SlideShare ist ein Scribd-Unternehmen logo
1 von 24
2014 Updated Land Use
Assumptions
City Council Meeting
Tuesday, March 4, 2014
Impact Fees
• "Impact fee" means a charge or assessment imposed by a political
subdivision against new development in order to generate revenue
for funding or recouping the costs of capital improvements or
facility expansions necessitated by and attributable to the new
development.
• Chapter 395 of the Texas Local Government Code permits the use
of impact fees to finance capital improvement and facility
expansion costs attributable to projected new development within
identified service areas located in the corporate boundaries or
extraterritorial jurisdiction of a political subdivision.
• The Land Use Assumptions Report is used in the development of
the Capital Improvements Plan and ultimately, the adoption of an
impact fee structure
2014 LUA/CIP Update Activity-To-Date
December
11, 2013

December
17, 2013

December
19, 2013

December
27, 2013

January 7,
2014

January
28, 2014

February
13, 2014

• Public Service Board received the update of the land use assumptions

• City Council received the update of the land use assumptions

• Capital Improvements Advisory Committee and the City Plan Commission received the same update

• El Paso Water Utilities submitted the Preliminary EPWU 2014 Impact Fee Report to the City Council
which included the revised Capital Improvements Plan
• City Council adopted a Resolution to hold a public hearing to discuss and review the updated of the
land use assumptions and capital improvements plan and determine whether to amend the plan

• CIAC filed its written comments on the proposed amendments to the City Council

• City Plan Commission was presented the proposed amendments for its review. The Commission
recommended approval of the amendments (6-0-1).
Full Build-Out Projections Comparison Table
Existing Estimates at Build-Out

Updated Estimates at Build-Out

Service Area

Total Residential
Service Units

Population

Total Residential
Service Units

Population

Northeast Subtotal

44,586

134,718

54,923

168,065

W estside Subtotal

23,434

83,037

23,659

72,398

Eastside Subtotal

41,589

135,706

37,753

115,524

Total

109,609

353,461

116,335

355,986

Population Estimates

Residential Service Units
140,000

400,000

120,000

350,000
300,000

100,000

250,000

80,000

200,000
60,000

109,609

116,335

40,000
20,000

6.1% Increase

0

150,000
100,000
50,000

353,461

355,986

0.7% Increase

0
2009 Estimates

2014 Estimates

2009 Estimates

2014 Estimates
Land Use Assumptions Technical Report
Sections
Impact Fee Service Areas: An explanation and description of the
water and wastewater impact fee service areas.
Methodology: An explanation of the general methodology used to
prepare and update the land use assumptions.
Full Build-Out Projection: Population and service unit holding
capacity of land located within the impact fee service areas.
Ten-Year Growth Projection: Population and service unit growth
assumptions for the corresponding ten-year time period between
2014 and 2024.
Summary: A brief summation of the land use assumptions report
2014 update.
Land Use Assumptions Technical Report
Sections
- Land Use Assumptions – Maps Comparison (2008 | 2014)

- Northeast Impact Fee Area
- Westside Impact Fee Area
- Eastside Impact Fee Area
- Projections
- Ten-Year Growth Population and Service Unit Projections
- Full Build-Out Population and Service Unit Projections
Northeast Impact Fee Area – 2008 LUA
Northeast Impact Fee Area – 2014 LUA

Service Area

Total
Acreage

Developed
Acreage
Acreage Developed (%)

Northeast Impact Fee Service Area
1

Northeast Master Plan

4,835

34

0.7

05A Northwest Fort Bliss A

4,812

250

5.2

05B Northwest Fort Bliss B

4,929

917

18.6

05C Northwest Fort Bliss C

4,520

0

0

Northeast Subtotal

19,095

1,203

6.3
Westside Impact Fee Area – 2008 LUA
Westside Impact Fee Area – 2014 LUA
Service Area

Total
Acreage

Developed
Acreage
Acreage Developed (%)

