SlideShare ist ein Scribd-Unternehmen logo
1 von 3
RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                                           MEASURES IN PLACE


             Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                                                   Director – Adam Foster

                                                                                                   Assessor – Richard               Assessment Date:
Accommodation Assessed House
                                                                                                   O’Connor

                                                                                                                                          RISK (with controls)    Additional
                                         Who might be
          HAZARD                                                                     PRECAUTIONS/CONTROLS                                                         Controls
                                         harmed and
      potential for harm                                                 already in place to remove hazard, reduce risk level              L       S         R    Needed.
                                         how ?
                                                                                                                                                                 Details Over
Trips, Slips and Falls                                                   •    Keep wires away and tidy                                     2       2         4
                                                                         •    When filming party scene make sure everyone stays
                                                                              in an allocated area
                                                                         •    Make sure that we keep all of the scenes with the
                                                                              public sensible and keep the public out of it.
Fire Hazards                                                             •    Make sure we don’t have too many electronics
                                                                              running at the same time
                                                                         •    Keep the exits clear
                                                                                                                                           1       3         3
Accident                                                                 •    If people are drinking in the film don’t use real
                                                                              alcohol.                                                     1       2         2
Electrical                                                               •    If we use props such as DJ decks, lights and music
                                                                              systems we have to make sure we take relevant                1       2         2
                                                                              precautions such as volume of music, don’t make
                                                                              the lights either too dim or flash too much

The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)   LIKELIHOOD                                                   (S)       SEVERITY OF HAZARD                          (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                              (LxS).
1. Hazard      exists   very   infrequently;   limited   numbers    1.       Could cause minor injury only
exposed                                                             2.       Could cause major injury/3 day or more           Very high risks score 6 or 9
2.   Likely to occur; hazard exists intermittently or occurs           absence                           Moderate risks score 3 or 4
     occasionally                                              3.   Could cause fatality/severe injury   Low priority risks score      1 or 2
3.   Likely to occur soon; permanent hazard or occurs
     daily / repeatedly; many may be exposed                                                             VERY HIGH RISKS NEED IMMEDIATE ACTION


Signature of Health & Safety Officer                                                                      Date

Signature of Senior member of management with                                                             Date
Health and Safety Responsibility.

Review of Risk Assessment                                                                                 Date
Annual Review, Re-Visit or changes in Identified
Hazards
RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ]

Activity/Workplace Assessed:                                   Assessor:           Assessment Date:

                  ADDITIONAL CONTROLS NEEDED [ Mandatory For Risk Level 6 or 9 ]        To be actioned by:   Date Completed:

GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK.




TRAINING NEEDED:




COMMUNICATION:

Weitere ähnliche Inhalte

Ähnlich wie Risk assessment

Risk assessment troc
Risk assessment trocRisk assessment troc
Risk assessment trocDmeeThriller
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bankDmeeThriller
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSamHill129
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street finalDmeeThriller
 
Risk Assessment Form draft 1
Risk Assessment Form draft 1Risk Assessment Form draft 1
Risk Assessment Form draft 1Angharad Wilkins
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaLewisHodson1412
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment FormGraveney School
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1BigCheese1
 
Level 2 field worker general
Level 2   field worker generalLevel 2   field worker general
Level 2 field worker generalSECURE-ENERGY
 
Risk assessment form (Scarlett Rowe)
Risk assessment form (Scarlett Rowe)Risk assessment form (Scarlett Rowe)
Risk assessment form (Scarlett Rowe)asmediae12
 
Level 2 field worker general
Level 2   field worker generalLevel 2   field worker general
Level 2 field worker generalSECURE-ENERGY
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalDmeeThriller
 

Ähnlich wie Risk assessment (20)

Risk assessment classroom
Risk assessment classroomRisk assessment classroom
Risk assessment classroom
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment troc
Risk assessment trocRisk assessment troc
Risk assessment troc
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bank
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street final
 
Risk Assessment Form draft 1
Risk Assessment Form draft 1Risk Assessment Form draft 1
Risk Assessment Form draft 1
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment Form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Level 2 field worker general
Level 2   field worker generalLevel 2   field worker general
Level 2 field worker general
 
Risk assessment form (Scarlett Rowe)
Risk assessment form (Scarlett Rowe)Risk assessment form (Scarlett Rowe)
Risk assessment form (Scarlett Rowe)
 
Level 2 field worker general
Level 2   field worker generalLevel 2   field worker general
Level 2 field worker general
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene final
 

Mehr von empentertainment (20)

Me and my films
Me and my filmsMe and my films
Me and my films
 
Hip hop shakespeare moodboard
Hip hop shakespeare moodboardHip hop shakespeare moodboard
Hip hop shakespeare moodboard
 
My evaluation
My evaluationMy evaluation
My evaluation
 
How to analyse a film
How to analyse a filmHow to analyse a film
How to analyse a film
 
Log
LogLog
Log
 
Pitch presentation
Pitch presentationPitch presentation
Pitch presentation
 
Iron man 3 essay
Iron man 3 essayIron man 3 essay
Iron man 3 essay
 
Production diary
Production diaryProduction diary
Production diary
 
Speed genre analysis sheet
Speed genre analysis sheetSpeed genre analysis sheet
Speed genre analysis sheet
 
Superbad genre analysis sheet
Superbad genre analysis sheetSuperbad genre analysis sheet
Superbad genre analysis sheet
 
Sky fall genre analysis sheet
Sky fall genre analysis sheetSky fall genre analysis sheet
Sky fall genre analysis sheet
 
Me and my films
Me and my filmsMe and my films
Me and my films
 
Production schedule 15.04.13
Production schedule 15.04.13Production schedule 15.04.13
Production schedule 15.04.13
 
Remake assignment article
Remake assignment articleRemake assignment article
Remake assignment article
 
Me and my films
Me and my filmsMe and my films
Me and my films
 
Task 3
Task 3Task 3
Task 3
 
Task 222
Task 222Task 222
Task 222
 
Definitions
DefinitionsDefinitions
Definitions
 
Magazine questionnaire results
Magazine questionnaire resultsMagazine questionnaire results
Magazine questionnaire results
 
Music magazine questionnaire
Music magazine questionnaireMusic magazine questionnaire
Music magazine questionnaire
 

Risk assessment

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Director – Adam Foster Assessor – Richard Assessment Date: Accommodation Assessed House O’Connor RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Trips, Slips and Falls • Keep wires away and tidy 2 2 4 • When filming party scene make sure everyone stays in an allocated area • Make sure that we keep all of the scenes with the public sensible and keep the public out of it. Fire Hazards • Make sure we don’t have too many electronics running at the same time • Keep the exits clear 1 3 3 Accident • If people are drinking in the film don’t use real alcohol. 1 2 2 Electrical • If we use props such as DJ decks, lights and music systems we have to make sure we take relevant 1 2 2 precautions such as volume of music, don’t make the lights either too dim or flash too much The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9
  • 2. 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION Signature of Health & Safety Officer Date Signature of Senior member of management with Date Health and Safety Responsibility. Review of Risk Assessment Date Annual Review, Re-Visit or changes in Identified Hazards
  • 3. RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ] Activity/Workplace Assessed: Assessor: Assessment Date: ADDITIONAL CONTROLS NEEDED [ Mandatory For Risk Level 6 or 9 ] To be actioned by: Date Completed: GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK. TRAINING NEEDED: COMMUNICATION: