ATCO-BaasKaar Roadmap to
SAP Quality Award 2014
Prepared by Ahmed Rami Elsherif
26/01/2015
ERP Projects Challenges
Failure Factor %
Executive Support 18%
User Involvement 16%
Experienced Project Management 14%
Clear Business Objective 12%
Clear Project Scope 10%
Standard Software Infrastructure 8%
Firm Basic Requirements 6%
Formal Methodology 6%
Reliable Estimates of Budget & Time 5%
Others 5%
Total 100%
Based on the Chaos study by Standish
group only 30% of ERP projects are
considered successful, the rest is either
failure or challenged. The same study
identifies to following as the top 10 reasons
for ERP projects failures:
As you can see from the
top 5 reasons of failure
that such a project is all
about people and
involvement for which
we all have to commit
even before we allocate
the funds.
This is not an IT or
Finance project it is a
Business
Transformation Project ,
for which we all have to
participate actively.
What could go wrong in such a project?
How we got this project right on track
and WON the SAP Quality Award?
Delivering Successful Solutions
Following ASAP and PMBOK Project Management
Methodologies and Best Practices.
The Project Management Body of Knowledge (PMBOK) is a collection of
processes and knowledge areas accepted as best practice for the project
management profession developed by the Project Management Institute.
 Accelerated SAP (ASAP) is SAP's standard implementation methodology. It
contains the Roadmap, a step-by-step guide that incorporates experience from
many years of implementing R/3.
 Accelerated SAP contains a multitude of tools, accelerators and useful
information to assist all team members in implementing R/3. Quality checks are
incorporated at the end of each phase to easily monitor deliverables and critical
success factors.
And committing to SAP 10 Quality Standards Explained
next…..
Principle 1: Anchor Business value firmly in
your project.
1. The project main objective is establishing a solid ERP infrastructure that
will be able to handle business current and future growth requirements.
2. Improve business processes by following SAP business Process Best
Practices.
3. Unify processes and master data across different business units by making
use of SAP functionality in that respect.
4. Introduce production planning (PP), Plant Maintenance (PM), customer
service (CS), Payroll (HCM), and Fixed Assets.
Principle 2: Determine clear requirements early
on.
1. Requirement gathering started early in the project preparation phase (1
month) and continued during the Business Blueprint phase (2 Month).
2. Senior FI consultant was involved from day-one by visiting different
business units and understanding their business requirements from FI and
Operational point view.
3. More detailed requirement gathering was done by the different specialized
consultants based on the preliminary findings of the FI consultant.
4. Interviews and business walkthroughs conducted with end users and
middle and higher management in each business unit.
5. Findings and proposed solutions verified and confirmed with business unit
management and corporate management.
Principle 3: Cooperate with stakeholders and
use a proper governance model
1. Business unit’s management teams were participant in the ERP selection process.
They have attended evaluation and solution presentation by SAP, Oracle and
Microsoft. Based on their scoring and other criteria’s set by IT/ERP Manger, CFO
and CEO SAP was selected.
2. Orientation on ASAP implementation mythology was given to higher management
and to end users before the kickoff of the project. Two important messages
where stressed in such meetings:
a. The fact that this is not only an IT project but mainly a business
transformation project.
b. Stakeholder (end user, Manger and executives) active participation is
indispensable for the success of the project.
3. Project charter was drafted jointly by ATCO and BaasKaar project managers and
approved by ATCO executive management before project start.
4. Kick off meeting held with the attendance of ATCO executive management, ATCO-
SAP team, and implementation partner team.
Principle 4: Ensure Timely delivery and
effective tracking.
1. High level project scope and time line were agreed with implementation
partner and ATCO stakeholders before project kickoff.
2. A better understanding of project scope and requirements, during project
preparation phase a led to some schedule adjustments. These adjustments
in time and budget (project 2 month extension) were discussed and formally
agreed on with implementation partner and ATCO project sponsors.
3. Go live date was split into 2 groups of company codes.
4. Further discussions and consideration happened during the business
blueprinting phase , which resulted in modifying some milestones while
maintaining the overall project timing.
5. Weekly reports where generated and discussed comparing actual versus
planned activities status and who is the responsible person. This reports
discussed between ATCO and BaasKaar teams.
6. Project steering committee was informed on a monthly basis on the status
of the project schedule, and involved when needed to facilitate activities that
might affect the project schedule.
Principle 5: Staff Project with sufficient,
competent, motivated people.
1. Project was announced to all company employees, and volunteers were
requested to participate. They were asked to fill in a form explain how they
can contribute to the project and what are their areas of experience.
2. In all orientation session with projects sponsors and business units
managers it was always highly stressed the importance of committing their
star employees to the project.
3. Business units were asked to nominate their power users in each module.
4. Fully dedicated team was formed from IT for the project.
Principle 6: Apply appropriate methodology
and plan for quality.
1. ASAP Implementation methodology and PMI-PMBOK standards were fully
applied in the project because they are tested and reliable project
management tools.
2. Joint ATCO-BaasKaarProject planning session held.
3. Weakly progress report of Actual Vs Planned activates reviewed.
4. Requirements gathering session held between consultants and end users.
Confirmation session where held with general manager.
5. Blue prints were presented and explained to the business unit managers,
before handing over for sign off. Question and answer session were held to
clarify the requirements.
6. User acceptance testing session realized during the realization phase,
together with training sessions. UAT was formally accepted by user sign
offs.
7. Over all phase sign off was done based on phase deliverables individual
sign offs.
Principle 7: Identify and manage risks jointly
throughout the project.
Risk management plan was established during the early stage. The key
elements of the project Risk Management process are as follows:
 
