State of the Power System
Update
Brian Dames
Chief Executive
Overview
Review of the quarter
Outlook for winter
Creating a sustainable Generation fleet
Conclusion
5/27/2013 2
3
Key Messages
• This winter will be different in that generation maintenance will be done and not
deferred. Eskom is committed to maintaining at least 9 generation units between April
and August to ensure the long term sustainability of the plant.
• There is sufficient capacity to meet the demand most of the day. The concern is the
peak demand between 5pm and 9pm. If that can be reduced by as much as 2000MW,
the security of electricity supply will be adequate.
• Residential customers, particularly those that use geysers, space heating and pool
pumps can make the biggest difference by switching off this equipment for 4 hours
and will yield more than 2000MW savings.
• Eskom has completed a 5 year review of its maintenance requirements to create a
sustainable generation fleet. It is committed to doing the maintenance that will ensure
a sustainable generation fleet to meet the long term supply requirements for country.
• In the short to medium term, this will introduce risks to balancing supply and demand.
In order to manage these risks, the country must continue to focus on additional supply
options, energy efficiency and some form of mandatory energy conservation
schemes.
• Eskom is committed to completing the new build programme and is putting the
necessary resources in place to do so.
4
Overview
• We kept the lights on during summer, as we have done for the past five years
• Going into winter, we face new challenges: Eskom cannot do it alone
• Our power stations are ageing and are being run hard. Sustained high levels of planned
maintenance are needed to ensure reliable performance
• The power system has been particularly tight and planned maintenance was impacted
during 2013 due to:
• The failure of a transmission line from Mozambique due to flooding, which reduced imports
from Cahora Bassa – 850 MW
• The unplanned outage of Koeberg Unit 1 – 900MW
• The need to manage the impact of the strike at Exarro’s coal mines – 1000MW
• Volatile power station performance
• We kept the lights on in summer using Open Cycle Gas Turbines and demand side
measures, but planned maintenance had to be reduced
• Eskom usually reduces maintenance to the minimum in winter so that we can meet
higher demand. But this winter is different – planned maintenance cannot be deferred
• Demand during winter evening peaks can jump by up to 3000 MW in 1 hour, as
households switch on lights, heaters and cookers
• Please help us Beat the Peak : switch off non-essential appliances from 5-9pm
5
Overview (continued...)
• We have reached a point where we cannot continue to defer planned
Generation maintenance any longer because this could have severe
consequences.
• The performance of Eskom’s own Generation fleet is volatile and that of the
Cahora Bassa scheme has become unpredictable.
• The Multi-Year Price Determination 3 (MYPD3) determination adds to the
challenge of managing a tight power system by reducing Eskom’s ability to
procure additional demand and supply side levers.
• We will implement a Generation maintenance strategy which is based on an
80% Availability; 10% Planned maintenance and 10% Unplanned outages
over 5 years to maintain the current fleet, meet environmental requirements
and achieve predictable performance from our existing assets.
• Much of the planned maintenance will be fixed, providing certainty for
planning, while outages will be done to ensure we can comply with
Environmental legislation
• Additional supply and demand side options must be explored to meet medium
term electricity demand.
Overview
Review of the quarter
Outlook for winter
Creating a sustainable Generation fleet
Conclusion
5/27/2013 6
7
Planned maintenance and unplanned outages
Planned
%
Jan Feb Mar Apr May Jun
Jul Aug Sept Oct Nov Dec
2013 13.07 9.7 9.1
2012 12.57 13.1 13.51 13.81 10.5 7.41 5.45 5.44 5.27 8.74 9.63 13.06
2011 9.96 7.62 8.42 8.66 6.3 4.5 2.9 5.97 8.8 9.56 7.64 15.58
2010 11.91 10.53 10.71 11.57 7.0 2.6 1.72 6.36 10.66 8.54 9.06 12.31
• Reduced Cahora
Bassa imports, the
Koeberg 1 outage,
and high unplanned
outages meant less
space to do planned
maintenance
• Power station
performance tends
to be more volatile in
summer
• More maintenance
needed to improve
reliability
• Reduction of
unplanned outages
to 4500 MW by
winter
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
MW
Date
Unplanned Plant Unavailability at Peak
Unavailability
Winter
Allowance
Summer
Allowance
8
We increased use of open cycle gas turbines
to keep the lights on
The OCGTs were run harder in January, February and March
2013 than in any month in the last 4 years. Average load factors
were close to 20%.
Cahora Bassa availability
2013/05/27 9
