P. Mukherjee
Dy. General Manager
IT - New Initiatives
7th October, 2013
Distribution Related Engineering Asset Management System
(DREAMS)
CESC – Electricity Generation & Distribution Company
Serving Calcutta & its adjoining areas since 1897.
The electrification of Calcutta took place 17 years
after New York & 11 years after London.
The Calcutta Tramways switched to electricity
from horse drawn carriages in 1902.
CESC now belongs to the youngest & one of the most
vibrant industrial houses – RP - Sanjiv Goenka
Group since 2011.
CESC – Electricity Generation & Distribution Company
Licensed Area of 567 sq. km.
Total Generating Capacity : 1225 MW
Peak Demand : 1900 MW
Average Demand : 1600-1700 MW
Total Low Tension Consumer Base : 27.20 Lacs
Total High Tension Consumer Base : 1726
CESC’s Experience
Earlier Scenario :
Unstructured and non uniform practices followed in
maintaining records of Asset and their up-keep.
CM & CBM were mostly not supported.
Leading to disproportionately more unplanned
maintenance than planned maintenance .
Difficulty in estimating maintenance cost and analyzing
maintenance performance.
Solution : CESC’s Asset Management Software.
Distribution Related Engineering Asset Management System
(DREAMS)
Features and Functionalities of DREAMS
Integrated Asset Register of major electrical plant and equipment in use
including allied assets such as Substations building, premises and yards.
Maintenance Management functionalities encompassing
Preventive Maintenance(PM)
Status & Condition Monitoring (SM&CM)
Condition Based Maintenance (CBM)
Repair/Breakdown Maintenance (BM)
Abnormal Observation (AO)
Carrying out all maintenance activities as per SM,CM,PM regimes
stored in the system.
Analyze, interpret and maintain the transformers with the help of the
Dissolve Gas Analysis (DGA) Dash-Board tool integrated with the system.
Handing Over Taking Over (HOTO) Module for managing assets during
creation, installation and commissioning before handing over to
Operations & Maintenance (O/M) group.
ASSETS CONSIDERED
 Power Transformer
 33/0.4 kV Earthing Transformer
 33/0.4 kV Auxiliary Transformer
 Indoor Switchboard
 Outdoor Circuit Breaker
 Outdoor Isolator
 Outdoor CT
 Outdoor VT
 Distribution Transformer
 Outdoor Lightning Arrester
 Ring Main Unit (RMU)
 Premises
 Neutral Earthing Switch
 Outdoor Cable Sealing End
 Battery
 Battery Charger
 Capacitor Bank
DREAMS
Total No. of Assets as on date : 24578
CODIFICATION OF ASSETS
DREAMS
 An algorithm was formulated to assign an 8 character unique code to all assets
 The left most character signifies the Super Category like Power Transformer etc.
 The next left most character denotes the Primary Voltage like 220KV etc.
 The next five digits from left is a unique serial number
 The right most character is used to differentiate amongst assets of same primary
voltage but with different secondary voltage.
 Super Category : Power Transformer
220/132/33 KV Power Transformer A7*****O
132/33 KV Power Transformer A6*****O
33/20 KV Power Transformer A5*****A
33/11 KV Power Transformer A5*****B
33/11-6 KV Power Transformer A5*****C
33/6 KV Power Transformer A5*****D
20/6 KV Power Transformer A4*****O
11/6 KV Power Transformer A3*****O
6/3.3 KV Power Transformer A2*****O
 Super Category : Distribution Transformer
11/0.4 KV Distribution Transformer B3*****A
11/6-0.4 KV Distribution Transformer B3*****B
6/0.4 KV Distribution Transformer B2*****O
ASSET REGISTER
DREAMS
 Asset Searching
 Assets searched using different criteria such as category/location/make/name/Asset No.
 All criteria appear on the upper part of left pane of the screen.
 General Tab
 The list of assets based on the selected searching criteria appears on the right pane.
 All the attributes displayed alongside the asset no. with a scrolling facility.
ASSET REGISTER
DREAMS
 Asset Sorting & Filtering
 Sorting of Assets based on the values of any attribute in ascending/descending
order.
 Application of Filter on the values of any attribute of Assets.
ASSET REGISTER
DREAMS
 Health Tab
 Indication of health of any asset through color codes based on the last observations from
SM/CM/AO. ‘RED’ -> URGENT ’BLUE’ -> IMPORTANT
ASSET REGISTER
DREAMS
 Maintenance Tab
 Display of schedule for forthcoming maintenance activity (SM/CM/PM) as on date