Westside Impact Fee Service Area
2

Westside Master Plan

1,589

0

0

294

5

1.8

03E I-10375 MP

1,132

62

5.5

04A Northwest Artcraft A

1,639

82

5

04B Northwest Artcraft B

807

69

8.5

04C Northwest Artcraft C

159

41

26.1

04D Northwest Artcraft D

218

158

72.6

04E Canutillo

801

759

94.8

2,348

1,416

60.3

8,986

2,597

28.9

03A Northwest Vinton A

----- Other
Westside Subtotal
Eastside Impact Fee Area – 2008 LUA
Eastside Impact Fee Area – 2014 LUA
Service Area

Total
Acreage

Developed
Acreage
Acreage Developed (%)

Eastside Impact Fee Service Area
08B Eastside

4,826

0

0

12

2,919

1,819

62.3

785

113

14.4

118

0

0

2,826

31

1.1

South Montana

12B South Montana B
6

South Fort Bliss

8

East Battle

10B South Fort Bliss B
Eastside Subtotal

538

0

0

12,013

1,958

16.3
Comparison of Developed Acreage Share
Share of Developed Acreage (%)
Service Area

2014
Existing

2018
1
Projected

2024
Projected

0.7

43

15

05A Northwest Fort Bliss A

5.2

5

10

05B Northwest Fort Bliss B

18.6

17

25

05C Northwest Fort Bliss C

0

4

5

0

27

15

03A Northwest Vinton A

1.8

12

10

03E I-10375 MP

5.5

4

10

5

24

20

Northeast Impact Fee Service Area
1

Northeast Master Plan

Westside Impact Fee Service Area
2

Westside Master Plan

04A Northwest Artcraft A
04B Northwest Artcraft B

8.5

13

10

04C Northwest Artcraft C

26.1

37

50

04D Northwest Artcraft D

72.6

38

80

04E Canutillo

94.8

70

95

----- Other

60.3

28

70

0

17

10

62.3

31

70

14.4

74

20

0

66

20

Eastside Impact Fee Service Area
08B Eastside
12

South Montana

12B South Montana B
6

South Fort Bliss

8

East Battle

1.1

72

50

10B South Fort Bliss B

0

8

5
Northeast Impact Fee Area – 2008 LUA
Northeast Impact Fee Area – 2014 LUA
Westside Impact Fee Area – 2008 LUA
Westside Impact Fee Area – 2014 LUA
Eastside Impact Fee Area – 2008 LUA
Eastside Impact Fee Area – 2014 LUA
Service Areas– Total Acreage
Service Area
Northeast
01 Northeast MP
05A Northwest Fort Bliss A
05B Northwest Fort Bliss B
05C Northwest Fort Bliss C
Northeast Subtotal

Total Acreage

4,835
4,812
4,929
4,520
19,095

Westside
02 Westside MP
03A Northwest Vinton A
03E I-10375 MP
04A Northwest Artcraft A
04B Northwest Artcraft B
04C Northwest Artcraft C
04D Northwest Artcraft D
04E Canutillo
Other

1,589
294
1,132
1,639
807
159
218
801
2,348

Westside Subtotal

8,986

Eastside
08B Eastside
12 South Montana
12B South Montana B
06 South Fort Bliss
08 East Battle
10B South Fort Bliss B

4,826
2,919
785
118
2,826
538

Eastside Subtotal

12,013

Total

40,094
Ten-Year Growth Projections
Census
Service Area

2000

2010

2024 Population

2024 Total Non2024 Total Residential
2024 Total Service Units
Residential Service Units
Service Units
at Build-Out
at Build-Out

Northeast
01 Northeast MP
05A Northwest Fort Bliss A
05B Northwest Fort Bliss B
05C Northwest Fort Bliss C
Northeast Subtotal

0
0
2,199
10
2,209

0
0
4,799
28
4,827

6,514
4,956
11,213
1,512
24,193

2,129
1,619
3,664
494
7,906

425
9
2,951
115
3,500

2,554
1,629
6,616
609
11,407

Westside
02 Westside MP
03A Northwest Vinton A
03E I-10375 MP
04A Northwest Artcraft A
04B Northwest Artcraft B
04C Northwest Artcraft C
04D Northwest Artcraft D
04E Canutillo
Other
Westside Subtotal

