BHAVINI’s NOMINATION FOR ENGINEERING
EXCELLENCE AWARD - 2013

Presentation by

Dr. Prabhat Kumar
Distinguished Scientist and
Chairman & Managing Director
Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI)
Department of Atomic Energy
A Government of India Enterprise
Kalpakkam 603 102, Tamilnadu, India
INDIA’S THREE STAGE NUCLEAR
POWER PROGRAMME

12 GWe, 30 Yr

Natural
Uranium

Th

E LE CT RI CIT Y

PHWR

Depleted U
Pu

300 GWe, 30 Yr
Pu FUELLED
FAST BREEDERS

Th

E LE CT RI CIT Y

500 GWe, 500 Yr
Pu

U-233

U-233 FUELLED
BREEDERS

E LECTRICITY

U-233

STAGE 1

STAGE 2

STAGE 3

BHAVINI has commenced activities on second stage
• Prototype
Fast
Breeder
Reactor (PFBR) is first of its
kind nuclear reactor in the
country
• India’s very important and
prestigious project
• Advanced construction stage
Fuel

: PuO2+ UO2

Thermal Power

: 1250 MWth

Electrical output

: 500 MWe

Coolant

: Liquid Na

Thermal Efficiency

: 40%
Prototype Fast Breeder Reactor Flow Chart
Fukushima incident could have been avoided if passive
decay heat removal system like PFBR exist in their reactor

PFBR, the only nuclear reactor in
the country has secondary loop
No power required for
removal of decay heat
PFBR REACTOR ASSEMBLY COMPONENTS
Huge size reactor with
complex constructional
features

Man standing

1

Main Vessel

2

Core Support Structure

3

Core Catcher

4

Grid Plate

5

Core

6

Inner vessel

7

Roof slab

8

Large Rotatable Plug

9

Small Rotatable Plug

10 Control Plug
11 Absorber Rod Drive Mechanism
12 Transfer Arm
13 Intermediate Heat Exchanger
14 Primary Sodium Pump
15 Safety Vessel
Stringent administrative and quality
controls at every stage
What all makes PFBR project eligible for
Engineering Excellence Award 2013
Indigenous and New Technology
Many Challenges overcome successfully and
Innovations in many activities
Achievements and high success rate in every
activities
Manufacture
of
thin
walled
gigantic
components for the first time in the country
Handling & Erection of over dimensional
equipment without single dent
Design, Construction, Equipment fabrication
and Regulatory approval in parallel
Few points which make PFBR project
innovative
 First of its kind nuclear reactor in the country
- Generates more Plutonium than it consumes

 Manufacturing of gigantic equipment at site due
to transportation constraints meeting all the
stringent specification requirements
 Development of special grade materials in large
scale in the country never done in the past
 Development of Novel equipment erection
techniques
 Huge quantity of highly reactive Sodium transfer
without a single drop of leak
- 1750 tones !!!
Highly reactive Liquid
Sodium transfer
Largest and deepest excavated pit in Indian
nuclear plants immediately next to sea
(200 meters from the sea)
National record of largest concrete pouring in
single stretch ever done by any industry in India
Initially 5000 cubic meter concreting during
2005 and then surpassed BHAVINI’s own
record by pouring 5800 cubic meter concrete
Off Shore Submarine Tunnel
Under sea Tunnel 567 meters
length at 50 meters below the sea

Constructed for the first time in the country
Tsunami bund/Shore Protection/Outfall Channel

Tsunami bund

Shore
protection

Outfall Channel

15

15
Coastal plantation

Engineered sand dune

Unique method of Tsunami protection
system for the reactor site
INCREASE IN ELEVATION
The nuclear island finished floor level
is raised to 15.7 meters for reactor
protection from future Tsunami if any
Fabrication of gigantic reactor
components for PFBR
Fabrication of over dimensional, thin
walled reactor components at PFBR site
FABRICATION OF MAIN VESSEL
Great
Challenge
Made for
the first
time in the
country