through color codes based on the periodicity as mentioned in the maintenance Regime.
‘RED’ -> OVERDUE ’BLUE’ -> scheduled within one month.
MAINTENANCE FUNCTIONS
DREAMS
 Status Monitoring (SM)
 Monitoring of assets through visual inspection.
 Urgent/Important observations posted in the system.
 Job Allocation & Attending to the job by O&M engineers.
MAINTENANCE FUNCTIONS
DREAMS
 Condition Monitoring (CM)
 Monitoring of assets by measurements through Intrusive & Non-Intrusive activities.
 Non-Intrusive CM (e.g. Thermo-graphic Scanning etc.) measurements posted in the system.
 Job Allocation & Attending to the job by O&M engineers.
 Non-Intrusive CM Re-measurement done again.
 Intrusive CM measurements (e.g. IR & PI Values etc.) are taken & posted by O&M
departments.
 Non-Intrusive CM
MAINTENANCE FUNCTIONS
DREAMS
 Preventive Maintenance (PM)
 The Preventive Maintenance (PM) done by O&M departments as per the schedule
mentioned in the PM Regime.
MAINTENANCE FUNCTIONS
DREAMS
 Maintenance Regime
 The SM/CM/PM Regime for different categories of assets are stored in the system.
MAINTENANCE FUNCTIONS
DREAMS
 Queries & Reports
 There are a host of queries & reports which caters to the diverse requirements across all
user departments.
MAINTENANCE FUNCTIONS
DREAMS
 Dissolve Gas Analysis (DGA) Dash Board
 The results of gases (CH4,C2H2,C2H4 etc.) from oil samples of Power Transformer posted
inside the DGA Dash Board.
 Six different interpretation methods such as :- IEC Reference, ROGER’s Ratio, DORNENBERG’s
Ratio, Key Gas Method, Combustible Gas Method, Permissible Concentration Gas Method
used to interpret the health of the transformer.
MAINTENANCE FUNCTIONS
DREAMS
 Dissolve Gas Analysis (DGA) Dash Board
 The results of gases CH4,C2H2,C2H4 can also be plotted on Duval Triangle .
 Trend Analysis of dissolved gases through Line & Bar Chart is also possible.
HARDWARE PLATFORM
DATA CENTRE
CENTRAL SERVER REGIONAL SERVICES
C
E
S
C
N
E
T PCs at User End
ONLINE
ACCESS
SUN
M4000
(App)
SUN
M4000
(DB)
SUN Storage
Tek 6580 (16 TB)
CENTRALISED ARCHITECTURE
DREAMS
4 Ultra Sparc VII+
128 GB
4 Ultra
Sparc VII+
128 GB
SOFTWARE PLATFORM
State of the Art Technology
 O/S : Sun Solaris 10
 Database : Oracle 10g Enterprise Edition
 Application tier : J2EE (Glassfish)
 Front end : Web browser (Internet Explorer)
 Architecture : 3-Tier
Browser - Application Server - Database Server
DREAMS
ENGINEERING EXCELLENCE
 Pioneering effort in conceptualization, design, development and
implementation of a state-of-the-art IT application for Engineering
Asset Management, developed in-house.
 Multi-faceted Asset Register.
Provides entire Asset database on finger tips.
An innovatively designed single window for viewing all asset
information, health & maintenance schedules together.
DREAMS
 Dissolve Gas Analysis (DGA) Dashboard :
 A perfect analysis tool to identify failure prone Power Transformers
and thereby taking proactive measures to avoid breakdown.
KEY IMPACTS
 Significant reduction in un-planned maintenance.
 Inculcating a new philosophy of planned maintenance through :
 Status Monitoring (SM)
 Condition Monitoring (CM) & Condition Based Maintenance (CBM)
 Preventive Maintenance (PM)
DREAMS
24
112
136
18
63
81
0
20
40
60
80
100
120
140
160
11 KV DOWNSTREAM
SWITCHGEAR
6 KV DOWNSTREAM
SWITCHGEAR
TOTAL DOWNSTREAM
SWITCHGEAR
2011-12 2012-13
Till Mar 2013
 Resultant Fault Reduction in Switchgears
KEY IMPACTS
DREAMS
 Financial
Till Mar 2013Rupees in Lacs
 Green Initiative
 Paper-less storage of asset information and maintenance records.
 Paper-less communication through system generated emails.
KEY IMPACTS
 Tracking of assets throughout its lifecycle.
 Planning and allocation of appropriate resources by O&M
Departments well ahead of time.
 A host of queries and reports available to monitor the timely
completion of O&M activities, identify performing & non-performing
assets.
 Analysis of commissioning and maintenance related data in order to
provide insight into asset performance and planning for its
replacement.
DREAMS
FUTURE READINESS
DREAMS
 Having potential to make itself scalable at the
enterprise level by including assets of Generation and
Transmission.
 Capable of Integration with Geographical Information
Systems (GIS)
 Capable of Integration with ERP for Finance and
Purchase Divisions.
e-mail : partha.mukherjee@rp-sg.in
DREAMS

