The WebEx weekly meeting with all managers related to the program's issues, action items, inter-dependencies, updates, schedules, and progress reports.
3. Meeting Transcript for HCM-F Weekly Program Meeting
Basic Meeting Information:
Meeting Topic: HCM-F Weekly Program Meeting
Host: Alejandro Perez
Meeting number: 206 637 108
Start Time: Thursday, February 06, 2014 05:59:33 AM(GMT -8:00)
End Time: Thursday, February 06, 2014 07:06:54 AM(GMT -8:00)
Meeting URL: https://cisco.webex.com/cisco
Attendee List:
Kurt, Teresa Walfield, Clint Entrop (centrop - TECHNICAL LEADER.ENGINEERING), Aditya Vats, Oscar E. Arenas, Herb,
Sreejith N T, Mark Bridges, Kevin Whitaker, Tom Hill (tomhill),Information
Controlled Chris Claytor, Nagendra Kunuturi, Craig Miller, Rick Kauten,
Mohammad Al-Taraireh (maltarai - PRODUCT MANAGER.ENGINEERING), Alejandro Perez, Mike Wheeler,
Record: https://cisco.webex.com/ciscosales/lsr.php?RCID=436fe135e1074fd0a9f11a6bfd9eb1cd
3
4. 06FEB14
Rank
Date / ID
Type
Action Item
1
20140127-1
Risk - Short Term
Test Resources Constrained / Shortage
2
20140128-01
Action - Short
Term
Release Def inition
3
20131113-01
Action - Long
Term
HCM-F "Hot Fix" / COP File Procedure
Development
4
20131016-02
Action – Long
Term
Policy Standing Updates
Ow ner
20131211-01
Action - Long
Term
Rally Portof olio Manager Transition
6
20140124-01
Action – Long
Term
EOL of HCM-F 8.6.X
Due Date /
Status
Tom Hill / Scrum
Masters /
Alejandro
10.0.1
2/06
Kurt/ Herb /
Alejandro
Program
2/10
Kurt H. / Herb /
Alejandro
Program
2/15
Kurt/ Herb /
Alejandro
HCM-F
10.0.1
2/15
Herb / Alejandro /
Craig / Mable
Program
2/15
Kurt H. / Herb /
Alejandro
HCM-F
8.6.X
3/30
Controlled
Information
5
Product
Status
2/06- Test ENGs and Scrum Masters review ing w ork to f it in Test Throttles.
Wiki and Rally to be updated. 1/27 - @ HCM-F Weekly Meeting (23JAN14)HCM-F test manager has ask f or an escalation and help f or test resources.
Team suggest shif ting resources, shif ting f ocus on 10.0.1 only, meetings,
etc. PgM asks Scrum Masters to ref lect new TT schedule f or both USn, in
2/06- PP Slides on Release Def inition w as provided. Team af f irmed w ith
Nancy Grif f in on compliance and level of Agile Commitment Overhead. 1/28HCM-F teams needs to determine the def inition of the releases (ES, SU, .X)
in order to determine the level of Admin OH such as Agile Commitments.
2/06- PgM upload COP f ile prof ess in EDCS f or f urther actions: EDCS1373795. 1/23- No changes. 1/15- No changes. 1/08- COP File process in
PRRQ - 911 COP File w as released under curernt process - 12/05- Kurt
stated the the f eature set drops are pretty clean and not longer need to be
2/06 - No update. 1/30- Action Item #201400129-01- now tracked here.
1/23- No changes. 1/15- No changes. 112/19- No changes. 11/12- Kurt
explained that this w ill be dow n the line around APR14 and FEB14. 10/31No updates. Other actions on higher priority. 10/16- Ref erence to action
items in AC5 Deck: Policy Standing Slide.
2/04 - Rally Structure w as presented to the ENG Managers f or f eedback.
ENG manager not aligned w ith Rally Strucutre Terminology. 1/28 - @ HCM-F
Backlog Ref ining Session- PdMs & Architects w ere trained and educated
by PgM in Rally usage in order to properly begin connecting HCM-F Features
2/06- No update - 1/23 - Conversation w / team on the matter. 8.6x options
presented. EOL or postpone w / a new er CM version. PdMs pref er EOL
8.6.x.