Diameter achieved within 10mm tolerance for total 12900 mm
INNER VESSEL
Positional accuracy,
alignment and
orientation has to
be maintained
during fabrication
To be lifted during
erection without swing

Man standing

Safety Vessel with Thermal Insulation Panels
Primary Pipe-Grid Plate assembly

The Grid Plate supports all the
core subassemblies of PFBR

Welding to be done in
constrained space meeting
stringent specification
requirements
WELDING
BETWEEN
ROOF SLAB
(RS) AND MAIN
VESSEL (MV)

Very important joint
Weld carries about
2500 tones of
weight
Welding to be carried
out
insitu
in
confined space
Tube to Tubesheet welding, Post Weld Heat Treatment and
Micro-Focal radiography for PFBR Steam Generators

Welding
Nuclear Clean Hall

Local Heat Treatment

Micro-Focal Radiography
Fabrication of 26 meters length
Steam Generators in shop
FABRICATED STEAM GENERATORS

Straightness achieved within 3mm on 26,000 mm length of SG !!!!!!
Challenges in header pullout to bend tubes
welding for Sodium to Air Heat Exchangers

Extremely
Difficult
Header Welding - Needs highly qualified and skilled welders
Header Welding- Extremely difficult

Challenge
Reactor equipment erection
Erection of
PFBR
equipment
without
single dent
ERECTION OF MAJOR COMPONENTS

Safety Vessel

Main Vessel

Thermal Baffle
Safety Vessel is being lowered into Reactor Vault
in a constrained space without swing
Erection of Thermal Baffle
ERECTION OF MAJOR COMPONENTS

Grid Plate

Inner Vessel

Roof Slab
Massive
Argon
Buffer
Tank
erection
STEAM GENERATOR (SG)
ERECTION

SPECIAL ARRANGEMENT FOR
SHIFTING SG (25 METER LONG
COMPONENT)

PLACING SG IN SPECIAL
TILTING MECHANISM
TILTING
FOR
ERECTION

CONNECTION
OF LIFTING
SLINGS

LOWERING OF SG IN
STEAM GENERATOR
BUILDING
SG LIFTED WITH HEAVY
DUTY CRAWLER CRANE

POSITIONING &
ALIGNMENT

FIXING OF
HEATERS
ON SG
Operational excellence of the project
 Meticulous planning and Management






Technical aspects
Finance
Human Resources
Contracts and Material Management
Safety & Security

 Adjust as per design
 No damage/dent on any equipment during
erection
 Financial Management


NIL report during the CIG audits

 Awards
INDUSTRIAL SAFETY AWARDS
High performance in safety in
the construction sector !!!!!

“Industrial Safety Award” by Atomic Energy Regulatory Board
“Suraksha Puraskar” by National Safety Council of India
AWARDS - HUMAN RESOURCES
Development and inspiration of
true potential of human capital

“Best HR Practices–2012 Award” by National
Institute of Personnel Management (NIPM)
Award for outstanding Concrete Structure

“ICI (TNCC) - Ultratech Award”
by Indian Concrete Institute
How PFBR project has added to the self
reliance of India in the chosen sector
 Excellences by young team with an average
age of 30 years
 Documentation/Technical Papers
- More than 300 papers in National/International
Conferences/Journals by young company

 Visit of 23,000 students at PFBR project site as
a part of outreach programme
Key impacts which PFBR project has made
 Sustainability
 Improvement in the quality standards
 Creation of new and indigenous technological
capability in terms of machining, welding,
fabrication, testing, handling and erection
 First Time right approach
 Neighborhood Development
•
•
•
•
•
•
•

Indirect employment
Education
Infrastructure
Health & hygiene
Water supply
Outreach programme
Sports
Science Lab Apparatus & Models donated to Annamalai Middle School,
Desumughipet, Thirukalukundram

