1. FILM PRODUCTION RISK ASSESSMENT
This risk assessment is for Harrop Fold High School, Manchester, Little Hulton, Hilton Lane, M28 OSY. It will be filmed in the recording studio
and the main entrance. There are small risks; however, to ensure it is safe to film, we have put together this assessment. We will cover
equipment and filming space.
HAZARD IN WHICH SCENE PERSON WHO MAY PROPERTY THAT RISK CONTROLS RISK ASSESSMENT FURTHER ACTION
IS THIS HAZARD BE HARMED COULD BE ALREADY IN PLACE *See chart TO BE TAKEN
PRESENT? DAMAGED
Wires Most scenes Cast and crew Instruments Tape wires down to Low Yellow tape used so
floor. it’s clearer to see.
Electrical Every Scene Cast and Crew Instruments and Keep track of how Moderate Take breaks from
equipment recording much the equipment using equipment.
equipment is being used so it
isn’t over powered.
Confined places Most scenes Cast and crew Instruments Don’t have too Low Know where you
many people in one are meant to be
room at one time, during filming.
only if needed.
Risk Assessment Chart
Hazard likelihood / Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (i.e. Someone could get EXTREME
seriously hurt)
Could happen or mild consequences (i.e. someone could suffer a minor HIGH
injury)
Unlikely to happen or minor consequences (i.e. production could be slightly MODERATE
delayed)
Rarely happens and very insignificant consequences LOW