July 31st.
• We anticipate the task force will be convened by June 30th and we will schedule a
kick-off meeting with the task force in early July.
11
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Next steps with target dates
12
• Work with task force to develop final concept and publish to website in
September, 2015
• Community meeting to present final concept – October, 2015
• Continue to work with task force to develop 95% design plans, and
complete permitting – January, 2016
• Final design phase public meeting – Spring 2016
• Final plan authorization and bidding phase – TBD based on funding and
approved budget
• Target is late spring/early summer, 2016
• Sequence with Dead Run Segment 1 (Dominican Retreat)
• Pardon Our Dust meeting with residents and contractor before issuing
construction notice to proceed.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised – tree and canopy loss
13
-Proposed removal of more than 250 trees from McLean Central Park, including about 100 of the
park's largest trees.
-Proposed removal of virtually all other growth in a wide swath along the creek from Churchill
Road to Elizabeth Drive.
Current concept plan:
• 88 > 12” trees, up to 10
for access, 23 are at risk.
• 133 6-12” trees, up to 20
for access, 28 are at risk.
• Approximately 20% of
trees proposed for
removal are at risk.
• Estimated canopy loss is
approximately 11% of area
shown in red.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised – flash flooding
14
-Failure to address a related and major park problem: flash flooding from storm water
runoff that flows into the creek.
Tradeoff: Reduce channel size (to the low end of the range that still provides for a stable stream) and reduce tree
impacts, but the reduction in flood levels will be smaller. If we continue to realign the channel away from lots
(again, within an acceptable range), this will impact more trees.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised – replacement plantings and trail closure
15
- Lack of provisions made by the county to maintain or protect replacement plantings
from failure or encroachment of invasive species after the project is completed.
This would be considered and made part of the final plan. We would work
with the Park Authority and homeowners to come up with a final
maintenance and invasive plant control plan for the reforestation measures
in the park.
- Closure of large sections of the park and trail for approximately 9-12 months.
This is inaccurate. We would always try to keep the trails open – again this is
a tradeoff, we can reduce the access impacts by using the trail but there will
some work hour closure of the trails if we opt to use the trails for access.
Temporary trails would be part of the project and we would work with the
Park Authority to maintain the access into the park provided by trails.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised – public notification
16
--Woefully inadequate notification of the public about this project, its scope, and
impact on the community; there has been no visible signage in the park that would
notify park users.
We recognize that our standard public notification process was inadequate. The Park
Authority has provided us with templates and examples of their public notification
process for the park master planning process, and we will follow the same procedure
for notification. This includes:
- Significantly expanding the area where meeting notification postcards/letters are
sent.
- Posting signs in the park about upcoming meetings.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised – water quality benefits
17
- Insufficient evidence that this project, given the extensive damage it will do to the
existing park environment, is the best way to achieve the proposed goals. In fact, no
estimate has been released of how much the water quality will improve over what
period of time.
A summary of this information was provided in the February meeting:
• Chesapeake Bay Expert Panel protocols used for estimating stream restoration
nutrient credits.
• For Total Phosphorus (TP) as an example the estimated reduction in loadings as a
result of the proposed stream restoration for Segments 2/3 ranges from 0.063 to
0.261 lbs/LF/yr.
• This compares to a ‘default’ rate of 0.068 lbs/LF/yr. The high end of the estimated
load reduction is 3X the default rate.
• Total annual estimated reduction in erosion for Segment 2/3 is between 783 to
1,500 tons/year and the estimated reduction in TP loading is between 190 and
788 lbs/year
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised in petition: Projected Water Quality
Improvements
18
0
2
4
6
400 600 800 1200 2200
Numberofprojects
$/ft
Streams - Unit Cost
Mean = $753/ft , Median = $601/ft
• Using the mean unit cost $753/ft, the cost per unit lb of annual TP reduction ranges from
to $3,000 to $12,000
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues raised in petition: Projected Water Quality
Improvements
19
Estimated range for proposed Dead Run Segment 2/3 restoration:
$3,000 - $12,000 $/lb TP/yr
Practices Number
Installed TP TN TSS
Stream Restoration 10 $ 25,583 $ 2,812 $ 13
Infiltration Swales & Trenches 3 $ 33,583 $ 5,765 $ 204
Pond Retrofits 32 $ 35,908 $ 7,928 $ 183
Soil Compost Amendment 9 $ 120,164 $ 16,797 $ 781
Dry Swales 7 $ 132,423 $ 22,732 $ 803
Bioretention (Rain Gardens) 18 $ 168,973 $ 28,935 $ 1,026
Pervious Pavement 4 $ 198,624 $ 33,631 $ 1,211
Capital Cost ($/lb/yr)
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Additional issues
20
- Use smaller equipment to minimize impacts
It is possible to write limitations on equipment in the bid documents as a special
condition, but potential problems include:
• Fewer bidders (possibly none)
• Significantly higher cost
• Significantly longer timeline
To reduce impacts we will consider/evaluate:
• Access alignments that minimize tree disturbance
• Design revisions that meet the overall goals but have less of an impact on trees
• Equipment used by stream restoration contractors e.g. track equipment has less
compaction and other impacts and allows them to work in wetter areas.
• Contractors generally use timber matting to further reduce soil compaction and
protect tree roots.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Equipment used during construction
21
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Equipment used during construction
22
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Churchill Road Bridge Flooding
23
• VDOT inspection reports indicate no deficiencies with the bridge.
• No current or future project planned for the bridge.
• Not subject to frequent closures because of overtopping.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Churchill Road Bridge Backwater area