1.Risk Planning concerning with determining how to approach the Risk
Management activities for business area or project.
2.Risk Identification involving identifying the threats to business or project
objectives.
3.Risk Analysis involving determining which risks are the most important by way
of a quantitative and qualitative assessment of the identified risks.
4.Risk Response involving deciding what actions to take concerning specific
risks or opportunities.
5.Risk Monitoring-keeping track of the risks and the corresponding actions, and
looking for new threats to predefined objectives.
Three most important risks identified during
the project were
1.Accuracy of requirements: To mitigate these risk requirements were
confirmed vertically within the department and cross checked with other related
departments.
2.Data migration: requirements for master data and opening transactions were
shared with the concerned departments early in the blueprinting stage. Owners,
responsible and delivery date was followed on jointly by ATCO and
Implementation partner weekly.
3.Training and user acceptance testing: training schedule was circulated and
GM where asked to assign staff for the training. Attendance sheets signed by
the users accepting the training and the solution testing. Different timing
choices where given to accommodate daily routine work and SAP training.
Principle 8: Exploit standard software using
solution best practices
1. Follow SAP best practices was a main assumption in the project conception
and was followed strictly throughout the project.
2. Custom developments were very minimally used for reports and smart
forms.
3. Integrations and interfaces with other systems were identified early in the
blueprinting phase.
4. These interfaces were approved functionally with the end user, before
sending them for development.
Principle 9: Achieve production readiness:
1. Routines for data extraction and conversion were discussed early on
between ATCO and BaasKaar teams. This includes AP/AR/GL Balances,
Stock, Open PO and SD.
2. Routines tested in quality environment.
3. Cutover plan discussed thoroughly between ATCO and BaasKaar teams.
Agreed to lunch SD, MM, PP , PM and finally FI.
4. Closing dates were presented and agreed on with operations and finance
departments.
5. Schedule of delivery of opening balance was closely monitored and
controlled.
6. Go live was announced one week ahead with the distribution of flyers with
frequently used T-Codes and contact information of ATCO SAPDESK.
Principle 10: Use organizational change
management to transform business:
1. Buy-in, collective ownership and consensus at all organizational levels were
main themes for this project. Starting with the ERP vendor selection
process where all business units general managers and key users where
actively involved ending up with going live and support.
2. A serious of executive and managerial presentation were delivered explain
that this a business project in the first place and in technology one in the
second place.
3. Business unit level kick of meeting explained, about possible difficulties
during the project and how we plan to overcome them.
4. The importance of SAP business best practice process was repeatedly
stressed and explained.
5. Measured the success of the strategy by hearing more “We” and less
“SAP,IT people”.
6. Extensive end user training.
In Summary we attribute our success to:
1.Very intensive work on project communication and stakeholders
management.
2.Clear distribution of responsibilities between ATCO team and
BaasKaar teams.
3.Adherence to ASAP, Agile and PMI-PMBOK project management
tools and standards
4.Following SAP best practice processes and minimizes customization.
5.Good understanding of business requirements by the ATCO IT team
and transfer of this knowledge to BaasKaar teams.
6.Very enthusiastic end users’ contribution and cordial environment
between users and the implementation (Baaskaar & ATCO-IT) teams.