4
5. Key Leaders
Controlled Information
•
Product Management = Mohammed Al-Taraireh, Herb Sayre, and John (Van) Hammond
•
Program Manager = Alejandro Perez
•
Architecture = Michael Wheeler
•
Eng Dev = Mark Bridges, Eddie Bishop, Kurt Hamlin, Nagendra Kunuturi, Chuck Homola
•
Test = Tom Hill
Controlled Information
•
Doc Manager = Karla Ormsby
05DEC13
Extended Team:
•
Scrum Masters = Craig Miller, Kevin Whitaker, Sreejith N T
•
Leads = Bud Luck, Dan Linton, Nelson Gill, Steve Hand, Marc Elewitz, Vijayendra Shetty
•
Test Leads = Joe Chen, Subodh Shah
•
Solution Test = Ramanuj Kushwaha, Jay Khalil
Controlled Information
•
EFT Leads = Kai Xu
•
Doc Leads = Teresa Walfield, Joey Desmond, Ken Furlong
•
Other PgMs = Sreejith N T, Chris Claytor, Rick Kauten
•
Other PdMs = Mable Chiu (Vz Prime)
Documents (Hyperlinked)
•
Wiki Links:
•
•
•
HCM-F Wiki Central: http://wikicentral.cisco.com/display/HUCS/HCM-F+Wiki+Home
HCM-F EDCS Home Page: http://wwwin-eng.cisco.com/Eng/VTG/IPCBU/Managed_Services/Multiplicity/HCM-F/
HCM-F DoD: http://wikicentral.cisco.com/display/HCSDEV/HCM-F DoD
5
6. Program Balance Scorecards per Release
HCM-F Overall Schedule
HCM-F External Dependency Tracking
6
8. 05FEB14
HCM-F 10.0.1
AC / IR:
Scope
Schedule
Budget
Resources
AC5/IR5 + IR6: I89
85%
10.1.1?? I131
New Plan: Point 3679 3788 (+109 to Workload)
Features: 17
Current Point Estimate Changes: (Weekly)
3622 3788 (+166 to workload)
Increases in Scope
Accepted Points Changes: (Weekly)
2882 3215 (+333 Point increase)
No Formal AC
Current Plan: 88 Points
Features: 8
IR 5 LDAP Notification Carrier over - TBD
Frinde Node Tracked separately – Rally – Remote
Access Portal (RAP)
Host 1 (1/31/14) Linear Plan: 103% = Late by 18% (28 Days)
Host 2 (2/28/14) Linear Plan: 87% = Early by -2% (4 Days)
Excepted to slip due to BXB TRNG to critical path teams
Post 10.0
HOST 1: ~ 4/18/14
Total Value: $6.68 $6.97MM
Actual Value Earned: $5.92MM
Actual vs Host 1: Under by 18%
Actual vs Host 2: Under by 3%
64%
Total Value: $162K
Actual Value Earned: $102K
Actual vs Host: TBD
Sprint 2014#1: 647 Points
Current Workload: 484 Points = Light workload / or/ current planning
GAP to AVG Team Performance: Under 26%
GAP to Previous Iteration Team Performance: Under by 34%
GAP to Previous Budged Team Performance: Under by 65%
Controlled
Test Resources Needed: Over Capacity for FEB: Tom Hill’s Details
Information
Escalation Requested
HCM-F Managers will provide plan
8
9. 05FEB14
HCM-F 10.5.1
AC / IR:
25%
AC5/IR5 + IR6: I94
Scope
Total Features: 2
Current Point Estimate: (Weekly)
1190 1244 (+54 to workload)
Accepted Points: (Weekly)
302 320 (+18 Point Increase)
Schedule
AC6 Planning to begin – 12/01/13
No Official AC
10.5 HOST – TBD
Budget
Resources
Total Value: $2.29MM
Actual Value Earned: $589K
Actual vs 10.5 Host: TBD
Same as IR5 + IR6
9
10. 05FEB14
HCM-F 9.2.1 Sustaining
Release
Scope
Schedule
Budget
Resources
ES 1: I110
0%
COP File
F502 - CIA 3983: HLM Report Access
F535 - Fake Phones
F542 - Connect Location
F688 – ES Defect Fix Package
F727 – Release Basic
AT&T Requirement
Transfer Selected Files - CSCuc19723
Tracked in US153716
Item completed – COP File process beginning
SU2 Timeline – Agreed to move to SU3
Following SU3 Timeline
No current commitment – 2/12/14
HOST SU3 – TBD
TBD
TBD
--%
TBD
Rally: Need Point Estimates for Features / fixes need recording
Same as IR5 + IR6
10
11. 05FEB14
HCM-F 9.1.1 Sustaining
Release
Scope
Schedule
Budget
Resources
100%
COP File
SI Report Failure - CSCul48289
Complete – FET
PdM, ENG, & Test Approved
HCM-F COP File Guide under Review
HCM-F Team in agreement w/ COP File usage
Uploaded to PRRQ for review
Need HCM-F Manager Review
Minor Action Items:
Updated of Release Notes
COP Reuploaded – Waiting on Final Confirmation/“Go”
Inform TAC
Update TAC Case
Date of Delivery: 7JAN14
TBD
TBD
TBD
The HCM-F India Team & Support Personnel mobilized quickly and efficiently
11
12. 05FEB14
Internal OPS
Type:
Scope
Schedule
Budget
Resources
Defect Reduction
Scrap Rate
I92 Rally Initiative
Found to Fix Ratio: Increase in Defects
10.0 Defects:
SEV 1-3 Defects: (#) 73
(X<35 Goal): Over, but reducing
SEV 1- 6: (#) 416
9.2.1 Defects:
SEV 1-3 Defects: (#) 9
(X<25 Goal): Within & Lower
SEV 1-6: (#) 171
I93 Rally Initiative
PC4HCS Deprecation
Points: 117
Scrap % Goal: (X<10% Goal): Within
Ratio to Total Value Earned
Subject to Change
10.0.1 HOST 2/28/14 - effort to align w/ Goal Standards
PC4HCS – last know deprecated effort
Total Value: ???