Donated PC and books to Govt. Higher Sec. School,
Pudupattinam on 28.04.2008

Donation of Personal computers to the schools

Vocational Training Programme for Neighborhood village youth from 27.09.2005

Water Pump & Pump room for Panchayat Union
Primary School Meiyur

Vocational Training courses II batch commenced on 02.10.2006

Construction of Compound Wall- Panchayath
Union Primary School Sadhrangapattinam

Water Tank & Hand Wash Facility Panchayath
Union Primary School Sadhrangapattinam
Epidemiological Health Survey with
Assistance from BHAVINI

One R.O. Plant has been installed at Sadras Meyyur
kuppam, Kalpakkam

`
Sadras Primary Health Centre – Maternity Ward

Sprayed mosquito repellant in the
surrounding villages as preventive
measure for chickengunia

In co-ordination with Dr.M.S.Swaminathan Research
Foundation, Chennai, action has been initiated to set up
Village Knowledge Centre
Bio-shield
Hatchery – Self Help Groups
Few points which illumine more on the future
readiness of the project
 Robust feedback system for
-Knowledge management
-Sharing of experiences with industry and academia
-Win Win situation for all

 Training, qualification & capability developmen
 Strengthening of Industries

-Tools/fixtures
- Facilities
- Techniques
- Manufacture
- Inspection

 Standardized design and manufacturing
 Modular concept to the possible extent
Over all Night View

PFBR the pride of
nation
53
Thank
You

Weitere ähnliche Inhalte

Was ist angesagt?

SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGERSOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
iQHub
 

Was ist angesagt? (20)

New Battery Technology Developments
New Battery Technology DevelopmentsNew Battery Technology Developments
New Battery Technology Developments
 
A presentation about ITER
A presentation about ITERA presentation about ITER
A presentation about ITER
 
Nuclear engineering matreials
Nuclear engineering matreialsNuclear engineering matreials
Nuclear engineering matreials
 
SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGERSOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
SOLID-STATE BATTERY PERFORMANCE FOR THE EV INDUSTRY - COMMERCIAL TO PASSENGER
 
Zinc oxide thin film
Zinc oxide thin filmZinc oxide thin film
Zinc oxide thin film
 
Challenges & barriers to financing industry decarbonisation - Insights from t...
Challenges & barriers to financing industry decarbonisation - Insights from t...Challenges & barriers to financing industry decarbonisation - Insights from t...
Challenges & barriers to financing industry decarbonisation - Insights from t...
 
ALD/CVD APPLICATIONS, EQUIPMENT AND PRECURSORS IN HIGH VOLUME MANUFACTURING
ALD/CVD APPLICATIONS, EQUIPMENT AND PRECURSORS IN HIGH VOLUME MANUFACTURINGALD/CVD APPLICATIONS, EQUIPMENT AND PRECURSORS IN HIGH VOLUME MANUFACTURING
ALD/CVD APPLICATIONS, EQUIPMENT AND PRECURSORS IN HIGH VOLUME MANUFACTURING
 
SNL Small Modular Reactor Program
SNL Small Modular Reactor ProgramSNL Small Modular Reactor Program
SNL Small Modular Reactor Program
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Battery materials
Battery materialsBattery materials
Battery materials
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Basic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear EngineeringBasic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear Engineering
 
Atomic bomb
Atomic bombAtomic bomb
Atomic bomb
 
Energy storage
Energy storageEnergy storage
Energy storage
 
61010 national difference for slideshare
61010 national difference for slideshare61010 national difference for slideshare
61010 national difference for slideshare
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Classification of nuclear reactors
Classification of nuclear reactorsClassification of nuclear reactors
Classification of nuclear reactors
 
Nuclear Power
Nuclear PowerNuclear Power
Nuclear Power
 
Overview of Fast Breeder Reactors
Overview of Fast Breeder ReactorsOverview of Fast Breeder Reactors
Overview of Fast Breeder Reactors
 
CdTe Solar Cells
CdTe Solar CellsCdTe Solar Cells
CdTe Solar Cells
 

Ähnlich wie Bharatiya nabhikiya vidyut nigam limited (bhavini)

curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Sunil Singh
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
Carlo Avanzini
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
 

Ähnlich wie Bharatiya nabhikiya vidyut nigam limited (bhavini) (20)

Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...
 