0
0
0
299
289
0
836
3,633
1,167
6,224

0
0
0
312
251
0
1,001
4,760
2,149
8,473

2,447
105
872
3,505
931
583
1,837
5,672
7,030
22,982

800
34
285
1,145
304
190
600
1,854
2,298
7,511

83
105
149
0
27
96
64
1,177
5,811
7,513

883
139
434
1,145
331
287
664
3,031
8,109
15,024

Eastside
08B Eastside
12 South Montana
12B South Montana B
06 South Fort Bliss
08 East Battle
10B South Fort Bliss B
Eastside Subtotal

13
6,766
0
0
0
0
6,779

682
7,625
7
0
21
0
8,335

5,260
10,719
1,960
204
14,529
387
33,059

1,719
3,503
640
67
4,748
126
10,804

496
1,955
157
59
104
0
2,771

2,215
5,458
797
126
4,852
126
13,575

15,212

21,635

80,235

26,220

13,784

40,005

Total
Full Build-Out Projections
Service Area

Population at
Build-Out

Total Residential Service Total Non-Residential Service Total Service Units at
Units at Build-Out
Units at Build-Out
Build-Out

Northeast
01 Northeast MP

43,424

14,191

2,833

17,024

05A Northwest Fort Bliss A

49,556

16,195

91

16,285

05B Northwest Fort Bliss B

44,850

14,657

11,805

26,462

05C Northwest Fort Bliss C

30,234

9,881

2,298

12,179

168,065

54,923

17,027

71,950

02 Westside MP

16,313

5,331

553

5,885

03A Northwest Vinton A

1,054

344

1,049

1,394

03E I-10375 MP

8,722

2,850

1,493

4,343

04A Northwest Artcraft A

17,526

5,727

0

5,727

04B Northwest Artcraft B

9,307

3,041

271

3,313

04C Northwest Artcraft C

1,165

381

193

574

04D Northwest Artcraft D

2,296

750

80

830

04E Canutillo

5,971

1,951

1,239

3,190

Other

10,043

3,282

8,301

11,584

Westside Subtotal

72,398

23,659

13,180

36,839

08B Eastside

52,596

17,188

4,962

22,151

12 South Montana

15,313

5,004

2,793

7,797

12B South Montana B

9,798

3,202

784

3,986

06 South Fort Bliss

1,022

334

297

632

08 East Battle

29,058

9,496

207

9,704

Northeast Subtotal
Westside

Eastside

10B South Fort Bliss B

7,736

2,528

0

2,528

Eastside Subtotal

115,524

37,753

9,044

46,797

Total

355,986

116,335

39,251

155,586
Full Build-Out Projections Comparison Table
Existing Estimates at Build-Out

Updated Estimates at Build-Out

Total Residential
Service Units

Population

Total Residential
Service Units

Population

01 Northeast MP
05A Northwest Fort Bliss A
05B Northwest Fort Bliss B
05C Northwest Fort Bliss C

16,353
8,660
13,763
5,810

46,268
24,135
48,047
16,268

14,191
16,195
14,657
9,881

43,424
49,556
44,850
30,234

Northeast Subtotal

44,586

134,718

54,923

168,065

4,874
450
2,741
4,592
2,620
560
880
1,684
5,033

14,767
1,364
9,594
18,368
10,480
2,240
3,520
6,736
15,968

5,331
344
2,850
5,727
3,041
381
750
1,951
3,282

16,313
1,054
8,722
17,526
9,307
1,165
2,296
5,971
10,043

23,434

83,037

23,659

72,398

08B Eastside
12 South Montana
12B South Montana B
06 South Fort Bliss
08 East Battle
10B South Fort Bliss B