Actual Value Earned: ????
3.16%
Total Value of Scrap: $215K
Same as 10.0 AC5/IR5
12
13. 06FEB14
Milestone
Related
Owner
Plan
IR5 Readout & Plan to Finish 10.0
10.0.1
Alejandro
1/10/14
Throttle pull, sanity, Image avail (TT2) Drop
10.0.1
Craig M
1/13/14
1/17/14
Throttle pull, sanity, Image avail (TT3) Drop
10.0.1
Craig M
1/27/14
1/31/14
HOST 1
10.0.1
Alejandro
1/27/14
1/31/14
HCM-F TOI docs ready – EFT
10.0.1
Mark B.
12/20
2/13
9.2.1 ES1
Alejandro
2/12
ES releases do not require ACs IAW Nancy Griffin
10.0.1
Craig M
2/14
Sanity Test Only / No Regression / Features slips
9.2.1 ES1
Alejandro
12/18/13
Throttle pull, sanity, Image avail (TT5) Drop
10.0.1
Craig M
2/25
Dev & Feat. test complete
10.0.1
Craig M
11/30/13
HOST 2 + TT5 Regression
10.0.1
Alejandro
2/28/14
HCM-F FCS candidate build
10.0.1
Release Note CDET list to Docs
10.0.1
HCM-F TOI draft docs ready – TAC
HCM-F 921 ES 1 Agile Commit 1
Throttle pull, sanity, Image avail (TT4) Drop
HCM-F 921 ES 1 Drop
Controlled
Craig M
Information
Forecast
Actual
1/10/14
2/27/14
Comments
Deviation Approved
Integrated with VOSS Drop 7
*Template was not filled out / No OH wanted
Date Change – agreed by team
2/27
2/28/14
4/02
Craig M
3/04/14
4/02
RR-10 days – adjusted to new FCS date
10.0.1
Mark B / Teresa
3/07/14
4/02
2/28 1st draft; Final 3/07 – adjusted to new FCS date
Release note review
10.0.1
Mary N/ Teresa
3/07/14
4/02
RR-1 week– adjusted to new FCS date
Complete COSI & Prod Security
10.0.1
Kurt H.
3/07/14
4/02
- adjusted to new FCS date
10.0.1 ??
Van H. / Kurt H.
TBD
Wait on high LVL schedule
HCM-F 10.0.1 FCS RR
10.0.1
Alejandro
4/09
EDCS - TBD – adjusted to new FCS date
HCM-F eLib / CCO
10.0.1
Kurt H.
4/09
– adjusted to new FCS date
TOI Review – TAC – Ready for FCS
10.0.1
Mark B.
3/19/14
4/18
Adjusted to new FCS date
HCS FCSRR
10.0.1
Chris
3/28/14
5/02
HCS FCS 5/02 - Adjusted to new FCS date
HOST 1 (for ???)
10.5.1
Alejandro
3/30/14
TBD
HCM-F 10.1.1 ??? Agile Commit 1
3/14/14
13
14. 06FEB14
Commitment / Functionality
CUCM SSO/SAML friendly drop
CUBE-SP deployment configuration: same
adjancency IP in CUBE-SP and SIP trunk with
"run on all nodes" + SU1 Patch
Localization Drop 1: HCM-F UI
Mark Bridges
CUCDM
HCM-F
Finish
Target
13-Jul
Chuck Homola / Chris
Claytor
HCM-F
Prime Collab
8-Nov
HCM-F
Localization
Team
8-Nov
On Track
13-NOV
11-NOV
Owner
Eddie Bishop / Fei Fei /
Emilio
Producer
Customer
Forecast
Actual
Comments
12-Oct Based on Italy-ICE Wiki Dependencies (link)
From PC4HCS to Prime Collab Dependency; From
HCS-Backlog-IR5-PC4HCS-V6 Excel---Craig Miller: No
longer required
11/13 – confirmed by Eddie Bishop
Moved to MVO: POC: Jim Briant & Bryce Bilinger- //
Mark – available- who will do the testing?
