SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Contribute the potential aspect of technical and creative skills to
help in developing a progressive, orderly, aesthetic, functional, and
systematic physical environment making our world an ideal and
better place to live.
To be able to join the rank of a highly productive, technically efficient,
and cause motivated working team aiming to promote cooperation,
flexibility, and resourcefulness among disciplines in order to achieve
the social, economic, and environmental requirements.
I graduated the Bachelor of Science in Architecture from Technological Institute of the
Philippines. It is a private higher education institution located in the large city of Manila
(population range: 1,000,000-5,000,000 inhabitants), National Capital Region. This
institution has also branch campuses in the following locations: Quezon City. Officially
accredited/recognized by the Commission on Higher Education, Philippines, Technological
Institute of the Philippines (TIP) is a large (enrollment range: 15,000-19,999 students)
coeducational higher education institution. Technological Institute of the Philippines (TIP)
offers courses and programs leading to officially recognized higher education degrees such
as bachelor degrees, master degrees, doctorate degrees in several areas of study. TIP also
provides several academic and non-academic facilities and services to students including a
library, sport facilities and/or activities, financial aids and/or scholarships, as well as
administrative services..
Dubai Municipality Accredited
Dubai Civil Defence Accredited
Trakeesh- Blue Card Accredited
Society of Engineers
UAE. (Affiliated Member
Membership No: 19582
Sharjah Municipality Accredited
•discuss the ideas, objectives, requirements and budget of a project and in some cases help to
select a site;
•consult with other professionals about design;
•assess the needs of the building and its users and advise the client on the practicality of their
project;
•prepare and present feasibility reports and design proposals to the client;
•assess the impact on the local environment;
•use design and project management, specifically using computer-aided design software;
•keep within financial budgets and deadlines;
•produce detailed workings, drawings and specifications;
•specify the nature and quality of materials required;
•prepare tender applications and presentations;
•negotiate with contractors and other professionals;
•prepare applications for planning and building control departments;
•draw up tender documents for contracts;
•project manage and help to coordinate the work of contractors;
•control a project from start to finish;
•carry out regular site visits to check on progress and ensure that the project is running on time
and to budget;
•resolve problems and issues that arise during construction;
•ensure that the environmental impact of the project is managed.
•Applies for Building Permit to Dubai Municipality (DM) for approval of Design drawings.
Submits, by online application, the Preliminary and Final design drawings complying with the
Green building requirements and Civil Defence Fire Protection regulations. Sets appointment, by
personal or video conference, for revision of drawings and modification.
•Manages various services, consult with the Owner, research design criteria, attend meetings,
communicate with the Project team, report progress of the Work to the Owner, and submits a
schedule of services showing anticipated dates for start of construction and substantial
completion.
•During Schematic Design phase, “prepares a preliminary evaluation of the Owner’s program,
schedule, budget for the Cost of the Work, Project site, and the proposed procurement or
delivery method and other Initial Information, each in terms of the other”. Also, makes
recommendations on environmentally responsible design options available and applicable to
the Project and discuss with the Owner the feasibility of incorporating these options. And also
consider materials, building systems and equipment consistent with owner’s budget, and
schedule.
•The Design Development phase follows the Schematic Design phase, submits
•drawings and specifications showing the development of the design to the Owner, and updates
the estimated pricing.
•The Construction Documents phase follows the Design Development phase approved by the
Owner, and documentation of the Project continues in a more detailed manner. An updated
estimated Cost of the Work is included. These documents will be sent to the Owner, who will
forward to various contractors during the Bidding or Negotiation phase.
•Assists the Owner during the Bidding or Negotiation phase, and offer substitutions of materials.
•Reviews and approve companies’ prequalification in order to ensure that the Proponents invited
to bid for the certain work are capable of delivering quality and value specific output to the project
requirements. Based from the documents submitted by the Suppliers, they have to be evaluated if
they are technically reliable and efficiently qualified to manufacture and install the products based
on their experience, capability, resources, quality assurance, assets etc. Also, develops standard
Criteria that will serve as a basis for the evaluation for grading and selecting the rightful candidate
who deserve to acquire the project. Evaluates every materials submitted by the Suppliers to be