24
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Response to issues – task force recommendation:
25
Therefore, we ask that Fairfax County:
1. Develop a new, much less invasive and impactful approach in order to preserve our park.
2. Change and significantly extend the entire timetable for the new project to provide full opportunity for
public response.
3. Provide widespread notification, including visible signage in the park, that would notify park users and
the community at large about the full scope of the new project proposal, its impact on the park, and
flooding.
- We recommend that a citizens task force (“Stream Team”) be convened
by Supervisor Foust’s office.
- The task force would be actively involved in revising the current concept
plan to make sure it was acceptable to the community:
- Clearly understand community goals and expectations
- Work with the design team to incorporate the community goals and establish a
timeline
- Be able to convey the details of design constraints and tradeoffs to the community
- Attend design charette meetings
- Perform detailed review of concept plan revisions to make sure it met the
community goals before it is presented to the wider community
- Recommend approximately 10 representatives from the community
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Northern Virginia Stream Restoration Bank
26
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Northern Virginia Stream Restoration Bank
27
1Access Options
2Options for Refining the Design
1Access Options
• Alternative 1 Approach
• Proposed some access along the left bank of the stream through
Reach 3 adjacent to Elizabeth Dr.
• Alternative 2 Approach
• Proposed access within the Park only, along the sanitary sewer
easement and two sections of trail. No access on private properties.
• Additional alternatives Explored
• Access along sanitary sewer easement and trail.
• Selecting route that has least amount of tree impacts.
1Access – Alternative Study
1Access – Alternative Study
2 Design Refinement
• Options for Refinement of the
Design
• Smaller Channel Cross-section in specific
areas
• Transition from smaller to larger channel sections in areas,
where possible
• Opportunities to save trees
• Still focus on less frequent storm events and
improving the impacts of flooding especially
in the Segment 3 Upper area
• Maintain overall channel stability
2 Design Refinement
Pre/Post Comparison – Existing Section 1355
2 year flow out of banks
• Existing Conditions Analysis
2 Design Refinement
Pre/Post Comparison – Existing Section 1355
2 year flow out of banks
• Typical Channel Segment Upper,
~90 SF Area
2 Design Refinement
Pre/Post Comparison – Existing Section 1355
2 year flow out of banks
• Nested Channel Segment Upper,
~60 SF Area
2 Design Refinement
Pre/Post Comparison – Existing Section 1355
2 year flow out of banks
• Comparison
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration Potential
37
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Chesapeake Bay Preservation Ordinance
Resource Protection Area (RPA)
http://www.fairfaxcounty.gov/dpwes/environmental/cbay/
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Divisiont
Stream Buffer Existing Conditions
39
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration Potential
40
Segment 3 Stream Buffer Concept
Left Bank Left Bank Residential Residential
35 foot 50 foot 35 foot 50 foot
Area (Acres) 1.14 1.55 0.46 0.87
Canopy Trees 114 155 46 87
Understory Trees 229 310 92 174
Shrubs 1,246 1,690 501 946
Estimate tree and shrub plantings for Segment 3: Left Bank Only
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration - Example
41
Typical Planting Area
County Staff will
coordinate with
individual
homeowners on
plant selection and
placement on their
properties
Buffer Parameters
35’ Minimum from
edge of stream
bank
50’ Offset optional
Plant density
determined by
Chesapeake Bay
Preservation
Ordinance
Dense planting will
provide privacy
screening and help
mitigate tree loss
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration - Example
42
Shrub Layer
Typical Shrub
Species
Spicebush
American
Elderberry
Witch Hazel
Winterberry Holly
Silky Dogwood
Button Bush
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration - Example
43
Understory Trees
Typical Understory
Species
Sweetbay Magnolia
Eastern Redbud
American
Hornbeam
Hazel Alder
Slippery Elm
Sassafras
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division
Stream Buffer Restoration
44
Canopy Layer
Canopy
Tree
Evergreen
Understory
Tree
Deciduous
Understory
Tree
Shrub
Typical Canopy
Tree Species
Sugar Maple
River Birch
American Basswood
Common Persimmon
Swamp White Oak
Pin Oak
Willow Oak
Black Gum
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Next steps: Task Force
45
- We recommend that a citizens task force (“Stream Team”) be convened
by Supervisor Foust’s office.
- The task force would be actively involved in revising the current concept
plan to make sure it was acceptable to the community:
- Clearly understand community goals and expectations
- Work with the design team to incorporate the community goals and establish a
timeline
- Be able to convey the details of design constraints and tradeoffs to the community
- Attend design charrette meetings and participate in field reviews
- Perform detailed review of concept plan revisions to make sure it met the
community goals before it is presented to the wider community
- Recommend approximately 10 representatives from the community
- We will continue to receive comments on the current concept through
July 31st.
- We anticipate the task force will be convened by June 30th, and we will
schedule a kick-off meeting with the task force in early July.
Stormwater Planning Division
Dead Run Segment 2/3 Stream Restoration Project
Next steps with target dates
46
• Work with task force to develop final concept and publish to website in
September, 2015
• Community meeting to present final concept in early October, 2015
• Develop 95% design plans, permitting by January, 2015
• Final design phase public meeting, early spring 2016
• Final plan authorization and bidding phase – TBD based on funding and
approved budget
• Target is late spring/early summer, 2016
• Sequence with Dead Run Segment 1 (Dominican Retreat)
• Pardon Our Dust meeting with residents and contractor before issuing
construction notice to proceed
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/dpwes
Dead Run Segment 2/3 Stream Restoration Project
Stormwater Planning Division 47
Dipmani Kumar, P.E., CFM
Project Manager
703-324-5500
dkumar@fairfaxcounty.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Fairfax County
 
Stormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaStormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaFairfax County
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
 
Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Fairfax County
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectFairfax County
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectFairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectFairfax County
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Fairfax County
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Fairfax County
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitFairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationFairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesFairfax County
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Fairfax County
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Fairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectFairfax County
 

Was ist angesagt? (20)

Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Stormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaStormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, China
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 

Andere mochten auch

Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting Fairfax County
 
Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingFairfax County
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community MeetingFairfax County
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Fairfax County
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Fairfax County
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Fairfax County
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFairfax County
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond RetrofitFairfax County
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Fairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream RestorationFairfax County
 
Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Fairfax County
 
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016Fairfax County
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectFairfax County
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Fairfax County
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Fairfax County
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration ProjectFairfax County
 

Andere mochten auch (18)

Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting
 
Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach Meeting
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012
 
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit Project
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 

Ähnlich wie Dead Run Stream Restoration Public Meeting June 9, 2015

Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingFairfax County
 
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015Fairfax County
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanFairfax County
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectFairfax County
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Fairfax County
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT U.S. Water Alliance
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Fairfax County
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Fairfax County
 
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...Fairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Fairfax County
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsToronto Public Consultation Unit
 
Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020Fairfax County
 
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Fairfax County
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Fairfax County
 
Partnerships for Greening Atlanta - MT
Partnerships for Greening Atlanta - MTPartnerships for Greening Atlanta - MT
Partnerships for Greening Atlanta - MTPark Pride
 

Ähnlich wie Dead Run Stream Restoration Public Meeting June 9, 2015 (20)

Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
 
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
 
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Oc...
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020Long Branch Central Watershed Management Area Project Overview October 26, 2020
Long Branch Central Watershed Management Area Project Overview October 26, 2020
 
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
Partnerships for Greening Atlanta - MT
Partnerships for Greening Atlanta - MTPartnerships for Greening Atlanta - MT
Partnerships for Greening Atlanta - MT
 

Mehr von Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
 

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

KĂźrzlich hochgeladen

10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...Faga1939
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfssuser5750e1
 
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024Insiger
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdomlunadelior
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...anjanibaddipudi1
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubaikojalkojal131
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdflambardar420420
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...IT Industry
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X79953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...srinuseo15
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...hyt3577
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsVoterMood
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...tewhimanshu23
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptxYasinAhmad20
 

KĂźrzlich hochgeladen (20)

10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024
Job-OriĐľntĐľd Courses That Will Boost Your Career in 2024
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 