Weitere ähnliche Inhalte

Was ist angesagt?

full report original
full report originalfull report original
full report original
gokulnath R.S
 
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
Komandur Sunder Raj, P.E.
 

Was ist angesagt? (20)

full report original
full report originalfull report original
full report original
 
J010316164
J010316164J010316164
J010316164
 
406 bruce worthington_windows_server_power_efficiency_slideshare
406 bruce worthington_windows_server_power_efficiency_slideshare406 bruce worthington_windows_server_power_efficiency_slideshare
406 bruce worthington_windows_server_power_efficiency_slideshare
 
electrical&inst engineer
electrical&inst engineerelectrical&inst engineer
electrical&inst engineer
 
IRJET- Hybrid Feed Forward Control for Power Factor Correction Rectifier
IRJET-  	  Hybrid Feed Forward Control for Power Factor Correction RectifierIRJET-  	  Hybrid Feed Forward Control for Power Factor Correction Rectifier
IRJET- Hybrid Feed Forward Control for Power Factor Correction Rectifier
 
PID Controller based DC Motor Speed Control
PID Controller based DC Motor Speed ControlPID Controller based DC Motor Speed Control
PID Controller based DC Motor Speed Control
 
P1111223206
P1111223206P1111223206
P1111223206
 
Gowtham resume
Gowtham resumeGowtham resume
Gowtham resume
 
Microgrid Controller HIL Demonstration Platform
Microgrid Controller HIL Demonstration PlatformMicrogrid Controller HIL Demonstration Platform
Microgrid Controller HIL Demonstration Platform
 
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
 
Simulation DC Motor Speed Control System by using PID Controller
Simulation DC Motor Speed Control System by using PID ControllerSimulation DC Motor Speed Control System by using PID Controller
Simulation DC Motor Speed Control System by using PID Controller
 
EXISTING APPROACH FOR MANAGING VOLTAGE CONSTRAINTS
EXISTING APPROACH FOR MANAGING VOLTAGE CONSTRAINTSEXISTING APPROACH FOR MANAGING VOLTAGE CONSTRAINTS
EXISTING APPROACH FOR MANAGING VOLTAGE CONSTRAINTS
 
Milestone checklist
Milestone checklist   Milestone checklist
Milestone checklist
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation software
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
 
IRJET-Robust Intelligent Controller for Voltage Stabilization of dc-dc Boost ...
IRJET-Robust Intelligent Controller for Voltage Stabilization of dc-dc Boost ...IRJET-Robust Intelligent Controller for Voltage Stabilization of dc-dc Boost ...
IRJET-Robust Intelligent Controller for Voltage Stabilization of dc-dc Boost ...
 
Energy measuring insulation monitoring programmable controller melsec-q seri...
Energy measuring  insulation monitoring programmable controller melsec-q seri...Energy measuring  insulation monitoring programmable controller melsec-q seri...
Energy measuring insulation monitoring programmable controller melsec-q seri...
 