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGTHE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
 
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
 
Shashi
ShashiShashi
Shashi
 
Lokesh Training report from BHEL
Lokesh Training report from BHELLokesh Training report from BHEL
Lokesh Training report from BHEL
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Appropriate technology part 2
Appropriate technology   part 2Appropriate technology   part 2
Appropriate technology part 2
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Summer Training Presentation
Summer Training PresentationSummer Training Presentation
Summer Training Presentation
 
4th yer ppt
4th yer  ppt4th yer  ppt
4th yer ppt
 
Industrial visit Report
 Industrial visit Report Industrial visit Report
Industrial visit Report
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Report on practical training NTPC BARH
Report on practical training NTPC BARHReport on practical training NTPC BARH
Report on practical training NTPC BARH
 
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
 
Scenario of Power Production and distribution in India
Scenario of Power Production and distribution in IndiaScenario of Power Production and distribution in India
Scenario of Power Production and distribution in India
 
Profile of the saravana global energy ltd
Profile of the saravana global energy ltdProfile of the saravana global energy ltd
Profile of the saravana global energy ltd
 
Power engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadavPower engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadav
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 

Mehr von engineeringwatch

Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
engineeringwatch
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
engineeringwatch
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
engineeringwatch
 

Mehr von engineeringwatch (20)

Eduindia UPTU Portfolio
Eduindia UPTU PortfolioEduindia UPTU Portfolio
Eduindia UPTU Portfolio
 
Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolio
 
Eduindia Portfolio
Eduindia PortfolioEduindia Portfolio
Eduindia Portfolio
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Booklet
 
Edu india presentation
Edu india presentationEdu india presentation
Edu india presentation
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation system
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Globus infocom limited
Globus infocom limitedGlobus infocom limited
Globus infocom limited
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Csir cftri
Csir cftriCsir cftri
Csir cftri
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
Hscc (india) ltd
Hscc (india) ltdHscc (india) ltd
Hscc (india) ltd
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
 
Braithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkataBraithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkata
 

Kürzlich hochgeladen

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
doktercalysta
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
jual Obat Aborsi Bandung, Wa : 085180626899 Apotik jual Obat Cytotec Di Bandung
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
CaitlinCummins3
 
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
Spesiialis Kandungan BPOM
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Aurelien Domont, MBA
 

Kürzlich hochgeladen (20)

Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
 
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptxExploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
 
The Risks of Ignoring Bookkeeping in Your Business
The Risks of Ignoring Bookkeeping in Your BusinessThe Risks of Ignoring Bookkeeping in Your Business
The Risks of Ignoring Bookkeeping in Your Business
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
 
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
(( wa 0851/7541/5434 )) Jual Obat Aborsi Di Surabaya - Cytotec Misoprostol 20...
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 

Bharatiya nabhikiya vidyut nigam limited (bhavini)