PCD drop to be used as a tool for HCS customer
migration
Mark B. / Bryce Bilinger
PrimeCollab
HST
11-Nov
On Track
CUCDM 10.0 – Flexible Structure
Kurt Hamlin
CUCDM
HCM-F
13-Nov
30-Nov
Local Provisioning for Prime Collab
Li Chen / Chris Claytor
HCM-F
Prime Collab
14-Nov
18-NOV
HCMF Platform takes releases from VOS (CUCM
– Platform)
Nagendra
VOS
Platform
15-Nov
VOS team reviews Platform team changes on
CC_mainline
Nagendra
VOS
Platform
Ongoing
On Track
CIM Node Serviceability / DRF / L2 Upgrades
Eddie Bishop
ICE Team
HCM-F
19-Nov
23DEC13 20DEC13 for improvements.
CIS Components from CCATG
Eddie Bishop / Man Loh
CCATG
HCM-F
20-Nov
23DEC13 20DEC13 functionality: they ask for resources Ongoing talks
HCM-F User/ Admin Documentation
Controlled
Eddie Bishop / Debbie
Bidwell
Information
HCM-F
Doc Team
9-Dec
CUCDM 2 - Drop 7
Kurt Hamlin / Bud Luck
CUCDM
HCM-F
13-Jan
Prime Collab: APIs
Chuck Homola / Lin Chang
NMTG
HCM-F
14-Jan
Eddie Bishop / Fei Fei /
Emilio
HCM-F
Localization
Team
1/27/14
2/04/14
Localization Drop 2: HCM-F UI
02-DEC
21-NOV
21-NOV
Part of Core functionality. Assumes this to be Hierarchy
Model.
From PC4HCS to Prime Collab Dependency; From
HCS-Backlog-IR5-PC4HCS-V6 Excel
IDed on 03OCT13. Time Period Oct-Nov13; not
expection in any VOS changes that HCMF platform
needs to take from VOS platform for 10.0.1
12/05 – Sreejith & India Team will monitor and keep the
team posted
12/05- TBD by ENG MGMT. Code issues and requset
12/05 – TBD by ENG MGMT. 12/02 – CIS is reducing
Must confirm the DOC plan
Controlled Information
TBD
CUCDM 10.0 - Drop 10
Kurt Hamlin / Bud Luck
CUCDM
HCM-F
1/20/14
On Track
CUCDM 10.0 - Drop 11
Kurt Hamlin / Bud Luck
CUCDM
HCM-F
2/3/14
2/11/14
HCM-F
Localization
Team
2/3/14
http://wikicentral.cisco.com/display/HCSDEV/HCS+Fulfi
1/14/14
llment+10.0+Install+and+Configuration+--+Drop+7
IAW Kevin Whitaker’s IM conversation: Item is
1/15/14
complete
2/06- No updated provided. 1/30-Deferred
Based on Game Changer AC3 & Bud Luck /Rick
Kauten Confirmation – Iteration 10 => HCM-F Drop 8
2/06- Bud Luck informed that the expected drop date
will be 2/11 ---Based on Game Changer AC3 & Bud
Luck /Rick Kauten Confirmation – Iteration 11=> HCMF Drop 9
On Track
Localization Drop: HCM-F OLH
Eddie Bishop / Fei Fei /
Emilio
CUCDM 10.0 - Drop 12
Kurt Hamlin / Bud Luck
CUCDM
HCM-F
2/17/14
On Track
CUCDM 10.0 - Drop 13
Kurt Hamlin / Bud Luck
CUCDM
HCM-F
3/3/14
On Track
CUCDM 10.0 – Complete Customer Admin
Function (GUI)
Kurt Hamlin
CUCDM
HCM-F
4/14/14
On Track
1/20/14
Based on Game Changer AC3 & Bud Luck /Rick
Kauten Confirmation – Iteration 12 => HCM-F Drop 10
Based on Game Changer AC3 & Bud Luck /Rick
Kauten Confirmation – Iteration 13 => HCM-F Drop 11
Continuous Drop (2 weeks) based on Functionality –
Batching – based on FCL - FCS (4/14)
14
15. 06FEB14
HCM-F Drops
The following drops are available. The
latest drop is generally the last one.
Drop 1 (complete)
Drop 2 (complete Oct 7)
Drop 3 (complete Oct 18)
Drop 4 (complete Oct 30)
Drop 5 (complete Nov 21)
Drop 6 (complete Dec 12)
Drop 7 (complete Jan 13)
Drop 8 (complete Jan 28)
Drop 9 (TBD- Target 2/11)
Controlled
Information
Needs
Updating
http://wikicentral.cisco.com/display/HUCS/HCM-F+10.0+Test+Throttle+Schedule
15
16. 05FEB14
Use for EL1 USn
drill down
TT
Date
EL1
USn
Update
Needed
Link:
https://us1.rallydev.com/#/5337664891d/detail/portfolioitem/initiative/1411473940
3/children
16
18. 29JAN14
HCM-F Template Work
• Need better IDing for quick Search
• Report in CDETS to RickControlled
Kauten
Information
o Bugs
o Issues
o SW Breakages
So Rick can quickly coordinate w/ VOSS and track their progress toward fixes
18
19. PdMs
ENG Managers
Test Team
Localization
Doc Team
19
20. 06FEB14
Sprint & Verizon 1-Day Workshop
HCM-F talks & expectations
Includes Agile talks
Sprint Planning
RTP
Extra consideration to RTP due to 6 scrum teams
RCDN
Technical Debt Handling - TBD
Working Backlog Grooming Prioritization
Meeting Schedule – TBD based on backlogs
http://wikicentral.cisco.com/display/HUCS/HCM-F+Backlog+Grooming
20
21. 30JAN14
10.0.1 TorreyPines
Release Basic
HCM-F/ CUCDM Integration
- LDAP User Identity Onboarding
- Integrated Admin Portal
- Seamless Admin Experience w/
SSO
- OSS/BSS Integration
- API Gateway
Service Inventory Reporting
Improvements
License Management Improvements
Shared UCM / Partitioned CUCxn
Prime Collaboration (*) Fulfillment
Improved Resiliency
IPA support of CUP
(*) PC4HCS EOL/Dropped
9.2.1 ES
HLM Report Access
Fake Phones
Connect Location
Country Dial Plan
Feature
10.0.1
SU/10.1.1
Remote Access
Portal (Fringe Node)
HLM Report Access
Fake Phones
Connect Location
Country Dial Plan
10.5.1 (AC6) Augusta
CSR 10.5 Release Alignment
CUCDM Evolution Fulfillment Automation
Enhancements
ID Management Improvements - CIM Node
Introduction
Dial Plan Enhancements
Localization - Arabic
License Reporting Enhancements
Service Inventory Enhancements
PCD positioning vs Platform Manager
Brownfield Migration to UC 10.0 using PCD
CUCDM/HCM-F Integration Improvements
21
22. Chuck Homola / Proxy: Kevin Whitaker
Eddie Bishop / Proxy: Kevin Whitaker
Kurt Hamlin / Proxy: Controlled Information
Craig Miller
Nagendra / Proxy: Sreejith NT /or/ Vijayendra Shetty
Mark Bridges / Proxy: Craig Miller
22
23. 06 February 2014
HCS-RCD-CHOMOLA/EBISHOP
Overall Status
Controlled Information
Issues/Risks/Open Items
• Engineers from both teams are working user stories for
Coexistence and OPA, and defect reduction.
Escalations:
None
Milestones -
US153124
US153125
US153131
US150611
US151585
US151586
US151587
defect reduction
Statu
s
Complete
By
21-Feb2014
Dependen
cy
Comments
Will complete by 21-Feb-2014.
23
28. Mark Bridges
Controlled Information
HCM-F Scrum Teams Status – Team1
Overall Status
2/6/14
Assumptions
Team is responsible for Common Services Framework; Platform;
Serviceability; HLM; POS; + CIS enhancements; CSF frameworks
• Iteration 2014#1 is Completed
• Work complete.