Dead Run Stream Restoration Public Meeting June 9, 2015

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Dead Run Segments 2/3 Stream Restoration Project Public Meeting Dolley Madison Library June 9, 2015
  • 2. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Meeting Outline 2 • Project extent and timeline • Response to issues raised • Next Steps • Outline of Potential Design Refinements • Q&A • Walk to site
  • 3. Dead Run Segment 2/3 Stream Restoration Project Project Limits 3 Segment 2 – McLean Central Park • 800 Linear Feet • Completely in Park • Starts below previously restored section near library Segment 3 – Dead Run Stream Valley Park • 1,500 Linear Feet • Extends to Churchill Road • Residential lots along Elizabeth Drive and Carol Rayes Street
  • 4. Stormwater Planning Division Watershed Planning and Project Implementation • Watershed Characterization – Water Quality Monitoring – Physical Stream Assessment – Land Use Change – Pollutant Loading • Structural Project – 25 year plan • Non-Structural Practices – Policy and Regulations 4 http://www.fairfaxcounty.gov/dpwes/watersheds/
  • 5. Stormwater Planning Division Watershed Planning and Project Implementation • Dead Run has a drainage area just over 3 mi2 • 24 priority projects identified in the watershed management plan • Pond retrofits • LID Stormwater Enhancements • Stream Restoration • Neighborhood Stormwater Improvements 5 http://www.fairfaxcounty.gov/dpwes/stormwater/ projects/project_list.htm
  • 6. Stormwater Planning Division Stormwater Program Regulatory Drivers • National Pollutant Discharge Elimination System (NPDES) • Virginia Stormwater Management Program (VSMP) – Municipal Separate Storm Sewer Permit (MS4) – Includes watershed planning and project implementation • Total Maximum Daily Loads (TMDLs) – Chesapeake Bay – Local Streams – Establishes pollutant loading budget for a given impaired water body to meet water quality standards 6
  • 7. Stormwater Planning Division Dead Run– Stream Conditions 7
  • 8. Stormwater Planning Division Dead Run – Stream Conditions 8 Fairfax County Annual Water Quality Report • http://www.fairfaxcounty.gov/hd/streams/strannualrpt.htm Virginia Department of Environmental Quality • Water Quality Report (305b report) • http://www.deq.virginia.gov/Programs/Water.aspx U.S. Geological Survey • Dead Run stream gage at Whann Avenue • Fairfax County Water Resource Monitoring • http://va.water.usgs.gov/fairfax/
  • 9. Stormwater Planning Division Dead Run Stream Restoration Project Benefits and Goals: • Improve water quality – Reduce sediment and nutrient loads • Stabilize stream banks to – Reduce stream bank erosion – Protect property – Reduce tree loss • Improve aquatic habitat • Restore and enhance vegetated stream buffer (riparian corridor) Others: • Reduce frequent flooding 9
  • 10. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Project timeline 10 • Project initiated: Fall, 2013. • Surveys and assessment completed: Winter, 2013 • Pre-concepts submitted: April, 2014 • First public meeting: April 23, 2014 • Field walk with FCPA, MTF, Urban Forestry: August 15, 2014 • Pre-concept revisions to minimize tree loss completed: February, 2015 • Second public meeting: February 18, 2015 • Revised concept plan with alternative access options for Segment 3 completed: May 12, 2015 • First field walk with community: May 19, 2015 • Second field walk with community: June 9, 2015
  • 11. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Next steps: Task Force • We recommend that a citizens task force (“Stream Team”) be convened in coordination with Supervisor Foust’s office. – The task force would be actively involved in revising the current concept plan to make sure it was acceptable to the community: – Clearly understand community goals and expectations – Work with the design team to incorporate the community goals and establish a timeline – Be able to convey the details of design constraints and tradeoffs to the community – Attend design charette meetings – Perform detailed review of concept plan revisions to make sure it met the community goals before it is presented to the wider community – Recommend up to 10 representatives from the community • We will continue to receive comments on the current concept through July 31st. • We anticipate the task force will be convened by June 30th and we will schedule a kick-off meeting with the task force in early July. 11
