Assessment of slab bridges through proofAssessment of slab bridges through proof
loading in the Netherlandsloading in the Netherlands
Eva Lantsoght, Cor van der Veen, Ane de Boer,
Dick Hordijk
OverviewOverviewOverviewOverview
• Introduction
• Pilot proof load tests
• Laboratory experiments
• Recommendations
• Preparation of proof load tests
• Execution of proof load tests
• Analysis of proof load tests
• Summary and conclusions
Slab shear experiments, TU Delft
Why load testing?Why load testing?
Bridges from 60s and 70s
The Hague in 1959
Increased live loads
common heavy and long truck (600 kN)
End of service life + larger loads
Safety philosphy of proof load testingSafety philosphy of proof load testing
• Safety philosophy
• Stop criteria:
•Further loading not
permitted
•Failure near
•Irreversible damage
near
MSc Thesis W. Vos
Research needResearch needResearch needResearch need
Guideline for proof loading of existing
(RC slab) bridges for the Netherlands
Flexure + shear
TU Delft Proof Load TestsTU Delft Proof Load Tests
• Proof load tests:
•Heidijk 2007
•Medemblik 2009
•Vlijmen-Oost 2013
•Halvemaans Bridge 2014
•Ruytenschildt Bridge 2014
•Viaduct Zijlweg 2015
•Viaduct De Beek 2015
TU Delft proof load tests
Laboratory testingLaboratory testingLaboratory testingLaboratory testing
• Ruytenschildt beams
• Cyclic loading protocol
• Analysis of stop criteria
• Beams with plain bars
• Effect of number of cycles
• Effect of loading speed
• Load levels
• Analysis of stop criteria
Beams RSB01 after failure (Yang, 2015)
Yang, Y. (2015). "Experimental Studies on the Structural Behaviours of Beams from Ruytenschildt Bridge,"
Stevin Report 25.5-15-09, Delft University of Technology, Delft, 76 pp.
Beams RSB02B after failure (Yang, 2015)
Preparation steps (1)Preparation steps (1)
• Preliminary inspection and
rating
• Dimensions and material
properties
• Live load: lane load +
design tandem
• RBK load levels
•Different β
•Different load factors
•γsw = 1.1 for proof load testing
Preparation steps (2)Preparation steps (2)
• Critical position
•Bending moment: largest
moment
•Shear: 2.5d from support
• Required proof load
•Same shear or bending
moment as with load
combination
•Value → considered safety
level
Preparation steps (3)Preparation steps (3)
• Sensor plan:
•Deflection profiles in longitudinal and
transverse direction
•Deflection at supports
•Strain on bottom of cross-section
•Reference strain measurements to
correct for T
•Opening existing cracks
•Opening new cracks
•Applied load => load cells
•Acoustic emission measurements
(current research)
Execution steps (1)Execution steps (1)
• Cyclic loading scheme
•Check linearity and reproducibility of measurements
•Baseline load level
• Load levels ≈ safety levels CC3 RBK:
• Low level to check instrumentation
• SLS
• Intermediate level
• Target proof load
Execution steps (2)Execution steps (2)
Execution steps (3)Execution steps (3)Execution steps (3)Execution steps (3)
Analysis StepsAnalysis Steps
• Data analysis
•Correct for T
•Correct for support
displacements
•Make final plots for report
Summary and conclusionsSummary and conclusions
• Proof loading to approve existing
bridges, also for shear
• Pilot proof load tests in the
Netherlands + laboratory tests
• Current recommendations
• Further laboratory testing on slabs in
shear is necessary Ruytenschildt Bridge
Contact:
Eva Lantsoght
E.O.L.Lantsoght@tudelft.nl // elantsoght@usfq.edu.ec
+31(0)152787449

Weitere ähnliche Inhalte

Was ist angesagt?

Defining loading criteria for proof loading
Defining loading criteria for proof loading Defining loading criteria for proof loading
Defining loading criteria for proof loading
Eva Lantsoght
 
The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...
Eva Lantsoght
 
Shear capacity of the ruytenschildt bridge
Shear capacity of the ruytenschildt bridge Shear capacity of the ruytenschildt bridge
Shear capacity of the ruytenschildt bridge
Eva Lantsoght
 
Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt BridgeApplication of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
Eva Lantsoght
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...
Eva Lantsoght
 

Was ist angesagt? (20)

Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...
 
Proof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekProof load testing of the viaduct De Beek
Proof load testing of the viaduct De Beek
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...
 