used and installed in the construction if they are complying with the Specifications, Quality
Assurance Compliance, Material Testing Laboratory, and Installation & product Warranty, to prove
and assure if they can really handle or execute the work effectively and efficiently.
•Provides administration of the Contract for Construction, and, when granted authority, will be the
Owner’s representative, acting on the Owner’s behalf during construction until the final Certificate
for Payment is issued.
•Visits the site at appropriate intervals to become generally familiar with the progress and
quality of the Work completed, observing if it complies with the Contract Documents. The
Architect is not responsible for the means and methods of construction, or for safety
precautions at the jobsite. These are the Contractor’s sole responsibilities.
•Keeps the Owner informed about the progress of the Work and will report deviations, defects
and deficiencies. The Architect is not responsible for the Contractor’s failure to carry out the
Work in accordance with the Contract Documents.
•Investigates matters regarding site conditions that are different than expected found by the
Contractor during the performance of the Work. The Architect will then recommend an
adjustment of the Contract Sum and/or Contract Time based on these unanticipated conditions.
•Establishes the point of communication between the Owner and Contractor.
•Reviews, then accept or reject, the Contractor’s Application for Payment. If accepted, the
Architect will issue a Certificate of Payment to the Owner, in order to initiate payment to the
Contractor. The issuance of this Certificate means that the Architect represents, to the best of
his knowledge, information and belief, that the Work has progressed to a certain point and is in
accordance with the Contract Documents.
•Recommends to withhold payment if portions of the Work are defective, if third party claims
may be or are made against the Owner, if Subcontractors have not been paid, if the Work
cannot be completed for the unpaid balance of the Contract Sum or in the remaining Contract
Time, if there is damage to the Owner or a separate contractor, or by repeated failure of the
Contractor to
•carry out the Work in accordance to the Contract Documents.
•Conducts and order inspection or testing of the Work. The Owner may be obligated to pay for
these inspections and tests, but if Contractor’s work had been done incorrectly, then the
Contractor shall be responsible for these costs and the Architect’s additional time.
Reviews Shop Drawings, Product Data and Samples submitted by the Contractor for compliance
with the design intent only.
Do not take responsible for the means and methods of construction or for safety precautions
and will not be responsible for the Contractor’s failure to perform the Work in accordance with
the Contract Documents.
Prepares Change Orders and Construction Change Directives, and may authorize minor changes
that do not affect the Contract Sum and/or Contract Time.
•Inspects the Work to determine the dates of Substantial Completion and Final Completion,
check if the Contractor finished his punch list, and if the Work conforms to the Contract
Documents.
•Receives and forward to the Owner all close out requirements, and will issue the final
Certificate for Payment.
•Interprets and decide matters concerning the Contract Documents, decide matters regarding
performance, and will respond to contractor’s requests for information regarding the Contract
Documents.
•Set as Initial Decision Maker, who will be responsible for providing initial decisions on claims
between the Owner and Contractor. The initial decision maker may be another individual, but
will be the Architect if no other individual is selected and named in the Construction Contract.
•Produces a further set of detailed drawings for the projects with precise dimensions
specifications, materials, and information.
•Produces a further set of detailed drawings for the projects with precise dimensions
specifications, materials, and information.
G+7 + 3B Residential Building, owned by Mr. Ali Zalman located at Bur Dubai. a G+7 Villa with
five residential flats for each floors and an attached bathroom for every bedrooms. Also
includes, Gym and Swimming Pool facilities. My first ongoing project that I have stared in the
company from concept design up to the Authority permit application and submission.
Total Build-up Area 5,275.50 m². 3 Basements consist of 13 Nos. Car Parks, Fire Water Tank, Pump Room,
Services Rooms, Staircase & Lift Rooms/Lobby etc.. Ground Floor covered of 13 Nos. Car Parks, Substation, Guard
Room, Service Rooms, Garbage Room, Staircase & Lift Room/Lobby etc.. 7 Typical Floors with 4 Nos. Flat at each
floor; Roof consists of Lift Machine Room & Staircase Room.
Wadi Tower, one of a series of high rise buildings within City of Arabia, a 40 Storey Level
Hotel Apartment Building sets in an ecological environment, the fully residential Wadi
Tower presents the most refreshing and exciting surroundings to live in. Wadi Tower is
located within the City of Arabia in Dubailand and behind the striving project of Wadi Walk.
This towering structure is the epitome of luxury and comfort.
The tower contains 1, 2, 3 bedroom, duplex apartments and penthouses with unit size of
837 – 2235 Sq. Ft. (Duplex 3,447 Sq. Ft.).
 