  • 12. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Next steps with target dates 12 • Work with task force to develop final concept and publish to website in September, 2015 • Community meeting to present final concept – October, 2015 • Continue to work with task force to develop 95% design plans, and complete permitting – January, 2016 • Final design phase public meeting – Spring 2016 • Final plan authorization and bidding phase – TBD based on funding and approved budget • Target is late spring/early summer, 2016 • Sequence with Dead Run Segment 1 (Dominican Retreat) • Pardon Our Dust meeting with residents and contractor before issuing construction notice to proceed.
  • 13. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised – tree and canopy loss 13 -Proposed removal of more than 250 trees from McLean Central Park, including about 100 of the park's largest trees. -Proposed removal of virtually all other growth in a wide swath along the creek from Churchill Road to Elizabeth Drive. Current concept plan: • 88 > 12” trees, up to 10 for access, 23 are at risk. • 133 6-12” trees, up to 20 for access, 28 are at risk. • Approximately 20% of trees proposed for removal are at risk. • Estimated canopy loss is approximately 11% of area shown in red.
  • 14. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised – flash flooding 14 -Failure to address a related and major park problem: flash flooding from storm water runoff that flows into the creek. Tradeoff: Reduce channel size (to the low end of the range that still provides for a stable stream) and reduce tree impacts, but the reduction in flood levels will be smaller. If we continue to realign the channel away from lots (again, within an acceptable range), this will impact more trees.
  • 15. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised – replacement plantings and trail closure 15 - Lack of provisions made by the county to maintain or protect replacement plantings from failure or encroachment of invasive species after the project is completed. This would be considered and made part of the final plan. We would work with the Park Authority and homeowners to come up with a final maintenance and invasive plant control plan for the reforestation measures in the park. - Closure of large sections of the park and trail for approximately 9-12 months. This is inaccurate. We would always try to keep the trails open – again this is a tradeoff, we can reduce the access impacts by using the trail but there will some work hour closure of the trails if we opt to use the trails for access. Temporary trails would be part of the project and we would work with the Park Authority to maintain the access into the park provided by trails.
  • 16. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised – public notification 16 --Woefully inadequate notification of the public about this project, its scope, and impact on the community; there has been no visible signage in the park that would notify park users. We recognize that our standard public notification process was inadequate. The Park Authority has provided us with templates and examples of their public notification process for the park master planning process, and we will follow the same procedure for notification. This includes: - Significantly expanding the area where meeting notification postcards/letters are sent. - Posting signs in the park about upcoming meetings.
  • 17. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised – water quality benefits 17 - Insufficient evidence that this project, given the extensive damage it will do to the existing park environment, is the best way to achieve the proposed goals. In fact, no estimate has been released of how much the water quality will improve over what period of time. A summary of this information was provided in the February meeting: • Chesapeake Bay Expert Panel protocols used for estimating stream restoration nutrient credits. • For Total Phosphorus (TP) as an example the estimated reduction in loadings as a result of the proposed stream restoration for Segments 2/3 ranges from 0.063 to 0.261 lbs/LF/yr. • This compares to a ‘default’ rate of 0.068 lbs/LF/yr. The high end of the estimated load reduction is 3X the default rate. • Total annual estimated reduction in erosion for Segment 2/3 is between 783 to 1,500 tons/year and the estimated reduction in TP loading is between 190 and 788 lbs/year