652
8,132
22,515
2,477
4,663
3,150

2,607
24,395
67,544
9,908
18,652
12,600

17,188
5,004
3,202
334
9,496
2,528

52,596
15,313
9,798
1,022
29,058
7,736

Eastside Subtotal

41,589

135,706

37,753

115,524

Total

109,609

353,461

116,335

355,986

Service Area
Northeast

Westside
02 Westside MP
03A Northwest Vinton A
03E I-10375 MP
04A Northwest Artcraft A
04B Northwest Artcraft B
04C Northwest Artcraft C
04D Northwest Artcraft D
04E Canutillo
Other

Westside Subtotal

Eastside
Full Build-Out Projections Comparison Table
Existing Estimates at Build-Out

Updated Estimates at Build-Out

Service Area

Total Residential
Service Units

Population

Total Residential
Service Units

Population

Northeast Subtotal

44,586

134,718

54,923

168,065

W estside Subtotal

23,434

83,037

23,659

72,398

Eastside Subtotal

41,589

135,706

37,753

115,524

Total

109,609

353,461

116,335

355,986

Population Estimates

Residential Service Units
140,000

400,000

120,000

350,000
300,000

100,000

250,000

80,000

200,000
60,000

109,609

116,335

40,000
20,000

6.1% Increase

0

150,000
100,000
50,000

353,461

355,986

0.7% Increase

0
2009 Estimates

2014 Estimates

2009 Estimates

2014 Estimates

Weitere ähnliche Inhalte

Mehr von epdevelopment

Item 5.5 transitional living
Item 5.5 transitional livingItem 5.5 transitional living
Item 5.5 transitional living
epdevelopment
 

Mehr von epdevelopment (20)

El Paso City Council 08.05.14 Agenda Item 6.2: Special Permit
El Paso City Council 08.05.14 Agenda Item 6.2: Special PermitEl Paso City Council 08.05.14 Agenda Item 6.2: Special Permit
El Paso City Council 08.05.14 Agenda Item 6.2: Special Permit
 
El Paso City Council 08.05.14 Agenda Item 6.1: Zoning
El Paso City Council 08.05.14 Agenda Item 6.1: Zoning El Paso City Council 08.05.14 Agenda Item 6.1: Zoning
El Paso City Council 08.05.14 Agenda Item 6.1: Zoning
 
Item 5.5 transitional living
Item 5.5 transitional livingItem 5.5 transitional living
Item 5.5 transitional living
 
El Paso City Council 07.29.14 Agenda Item 5.3: Zoning
El Paso City Council 07.29.14 Agenda Item 5.3: Zoning El Paso City Council 07.29.14 Agenda Item 5.3: Zoning
El Paso City Council 07.29.14 Agenda Item 5.3: Zoning
 
El Paso City Council 07.29.14 Agenda Item 5.1: Zoning
El Paso City Council 07.29.14 Agenda Item 5.1: ZoningEl Paso City Council 07.29.14 Agenda Item 5.1: Zoning
El Paso City Council 07.29.14 Agenda Item 5.1: Zoning
 
El Paso City Council Agenda Item 11.1.1: Special Permit for Infill Development
El Paso City Council Agenda Item 11.1.1: Special Permit for Infill DevelopmentEl Paso City Council Agenda Item 11.1.1: Special Permit for Infill Development
El Paso City Council Agenda Item 11.1.1: Special Permit for Infill Development
 
El Paso City Council Agenda Item 9.2
El Paso City Council Agenda Item 9.2 El Paso City Council Agenda Item 9.2
El Paso City Council Agenda Item 9.2
 
El Paso City Council Agenda Item 9.1
El Paso City Council Agenda Item 9.1El Paso City Council Agenda Item 9.1
El Paso City Council Agenda Item 9.1
 
El Paso City Council Agenda Item 8.7: Special Privilege License
El Paso City Council Agenda Item 8.7: Special Privilege LicenseEl Paso City Council Agenda Item 8.7: Special Privilege License
El Paso City Council Agenda Item 8.7: Special Privilege License
 