  • 1. BHAVINI’s NOMINATION FOR ENGINEERING EXCELLENCE AWARD - 2013 Presentation by Dr. Prabhat Kumar Distinguished Scientist and Chairman & Managing Director Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI) Department of Atomic Energy A Government of India Enterprise Kalpakkam 603 102, Tamilnadu, India
  • 2. INDIA’S THREE STAGE NUCLEAR POWER PROGRAMME 12 GWe, 30 Yr Natural Uranium Th E LE CT RI CIT Y PHWR Depleted U Pu 300 GWe, 30 Yr Pu FUELLED FAST BREEDERS Th E LE CT RI CIT Y 500 GWe, 500 Yr Pu U-233 U-233 FUELLED BREEDERS E LECTRICITY U-233 STAGE 1 STAGE 2 STAGE 3 BHAVINI has commenced activities on second stage
  • 3. • Prototype Fast Breeder Reactor (PFBR) is first of its kind nuclear reactor in the country • India’s very important and prestigious project • Advanced construction stage Fuel : PuO2+ UO2 Thermal Power : 1250 MWth Electrical output : 500 MWe Coolant : Liquid Na Thermal Efficiency : 40%
  • 4. Prototype Fast Breeder Reactor Flow Chart Fukushima incident could have been avoided if passive decay heat removal system like PFBR exist in their reactor PFBR, the only nuclear reactor in the country has secondary loop No power required for removal of decay heat
  • 5. PFBR REACTOR ASSEMBLY COMPONENTS Huge size reactor with complex constructional features Man standing 1 Main Vessel 2 Core Support Structure 3 Core Catcher 4 Grid Plate 5 Core 6 Inner vessel 7 Roof slab 8 Large Rotatable Plug 9 Small Rotatable Plug 10 Control Plug 11 Absorber Rod Drive Mechanism 12 Transfer Arm 13 Intermediate Heat Exchanger 14 Primary Sodium Pump 15 Safety Vessel
  • 6.
  • 7. Stringent administrative and quality controls at every stage
  • 8. What all makes PFBR project eligible for Engineering Excellence Award 2013 Indigenous and New Technology Many Challenges overcome successfully and Innovations in many activities Achievements and high success rate in every activities Manufacture of thin walled gigantic components for the first time in the country Handling & Erection of over dimensional equipment without single dent Design, Construction, Equipment fabrication and Regulatory approval in parallel
  • 9. Few points which make PFBR project innovative  First of its kind nuclear reactor in the country - Generates more Plutonium than it consumes  Manufacturing of gigantic equipment at site due to transportation constraints meeting all the stringent specification requirements  Development of special grade materials in large scale in the country never done in the past  Development of Novel equipment erection techniques  Huge quantity of highly reactive Sodium transfer without a single drop of leak - 1750 tones !!!
  • 11. Largest and deepest excavated pit in Indian nuclear plants immediately next to sea (200 meters from the sea)
  • 12. National record of largest concrete pouring in single stretch ever done by any industry in India Initially 5000 cubic meter concreting during 2005 and then surpassed BHAVINI’s own record by pouring 5800 cubic meter concrete
  • 14. Under sea Tunnel 567 meters length at 50 meters below the sea Constructed for the first time in the country
  • 15. Tsunami bund/Shore Protection/Outfall Channel Tsunami bund Shore protection Outfall Channel 15 15
  • 16. Coastal plantation Engineered sand dune Unique method of Tsunami protection system for the reactor site
  • 17. INCREASE IN ELEVATION The nuclear island finished floor level is raised to 15.7 meters for reactor protection from future Tsunami if any
  • 18. Fabrication of gigantic reactor components for PFBR
  • 19. Fabrication of over dimensional, thin walled reactor components at PFBR site
  • 20. FABRICATION OF MAIN VESSEL Great Challenge Made for the first time in the country Diameter achieved within 10mm tolerance for total 12900 mm
  • 21. INNER VESSEL Positional accuracy, alignment and orientation has to be maintained during fabrication
  • 22. To be lifted during erection without swing Man standing Safety Vessel with Thermal Insulation Panels
  • 23. Primary Pipe-Grid Plate assembly The Grid Plate supports all the core subassemblies of PFBR Welding to be done in constrained space meeting stringent specification requirements
  • 24.
  • 25. WELDING BETWEEN ROOF SLAB (RS) AND MAIN VESSEL (MV) Very important joint Weld carries about 2500 tones of weight Welding to be carried out insitu in confined space