  • 18. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised in petition: Projected Water Quality Improvements 18 0 2 4 6 400 600 800 1200 2200 Numberofprojects $/ft Streams - Unit Cost Mean = $753/ft , Median = $601/ft • Using the mean unit cost $753/ft, the cost per unit lb of annual TP reduction ranges from to $3,000 to $12,000
  • 19. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues raised in petition: Projected Water Quality Improvements 19 Estimated range for proposed Dead Run Segment 2/3 restoration: $3,000 - $12,000 $/lb TP/yr Practices Number Installed TP TN TSS Stream Restoration 10 $ 25,583 $ 2,812 $ 13 Infiltration Swales & Trenches 3 $ 33,583 $ 5,765 $ 204 Pond Retrofits 32 $ 35,908 $ 7,928 $ 183 Soil Compost Amendment 9 $ 120,164 $ 16,797 $ 781 Dry Swales 7 $ 132,423 $ 22,732 $ 803 Bioretention (Rain Gardens) 18 $ 168,973 $ 28,935 $ 1,026 Pervious Pavement 4 $ 198,624 $ 33,631 $ 1,211 Capital Cost ($/lb/yr)
  • 20. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Additional issues 20 - Use smaller equipment to minimize impacts It is possible to write limitations on equipment in the bid documents as a special condition, but potential problems include: • Fewer bidders (possibly none) • Significantly higher cost • Significantly longer timeline To reduce impacts we will consider/evaluate: • Access alignments that minimize tree disturbance • Design revisions that meet the overall goals but have less of an impact on trees • Equipment used by stream restoration contractors e.g. track equipment has less compaction and other impacts and allows them to work in wetter areas. • Contractors generally use timber matting to further reduce soil compaction and protect tree roots.
  • 21. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Equipment used during construction 21
  • 22. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Equipment used during construction 22
  • 23. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Churchill Road Bridge Flooding 23 • VDOT inspection reports indicate no deficiencies with the bridge. • No current or future project planned for the bridge. • Not subject to frequent closures because of overtopping.
  • 24. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Churchill Road Bridge Backwater area 24
  • 25. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Response to issues – task force recommendation: 25 Therefore, we ask that Fairfax County: 1. Develop a new, much less invasive and impactful approach in order to preserve our park. 2. Change and significantly extend the entire timetable for the new project to provide full opportunity for public response. 3. Provide widespread notification, including visible signage in the park, that would notify park users and the community at large about the full scope of the new project proposal, its impact on the park, and flooding. - We recommend that a citizens task force (“Stream Team”) be convened by Supervisor Foust’s office. - The task force would be actively involved in revising the current concept plan to make sure it was acceptable to the community: - Clearly understand community goals and expectations - Work with the design team to incorporate the community goals and establish a timeline - Be able to convey the details of design constraints and tradeoffs to the community - Attend design charette meetings - Perform detailed review of concept plan revisions to make sure it met the community goals before it is presented to the wider community - Recommend approximately 10 representatives from the community
  • 26. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Northern Virginia Stream Restoration Bank 26
  • 27. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Northern Virginia Stream Restoration Bank 27
  • 28. 1Access Options 2Options for Refining the Design
  • 29. 1Access Options • Alternative 1 Approach • Proposed some access along the left bank of the stream through Reach 3 adjacent to Elizabeth Dr. • Alternative 2 Approach • Proposed access within the Park only, along the sanitary sewer easement and two sections of trail. No access on private properties. • Additional alternatives Explored • Access along sanitary sewer easement and trail. • Selecting route that has least amount of tree impacts.
  • 32. 2 Design Refinement • Options for Refinement of the Design • Smaller Channel Cross-section in specific areas • Transition from smaller to larger channel sections in areas, where possible • Opportunities to save trees • Still focus on less frequent storm events and improving the impacts of flooding especially in the Segment 3 Upper area • Maintain overall channel stability