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...Shamil Habet
 
ASAP methodology overview
ASAP methodology overviewASAP methodology overview
ASAP methodology overviewBogdan Gorka
 
SAP ASAP 8 overview
SAP ASAP 8 overviewSAP ASAP 8 overview
SAP ASAP 8 overviewmanojdhir
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...Edureka!
 
What is new in pmbok ver 6
What is new in pmbok ver 6What is new in pmbok ver 6
What is new in pmbok ver 6Knowledge Max
 
PMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVEPMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVEKristinRomanoPMPPMIR
 
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...Shamil Habet
 
SAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key TaskSAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key TaskAnjali Rao
 
ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System Ankit Sharma
 
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-MusallamiChange in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-MusallamiAhmad Al-Musallami. MSc, PMP
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)Shamil Habet
 
ASAP Methodology
ASAP MethodologyASAP Methodology
ASAP Methodologyarun_bala1
 
Asap methodology 1st phase- project preparation
Asap methodology  1st phase- project preparationAsap methodology  1st phase- project preparation
Asap methodology 1st phase- project preparationRangabashyam S
 
PMO Business Case - QOREX simplified business case - PMO management and repor...
PMO Business Case - QOREX simplified business case - PMO management and repor...PMO Business Case - QOREX simplified business case - PMO management and repor...
PMO Business Case - QOREX simplified business case - PMO management and repor...Phil Trickey
 

Was ist angesagt? (19)

PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...PMP Chapter 3 of 6  Planning Process Group (24- Processes) (Based on PMBOK 6t...
PMP Chapter 3 of 6 Planning Process Group (24- Processes) (Based on PMBOK 6t...
 
Asap overview
Asap overviewAsap overview
Asap overview
 
ASAP methodology overview
ASAP methodology overviewASAP methodology overview
ASAP methodology overview
 
ASAP 8.0 Methodology
ASAP 8.0 MethodologyASAP 8.0 Methodology
ASAP 8.0 Methodology
 
SAP ASAP 8 overview
SAP ASAP 8 overviewSAP ASAP 8 overview
SAP ASAP 8 overview
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
 
SAP Implementation Phase!!
SAP Implementation Phase!!SAP Implementation Phase!!
SAP Implementation Phase!!
 
What is new in pmbok ver 6
What is new in pmbok ver 6What is new in pmbok ver 6
What is new in pmbok ver 6
 
SAP ASAP 8 Methodology
SAP ASAP 8 MethodologySAP ASAP 8 Methodology
SAP ASAP 8 Methodology
 
PMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVEPMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVE
 
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
 
SAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key TaskSAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key Task
 
ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System
 
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-MusallamiChange in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
 
Understand SAP ASAP 8.0
Understand SAP ASAP 8.0Understand SAP ASAP 8.0
Understand SAP ASAP 8.0
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
 
ASAP Methodology
ASAP MethodologyASAP Methodology
ASAP Methodology
 
Asap methodology 1st phase- project preparation
Asap methodology  1st phase- project preparationAsap methodology  1st phase- project preparation
Asap methodology 1st phase- project preparation
 
PMO Business Case - QOREX simplified business case - PMO management and repor...
PMO Business Case - QOREX simplified business case - PMO management and repor...PMO Business Case - QOREX simplified business case - PMO management and repor...
PMO Business Case - QOREX simplified business case - PMO management and repor...
 