Efficient reconfigurable architecture of baseband demodulator in sdr
Efficient reconfigurable architecture of baseband demodulator in sdrEfficient reconfigurable architecture of baseband demodulator in sdr
Efficient reconfigurable architecture of baseband demodulator in sdr
 
Analyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap softwareAnalyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap software
 

Ähnlich wie CESC Limited

AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
Ajesh Jacob
 
Training feedback Basavaraju
Training feedback BasavarajuTraining feedback Basavaraju
Training feedback Basavaraju
Basavaraju YM
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
Zondits
 

Ähnlich wie CESC Limited (20)

Cesc limited
Cesc limitedCesc limited
Cesc limited
 
Ems npc
Ems npcEms npc
Ems npc
 
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Smart Technology and Service Suite Equipment Monitoring - Diesel Gensets
Smart Technology and Service Suite Equipment Monitoring - Diesel GensetsSmart Technology and Service Suite Equipment Monitoring - Diesel Gensets
Smart Technology and Service Suite Equipment Monitoring - Diesel Gensets
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOC
 
Integrated Global Monitoring™ for Transformers
Integrated Global Monitoring™ for TransformersIntegrated Global Monitoring™ for Transformers
Integrated Global Monitoring™ for Transformers
 
Mitsubishi energy saving data collecting server eco-webserverⅲ_dienhathe.vn
Mitsubishi energy saving data collecting server eco-webserverⅲ_dienhathe.vnMitsubishi energy saving data collecting server eco-webserverⅲ_dienhathe.vn
Mitsubishi energy saving data collecting server eco-webserverⅲ_dienhathe.vn
 
Mitsubishi energy saving data collecting server eco webserver ⅲ_dienhathe.vn
Mitsubishi energy saving data collecting server eco webserver ⅲ_dienhathe.vnMitsubishi energy saving data collecting server eco webserver ⅲ_dienhathe.vn
Mitsubishi energy saving data collecting server eco webserver ⅲ_dienhathe.vn
 
Mitsubishi electric energy saving data collection server eco webserveriii-die...
Mitsubishi electric energy saving data collection server eco webserveriii-die...Mitsubishi electric energy saving data collection server eco webserveriii-die...
Mitsubishi electric energy saving data collection server eco webserveriii-die...
 
Mitsubishi electric energy saving data collection server eco webserveriii
Mitsubishi electric energy saving data collection server eco webserveriiiMitsubishi electric energy saving data collection server eco webserveriii
Mitsubishi electric energy saving data collection server eco webserveriii
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORING
 
IRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter ReadingIRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter Reading
 
Training feedback Basavaraju
Training feedback BasavarajuTraining feedback Basavaraju
Training feedback Basavaraju
 
IRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft DetectionIRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft Detection
 
Performance Optimization for Brushless DC Motor Using DRV8312 Evaluation Board
Performance Optimization for Brushless DC Motor Using DRV8312 Evaluation BoardPerformance Optimization for Brushless DC Motor Using DRV8312 Evaluation Board
Performance Optimization for Brushless DC Motor Using DRV8312 Evaluation Board
 
Monet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDBMonet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDB
 
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
 
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
 

Mehr von engineeringwatch

Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
engineeringwatch
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
engineeringwatch
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
engineeringwatch
 

Mehr von engineeringwatch (20)

Eduindia UPTU Portfolio
Eduindia UPTU PortfolioEduindia UPTU Portfolio
Eduindia UPTU Portfolio
 
Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolio
 
Eduindia Portfolio
Eduindia PortfolioEduindia Portfolio
Eduindia Portfolio
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Booklet
 
Edu india presentation
Edu india presentationEdu india presentation
Edu india presentation
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation system
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Globus infocom limited
Globus infocom limitedGlobus infocom limited
Globus infocom limited
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
 
Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Csir cftri
Csir cftriCsir cftri
Csir cftri
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
Hscc (india) ltd
Hscc (india) ltdHscc (india) ltd
Hscc (india) ltd
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Kürzlich hochgeladen (20)

DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 

CESC Limited

  • 1. P. Mukherjee Dy. General Manager IT - New Initiatives 7th October, 2013 Distribution Related Engineering Asset Management System (DREAMS)
  • 2. CESC – Electricity Generation & Distribution Company Serving Calcutta & its adjoining areas since 1897. The electrification of Calcutta took place 17 years after New York & 11 years after London. The Calcutta Tramways switched to electricity from horse drawn carriages in 1902. CESC now belongs to the youngest & one of the most vibrant industrial houses – RP - Sanjiv Goenka Group since 2011.
  • 3. CESC – Electricity Generation & Distribution Company Licensed Area of 567 sq. km. Total Generating Capacity : 1225 MW Peak Demand : 1900 MW Average Demand : 1600-1700 MW Total Low Tension Consumer Base : 27.20 Lacs Total High Tension Consumer Base : 1726
  • 4. CESC’s Experience Earlier Scenario : Unstructured and non uniform practices followed in maintaining records of Asset and their up-keep. CM & CBM were mostly not supported. Leading to disproportionately more unplanned maintenance than planned maintenance . Difficulty in estimating maintenance cost and analyzing maintenance performance. Solution : CESC’s Asset Management Software. Distribution Related Engineering Asset Management System (DREAMS)
  • 5. Features and Functionalities of DREAMS Integrated Asset Register of major electrical plant and equipment in use including allied assets such as Substations building, premises and yards. Maintenance Management functionalities encompassing Preventive Maintenance(PM) Status & Condition Monitoring (SM&CM) Condition Based Maintenance (CBM) Repair/Breakdown Maintenance (BM) Abnormal Observation (AO) Carrying out all maintenance activities as per SM,CM,PM regimes stored in the system. Analyze, interpret and maintain the transformers with the help of the Dissolve Gas Analysis (DGA) Dash-Board tool integrated with the system. Handing Over Taking Over (HOTO) Module for managing assets during creation, installation and commissioning before handing over to Operations & Maintenance (O/M) group.
  • 6. ASSETS CONSIDERED  Power Transformer  33/0.4 kV Earthing Transformer  33/0.4 kV Auxiliary Transformer  Indoor Switchboard  Outdoor Circuit Breaker  Outdoor Isolator  Outdoor CT  Outdoor VT  Distribution Transformer  Outdoor Lightning Arrester  Ring Main Unit (RMU)  Premises  Neutral Earthing Switch  Outdoor Cable Sealing End  Battery  Battery Charger  Capacitor Bank DREAMS Total No. of Assets as on date : 24578
  • 7. CODIFICATION OF ASSETS DREAMS  An algorithm was formulated to assign an 8 character unique code to all assets  The left most character signifies the Super Category like Power Transformer etc.  The next left most character denotes the Primary Voltage like 220KV etc.  The next five digits from left is a unique serial number  The right most character is used to differentiate amongst assets of same primary voltage but with different secondary voltage.  Super Category : Power Transformer 220/132/33 KV Power Transformer A7*****O 132/33 KV Power Transformer A6*****O 33/20 KV Power Transformer A5*****A 33/11 KV Power Transformer A5*****B 33/11-6 KV Power Transformer A5*****C 33/6 KV Power Transformer A5*****D 20/6 KV Power Transformer A4*****O 11/6 KV Power Transformer A3*****O 6/3.3 KV Power Transformer A2*****O  Super Category : Distribution Transformer 11/0.4 KV Distribution Transformer B3*****A 11/6-0.4 KV Distribution Transformer B3*****B 6/0.4 KV Distribution Transformer B2*****O
  • 8. ASSET REGISTER DREAMS  Asset Searching  Assets searched using different criteria such as category/location/make/name/Asset No.  All criteria appear on the upper part of left pane of the screen.  General Tab  The list of assets based on the selected searching criteria appears on the right pane.  All the attributes displayed alongside the asset no. with a scrolling facility.
  • 9. ASSET REGISTER DREAMS  Asset Sorting & Filtering  Sorting of Assets based on the values of any attribute in ascending/descending order.  Application of Filter on the values of any attribute of Assets.
  • 10. ASSET REGISTER DREAMS  Health Tab  Indication of health of any asset through color codes based on the last observations from SM/CM/AO. ‘RED’ -> URGENT ’BLUE’ -> IMPORTANT