  • 33. 2 Design Refinement Pre/Post Comparison – Existing Section 1355 2 year flow out of banks • Existing Conditions Analysis
  • 34. 2 Design Refinement Pre/Post Comparison – Existing Section 1355 2 year flow out of banks • Typical Channel Segment Upper, ~90 SF Area
  • 35. 2 Design Refinement Pre/Post Comparison – Existing Section 1355 2 year flow out of banks • Nested Channel Segment Upper, ~60 SF Area
  • 36. 2 Design Refinement Pre/Post Comparison – Existing Section 1355 2 year flow out of banks • Comparison
  • 37. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration Potential 37
  • 38. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Chesapeake Bay Preservation Ordinance Resource Protection Area (RPA) http://www.fairfaxcounty.gov/dpwes/environmental/cbay/
  • 39. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Divisiont Stream Buffer Existing Conditions 39
  • 40. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration Potential 40 Segment 3 Stream Buffer Concept Left Bank Left Bank Residential Residential 35 foot 50 foot 35 foot 50 foot Area (Acres) 1.14 1.55 0.46 0.87 Canopy Trees 114 155 46 87 Understory Trees 229 310 92 174 Shrubs 1,246 1,690 501 946 Estimate tree and shrub plantings for Segment 3: Left Bank Only
  • 41. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration - Example 41 Typical Planting Area County Staff will coordinate with individual homeowners on plant selection and placement on their properties Buffer Parameters 35’ Minimum from edge of stream bank 50’ Offset optional Plant density determined by Chesapeake Bay Preservation Ordinance Dense planting will provide privacy screening and help mitigate tree loss
  • 42. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration - Example 42 Shrub Layer Typical Shrub Species Spicebush American Elderberry Witch Hazel Winterberry Holly Silky Dogwood Button Bush
  • 43. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration - Example 43 Understory Trees Typical Understory Species Sweetbay Magnolia Eastern Redbud American Hornbeam Hazel Alder Slippery Elm Sassafras
  • 44. Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division Stream Buffer Restoration 44 Canopy Layer Canopy Tree Evergreen Understory Tree Deciduous Understory Tree Shrub Typical Canopy Tree Species Sugar Maple River Birch American Basswood Common Persimmon Swamp White Oak Pin Oak Willow Oak Black Gum
  • 45. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Next steps: Task Force 45 - We recommend that a citizens task force (“Stream Team”) be convened by Supervisor Foust’s office. - The task force would be actively involved in revising the current concept plan to make sure it was acceptable to the community: - Clearly understand community goals and expectations - Work with the design team to incorporate the community goals and establish a timeline - Be able to convey the details of design constraints and tradeoffs to the community - Attend design charrette meetings and participate in field reviews - Perform detailed review of concept plan revisions to make sure it met the community goals before it is presented to the wider community - Recommend approximately 10 representatives from the community - We will continue to receive comments on the current concept through July 31st. - We anticipate the task force will be convened by June 30th, and we will schedule a kick-off meeting with the task force in early July.
  • 46. Stormwater Planning Division Dead Run Segment 2/3 Stream Restoration Project Next steps with target dates 46 • Work with task force to develop final concept and publish to website in September, 2015 • Community meeting to present final concept in early October, 2015 • Develop 95% design plans, permitting by January, 2015 • Final design phase public meeting, early spring 2016 • Final plan authorization and bidding phase – TBD based on funding and approved budget • Target is late spring/early summer, 2016 • Sequence with Dead Run Segment 1 (Dominican Retreat) • Pardon Our Dust meeting with residents and contractor before issuing construction notice to proceed
  • 47. Additional Information For additional information, please contact www.fairfaxcounty.gov/dpwes Dead Run Segment 2/3 Stream Restoration Project Stormwater Planning Division 47 Dipmani Kumar, P.E., CFM Project Manager 703-324-5500 dkumar@fairfaxcounty.gov