Proof loading of existing bridges
Proof loading of existing bridges Proof loading of existing bridges
Proof loading of existing bridges
 
Defining loading criteria for proof loading
Defining loading criteria for proof loading Defining loading criteria for proof loading
Defining loading criteria for proof loading
 
Shear Assessment of Slab Bridges
Shear Assessment of Slab BridgesShear Assessment of Slab Bridges
Shear Assessment of Slab Bridges
 
Modeling of symmetrically and asymmetrically loaded reinforced concrete slabs
Modeling of symmetrically and asymmetrically loaded reinforced concrete slabsModeling of symmetrically and asymmetrically loaded reinforced concrete slabs
Modeling of symmetrically and asymmetrically loaded reinforced concrete slabs
 
The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...
 
Shear capacity of the ruytenschildt bridge
Shear capacity of the ruytenschildt bridge Shear capacity of the ruytenschildt bridge
Shear capacity of the ruytenschildt bridge
 
Improved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concreteImproved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concrete
 
Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt BridgeApplication of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
 
Bridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsBridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabs
 
Shear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt BridgeShear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt Bridge
 
Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...
 
Extending service life of existing bridges
Extending service life of existing bridgesExtending service life of existing bridges
Extending service life of existing bridges
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...
 
Sparrows offshore modular rental crane presentation august 2014
Sparrows offshore modular rental crane presentation   august 2014Sparrows offshore modular rental crane presentation   august 2014
Sparrows offshore modular rental crane presentation august 2014
 
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
 
Introduction to litewalk
Introduction to litewalkIntroduction to litewalk
Introduction to litewalk
 
Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...
Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...
Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...
 

Ähnlich wie Assessment of slab bridges through proof loading in the Netherlands

Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...
Eva Lantsoght
 
Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...
Eva Lantsoght
 
Structural Engineering.ppt
Structural Engineering.pptStructural Engineering.ppt
Structural Engineering.ppt
Arshi23
 

Ähnlich wie Assessment of slab bridges through proof loading in the Netherlands (19)

Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...
 
Reliability index after proof load testing: viaduct De Beek
Reliability index after proof load testing: viaduct De BeekReliability index after proof load testing: viaduct De Beek
Reliability index after proof load testing: viaduct De Beek
 
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
 
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
 
Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...
 
Determination of loading protocol and stop criteria for proof loading with be...
Determination of loading protocol and stop criteria for proof loading with be...Determination of loading protocol and stop criteria for proof loading with be...
Determination of loading protocol and stop criteria for proof loading with be...
 
CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria
CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria
CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria
 
Capacity ruytenschildtbrug
Capacity ruytenschildtbrug Capacity ruytenschildtbrug
Capacity ruytenschildtbrug
 
Structural Engineering.ppt
Structural Engineering.pptStructural Engineering.ppt
Structural Engineering.ppt
 
Shear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt BridgeShear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt Bridge
 
Quick Scan Method
Quick Scan MethodQuick Scan Method
Quick Scan Method
 
Lekenpraatje
Lekenpraatje Lekenpraatje
Lekenpraatje
 
Prolonging the service life of existing reinforced concrete slab bridges
Prolonging the service life of existing reinforced concrete slab bridgesProlonging the service life of existing reinforced concrete slab bridges
Prolonging the service life of existing reinforced concrete slab bridges
 
Risk Mitigation for Highway and Railway Bridges
Risk Mitigation for Highway and Railway BridgesRisk Mitigation for Highway and Railway Bridges
Risk Mitigation for Highway and Railway Bridges
 
Testing to failure of the Ruytenschildt Bridge
Testing to failure of the Ruytenschildt BridgeTesting to failure of the Ruytenschildt Bridge
Testing to failure of the Ruytenschildt Bridge
 
2012 MATC Spring Lecture Series: Andrzej Nowak
2012 MATC Spring Lecture Series: Andrzej Nowak2012 MATC Spring Lecture Series: Andrzej Nowak
2012 MATC Spring Lecture Series: Andrzej Nowak
 
Modeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub StructureModeling and Design of Bridge Super Structure and Sub Structure
Modeling and Design of Bridge Super Structure and Sub Structure
 
Shear capacity of slabs under a combination of loads
Shear capacity of slabs under a combination of loadsShear capacity of slabs under a combination of loads
Shear capacity of slabs under a combination of loads
 
Concrete slabs under a combination of loads
Concrete slabs under a combination of loadsConcrete slabs under a combination of loads
Concrete slabs under a combination of loads
 

Mehr von Eva Lantsoght

Mehr von Eva Lantsoght (13)

Coneic presentation 2020
Coneic presentation 2020Coneic presentation 2020
Coneic presentation 2020
 
Pruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadasPruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadas
 
Pruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armadoPruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armado
 
El futuro del hormigon
El futuro del hormigonEl futuro del hormigon
El futuro del hormigon
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypes
 
Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?
 
Inspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigonInspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigon
 
10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhD10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhD
 
Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies
 
CV Eva Lantsoght
CV Eva LantsoghtCV Eva Lantsoght
CV Eva Lantsoght
 
Sound in engineering
Sound in engineeringSound in engineering
Sound in engineering
 
Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado
 
Extended Strip Model for slabs subjected to a combination of loads
Extended Strip Model for slabs subjected to a combination of loadsExtended Strip Model for slabs subjected to a combination of loads
Extended Strip Model for slabs subjected to a combination of loads
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Kürzlich hochgeladen (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 

Assessment of slab bridges through proof loading in the Netherlands

  • 1. Assessment of slab bridges through proofAssessment of slab bridges through proof loading in the Netherlandsloading in the Netherlands Eva Lantsoght, Cor van der Veen, Ane de Boer, Dick Hordijk
  • 2. OverviewOverviewOverviewOverview • Introduction • Pilot proof load tests • Laboratory experiments • Recommendations • Preparation of proof load tests • Execution of proof load tests • Analysis of proof load tests • Summary and conclusions Slab shear experiments, TU Delft
  • 3. Why load testing?Why load testing? Bridges from 60s and 70s The Hague in 1959 Increased live loads common heavy and long truck (600 kN) End of service life + larger loads
  • 4. Safety philosphy of proof load testingSafety philosphy of proof load testing • Safety philosophy • Stop criteria: •Further loading not permitted •Failure near •Irreversible damage near MSc Thesis W. Vos
  • 5. Research needResearch needResearch needResearch need Guideline for proof loading of existing (RC slab) bridges for the Netherlands Flexure + shear
  • 6. TU Delft Proof Load TestsTU Delft Proof Load Tests • Proof load tests: •Heidijk 2007 •Medemblik 2009 •Vlijmen-Oost 2013 •Halvemaans Bridge 2014 •Ruytenschildt Bridge 2014 •Viaduct Zijlweg 2015 •Viaduct De Beek 2015 TU Delft proof load tests
  • 7. Laboratory testingLaboratory testingLaboratory testingLaboratory testing • Ruytenschildt beams • Cyclic loading protocol • Analysis of stop criteria • Beams with plain bars • Effect of number of cycles • Effect of loading speed • Load levels • Analysis of stop criteria Beams RSB01 after failure (Yang, 2015) Yang, Y. (2015). "Experimental Studies on the Structural Behaviours of Beams from Ruytenschildt Bridge," Stevin Report 25.5-15-09, Delft University of Technology, Delft, 76 pp. Beams RSB02B after failure (Yang, 2015)
  • 8. Preparation steps (1)Preparation steps (1) • Preliminary inspection and rating • Dimensions and material properties • Live load: lane load + design tandem • RBK load levels •Different β •Different load factors •γsw = 1.1 for proof load testing
  • 9. Preparation steps (2)Preparation steps (2) • Critical position •Bending moment: largest moment •Shear: 2.5d from support • Required proof load •Same shear or bending moment as with load combination •Value → considered safety level
  • 10. Preparation steps (3)Preparation steps (3) • Sensor plan: •Deflection profiles in longitudinal and transverse direction •Deflection at supports •Strain on bottom of cross-section •Reference strain measurements to correct for T •Opening existing cracks •Opening new cracks •Applied load => load cells •Acoustic emission measurements (current research)
  • 11. Execution steps (1)Execution steps (1) • Cyclic loading scheme •Check linearity and reproducibility of measurements •Baseline load level • Load levels ≈ safety levels CC3 RBK: • Low level to check instrumentation • SLS • Intermediate level • Target proof load
  • 13. Execution steps (3)Execution steps (3)Execution steps (3)Execution steps (3)
  • 14. Analysis StepsAnalysis Steps • Data analysis •Correct for T •Correct for support displacements •Make final plots for report
  • 15. Summary and conclusionsSummary and conclusions • Proof loading to approve existing bridges, also for shear • Pilot proof load tests in the Netherlands + laboratory tests • Current recommendations • Further laboratory testing on slabs in shear is necessary Ruytenschildt Bridge
  • 16. Contact: Eva Lantsoght E.O.L.Lantsoght@tudelft.nl // elantsoght@usfq.edu.ec +31(0)152787449