Ähnlich wie ATCO-BaasKaar Roadmap to SAP Quality Award 2014

PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposalHugh Shults
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability frameworkRobert Greca, PMP, SA
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a projectRichardPierce28
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)Rintu Das
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdfSurashmie Kaalmegh
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah Nee
 

Ähnlich wie ATCO-BaasKaar Roadmap to SAP Quality Award 2014 (20)

2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Just Text PPM March 20 2015
Just Text PPM March 20 2015Just Text PPM March 20 2015
Just Text PPM March 20 2015
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
IT projects
IT projectsIT projects
IT projects
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability framework
 
PACMTN Portfolio1
PACMTN Portfolio1PACMTN Portfolio1
PACMTN Portfolio1
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a project
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Prince2017 part 2
Prince2017   part 2Prince2017   part 2
Prince2017 part 2
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016
 
Program management-steps
Program management-stepsProgram management-steps
Program management-steps
 

Mehr von Ahmed Rami Elsherif, PMP, ITBMC

Mehr von Ahmed Rami Elsherif, PMP, ITBMC (20)

Leading change
Leading changeLeading change
Leading change
 
Liderando el Cambio
Liderando el CambioLiderando el Cambio
Liderando el Cambio
 
Ahmed Rami Elsherif, CV
Ahmed Rami Elsherif, CVAhmed Rami Elsherif, CV
Ahmed Rami Elsherif, CV
 
Bolivia decide presentacion
Bolivia decide presentacionBolivia decide presentacion
Bolivia decide presentacion
 
Invoicing your client with wikiprojects
Invoicing your client with wikiprojectsInvoicing your client with wikiprojects
Invoicing your client with wikiprojects
 
Wikiprojects: Una Introducción
Wikiprojects: Una Introducción Wikiprojects: Una Introducción
Wikiprojects: Una Introducción
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Ahmed's 1 Page CV
Ahmed's 1 Page CVAhmed's 1 Page CV
Ahmed's 1 Page CV
 
ATCO Engineering - Process Evaluation
ATCO Engineering - Process EvaluationATCO Engineering - Process Evaluation
ATCO Engineering - Process Evaluation
 
Process groups and knowledge areas PMBOK 5th Edition
Process groups and knowledge areas PMBOK 5th EditionProcess groups and knowledge areas PMBOK 5th Edition
Process groups and knowledge areas PMBOK 5th Edition
 
dotProject Tutorial
dotProject TutorialdotProject Tutorial
dotProject Tutorial
 
Building your company's vision
Building your company's visionBuilding your company's vision
Building your company's vision
 
Introduction to dotProject
Introduction to dotProjectIntroduction to dotProject
Introduction to dotProject
 
Wikiprojects
WikiprojectsWikiprojects
Wikiprojects
 
HR Transformation
HR TransformationHR Transformation
HR Transformation
 
Introduction to ERP
Introduction to ERPIntroduction to ERP
Introduction to ERP
 
Sap Reporting
Sap ReportingSap Reporting
Sap Reporting
 
Sap Integrations
Sap IntegrationsSap Integrations
Sap Integrations
 
Sap Downstream web interfaces
Sap Downstream web interfacesSap Downstream web interfaces
Sap Downstream web interfaces
 
Business Intelligence Portal
Business Intelligence PortalBusiness Intelligence Portal
Business Intelligence Portal
 