El Paso City Council Agenda Item 8.5.1 & 8.5.2: Zoning & Special Permit
El Paso City Council Agenda Item 8.5.1 & 8.5.2: Zoning & Special Permit El Paso City Council Agenda Item 8.5.1 & 8.5.2: Zoning & Special Permit
El Paso City Council Agenda Item 8.5.1 & 8.5.2: Zoning & Special Permit
 
El Paso City Council Agenda Item 8.3: Special Permit
El Paso City Council Agenda Item 8.3: Special PermitEl Paso City Council Agenda Item 8.3: Special Permit
El Paso City Council Agenda Item 8.3: Special Permit
 
El Paso City Council Agenda Item 8.2: Zoning
El Paso City Council Agenda Item 8.2: ZoningEl Paso City Council Agenda Item 8.2: Zoning
El Paso City Council Agenda Item 8.2: Zoning
 
El Paso City Council Agenda Item 8.1: Special Permit
El Paso City Council Agenda Item 8.1: Special PermitEl Paso City Council Agenda Item 8.1: Special Permit
El Paso City Council Agenda Item 8.1: Special Permit
 
City Council 06.03.2014 Agenda Item 3.1
City Council 06.03.2014 Agenda Item 3.1City Council 06.03.2014 Agenda Item 3.1
City Council 06.03.2014 Agenda Item 3.1
 
Palisades Charrette #2 Findings
Palisades Charrette #2 FindingsPalisades Charrette #2 Findings
Palisades Charrette #2 Findings
 
El Paso City Council 04.22.2014 Agenda Item 12.2
El Paso City Council 04.22.2014 Agenda Item 12.2El Paso City Council 04.22.2014 Agenda Item 12.2
El Paso City Council 04.22.2014 Agenda Item 12.2
 
El Paso City Council 04.15.2014 Agenda Item 4.4
El Paso City Council 04.15.2014 Agenda Item 4.4El Paso City Council 04.15.2014 Agenda Item 4.4
El Paso City Council 04.15.2014 Agenda Item 4.4
 
El Paso City Council 04.15.2014 Agenda Item 4.3
El Paso City Council 04.15.2014 Agenda Item 4.3El Paso City Council 04.15.2014 Agenda Item 4.3
El Paso City Council 04.15.2014 Agenda Item 4.3
 
City Council 04.15.2014 Agenda Item 4.2
City Council 04.15.2014 Agenda Item 4.2City Council 04.15.2014 Agenda Item 4.2
City Council 04.15.2014 Agenda Item 4.2
 
UV120 Findings Report from March 5th 2014
UV120 Findings Report from March 5th 2014UV120 Findings Report from March 5th 2014
UV120 Findings Report from March 5th 2014
 

Kürzlich hochgeladen

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 

City Council 03.04.2014 Agenda Item 6.1 (Part 1 of 2)