  • 26. Tube to Tubesheet welding, Post Weld Heat Treatment and Micro-Focal radiography for PFBR Steam Generators Welding Nuclear Clean Hall Local Heat Treatment Micro-Focal Radiography
  • 27. Fabrication of 26 meters length Steam Generators in shop
  • 28. FABRICATED STEAM GENERATORS Straightness achieved within 3mm on 26,000 mm length of SG !!!!!!
  • 29. Challenges in header pullout to bend tubes welding for Sodium to Air Heat Exchangers Extremely Difficult
  • 30. Header Welding - Needs highly qualified and skilled welders
  • 31. Header Welding- Extremely difficult Challenge
  • 34. ERECTION OF MAJOR COMPONENTS Safety Vessel Main Vessel Thermal Baffle
  • 35. Safety Vessel is being lowered into Reactor Vault in a constrained space without swing
  • 37. ERECTION OF MAJOR COMPONENTS Grid Plate Inner Vessel Roof Slab
  • 39. STEAM GENERATOR (SG) ERECTION SPECIAL ARRANGEMENT FOR SHIFTING SG (25 METER LONG COMPONENT) PLACING SG IN SPECIAL TILTING MECHANISM TILTING FOR ERECTION CONNECTION OF LIFTING SLINGS LOWERING OF SG IN STEAM GENERATOR BUILDING SG LIFTED WITH HEAVY DUTY CRAWLER CRANE POSITIONING & ALIGNMENT FIXING OF HEATERS ON SG
  • 40. Operational excellence of the project  Meticulous planning and Management      Technical aspects Finance Human Resources Contracts and Material Management Safety & Security  Adjust as per design  No damage/dent on any equipment during erection  Financial Management  NIL report during the CIG audits  Awards
  • 41. INDUSTRIAL SAFETY AWARDS High performance in safety in the construction sector !!!!! “Industrial Safety Award” by Atomic Energy Regulatory Board “Suraksha Puraskar” by National Safety Council of India
  • 42.
  • 43.
  • 44. AWARDS - HUMAN RESOURCES Development and inspiration of true potential of human capital “Best HR Practices–2012 Award” by National Institute of Personnel Management (NIPM)
  • 45. Award for outstanding Concrete Structure “ICI (TNCC) - Ultratech Award” by Indian Concrete Institute
  • 46.
  • 47.
  • 48. How PFBR project has added to the self reliance of India in the chosen sector  Excellences by young team with an average age of 30 years  Documentation/Technical Papers - More than 300 papers in National/International Conferences/Journals by young company  Visit of 23,000 students at PFBR project site as a part of outreach programme
  • 49. Key impacts which PFBR project has made  Sustainability  Improvement in the quality standards  Creation of new and indigenous technological capability in terms of machining, welding, fabrication, testing, handling and erection  First Time right approach  Neighborhood Development • • • • • • • Indirect employment Education Infrastructure Health & hygiene Water supply Outreach programme Sports
  • 50. Science Lab Apparatus & Models donated to Annamalai Middle School, Desumughipet, Thirukalukundram Donated PC and books to Govt. Higher Sec. School, Pudupattinam on 28.04.2008 Donation of Personal computers to the schools Vocational Training Programme for Neighborhood village youth from 27.09.2005 Water Pump & Pump room for Panchayat Union Primary School Meiyur Vocational Training courses II batch commenced on 02.10.2006 Construction of Compound Wall- Panchayath Union Primary School Sadhrangapattinam Water Tank & Hand Wash Facility Panchayath Union Primary School Sadhrangapattinam
  • 51. Epidemiological Health Survey with Assistance from BHAVINI One R.O. Plant has been installed at Sadras Meyyur kuppam, Kalpakkam ` Sadras Primary Health Centre – Maternity Ward Sprayed mosquito repellant in the surrounding villages as preventive measure for chickengunia In co-ordination with Dr.M.S.Swaminathan Research Foundation, Chennai, action has been initiated to set up Village Knowledge Centre Bio-shield Hatchery – Self Help Groups
  • 52. Few points which illumine more on the future readiness of the project  Robust feedback system for -Knowledge management -Sharing of experiences with industry and academia -Win Win situation for all  Training, qualification & capability developmen  Strengthening of Industries -Tools/fixtures - Facilities - Techniques - Manufacture - Inspection  Standardized design and manufacturing  Modular concept to the possible extent
  • 53. Over all Night View PFBR the pride of nation 53