Dubai Camel Hospital, Dubai Camel Hospital at Al Lissailli, is one of the unique hospitals
taking care of racing and breeding camels and has comprehensively dedicated to look
after sick and injured camels from knee X-rays to examining upset stomachs. Project
managed by Engineer’s Office (EO).
Dubai Autism, is a non-profit organization based in Dubai (UAE)
dedicated to improving the quality of life for children with autism and
their families. Maintaining international standards, the Center provides
intervention programs using a holistic approach for children with autism.
The Center also provides information, support, advice and training to
professionals and parents of children with autism working towards
facilitating a better understanding of autism in the UAE community.
Libya restaurant, is a 1,000 seating and dining capacity designed to serve the
local delicacy With an easily accessible location, the restaurant is only 30
minutes away from Tripoli International Airport by car. Taxi service is readily
available from the airport and, along with the bus network, is the most common
way to get around the city. The restaurant is located on the right-hand side of
the lobby level when entering the hotel.
 
The project in Liberia represented the first Greenfield mining project
undertaken by ArcelorMittal, which was established in 2006 following
the merger of Arcelor and Mittal Steel. We accommodated the miners
of iron ore in Yekepa, Nimba County, and transport it to the iron ore
quay in Buchanan, Grand Bassa County. The offices are located in
Yekepa; Green Hill Quarry (Bong County); Buchanan and Monrovia,
Montserrado County.
The Accommodations are divided into two phases:
Phase one (2011 to 2015): ore will continue to be mined and shipped
to the European steel plants or to the open market in Asia
Phase two (2015 to ± 2030): the capacity of our iron ore mine will be
increased to 15 million tons a year. A new fixed ship loader at the
Buchanan port and a concentrator at the Yekepa concession to
produce iron ore pellets will be invested in by the company and
constructed.
A proposed 5 Bedrooms and 2 Floors Villa located at Fujairah is a stylish
and relaxed five-bedroom home enjoying a tranquil semi-rural setting along
the eastern coast. This perfect family hideaway is set within lush tropical
gardens and surrounded by the mountains and village communities of
Kalba. It features a 12m swimming pool, an extensive array of relaxing
indoor–outdoor living and dining areas.
An awe-inspiring engineering feat, Dubai Palm Islands is definitely the
largest artificial islands on earth. These Islands are three man made
islands in the form of massive palm trees connected to the beaches of
Dubai. The first island is the Palm Jumeirah, Jebel Ali Palm second and the
third is the Palm Deira which is the biggest of them all. This artificial
archipelago located off the coastline of United Arab Emirates in Persian
Gulf.
Aqua Dunya theme park is an adventurous park with
timeless fun and entertainment. The park is divided on the
basis of adventurous story of Rakaan and categorized into
three main islands. Each island presents its own story and
gives endless energy to enjoy the rides at its full glance. The
project is an ultimate grand experience of restaurants,
residential area and souk for shopping. The Aqua Dunya is
the perfect utilization of Dubai biggest resource of water.
One can jump into the water with all its mystery inside it
while there is a perfect rafting experience for those who
want to be faster than ever.
A joint venture of TAISEI Japan and TAV Turkey group of companies,
for the management, supervision, consultation and construction of
the New Doha International Airport. Works independently and
produces shop drawings for structural reinforcement steel layouts
and detailed section for each respective areas based on project
schedule and deadlines.
Mar Dedal Portfolio

Weitere ähnliche Inhalte

Was ist angesagt?

UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016Vic Carino
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain ProjectKhalid Hussain
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
EPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk ManagementEPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk Managementrockporshe
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi Shankar
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updatedMohammed Hashim
 
Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
Leo San Diego Resume
Leo San Diego ResumeLeo San Diego Resume
Leo San Diego ResumeLeo San Diego
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities DeepakSharma2602
 

Was ist angesagt? (20)

UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Resume
ResumeResume
Resume
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
EPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk ManagementEPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk Management
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
CV
CVCV
CV
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV final
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Naim CV
Naim CVNaim CV
Naim CV
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Leo San Diego Resume
Leo San Diego ResumeLeo San Diego Resume
Leo San Diego Resume
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
my cv.doc
my cv.docmy cv.doc
my cv.doc
 

Andere mochten auch

29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.Laszlo Kapas
 
Lucia hernandez
Lucia hernandezLucia hernandez
Lucia hernandezmetita
 
Construction landscape local[1]
Construction landscape local[1]Construction landscape local[1]
Construction landscape local[1]audreyting
 
ConstekSTUDIO
ConstekSTUDIOConstekSTUDIO
ConstekSTUDIOajlgalang
 
Magical Design Makeovers & 2009 Design Trends Ppt
Magical Design Makeovers & 2009 Design Trends PptMagical Design Makeovers & 2009 Design Trends Ppt
Magical Design Makeovers & 2009 Design Trends PptAHalperin
 
My Dream World Presentation
My Dream World PresentationMy Dream World Presentation
My Dream World PresentationSatu Miettinen
 
working drawings for beginners
working drawings for beginners working drawings for beginners
working drawings for beginners Dr.Ebtehal G
 
Chapter 01 working drawing
Chapter 01 working drawingChapter 01 working drawing
Chapter 01 working drawingObuekwec
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...Angeline KH
 
Working drawing
Working drawingWorking drawing
Working drawingbruhsocool
 
Board reporting template
Board reporting templateBoard reporting template
Board reporting templateInspiring Women
 

Andere mochten auch (20)

Showcase
ShowcaseShowcase
Showcase
 
29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.
 
Lucia hernandez
Lucia hernandezLucia hernandez
Lucia hernandez
 
Construction landscape local[1]
Construction landscape local[1]Construction landscape local[1]
Construction landscape local[1]
 
How to read working drawings
How to read working drawingsHow to read working drawings
How to read working drawings
 
ConstekSTUDIO
ConstekSTUDIOConstekSTUDIO
ConstekSTUDIO
 
Magical Design Makeovers & 2009 Design Trends Ppt
Magical Design Makeovers & 2009 Design Trends PptMagical Design Makeovers & 2009 Design Trends Ppt
Magical Design Makeovers & 2009 Design Trends Ppt
 
working drawings
working drawingsworking drawings
working drawings
 
Working Drawings
Working DrawingsWorking Drawings
Working Drawings
 
Architectural working drawings
Architectural working drawingsArchitectural working drawings
Architectural working drawings
 
Working Drawings
Working DrawingsWorking Drawings
Working Drawings
 
My Dream World Presentation
My Dream World PresentationMy Dream World Presentation
My Dream World Presentation
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
working drawings for beginners
working drawings for beginners working drawings for beginners
working drawings for beginners
 
Chapter 01 working drawing
Chapter 01 working drawingChapter 01 working drawing
Chapter 01 working drawing
 
Ferry Terminal
Ferry TerminalFerry Terminal
Ferry Terminal
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
 
Working drawing
Working drawingWorking drawing
Working drawing
 
Working drawing lectures 1 4
Working drawing lectures 1 4Working drawing lectures 1 4
Working drawing lectures 1 4
 
Board reporting template
Board reporting templateBoard reporting template
Board reporting template
 

Ähnlich wie Mar Dedal Portfolio

contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract managementVISHAKA BOTHRA
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docxManuSood11
 
Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Renilo Ubusan
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12TomKummer
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 

Ähnlich wie Mar Dedal Portfolio (20)

contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
PMC .docx
PMC .docxPMC .docx
PMC .docx
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docx
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Richie Resume
Richie Resume Richie Resume
Richie Resume
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 

Mar Dedal Portfolio

  • 1.
  • 2. Contribute the potential aspect of technical and creative skills to help in developing a progressive, orderly, aesthetic, functional, and systematic physical environment making our world an ideal and better place to live. To be able to join the rank of a highly productive, technically efficient, and cause motivated working team aiming to promote cooperation, flexibility, and resourcefulness among disciplines in order to achieve the social, economic, and environmental requirements. I graduated the Bachelor of Science in Architecture from Technological Institute of the Philippines. It is a private higher education institution located in the large city of Manila (population range: 1,000,000-5,000,000 inhabitants), National Capital Region. This institution has also branch campuses in the following locations: Quezon City. Officially accredited/recognized by the Commission on Higher Education, Philippines, Technological Institute of the Philippines (TIP) is a large (enrollment range: 15,000-19,999 students) coeducational higher education institution. Technological Institute of the Philippines (TIP) offers courses and programs leading to officially recognized higher education degrees such as bachelor degrees, master degrees, doctorate degrees in several areas of study. TIP also provides several academic and non-academic facilities and services to students including a library, sport facilities and/or activities, financial aids and/or scholarships, as well as administrative services..
  • 3. Dubai Municipality Accredited Dubai Civil Defence Accredited Trakeesh- Blue Card Accredited Society of Engineers UAE. (Affiliated Member Membership No: 19582 Sharjah Municipality Accredited
  • 4. •discuss the ideas, objectives, requirements and budget of a project and in some cases help to select a site; •consult with other professionals about design; •assess the needs of the building and its users and advise the client on the practicality of their project; •prepare and present feasibility reports and design proposals to the client; •assess the impact on the local environment; •use design and project management, specifically using computer-aided design software; •keep within financial budgets and deadlines; •produce detailed workings, drawings and specifications; •specify the nature and quality of materials required; •prepare tender applications and presentations; •negotiate with contractors and other professionals; •prepare applications for planning and building control departments; •draw up tender documents for contracts; •project manage and help to coordinate the work of contractors; •control a project from start to finish; •carry out regular site visits to check on progress and ensure that the project is running on time and to budget; •resolve problems and issues that arise during construction; •ensure that the environmental impact of the project is managed.
  • 5. •Applies for Building Permit to Dubai Municipality (DM) for approval of Design drawings. Submits, by online application, the Preliminary and Final design drawings complying with the Green building requirements and Civil Defence Fire Protection regulations. Sets appointment, by personal or video conference, for revision of drawings and modification. •Manages various services, consult with the Owner, research design criteria, attend meetings, communicate with the Project team, report progress of the Work to the Owner, and submits a schedule of services showing anticipated dates for start of construction and substantial completion. •During Schematic Design phase, “prepares a preliminary evaluation of the Owner’s program, schedule, budget for the Cost of the Work, Project site, and the proposed procurement or delivery method and other Initial Information, each in terms of the other”. Also, makes recommendations on environmentally responsible design options available and applicable to the Project and discuss with the Owner the feasibility of incorporating these options. And also consider materials, building systems and equipment consistent with owner’s budget, and schedule. •The Design Development phase follows the Schematic Design phase, submits •drawings and specifications showing the development of the design to the Owner, and updates the estimated pricing.