Hinweis der Redaktion

  1. GR - Access options – When we last meet – we had 2 access alternatives w/ sub options within each. Since the last meeting we explored additioal alternatives for access. XXXX
  2. Small dark green circles identify trees saved along access route by adjusting the path. The access path (yellow) is ~15’ wide. The Blue is the proposed stream channel bankfull width. This study would have more trail overlaps. we have looked at alternative access routes, following the trail and sanitary sewer and from a quick study we see a way to at least 22 trees just be adjusting the access routes
  3. Small dark green circles identify trees saved along access route by adjusting the path. The access path (yellow) is ~15’ wide. The Blue is the proposed stream channel bankfull width.
  4. Options for design refinement Smaller channel XS vs Typical, 60 SF vs 90 SF in Seg 3 Uppper for example. pros/cons (ie. Smaller channel section would disturb less land but would not address the flooding as much as the traditional channel design sizing we have no the plan now). We must incorporate the need to maintain some level of flood reduction for the folks living next to the upper section of Segment 3. This could potentially mean keeping the channel dimensions similar there while transitioning from a smaller channel section upstream and transitioning to a small channel section downstream, as long as the entire system remained stable. I’ll leave it up to you to explain the limitations of maintaining the flood reduction levels in the current concept for the upper section of Segment 3, while revising the upstream and downstream sections to minimize tree loss
  5. GR - Floodplain analysis and review of more frequent storm impacts (explain no-rise/no-impact requirement, show modeled results, and place lot line and building structure in cross-sections (or at least one or two representative cross-sections, so that residents understand the relative WSEs of the various storm events). Explain the nested bankfull channel is an option being evaluated that currently isn’t on the main plans. one slide with comparison of the pre/post 100 and 10 yrs storms, two slides with comparies of pre/post cross-sections (we’re only going to focus on a couple of the sections, not all six).  One slide for the nested channel study. This slide: focus on XS 1355…existing conditions 2 yr WSE is out of banks. XXXX