• The graph depicts the performance of the HVDC system in terms of its availability
• The availability since July 2012 has been poor
• This is due to the loss of a smoothing reactor (returned to service 15 November 2012)
followed by the loss of one of the lines due to flooding. The line is anticipated to return
to service by the end of April 2013.
0
0.5
1
1.5
2
2.5
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1-Jan-12 1-Mar-12 1-May-12 1-Jul-12 1-Sep-12 1-Nov-12 1-Jan-13 1-Mar-13
Date
HCB: Energy Availability Factor (EAF)
Jan 2012 - April 2013
In support of
Coal stocks at high levels despite labour unrest
10
Actual Stock days F2008, F2012 vs YTD Actual F2013
25 25
22
20 19 18
17 18
15
12
13 13
40
39 39
36
38
41 41
44 43
41
39 3938
39
40 42
43 44
45
47 47
48
49
47
0
10
20
30
40
50
60
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Stockdays
Months
Actual Stock days F2008,F 2012 vs YTD Actual F2013
2007/8 2011/12 2012/13
• Coal stock days are currently at 47 days (26 March).
• Stock days peaked at 49 days at the end of February (the highest ever), but were reduced by the
three-week Exxaro strike which impacted Matla, Arnot and Matimba Power stations
• The impact of the strike was well-managed – but capacity from affected power stations was reduced
by as much as 1000 MW during the day to conserve stockpiles, reducing space for planned
maintenance on Eskom’s generation fleet
• In support of road safety, trucking operations were halted during the Easter weekend
11
Integrated Demand Management Programme
Savings (MW) - Achievement Against MYPD
2 Targets
MYPD 2 Cumulative Demand Savings target = 1037MW
IDM Achievement (subject to final audit) = 1272MW (123% of MYDP2 target)
289 301
447
345 342
585
0
100
200
300
400
500
600
700
FY 2010/11 - Actual FY 2011/12 - Actual FY 2012/13 - Projection
DemandSavings(MW)
MYPD 2 IDM Achievement
12
2013 Financial Year – Demand Savings
Projection Split by Sector
IDM Projection FY 2013 = 585MW
Agriculture
6.69
1%
Commercial &
Corporates
102.45
18%
Industrial & Mining
111.17
19%
Residential - SWH
20.33
3%
Residential &
Munics
344.77
59%
0
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
2005 2006 2007 2008 2009 2010 2011 2012 2013
Demandsavings(MW)
Verified MW Eskom Target
1 339 1 422
2 244
1 827
0
500
1 000
1 500
2 000
2 500
2011 2012 2013 Target 2013
Annualisedenergysavings
(GWh)
The demand side management programme run by
Eskom has resulted in over 3 500MW of savings
since its inception
Cumulative verified demand savings (MW)
13
Energy Savings (GWh)
• The accumulated
verified demand
savings for the
combined financial
years 2005 to
2013, is 3 586MW
• This is almost
equivalent to the
output of a typical
power station
In support of
Residential programmes on track
• Power Alert system consistently achieved a residential evening peak
demand reduction of over 320MW, during summer, on worst system
constrained days. (>17,7million lights or 107 thousand geysers)
• Residential mass rollout programme, phase 1 is complete and
achieved a total savings of 218MW. More than 800,000 lower to middle
income households were visited (227 direct jobs and 3,018 indirect jobs
created)
• Residential mass rollout programme, phase 2 was launched in
September 2012. The savings target is 80MW and should be completed
in early 2014 financial year. The plan is to reach between 150,000 and
180,000 middle income households who will benefit from the retrofit of
geyser and pool timers, efficient shower heads and lighting. This phase
is expected to generate in excess 800 indirect jobs.
• Water heat pump rebate programme continues to grow. A total of
6807 units have been installed to date of which 3962 were installed in
the 2013 financial year.
14
Overview
Review of the quarter
Outlook for winter
Creating a sustainable Generation fleet
Conclusion
5/27/2013 15
17
Winter Plan 2013 – Typical Demand Profile
Going into winter, demand can spike by more than 3000 MW
during evening peak – equivalent to five units of a large power
station
18
Outlook for winter
• Cahora Bassa is expected to increase its output to 1300 MW by the last week of April
2013 and the final 200 MW is expected to be restored by the third quarter of 2013.
• Koeberg Unit 1 is expected to be back in service in mid-April
• Planned maintenance outages over the peak winter period (June-July) are
approximately 2000 MW. This is maintenance work that cannot be deferred
• There is an intense focus on reducing the level of unplanned outages to below 4500
MW
• Peak demand this winter is forecast at 36.8 GW, slightly lower than in 2012, but this is
the average for an hour – the “peak within the peak” can go as high as 37 GW – 38 GW
• We have supply and demand side initiatives in place – but we are concerned about the
impact which the NERSA tariff decision could have on our ability to finance the demand
side measures needed to manage a tight system