  • 1. 2014 Updated Land Use Assumptions City Council Meeting Tuesday, March 4, 2014
  • 2. Impact Fees • "Impact fee" means a charge or assessment imposed by a political subdivision against new development in order to generate revenue for funding or recouping the costs of capital improvements or facility expansions necessitated by and attributable to the new development. • Chapter 395 of the Texas Local Government Code permits the use of impact fees to finance capital improvement and facility expansion costs attributable to projected new development within identified service areas located in the corporate boundaries or extraterritorial jurisdiction of a political subdivision. • The Land Use Assumptions Report is used in the development of the Capital Improvements Plan and ultimately, the adoption of an impact fee structure
  • 3. 2014 LUA/CIP Update Activity-To-Date December 11, 2013 December 17, 2013 December 19, 2013 December 27, 2013 January 7, 2014 January 28, 2014 February 13, 2014 • Public Service Board received the update of the land use assumptions • City Council received the update of the land use assumptions • Capital Improvements Advisory Committee and the City Plan Commission received the same update • El Paso Water Utilities submitted the Preliminary EPWU 2014 Impact Fee Report to the City Council which included the revised Capital Improvements Plan • City Council adopted a Resolution to hold a public hearing to discuss and review the updated of the land use assumptions and capital improvements plan and determine whether to amend the plan • CIAC filed its written comments on the proposed amendments to the City Council • City Plan Commission was presented the proposed amendments for its review. The Commission recommended approval of the amendments (6-0-1).
  • 4. Full Build-Out Projections Comparison Table Existing Estimates at Build-Out Updated Estimates at Build-Out Service Area Total Residential Service Units Population Total Residential Service Units Population Northeast Subtotal 44,586 134,718 54,923 168,065 W estside Subtotal 23,434 83,037 23,659 72,398 Eastside Subtotal 41,589 135,706 37,753 115,524 Total 109,609 353,461 116,335 355,986 Population Estimates Residential Service Units 140,000 400,000 120,000 350,000 300,000 100,000 250,000 80,000 200,000 60,000 109,609 116,335 40,000 20,000 6.1% Increase 0 150,000 100,000 50,000 353,461 355,986 0.7% Increase 0 2009 Estimates 2014 Estimates 2009 Estimates 2014 Estimates
  • 5. Land Use Assumptions Technical Report Sections Impact Fee Service Areas: An explanation and description of the water and wastewater impact fee service areas. Methodology: An explanation of the general methodology used to prepare and update the land use assumptions. Full Build-Out Projection: Population and service unit holding capacity of land located within the impact fee service areas. Ten-Year Growth Projection: Population and service unit growth assumptions for the corresponding ten-year time period between 2014 and 2024. Summary: A brief summation of the land use assumptions report 2014 update.
  • 6. Land Use Assumptions Technical Report Sections - Land Use Assumptions – Maps Comparison (2008 | 2014) - Northeast Impact Fee Area - Westside Impact Fee Area - Eastside Impact Fee Area - Projections - Ten-Year Growth Population and Service Unit Projections - Full Build-Out Population and Service Unit Projections
  • 7. Northeast Impact Fee Area – 2008 LUA
  • 8. Northeast Impact Fee Area – 2014 LUA Service Area Total Acreage Developed Acreage Acreage Developed (%) Northeast Impact Fee Service Area 1 Northeast Master Plan 4,835 34 0.7 05A Northwest Fort Bliss A 4,812 250 5.2 05B Northwest Fort Bliss B 4,929 917 18.6 05C Northwest Fort Bliss C 4,520 0 0 Northeast Subtotal 19,095 1,203 6.3