Kürzlich hochgeladen

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 

Kürzlich hochgeladen (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

ATCO-BaasKaar Roadmap to SAP Quality Award 2014

  • 1. ATCO-BaasKaar Roadmap to SAP Quality Award 2014 Prepared by Ahmed Rami Elsherif 26/01/2015
  • 2. ERP Projects Challenges Failure Factor % Executive Support 18% User Involvement 16% Experienced Project Management 14% Clear Business Objective 12% Clear Project Scope 10% Standard Software Infrastructure 8% Firm Basic Requirements 6% Formal Methodology 6% Reliable Estimates of Budget & Time 5% Others 5% Total 100% Based on the Chaos study by Standish group only 30% of ERP projects are considered successful, the rest is either failure or challenged. The same study identifies to following as the top 10 reasons for ERP projects failures: As you can see from the top 5 reasons of failure that such a project is all about people and involvement for which we all have to commit even before we allocate the funds. This is not an IT or Finance project it is a Business Transformation Project , for which we all have to participate actively.
  • 3. What could go wrong in such a project?
  • 4. How we got this project right on track and WON the SAP Quality Award?
  • 5. Delivering Successful Solutions Following ASAP and PMBOK Project Management Methodologies and Best Practices. The Project Management Body of Knowledge (PMBOK) is a collection of processes and knowledge areas accepted as best practice for the project management profession developed by the Project Management Institute.  Accelerated SAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step guide that incorporates experience from many years of implementing R/3.  Accelerated SAP contains a multitude of tools, accelerators and useful information to assist all team members in implementing R/3. Quality checks are incorporated at the end of each phase to easily monitor deliverables and critical success factors. And committing to SAP 10 Quality Standards Explained next…..
  • 6. Principle 1: Anchor Business value firmly in your project. 1. The project main objective is establishing a solid ERP infrastructure that will be able to handle business current and future growth requirements. 2. Improve business processes by following SAP business Process Best Practices. 3. Unify processes and master data across different business units by making use of SAP functionality in that respect. 4. Introduce production planning (PP), Plant Maintenance (PM), customer service (CS), Payroll (HCM), and Fixed Assets.
  • 7. Principle 2: Determine clear requirements early on. 1. Requirement gathering started early in the project preparation phase (1 month) and continued during the Business Blueprint phase (2 Month). 2. Senior FI consultant was involved from day-one by visiting different business units and understanding their business requirements from FI and Operational point view. 3. More detailed requirement gathering was done by the different specialized consultants based on the preliminary findings of the FI consultant. 4. Interviews and business walkthroughs conducted with end users and middle and higher management in each business unit. 5. Findings and proposed solutions verified and confirmed with business unit management and corporate management.
  • 8. Principle 3: Cooperate with stakeholders and use a proper governance model 1. Business unit’s management teams were participant in the ERP selection process. They have attended evaluation and solution presentation by SAP, Oracle and Microsoft. Based on their scoring and other criteria’s set by IT/ERP Manger, CFO and CEO SAP was selected. 2. Orientation on ASAP implementation mythology was given to higher management and to end users before the kickoff of the project. Two important messages where stressed in such meetings: a. The fact that this is not only an IT project but mainly a business transformation project. b. Stakeholder (end user, Manger and executives) active participation is indispensable for the success of the project. 3. Project charter was drafted jointly by ATCO and BaasKaar project managers and approved by ATCO executive management before project start. 4. Kick off meeting held with the attendance of ATCO executive management, ATCO- SAP team, and implementation partner team.
  • 9. Principle 4: Ensure Timely delivery and effective tracking. 1. High level project scope and time line were agreed with implementation partner and ATCO stakeholders before project kickoff. 2. A better understanding of project scope and requirements, during project preparation phase a led to some schedule adjustments. These adjustments in time and budget (project 2 month extension) were discussed and formally agreed on with implementation partner and ATCO project sponsors. 3. Go live date was split into 2 groups of company codes. 4. Further discussions and consideration happened during the business blueprinting phase , which resulted in modifying some milestones while maintaining the overall project timing. 5. Weekly reports where generated and discussed comparing actual versus planned activities status and who is the responsible person. This reports discussed between ATCO and BaasKaar teams. 6. Project steering committee was informed on a monthly basis on the status of the project schedule, and involved when needed to facilitate activities that might affect the project schedule.
  • 10. Principle 5: Staff Project with sufficient, competent, motivated people. 1. Project was announced to all company employees, and volunteers were requested to participate. They were asked to fill in a form explain how they can contribute to the project and what are their areas of experience. 2. In all orientation session with projects sponsors and business units managers it was always highly stressed the importance of committing their star employees to the project. 3. Business units were asked to nominate their power users in each module. 4. Fully dedicated team was formed from IT for the project.
  • 11. Principle 6: Apply appropriate methodology and plan for quality. 1. ASAP Implementation methodology and PMI-PMBOK standards were fully applied in the project because they are tested and reliable project management tools. 2. Joint ATCO-BaasKaarProject planning session held. 3. Weakly progress report of Actual Vs Planned activates reviewed. 4. Requirements gathering session held between consultants and end users. Confirmation session where held with general manager. 5. Blue prints were presented and explained to the business unit managers, before handing over for sign off. Question and answer session were held to clarify the requirements. 6. User acceptance testing session realized during the realization phase, together with training sessions. UAT was formally accepted by user sign offs. 7. Over all phase sign off was done based on phase deliverables individual sign offs.
  • 12. Principle 7: Identify and manage risks jointly throughout the project. Risk management plan was established during the early stage. The key elements of the project Risk Management process are as follows:   1.Risk Planning concerning with determining how to approach the Risk Management activities for business area or project. 2.Risk Identification involving identifying the threats to business or project objectives. 3.Risk Analysis involving determining which risks are the most important by way of a quantitative and qualitative assessment of the identified risks. 4.Risk Response involving deciding what actions to take concerning specific risks or opportunities. 5.Risk Monitoring-keeping track of the risks and the corresponding actions, and looking for new threats to predefined objectives.
  • 13. Three most important risks identified during the project were 1.Accuracy of requirements: To mitigate these risk requirements were confirmed vertically within the department and cross checked with other related departments. 2.Data migration: requirements for master data and opening transactions were shared with the concerned departments early in the blueprinting stage. Owners, responsible and delivery date was followed on jointly by ATCO and Implementation partner weekly. 3.Training and user acceptance testing: training schedule was circulated and GM where asked to assign staff for the training. Attendance sheets signed by the users accepting the training and the solution testing. Different timing choices where given to accommodate daily routine work and SAP training.
  • 14. Principle 8: Exploit standard software using solution best practices 1. Follow SAP best practices was a main assumption in the project conception and was followed strictly throughout the project. 2. Custom developments were very minimally used for reports and smart forms. 3. Integrations and interfaces with other systems were identified early in the blueprinting phase. 4. These interfaces were approved functionally with the end user, before sending them for development.
  • 15. Principle 9: Achieve production readiness: 1. Routines for data extraction and conversion were discussed early on between ATCO and BaasKaar teams. This includes AP/AR/GL Balances, Stock, Open PO and SD. 2. Routines tested in quality environment. 3. Cutover plan discussed thoroughly between ATCO and BaasKaar teams. Agreed to lunch SD, MM, PP , PM and finally FI. 4. Closing dates were presented and agreed on with operations and finance departments. 5. Schedule of delivery of opening balance was closely monitored and controlled. 6. Go live was announced one week ahead with the distribution of flyers with frequently used T-Codes and contact information of ATCO SAPDESK.
  • 16. Principle 10: Use organizational change management to transform business: 1. Buy-in, collective ownership and consensus at all organizational levels were main themes for this project. Starting with the ERP vendor selection process where all business units general managers and key users where actively involved ending up with going live and support. 2. A serious of executive and managerial presentation were delivered explain that this a business project in the first place and in technology one in the second place. 3. Business unit level kick of meeting explained, about possible difficulties during the project and how we plan to overcome them. 4. The importance of SAP business best practice process was repeatedly stressed and explained. 5. Measured the success of the strategy by hearing more “We” and less “SAP,IT people”. 6. Extensive end user training.
  • 17. In Summary we attribute our success to: 1.Very intensive work on project communication and stakeholders management. 2.Clear distribution of responsibilities between ATCO team and BaasKaar teams. 3.Adherence to ASAP, Agile and PMI-PMBOK project management tools and standards 4.Following SAP best practice processes and minimizes customization. 5.Good understanding of business requirements by the ATCO IT team and transfer of this knowledge to BaasKaar teams. 6.Very enthusiastic end users’ contribution and cordial environment between users and the implementation (Baaskaar & ATCO-IT) teams.