• Approximately 2100 MW of Interruptible demand, for up to two hours a week, is
available from the BHP Billiton aluminium smelters to help manage the frequency of the
power system
Levers secured to date – some expire before winter
and others by December 2013
19
Short term initiatives
(Nov 2011 – Jun
2012)
Target
capacity
(MW)
Secured
capacity
(MW)
Operational
capacity (MW)
Status
SupplySide
Municipal Base Load
Power
515 515 180
Contract until 31 December
2012. Evaluating contract
extensions.
IPPs and short term
base load
230 196 196
Awaiting NERSA licensing
for 35 MW
Non-Eskom peaking
generation
120 40 40
80 MW falls outside pricing
mandate.
Cross border 93 93 93 Stable Operation
DemandSide
Power buyback 1000 1010 1010
Contracts conclude 31 May
2013. Evaluating contract
extensions.
Demand response
rewards programme
500 158 158
Programme to be
terminated
Mandatory ECS - - - Long term initiative
Stand-by customer
generation
100 11 7
Commercial challenges and
pricing
Residential Demand
Management
1000 300 300
Approval for
implementation of 158 MW
by end 2013/14 financial
year.
Supplemental DMP 500 196 196
DMP reduced due to power
buybacks
20
Power buybacks
• Eskom and large customers, mainly in the ferrochrome and ferroalloy industries entered
into a mutually beneficial arrangement in terms of power buybacks..
• Up to 1000MW of power was bought back with a commitment from the customers
involved to not compromise contractual commitments with their customers nor incur job
losses.
• Eskom used this space to continue with its planned maintenance programme.
• The current power buyback programme began in November 2012 and comes to an end
on 31 May 2013.
• Winter tariffs for Eskom’s large industrial and mining customers are implemented in the
months of June, July and August and these result in reduced demand.
21
Winter Plan 2013 – System Outlook
• April 2013 to 31 July 2013, the
system will be extremely tight
• This winter will be different to
previous winters as Eskom will have
to perform long duration planned
maintenance during the coldest
months
• There will be an intense focus on
managing the unplanned outage
level (UCLF) to below 4500MW in
April and May
• There is some flexibility to defer
maintenance but this would
increase the maintenance backlog.
• An Energy Conservation Scheme is
needed to protect the system
This represent one hour with highest peak demand in a week
6500/4500 MW
Unplanned
Plant Unavailability
Date UCLF Planned Forecast
Shortfall Including Operating
Reserves and Gas
22-Apr-13 Mon 6500 3944 31862
29-Apr-13 Mon 6500 5302 32026
06-May-13 Mon 6500 4810 32714
13-May-13 Mon 6500 4560 33020
20-May-13 Mon 6500 3738 33495
27-May-13 Mon 6500 3738 33698
03-Jun-13 Mon 4500 2450 34867
10-Jun-13 Mon 4500 2450 35216
17-Jun-13 Mon 4500 2564 35167
24-Jun-13 Mon 4500 2084 35344
01-Jul-13 Mon 4500 2579 35989
08-Jul-13 Mon 4500 2579 36510
15-Jul-13 Mon 4500 1986 36885
22-Jul-13 Mon 4500 1411 36574
29-Jul-13 Mon 4500 1240 36583
In support of
“Beat the Peak” - Four Hours, Four Steps
• Saving electricity reduces pressure on the grid and cuts your electricity
bill and South Africa’s carbon emissions
• Evening peak is between 5 pm and 9 pm – four steps to beat the
peak
1. Switch off all geysers and pool pumps during peak
2. Switch off all non-essential lighting
3. Find alternative to electrical heaters
• Dress warmly, and use space heaters less
• Insulate ceilings to keep the heat in
• Invest in thermostatically controlled heaters (fan heaters are ideal for
quick heat; oil heaters for longer periods)
• Consider gas heaters and hot water bottles
4. Respond to the Power Alert messages by switching off all
appliances that are not being used
• Switch to energy efficient technologies: take advantage of solar water
and water heating pump rebates and the residential mass rollout
programme, which provides a range of free products
22
Overview
Review of the quarter
Outlook for winter
Creating a sustainable Generation fleet
Conclusion
5/27/2013 23
The need for a sustainable Generation fleet
• Our power stations are ageing and needs focus to maintain and
improve performance.
• Planned maintenance has often had to be shifted or deferred to
ensure we have the capacity available to meet demand and keep the
lights on.
• This approach is not sustainable – it is essential that planned
maintenance be done to enable predictable and sustainable
performance from Eskom’s power stations.
• Eskom has put in place a five year strategy for Generation
sustainability which includes a firm commitment not to postpone
critical maintenance.
• We will implement a programme which will allow for better resource
planning and more effective use of contractor capacity as well as
improved internal skills and processes.
24
64% of Eskom’s current installed base load capacity
plants are past their midlife
25Source: Medium-Term Outlook January 2013; Gx Maintenance team