  • 6. •The Construction Documents phase follows the Design Development phase approved by the Owner, and documentation of the Project continues in a more detailed manner. An updated estimated Cost of the Work is included. These documents will be sent to the Owner, who will forward to various contractors during the Bidding or Negotiation phase. •Assists the Owner during the Bidding or Negotiation phase, and offer substitutions of materials. •Reviews and approve companies’ prequalification in order to ensure that the Proponents invited to bid for the certain work are capable of delivering quality and value specific output to the project requirements. Based from the documents submitted by the Suppliers, they have to be evaluated if they are technically reliable and efficiently qualified to manufacture and install the products based on their experience, capability, resources, quality assurance, assets etc. Also, develops standard Criteria that will serve as a basis for the evaluation for grading and selecting the rightful candidate who deserve to acquire the project. Evaluates every materials submitted by the Suppliers to be used and installed in the construction if they are complying with the Specifications, Quality Assurance Compliance, Material Testing Laboratory, and Installation & product Warranty, to prove and assure if they can really handle or execute the work effectively and efficiently. •Provides administration of the Contract for Construction, and, when granted authority, will be the Owner’s representative, acting on the Owner’s behalf during construction until the final Certificate for Payment is issued.
  • 7. •Visits the site at appropriate intervals to become generally familiar with the progress and quality of the Work completed, observing if it complies with the Contract Documents. The Architect is not responsible for the means and methods of construction, or for safety precautions at the jobsite. These are the Contractor’s sole responsibilities. •Keeps the Owner informed about the progress of the Work and will report deviations, defects and deficiencies. The Architect is not responsible for the Contractor’s failure to carry out the Work in accordance with the Contract Documents. •Investigates matters regarding site conditions that are different than expected found by the Contractor during the performance of the Work. The Architect will then recommend an adjustment of the Contract Sum and/or Contract Time based on these unanticipated conditions. •Establishes the point of communication between the Owner and Contractor. •Reviews, then accept or reject, the Contractor’s Application for Payment. If accepted, the Architect will issue a Certificate of Payment to the Owner, in order to initiate payment to the Contractor. The issuance of this Certificate means that the Architect represents, to the best of his knowledge, information and belief, that the Work has progressed to a certain point and is in accordance with the Contract Documents.
  • 8. •Recommends to withhold payment if portions of the Work are defective, if third party claims may be or are made against the Owner, if Subcontractors have not been paid, if the Work cannot be completed for the unpaid balance of the Contract Sum or in the remaining Contract Time, if there is damage to the Owner or a separate contractor, or by repeated failure of the Contractor to •carry out the Work in accordance to the Contract Documents. •Conducts and order inspection or testing of the Work. The Owner may be obligated to pay for these inspections and tests, but if Contractor’s work had been done incorrectly, then the Contractor shall be responsible for these costs and the Architect’s additional time. Reviews Shop Drawings, Product Data and Samples submitted by the Contractor for compliance with the design intent only. Do not take responsible for the means and methods of construction or for safety precautions and will not be responsible for the Contractor’s failure to perform the Work in accordance with the Contract Documents. Prepares Change Orders and Construction Change Directives, and may authorize minor changes that do not affect the Contract Sum and/or Contract Time.
  • 9. •Inspects the Work to determine the dates of Substantial Completion and Final Completion, check if the Contractor finished his punch list, and if the Work conforms to the Contract Documents. •Receives and forward to the Owner all close out requirements, and will issue the final Certificate for Payment. •Interprets and decide matters concerning the Contract Documents, decide matters regarding performance, and will respond to contractor’s requests for information regarding the Contract Documents. •Set as Initial Decision Maker, who will be responsible for providing initial decisions on claims between the Owner and Contractor. The initial decision maker may be another individual, but will be the Architect if no other individual is selected and named in the Construction Contract. •Produces a further set of detailed drawings for the projects with precise dimensions specifications, materials, and information. •Produces a further set of detailed drawings for the projects with precise dimensions specifications, materials, and information.