• Next iteration is planned
Issues/Risks/Open Items
• Iteration #1 Plan Estimate=99 86; Team Velocity/Capacity=147
• Accepted: 93 20 0
• Completed: 0 2 0
• In-Progress: 0 74 76 68
• Defined: 0 3 23 18
Key Decisions or system team attention needed
• None
Upcoming Milestones:
Complete
By
Dependency
Common Services Framework items
#1
None
TT2 regresssions; Feature Test + Automation; RTMT
HLM Feature Dev+Feature Test
#1
None
Scale, performance + feature test
Mulit-Node Cluster
#1
None
Add Sec passwd support, CIM node removal, RU App upgrade
Fringe Node investigation+prototype
#1
None
Prototype work
Feature 10.0/10.1
Status
Previou
s Status
Comments
28
29. HCM-F Scrum Teams Status – Team 4
Mark Bridges
Controlled Information
2/6/14
Assumptions
Overall Status
Issues/Risks/Open Items
• Iteration #1 is Completed
• Next iteration is in planning
•
•
•
•
•
Key Decisions or system team attention needed
Iteration #1 Plan Estimate=69 40 36; Team Velocity/Capacity= 75
Accepted: 69 26 2
Completed: 0 16 1
In-Progress: 0 28 21
Defined: 0 2 16 12 (Blocked=1; Cluster GUI page)
• SDR Vendor Move (Sybase – PostgreSQL)
Upcoming Milestones:
Feature 10.0/10.1
Status
Previous
Status
Complete
By
Dependency
Comments
PostgreSQL work
#1
LDM changes
LDM changes continue to roll in
Technical debt reduction
#1
None
General bug fixes + automation
UI changes: Cluster H/W page
#1
UI team
waiting for UI stubs
29
35. Controlled
Kurt Hamlin
Information
2/6/14
Controlled General
HCM-F Hamlin Information Scrum/Team
Overall Status
Key Decisions or system team attention needed
• Still have to work Versioning and Packaging Strategy for
HCM-F/CUCDM integration
• Good Progress this week, initial drop next week’s Drop 9
• Initial Upgrade tool form VOSS next week
• Bud in Boxboro next week
• Migration still to be groomed.
• Concern about SSO/RBAC schedule (RBAC Breakage, CUCDM Iter. 10)
• Overall Defect Backlog is still high. Will follow up with Dev. teams.
• Joint scrub of blocking defects with Test to focus VOSS. (ongoing)
• PSIRT fix and VOS increment for PSIRT:
• hcs_psirt branch created to incorportate this
• CXF changes are most concerning. Working options for that.
regression.
• Established Daily Stand-Ups with VOSS to address issues quicker.
Training others on HCM-F/CUCDM Workflows and Groovy.
Where to put resources opening up next week.
Feature / User Story
User ID Management/CUCDM Interop
Status
Behind
Issues/Risks/Open Items
• Largest Risk is with CUCDM Integration.
• Resolution of Blocking defects, prioritized for VOSS in Iter 11.
• Over capacity, with incoming Defect rate expected to go up, 1/31 HOST is
at risk (Throttles and content staging is only mitigating approach we have)
• CUCDM Refactoring impact to HCM-F unknown.
• Need script from VOSS to unblock Packaging, TBD. Werner back in Cape
Town this week will be focused on this.
• Boxboro Agile Training may introduce program delays. (TBD)
• Trying to handoff whatever we can to keep moving.
Complete
By
Dependency
Comments
Final RBAC content 2/17. Test will be
challenged to finish by End of Feb. Will
likely be some Automation bleed into
March.
LDM
On
Track
Final 10.0.1 Planning/Grooming
On
Track
Feb/MAr TBD, being scrubbed. Backlog
Grooming meetings underway, progress is
slow.
API Gateway Proxy (Regression Only), NBI Backwards Compatibility
On
Track
Regression has completed. NBI
performance Issue is now resolved.
NBI Conversion to REST
On
Track
Completed.
35
39. Tom Hill / Controlled Information
Proxy: Joe Chen
39
40. Controlled
Tom Hill
Information
2/06/14
HCM-F Feature Test Overview
Issues/Risks/Open Items
Overall Status
• SSO, User Management, RBAC and Multi Tenant features will not
make TT3, and are now planned to be delivered in TT5
• Automation work on the above feature targeted to be
completed in Feb.
• Minimal feature content expected in TT4
• Dropped regression testing on TT4, dev sanity only
• RCDN team picked up testing on OPA and Co-Existence features.
• Added regression run on new PSIRT branch, date not set yet.
Milestones
Status
• HOST 2 date at risk due to amount of work to be done in Feb. 4 features
to finish testing, 3 unscheduled feature to test, 9.2.1 HLM CIA, 2-3
regression cycles, automation to complete, doc reviews, Agile 2.0 training,
and team forming. There are also Voss dependencies in several areas
which is delaying some testing.
Escalations:
• The above risk
Plan Complete
By
Dependency
Comments
TT1 Feature Test + Regression
12/16
Complete 12/17
TT2 Feature Test + Targeted Regression
1/13
Complete 1/17
TT3 Feature Test + Targeted Regression
1/27
- Complete 1/31
- Not all TT3 features will meet definition of
done by 1/31.
TT4 Feature Test + Targeted Regression
2/15
TT4 regression dropped due to limited
content in the drop and to focus test team
on other important tasks.