909
1,860
KomatiGrootvlei
1,092
Camden
1,448
Hendrina
1,865
Arnot
2,160
Kriel
2,850
Duvha
3,450
Matla
3,450
Tutuka
3,510
Lethabo
41,930
Peaking
plants
4,405
Koeberg
3,558
Matimba
3,690
Kendal
3,840
Majuba
3,843
Total
50
86
73797071
625656
4643453939 Ø 58
Sent out capacity by station
MW
Useful life completed
Percent
Coal Nuclear Peaking
Stations more than half way through their operating lifecycle
Based on Coal Fleet Target Life = 60
years as per Life of Plant Plan
Coal Stations Design Life = 35 yrs
(7 stations past design life) without
capital investment
Achieving a Sustainable Generation Business requires us to
accommodate all major types of maintenance
26Source: Maintenance Strategy team
Major projects
▪ Sustainability projects refurbish
plant condition back to useful life
▪ Enhancement projects improve
station performance (e.g. LifeEx)
Environmental
▪ Upgrades to plant to reduce the
environmental impact of operating
the plant, e.g., reduce emissions or
water usage
Design-based
Maintenance
▪ Preventive maintenance intended to
keep the plant in working order. The
maintenance is carried out at
regular, predetermined intervals
(e.g. inspection every 18 months)
Statutory and
Safety
▪ Statutory maintenance is required
by law
▪ Safety maintenance ensures a safe
operating environment
Short-term/
Emergent Work
▪ Short-term is work done on
weekends and other short duration
maintenance opportunities
▪ Emergent maintenance is reactive
to addresses arising signs of
existing or imminent failure
Essential Design-based maintenance has been
backlogged with Statutory/Environ. given preference
Breakdown of FY2012 PCLF
Percent
1.9
2.0
8.7
0.5
EmergentExecuted
PCLF
Design
-based
Statutory
and
Safety
2.2
Short
term
2.1
Outage
extension
Small proportion of PCLF
executed was actual plant
philosophy (needs to be 6%)
Plant
With constrained capacity (maintenance space and ability to
execute), four primary technical levers exist in defining the
pathway to sustainability
27
1. Flexibility of the supply – demand relationship (e.g.
how many demand reducing levers to pull, Residential
Mass Roll-out, demand response options, accelerated
new capacity options and energy conservation scheme)
2. Delaying the clearance of the growing maintenance
backlog (smooth over 5 years – currently total 10%
backlog )
3. Prioritising some maintenance types over others
(e.g. philosophy over Life extension or other major
projects)
4. Targeting the overall health of the entire fleet and/or
a set of prioritised stations (e.g. All maintenance at
some stations while only some maintenance activity at
others: Plant prioritisation done on Remnant Life, Cost
of Production and Recent Plant Performance)
SOURCE: Maintenance strategy team
Strategy to ensure a sustainable Generation
fleet
• We have chosen a maintenance strategy for the next five years which
will ensure that Eskom’s Generation fleet is sustainable for the long
term
• This is based on an 80:10:10 principle – that is, on average, an
Energy Availability Factor of 80%, planned maintenance of 10% and a
projected unplanned outage ratio of 10%
• About 8% of the planned maintenance will be made up of
maintenance which will fixed in terms of its schedule. The other 2%
will be short term maintenance. This will allow for certainty in planning
and executing the maintenance outages. Outages to achieve
compliance to Environmental legislation, where no exemptions have
been obtained, will be done.
• Any improvement in unplanned outages will be used to create space
for planned maintenance
• A minimum of 9 units will undergo planned maintenance this winter,
because they have reached technical or statutory limits. This cannot
be rescheduled.
28
Overview
Review of the quarter
Outlook for winter
Creating a sustainable Generation fleet
Conclusion
5/27/2013 29
30
Conclusions
• The power system has been very tight during summer because of reduced imports and
high levels of unplanned outages, including Koeberg Unit 1, and this has meant less
space to do the maintenance work we had planned
• Going into winter, Eskom will for the first time plan to do extensive maintenance work,
even during the coldest months, to improve reliability
• Our teams are preparing contingency plans to manage the impact of any severe
weather events – as they did last winter
• We urge all customers to reduce demand, particularly over evening peak from 5pm-9pm
• We have done a comprehensive review of the five year maintenance plan required to
ensure our power stations can deliver more sustainable performance
• We have put initiatives in place on the supply and demand side – but are concerned
about the impact of the tariff decision on these
• An Energy Conservation Scheme or similar measures is needed as a safety net
• We are determined to keep the lights on for South Africa – but Eskom cannot do it alone
Thank you

