3. Project Details
Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Description:
The Brookfield Park Wet Pond Construction project was substantially completed on November 14, 2014. The project
consisted of rebuilding a failing wet pond to meet present day standards for stormwater detention and water quality.
Project Overview:
• Reconstruction of existing leaky & eroded dam (35 ft. high)
• Installation of a new semi circular riser structure with an observation deck
• Installation of a wetland forebay system and sediment removal
• Installation of grasscrete access road and restoration of parking lot with permeable pavement
• Restoration of two stormwater outfalls
• Incorporation of native landscaping to include vegetated floating wetlands
• Reduction of 147.1 lbs. of total nitrogen per year, 32.2 lbs. of total phosphorus per year, and 3.2 tons of sediment per
year leading to the Accotink Creek.
Project Team:
• Stormwater Planning Division – Sajan Pokharel, Suzanne Foster, Chad Crawford
• UDCD Transportation and Stormwater Construction Branch – Yudhie Brownson, Paul Thaler, Mannan Qureshi, Tammy Michelli
• UDCD Land Survey Branch – Greg Harper, Pat Gallahan, Matthias Strecker, Mike Perry, Gregg Housley
• Fairfax County Park Authority – Isabel Villarroel, Ed Richardson
• Maintenance and Stormwater Management Division – Don Lacquement, Carolyn Weber
• Urban Forestry Management Division – Hugh Whitehead, Samantha Wangsgard
• Corinthian Contractors, Inc. – William Boyland, Gary Keller, Declan Munslow, Warren Teague
• Dewberry – Geoffrey Cowan, Nicholas Shimmer, Jim Davidson, Mark Unterkofler
• ECS Limited – Scott Nelson, Prem Dhungana
4. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Dickenson St. & Floyd Ave. (Springfield, VA) – Tax Map No. 80-3
Project Site
5. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Existing Condition – Pond
6. Brookfield Park Dam Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Existing Condition – Dam Embankment
7. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Existing Condition – Dam Embankment
8. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Existing Condition – Dam Embankment
9. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Construction – Dam Embankment & Riser Structure
10. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Construction – Dam Embankment & Riser Structure
11. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Construction
12. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Construction
13. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Construction
14. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Condition – Forebay pond & Grasscrete access road
15. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Condition – Parking lot with permeable pavement
16. Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Post Condition– Coastal Plain Outfall System
17. Before After
Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
18. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Brookfield Park Wet Pond Construction
Utilities Design & Construction Division- Transportation and Stormwater Construction Branch
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.gov