  • 11. ASSET REGISTER DREAMS  Maintenance Tab  Display of schedule for forthcoming maintenance activity (SM/CM/PM) as on date through color codes based on the periodicity as mentioned in the maintenance Regime. ‘RED’ -> OVERDUE ’BLUE’ -> scheduled within one month.
  • 12. MAINTENANCE FUNCTIONS DREAMS  Status Monitoring (SM)  Monitoring of assets through visual inspection.  Urgent/Important observations posted in the system.  Job Allocation & Attending to the job by O&M engineers.
  • 13. MAINTENANCE FUNCTIONS DREAMS  Condition Monitoring (CM)  Monitoring of assets by measurements through Intrusive & Non-Intrusive activities.  Non-Intrusive CM (e.g. Thermo-graphic Scanning etc.) measurements posted in the system.  Job Allocation & Attending to the job by O&M engineers.  Non-Intrusive CM Re-measurement done again.  Intrusive CM measurements (e.g. IR & PI Values etc.) are taken & posted by O&M departments.  Non-Intrusive CM
  • 14. MAINTENANCE FUNCTIONS DREAMS  Preventive Maintenance (PM)  The Preventive Maintenance (PM) done by O&M departments as per the schedule mentioned in the PM Regime.
  • 15. MAINTENANCE FUNCTIONS DREAMS  Maintenance Regime  The SM/CM/PM Regime for different categories of assets are stored in the system.
  • 16. MAINTENANCE FUNCTIONS DREAMS  Queries & Reports  There are a host of queries & reports which caters to the diverse requirements across all user departments.
  • 17. MAINTENANCE FUNCTIONS DREAMS  Dissolve Gas Analysis (DGA) Dash Board  The results of gases (CH4,C2H2,C2H4 etc.) from oil samples of Power Transformer posted inside the DGA Dash Board.  Six different interpretation methods such as :- IEC Reference, ROGER’s Ratio, DORNENBERG’s Ratio, Key Gas Method, Combustible Gas Method, Permissible Concentration Gas Method used to interpret the health of the transformer.
  • 18. MAINTENANCE FUNCTIONS DREAMS  Dissolve Gas Analysis (DGA) Dash Board  The results of gases CH4,C2H2,C2H4 can also be plotted on Duval Triangle .  Trend Analysis of dissolved gases through Line & Bar Chart is also possible.
  • 19. HARDWARE PLATFORM DATA CENTRE CENTRAL SERVER REGIONAL SERVICES C E S C N E T PCs at User End ONLINE ACCESS SUN M4000 (App) SUN M4000 (DB) SUN Storage Tek 6580 (16 TB) CENTRALISED ARCHITECTURE DREAMS 4 Ultra Sparc VII+ 128 GB 4 Ultra Sparc VII+ 128 GB
  • 20. SOFTWARE PLATFORM State of the Art Technology  O/S : Sun Solaris 10  Database : Oracle 10g Enterprise Edition  Application tier : J2EE (Glassfish)  Front end : Web browser (Internet Explorer)  Architecture : 3-Tier Browser - Application Server - Database Server DREAMS
  • 21. ENGINEERING EXCELLENCE  Pioneering effort in conceptualization, design, development and implementation of a state-of-the-art IT application for Engineering Asset Management, developed in-house.  Multi-faceted Asset Register. Provides entire Asset database on finger tips. An innovatively designed single window for viewing all asset information, health & maintenance schedules together. DREAMS  Dissolve Gas Analysis (DGA) Dashboard :  A perfect analysis tool to identify failure prone Power Transformers and thereby taking proactive measures to avoid breakdown.
  • 22. KEY IMPACTS  Significant reduction in un-planned maintenance.  Inculcating a new philosophy of planned maintenance through :  Status Monitoring (SM)  Condition Monitoring (CM) & Condition Based Maintenance (CBM)  Preventive Maintenance (PM) DREAMS 24 112 136 18 63 81 0 20 40 60 80 100 120 140 160 11 KV DOWNSTREAM SWITCHGEAR 6 KV DOWNSTREAM SWITCHGEAR TOTAL DOWNSTREAM SWITCHGEAR 2011-12 2012-13 Till Mar 2013  Resultant Fault Reduction in Switchgears
  • 23. KEY IMPACTS DREAMS  Financial Till Mar 2013Rupees in Lacs  Green Initiative  Paper-less storage of asset information and maintenance records.  Paper-less communication through system generated emails.
  • 24. KEY IMPACTS  Tracking of assets throughout its lifecycle.  Planning and allocation of appropriate resources by O&M Departments well ahead of time.  A host of queries and reports available to monitor the timely completion of O&M activities, identify performing & non-performing assets.  Analysis of commissioning and maintenance related data in order to provide insight into asset performance and planning for its replacement. DREAMS
  • 25. FUTURE READINESS DREAMS  Having potential to make itself scalable at the enterprise level by including assets of Generation and Transmission.  Capable of Integration with Geographical Information Systems (GIS)  Capable of Integration with ERP for Finance and Purchase Divisions.