Weitere ähnliche Inhalte

Was ist angesagt?

medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorial
Riaan Barwise
 
Combined Heat and Power Capturing an Opportunity
Combined Heat and Power Capturing an OpportunityCombined Heat and Power Capturing an Opportunity
Combined Heat and Power Capturing an Opportunity
TNenergy
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
guest17a0764
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
Suresh Jambunathan
 

Was ist angesagt? (20)

Fuel Supply & Price Uncertainty Cheaper Power Demand by Consumer
Fuel Supply & Price UncertaintyCheaper Power Demand by ConsumerFuel Supply & Price UncertaintyCheaper Power Demand by Consumer
Fuel Supply & Price Uncertainty Cheaper Power Demand by Consumer
 
medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorial
 
Ips connect 2015 chris smith
Ips connect 2015 chris smithIps connect 2015 chris smith
Ips connect 2015 chris smith
 
Combined Heat and Power Capturing an Opportunity
Combined Heat and Power Capturing an OpportunityCombined Heat and Power Capturing an Opportunity
Combined Heat and Power Capturing an Opportunity
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyond
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity Generation
 
Session 3A - Gary Krivopapich
Session 3A - Gary KrivopapichSession 3A - Gary Krivopapich
Session 3A - Gary Krivopapich
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore wind
 
Cutter - E3 Valuing Storage short
Cutter - E3 Valuing Storage shortCutter - E3 Valuing Storage short
Cutter - E3 Valuing Storage short
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)
 
Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant
 
Integrated Wind Energy Storage
Integrated Wind Energy StorageIntegrated Wind Energy Storage
Integrated Wind Energy Storage
 
Electricity peak demand charges overview
Electricity peak demand charges overviewElectricity peak demand charges overview
Electricity peak demand charges overview
 
Rooftop Solar System in Raheja Eternity, Mumbai
Rooftop Solar System in Raheja Eternity, MumbaiRooftop Solar System in Raheja Eternity, Mumbai
Rooftop Solar System in Raheja Eternity, Mumbai
 
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsCogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and Benefits
 

Andere mochten auch (6)

Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
 
Eskom system status presentation
Eskom system status presentationEskom system status presentation
Eskom system status presentation
 
Solar and Electric Grid
Solar and Electric GridSolar and Electric Grid
Solar and Electric Grid
 
Geography Skills Revision
Geography Skills RevisionGeography Skills Revision
Geography Skills Revision
 
Exhibitions Presentation
Exhibitions PresentationExhibitions Presentation
Exhibitions Presentation
 
Grid and Area references
Grid and Area referencesGrid and Area references
Grid and Area references
 

Ähnlich wie Eskom State of the Power Briefing

The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
ReedExhibitionsMiddl
 
Current scenario of indian power sector & expectations from suppliers
Current scenario of indian power sector & expectations from suppliersCurrent scenario of indian power sector & expectations from suppliers
Current scenario of indian power sector & expectations from suppliers
SANJAY KUMAR
 
Energy efficiency in the tennessee valley
Energy efficiency in the tennessee valleyEnergy efficiency in the tennessee valley
Energy efficiency in the tennessee valley
TNenergy
 
POWER PLANT vs ENERGY STORAGE
POWER PLANT vs ENERGY STORAGEPOWER PLANT vs ENERGY STORAGE
POWER PLANT vs ENERGY STORAGE
SAMSUNG SDI
 
SmartPower-August 2015-Newsletter
SmartPower-August 2015-NewsletterSmartPower-August 2015-Newsletter
SmartPower-August 2015-Newsletter
Fergus Wheatley
 