TT5 Regression
2/28
Regression prior to HOST 2
Feature Automation
1/31
Automation of the TT5 features is planned to
be complete by 2/28
HOST 1
1/31
- Not all features will meet definition of done
by 1/31, so a HOST 2 has been added.
HOST 2
2/28
All 10.0 features will meet the definition of
done. Risks are listed above.
40
42. Teresa Walfield
Controlled
02/06/14
Information
HCM-F Documentation
Overall Status
Issues/Risks/Open Items
• EFT reviews send out.
• Authors working on CUCDM customizations, and HCMF updates
• EFT Review Sign Ups:
http://wikicentral.cisco.com/display/GROUP/10.0.1+Deliverable
s+and+Review+Information
• HCS Documentation integration is ongoing.
• Restructure work on HCM-F documents is complete
• HCM-F Doc Wiki and detailed schedule:
http://wikicentral.cisco.com/display/GROUP/HCMF+10.0.1+Documentation
Milestones
Escalations:
Target Date
Forecast
Date
Nov 8, 13
Jan 17, 14
Working on updating the doc plan to send out for
approval. Should be end of week.
All EFT source content received
Oct 25 – Dec 16
Jan 10, 14
Thank you everyone for providing as much content as
possible at this time.
Focus reviews of EFT updates
Dec 16 – Jan 20
Dec 16
Complete
PRRQ review of EFT documents
Jan 27 – Feb 10
Jan 27
EFT review notices have been sent out. Please review as
soon a possible. If you are not able to review , please
have your manager escalate.
Documentation Plan approval
Deliver OLH to localization
FCS Source Received
Focus reviews of FCS updates
Status
•Documentation plan approval
•Concern on documentation strategy for Core Vs. CUCDM.
•Reviewers participate in reviews
Actual Date
Comments
Feb 10
Dec 17 – Mar 31
Please continue to supply content as it becomes available.
Jan 9 – Apr 4
PRRQ for FCS Review
Apr 7 - 14
PRRQ FCS Approval
Apr 23 - 30
HCM-F docs posted to preview (ready
to go live)
May 6
42
43. Teresa Walfield
Controlled
Information
01/23/14
HCM-F Documentation Reviewers
Management Primes
Document Title
Document Doc Prime
Doc Aprovers
PdM
Architecture
Engineering
HCMF Component Documentation
HCMF Planning
Ken Furlong
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Steve Clark
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Mike Wheeler
Nelson Gill, Frank
Welty
Theresa Walfield
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Mike Wheeler
Subodh Shah
Mike Wheeler
Craig Miller, Yuqian
Tu
Mike Wheeler
Pranab Mehta, Vikas
Patel
Mike Wheeler
Pranab Mehta
Mike Wheeler
Riya Kariath, Rini
Oommen
Mike Wheeler
Yuqian Tu
HCMF Planning Guide
Amit Dave, Jeff Batson,
Mike Wheeler
Bud Luck, Nick Glesg
HCMF Install & Configure
HCMF Install & Configuration Guide
HCMF Operate/Maintain
HCMF Maintain and Operate Guide
HCMF Reference
Ken Furlong
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Mohammad AlTaraireh, Mark
Kepke Controlled Sayre
Herb Information
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Mohammad AlTaraireh, Mark
Kepke
Herb Sayre
Theresa Walfield
Mohammad AlTaraireh, Mark
Kepke
Release Notes for Cisco HCMF
Steve Clark
Cisco HCS API Gateway Proxy Developer Guide
Joey Desmond
Developer Guide for Cisco HCM-F
Steve Clark
Command Line Interface Reference Guide for Cisco HCMF
HCMF Troubleshooting Guide
Herb Sayre
HCMF Online Help (not Docs)
Platform Manager OLH
Service Inventory OLH
Infrastructure Manager OLH
RTMT OLH
Theresa Walfield/Joey
Desmond
Theresa Walfield/Joey
Desmond
Theresa Walfield/Joey
Desmond
Theresa Walfield/Joey
Desmond
Herb Sayre
Yuqian Tu
Herb Sayre
Yuqian Tu
Herb Sayre
Yuqian Tu
Herb Sayre
Yuqian Tu
43
46. 1/29/2014
2013
2014
2015
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar
UCM 9.1.2
FCS: 7/30/13
CUCM
HCS 9.2.1 SU1
UCM 10.0.1
E-Lib: 12/5/13
UCM 10.0.1 SU1 UCM 10.5.1
FCS: May ‘14 FCS: May ‘14
UCM 10.6.1 /11.0.1
FCS: Oct ‘14
FCS: 10/18/13
HCS 9.2.1 SU2
CC/EC: 10/22/13 FCS: 1/29/14
HCS 9.2.1 SU3
CC/EC: 2/7/14 FCS: 4/25/14
Controlled
Information
HCS 10.0.1
EC: 11/13/13
CC: 4/5/13
HCS 10.0.1 SU1 / 10.1.1
FCS: 5/02/14
AC1: Feb
FCS: July
HCS 10.5.1
AC1: March
FCS: 8/29/14
HCS 10.6.1 / 11.0.1
Complete
AC1: June
FCS: Nov
On track to Commit
At risk, mitigation plans in place
At risk, no mitigation
Planning
46
47. 12SEP13
Category:
Green
Yellow
Potential scope change that will
impact schedule and costs
Scope is in control
Scope
Approved resolution plan
Scope Change Management
Controls in place.