  • 10. G+7 + 3B Residential Building, owned by Mr. Ali Zalman located at Bur Dubai. a G+7 Villa with five residential flats for each floors and an attached bathroom for every bedrooms. Also includes, Gym and Swimming Pool facilities. My first ongoing project that I have stared in the company from concept design up to the Authority permit application and submission. Total Build-up Area 5,275.50 m². 3 Basements consist of 13 Nos. Car Parks, Fire Water Tank, Pump Room, Services Rooms, Staircase & Lift Rooms/Lobby etc.. Ground Floor covered of 13 Nos. Car Parks, Substation, Guard Room, Service Rooms, Garbage Room, Staircase & Lift Room/Lobby etc.. 7 Typical Floors with 4 Nos. Flat at each floor; Roof consists of Lift Machine Room & Staircase Room.
  • 11. Wadi Tower, one of a series of high rise buildings within City of Arabia, a 40 Storey Level Hotel Apartment Building sets in an ecological environment, the fully residential Wadi Tower presents the most refreshing and exciting surroundings to live in. Wadi Tower is located within the City of Arabia in Dubailand and behind the striving project of Wadi Walk. This towering structure is the epitome of luxury and comfort. The tower contains 1, 2, 3 bedroom, duplex apartments and penthouses with unit size of 837 – 2235 Sq. Ft. (Duplex 3,447 Sq. Ft.).   Dubai Camel Hospital, Dubai Camel Hospital at Al Lissailli, is one of the unique hospitals taking care of racing and breeding camels and has comprehensively dedicated to look after sick and injured camels from knee X-rays to examining upset stomachs. Project managed by Engineer’s Office (EO). Dubai Autism, is a non-profit organization based in Dubai (UAE) dedicated to improving the quality of life for children with autism and their families. Maintaining international standards, the Center provides intervention programs using a holistic approach for children with autism. The Center also provides information, support, advice and training to professionals and parents of children with autism working towards facilitating a better understanding of autism in the UAE community.
  • 12. Libya restaurant, is a 1,000 seating and dining capacity designed to serve the local delicacy With an easily accessible location, the restaurant is only 30 minutes away from Tripoli International Airport by car. Taxi service is readily available from the airport and, along with the bus network, is the most common way to get around the city. The restaurant is located on the right-hand side of the lobby level when entering the hotel.   The project in Liberia represented the first Greenfield mining project undertaken by ArcelorMittal, which was established in 2006 following the merger of Arcelor and Mittal Steel. We accommodated the miners of iron ore in Yekepa, Nimba County, and transport it to the iron ore quay in Buchanan, Grand Bassa County. The offices are located in Yekepa; Green Hill Quarry (Bong County); Buchanan and Monrovia, Montserrado County. The Accommodations are divided into two phases: Phase one (2011 to 2015): ore will continue to be mined and shipped to the European steel plants or to the open market in Asia Phase two (2015 to ± 2030): the capacity of our iron ore mine will be increased to 15 million tons a year. A new fixed ship loader at the Buchanan port and a concentrator at the Yekepa concession to produce iron ore pellets will be invested in by the company and constructed.
  • 13. A proposed 5 Bedrooms and 2 Floors Villa located at Fujairah is a stylish and relaxed five-bedroom home enjoying a tranquil semi-rural setting along the eastern coast. This perfect family hideaway is set within lush tropical gardens and surrounded by the mountains and village communities of Kalba. It features a 12m swimming pool, an extensive array of relaxing indoor–outdoor living and dining areas.
  • 14. An awe-inspiring engineering feat, Dubai Palm Islands is definitely the largest artificial islands on earth. These Islands are three man made islands in the form of massive palm trees connected to the beaches of Dubai. The first island is the Palm Jumeirah, Jebel Ali Palm second and the third is the Palm Deira which is the biggest of them all. This artificial archipelago located off the coastline of United Arab Emirates in Persian Gulf. Aqua Dunya theme park is an adventurous park with timeless fun and entertainment. The park is divided on the basis of adventurous story of Rakaan and categorized into three main islands. Each island presents its own story and gives endless energy to enjoy the rides at its full glance. The project is an ultimate grand experience of restaurants, residential area and souk for shopping. The Aqua Dunya is the perfect utilization of Dubai biggest resource of water. One can jump into the water with all its mystery inside it while there is a perfect rafting experience for those who want to be faster than ever.
  • 15. A joint venture of TAISEI Japan and TAV Turkey group of companies, for the management, supervision, consultation and construction of the New Doha International Airport. Works independently and produces shop drawings for structural reinforcement steel layouts and detailed section for each respective areas based on project schedule and deadlines.