  • 9. Westside Impact Fee Area – 2008 LUA
  • 10. Westside Impact Fee Area – 2014 LUA Service Area Total Acreage Developed Acreage Acreage Developed (%) Westside Impact Fee Service Area 2 Westside Master Plan 1,589 0 0 294 5 1.8 03E I-10375 MP 1,132 62 5.5 04A Northwest Artcraft A 1,639 82 5 04B Northwest Artcraft B 807 69 8.5 04C Northwest Artcraft C 159 41 26.1 04D Northwest Artcraft D 218 158 72.6 04E Canutillo 801 759 94.8 2,348 1,416 60.3 8,986 2,597 28.9 03A Northwest Vinton A ----- Other Westside Subtotal
  • 11. Eastside Impact Fee Area – 2008 LUA
  • 12. Eastside Impact Fee Area – 2014 LUA Service Area Total Acreage Developed Acreage Acreage Developed (%) Eastside Impact Fee Service Area 08B Eastside 4,826 0 0 12 2,919 1,819 62.3 785 113 14.4 118 0 0 2,826 31 1.1 South Montana 12B South Montana B 6 South Fort Bliss 8 East Battle 10B South Fort Bliss B Eastside Subtotal 538 0 0 12,013 1,958 16.3
  • 13. Comparison of Developed Acreage Share Share of Developed Acreage (%) Service Area 2014 Existing 2018 1 Projected 2024 Projected 0.7 43 15 05A Northwest Fort Bliss A 5.2 5 10 05B Northwest Fort Bliss B 18.6 17 25 05C Northwest Fort Bliss C 0 4 5 0 27 15 03A Northwest Vinton A 1.8 12 10 03E I-10375 MP 5.5 4 10 5 24 20 Northeast Impact Fee Service Area 1 Northeast Master Plan Westside Impact Fee Service Area 2 Westside Master Plan 04A Northwest Artcraft A 04B Northwest Artcraft B 8.5 13 10 04C Northwest Artcraft C 26.1 37 50 04D Northwest Artcraft D 72.6 38 80 04E Canutillo 94.8 70 95 ----- Other 60.3 28 70 0 17 10 62.3 31 70 14.4 74 20 0 66 20 Eastside Impact Fee Service Area 08B Eastside 12 South Montana 12B South Montana B 6 South Fort Bliss 8 East Battle 1.1 72 50 10B South Fort Bliss B 0 8 5
  • 14. Northeast Impact Fee Area – 2008 LUA
  • 15. Northeast Impact Fee Area – 2014 LUA
  • 16. Westside Impact Fee Area – 2008 LUA
  • 17. Westside Impact Fee Area – 2014 LUA
  • 18. Eastside Impact Fee Area – 2008 LUA
  • 19. Eastside Impact Fee Area – 2014 LUA
  • 20. Service Areas– Total Acreage Service Area Northeast 01 Northeast MP 05A Northwest Fort Bliss A 05B Northwest Fort Bliss B 05C Northwest Fort Bliss C Northeast Subtotal Total Acreage 4,835 4,812 4,929 4,520 19,095 Westside 02 Westside MP 03A Northwest Vinton A 03E I-10375 MP 04A Northwest Artcraft A 04B Northwest Artcraft B 04C Northwest Artcraft C 04D Northwest Artcraft D 04E Canutillo Other 1,589 294 1,132 1,639 807 159 218 801 2,348 Westside Subtotal 8,986 Eastside 08B Eastside 12 South Montana 12B South Montana B 06 South Fort Bliss 08 East Battle 10B South Fort Bliss B 4,826 2,919 785 118 2,826 538 Eastside Subtotal 12,013 Total 40,094
  • 21. Ten-Year Growth Projections Census Service Area 2000 2010 2024 Population 2024 Total Non2024 Total Residential 2024 Total Service Units Residential Service Units Service Units at Build-Out at Build-Out Northeast 01 Northeast MP 05A Northwest Fort Bliss A 05B Northwest Fort Bliss B 05C Northwest Fort Bliss C Northeast Subtotal 0 0 2,199 10 2,209 0 0 4,799 28 4,827 6,514 4,956 11,213 1,512 24,193 2,129 1,619 3,664 494 7,906 425 9 2,951 115 3,500 2,554 1,629 6,616 609 11,407 Westside 02 Westside MP 03A Northwest Vinton A 03E I-10375 MP 04A Northwest Artcraft A 04B Northwest Artcraft B 04C Northwest Artcraft C 04D Northwest Artcraft D 04E Canutillo Other Westside Subtotal 0 0 0 299 289 0 836 3,633 1,167 6,224 0 0 0 312 251 0 1,001 4,760 2,149 8,473 2,447 105 872 3,505 931 583 1,837 5,672 7,030 22,982 800 34 285 1,145 304 190 600 1,854 2,298 7,511 83 105 149 0 27 96 64 1,177 5,811 7,513 883 139 434 1,145 331 287 664 3,031 8,109 15,024 Eastside 08B Eastside 12 South Montana 12B South Montana B 06 South Fort Bliss 08 East Battle 10B South Fort Bliss B Eastside Subtotal 13 6,766 0 0 0 0 6,779 682 7,625 7 0 21 0 8,335 5,260 10,719 1,960 204 14,529 387 33,059 1,719 3,503 640 67 4,748 126 10,804 496 1,955 157 59 104 0 2,771 2,215 5,458 797 126 4,852 126 13,575 15,212 21,635 80,235 26,220 13,784 40,005 Total