BC, CC, EC, FCS Readiness
Review, Post Project Assessment
Potential scope changes that will
have a critical impact to schedule
and cost.
Resolution is not known.
Scope Change Management
Controls in place.
Project is on schedule (Within
Gate):
Schedule
Red
Deviation of 10% to 19%
from the gate schedule
Scope Change Management
Controls are not in place.
Deviation of ≥ 20% from the gate
schedule
Approved resolution plan
≤ 9% from the gate schedule.
Budget
Resources
≤ +/- 9% over committed funding.
Deviation of +/- 10% to 24%
from committed funding
Deviation of ≥ +/- 25% from
committed funding
There are no FTE and/or vendor
resource gaps
Potential FTE and/or vendor
resource gaps that will impact
schedule and costs.
Potential FTE and/or vendor
resource gaps that will have a
critical impact to schedule and
costs.
Approved resolution plan
Risks
(Point in Time)
Additional factors have a potentially
low impact on Scope, Schedule,
Budget and Resources
Blue
Additional factors have a potentially
medium impact on Scope,
Schedule, Budget and Resources
Additional factors have a potentially
high impact on Scope, Schedule,
Budget and Resources
A mitigation plan is in place.
A mitigation plan is not in place.
Black
New Business
Text
Fill
No change / Relevant
Updates
Business / updates / Changes
> 2 weeks old
Current Week / Meeting
Changes
Complete
No Time Depends
NA
Resolution is not known.
Purple
Business 1-3 weeks old
Updates 1-3 weeks old
Gray
Dropped / NR
Changes 1-3 weeks old
No Change from previous
and/or date shown
Dropped / NR
47
Hinweis der Redaktion
Completed by: Program Management
To be added: Pending:Monitor the progress toward the targets.ENG Manager Slides will contain:Their associated ENG Epic LVL USn Each committed ENG Epic LVL USn containing:Points Estimated (from AC)Points Actually Allocated to the USnPoints Forecasted to CompletionDependenciesRisksRisk Plans w/ one of the following:Mitigation PlanAcceptance PlanAvoidance PlanTransfer PlanOpportunity PlanPoint Capacity Left to AllocationOther Committed Activities:Defects to Fix w/Same criteria as USnMinor Releases Same criteria as USnOptional: Links to support the above
To be added: Pending:Monitor the progress toward the targets.ENG Manager Slides will contain:Their associated ENG Epic LVL USn Each committed ENG Epic LVL USn containing:Points Estimated (from AC)Points Actually Allocated to the USnPoints Forecasted to CompletionDependenciesRisksRisk Plans w/ one of the following:Mitigation PlanAcceptance PlanAvoidance PlanTransfer PlanOpportunity PlanPoint Capacity Left to AllocationOther Committed Activities:Defects to Fix w/Same criteria as USnMinor Releases Same criteria as USnOptional: Links to support the above Sybase detail:1) SDR Component Install with Postgres2) sdrclient multi-node changes for Postgres3) sdrcli changes to work with Postgres4) SDR Pojo API modifications for Postgres5) Testgen modifications for Posgres6) Change Notifications working with Postgres: write to FIFO, created external procedure to write to FIFO, develPostgres rpm7) Upgrade Converter Tool to convert 8.6.2, 9.0.1, 9.1.1 and 9.2.1schemas to Posgress Export Data from Sybase into format that can be imported with tools into Postgres In Progress, SDR Upgrade tool: changes from 8.6.2 all the way to 10.0.1 make work with Postgres 8) In Progress: other component changes to Postgres - remove links to ODBC libraries, load correct driver9) SDR schema tweaks: unique constraints with nulls triggersMid September – SeptemberSDR Upgrade tool: changes from 8.6.2 all the way to 10.0.1 make work with Postgres September and onwards:To Do list: SDR backup, restore, incremental backup, 10_0 postfix changes, authentication to be revisited, selinux issues resolved, sizing, configuration tuning for Postgres, High Availability)