Hinweis der Redaktion

  1. Why use a methodological approach to Implementation? Investing in a new business solution can bring major benefits to an organisation. The success or failure of a new Solution depends on how well it is implemented. A recent survey of software implementations showed that over 30% of projects perceived to have failed did so because of a lack of effective project planning. On the other hand less than 10% of projects perceived to have failed did so because of technology driven causes. AcceleratedSAP is the SAP Methodology for the Implementation (Initial, Upgrade, Extension) of SAP Solutions and supports cost effective and speedy Implementation of the SAP Solutions It has the following constituent parts: AcceleratedSAP (Methodology) Contentthe structured methodology content (processes, procedures, accelerators checklists, links to Standard SAP Documentation, etc. necessary for the Implementation (Initial, upgrade, Extension) of SAP Solutions. AcceleratedSAP (Methodology) Toolsetthe tools necessary for the Implementation (Initial, Upgrade, Extension, Template, etc. ) of SAP Solutions. AcceleratedSAP (Methodology) Roadmapsthe guidance and navigation necessary for the Implementation (Initial, upgrade, Extension) of SAP Solutions. AcceleratedSAP (Methodology) ExpertiseSAP knows SAP best and based on its vast experience provides this knowledge in concentrated form to its customers & partners through AcceleratedSAP.