  • 22. Full Build-Out Projections Service Area Population at Build-Out Total Residential Service Total Non-Residential Service Total Service Units at Units at Build-Out Units at Build-Out Build-Out Northeast 01 Northeast MP 43,424 14,191 2,833 17,024 05A Northwest Fort Bliss A 49,556 16,195 91 16,285 05B Northwest Fort Bliss B 44,850 14,657 11,805 26,462 05C Northwest Fort Bliss C 30,234 9,881 2,298 12,179 168,065 54,923 17,027 71,950 02 Westside MP 16,313 5,331 553 5,885 03A Northwest Vinton A 1,054 344 1,049 1,394 03E I-10375 MP 8,722 2,850 1,493 4,343 04A Northwest Artcraft A 17,526 5,727 0 5,727 04B Northwest Artcraft B 9,307 3,041 271 3,313 04C Northwest Artcraft C 1,165 381 193 574 04D Northwest Artcraft D 2,296 750 80 830 04E Canutillo 5,971 1,951 1,239 3,190 Other 10,043 3,282 8,301 11,584 Westside Subtotal 72,398 23,659 13,180 36,839 08B Eastside 52,596 17,188 4,962 22,151 12 South Montana 15,313 5,004 2,793 7,797 12B South Montana B 9,798 3,202 784 3,986 06 South Fort Bliss 1,022 334 297 632 08 East Battle 29,058 9,496 207 9,704 Northeast Subtotal Westside Eastside 10B South Fort Bliss B 7,736 2,528 0 2,528 Eastside Subtotal 115,524 37,753 9,044 46,797 Total 355,986 116,335 39,251 155,586
  • 23. Full Build-Out Projections Comparison Table Existing Estimates at Build-Out Updated Estimates at Build-Out Total Residential Service Units Population Total Residential Service Units Population 01 Northeast MP 05A Northwest Fort Bliss A 05B Northwest Fort Bliss B 05C Northwest Fort Bliss C 16,353 8,660 13,763 5,810 46,268 24,135 48,047 16,268 14,191 16,195 14,657 9,881 43,424 49,556 44,850 30,234 Northeast Subtotal 44,586 134,718 54,923 168,065 4,874 450 2,741 4,592 2,620 560 880 1,684 5,033 14,767 1,364 9,594 18,368 10,480 2,240 3,520 6,736 15,968 5,331 344 2,850 5,727 3,041 381 750 1,951 3,282 16,313 1,054 8,722 17,526 9,307 1,165 2,296 5,971 10,043 23,434 83,037 23,659 72,398 08B Eastside 12 South Montana 12B South Montana B 06 South Fort Bliss 08 East Battle 10B South Fort Bliss B 652 8,132 22,515 2,477 4,663 3,150 2,607 24,395 67,544 9,908 18,652 12,600 17,188 5,004 3,202 334 9,496 2,528 52,596 15,313 9,798 1,022 29,058 7,736 Eastside Subtotal 41,589 135,706 37,753 115,524 Total 109,609 353,461 116,335 355,986 Service Area Northeast Westside 02 Westside MP 03A Northwest Vinton A 03E I-10375 MP 04A Northwest Artcraft A 04B Northwest Artcraft B 04C Northwest Artcraft C 04D Northwest Artcraft D 04E Canutillo Other Westside Subtotal Eastside
  • 24. Full Build-Out Projections Comparison Table Existing Estimates at Build-Out Updated Estimates at Build-Out Service Area Total Residential Service Units Population Total Residential Service Units Population Northeast Subtotal 44,586 134,718 54,923 168,065 W estside Subtotal 23,434 83,037 23,659 72,398 Eastside Subtotal 41,589 135,706 37,753 115,524 Total 109,609 353,461 116,335 355,986 Population Estimates Residential Service Units 140,000 400,000 120,000 350,000 300,000 100,000 250,000 80,000 200,000 60,000 109,609 116,335 40,000 20,000 6.1% Increase 0 150,000 100,000 50,000 353,461 355,986 0.7% Increase 0 2009 Estimates 2014 Estimates 2009 Estimates 2014 Estimates