Ähnlich wie Eskom State of the Power Briefing (20)

Eskom load shedding update
Eskom load shedding updateEskom load shedding update
Eskom load shedding update
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
 
Renewable Energy Integration Limits
Renewable Energy Integration LimitsRenewable Energy Integration Limits
Renewable Energy Integration Limits
 
Current scenario of indian power sector & expectations from suppliers
Current scenario of indian power sector & expectations from suppliersCurrent scenario of indian power sector & expectations from suppliers
Current scenario of indian power sector & expectations from suppliers
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptx
 
Summary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrelSummary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrel
 
A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements
 
Energy efficiency in the tennessee valley
Energy efficiency in the tennessee valleyEnergy efficiency in the tennessee valley
Energy efficiency in the tennessee valley
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Solving Nigeria's Power Problems
Solving Nigeria's Power ProblemsSolving Nigeria's Power Problems
Solving Nigeria's Power Problems
 
L’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederL’esperienza della California, Mark Rothleder
L’esperienza della California, Mark Rothleder
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentation
 
POWER PLANT vs ENERGY STORAGE
POWER PLANT vs ENERGY STORAGEPOWER PLANT vs ENERGY STORAGE
POWER PLANT vs ENERGY STORAGE
 
Ntpc business strategy
Ntpc business strategyNtpc business strategy
Ntpc business strategy
 
SmartPower-August 2015-Newsletter
SmartPower-August 2015-NewsletterSmartPower-August 2015-Newsletter
SmartPower-August 2015-Newsletter
 
Storage summit edf - richard burton 25.02.18
Storage summit   edf - richard burton 25.02.18Storage summit   edf - richard burton 25.02.18
Storage summit edf - richard burton 25.02.18
 
Powergen off grid power supply
Powergen off grid power supplyPowergen off grid power supply
Powergen off grid power supply
 
CCXG Forum, September 2021, Mandy Rambharos
CCXG Forum, September 2021,  Mandy RambharosCCXG Forum, September 2021,  Mandy Rambharos
CCXG Forum, September 2021, Mandy Rambharos
 
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
 

Mehr von Durban Chamber of Commerce and Industry

Mehr von Durban Chamber of Commerce and Industry (20)

SUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULESSUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULES
 
201507 caisson repair project final
201507 caisson repair project final201507 caisson repair project final
201507 caisson repair project final
 
Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2
 
Speakers' profiles
Speakers' profilesSpeakers' profiles
Speakers' profiles
 
Mail shot wom. conv. a4
Mail shot   wom. conv. a4Mail shot   wom. conv. a4
Mail shot wom. conv. a4
 
Talk sign a5 flyer 2015
Talk sign a5 flyer 2015Talk sign a5 flyer 2015
Talk sign a5 flyer 2015
 
ethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual reportethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual report
 
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
 
Sefa breakfast session presentation
Sefa breakfast session presentationSefa breakfast session presentation
Sefa breakfast session presentation
 
Invitation letter to careers expo 2015
Invitation letter to careers expo 2015Invitation letter to careers expo 2015
Invitation letter to careers expo 2015
 
Invitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual conventionInvitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual convention
 
Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015
 
Daily market commentary 10122014
Daily market commentary 10122014Daily market commentary 10122014
Daily market commentary 10122014
 
Invitation
InvitationInvitation
Invitation
 
Daily market commentary 11112014
Daily market commentary 11112014Daily market commentary 11112014
Daily market commentary 11112014
 
Daily market commentary 10102014
Daily market commentary  10102014Daily market commentary  10102014
Daily market commentary 10102014
 
Jirah article 2014
Jirah article 2014Jirah article 2014
Jirah article 2014
 
KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair
 
Gibela supplier specs
Gibela supplier specs Gibela supplier specs
Gibela supplier specs
 
Tongaat Hullett - Durban Investment Roadshow
Tongaat Hullett - Durban Investment RoadshowTongaat Hullett - Durban Investment Roadshow
Tongaat Hullett - Durban Investment Roadshow
 

Kürzlich hochgeladen

Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 

Eskom State of the Power Briefing

  • 1. State of the Power System Update Brian Dames Chief Executive
  • 2. Overview Review of the quarter Outlook for winter Creating a sustainable Generation fleet Conclusion 5/27/2013 2
  • 3. 3 Key Messages • This winter will be different in that generation maintenance will be done and not deferred. Eskom is committed to maintaining at least 9 generation units between April and August to ensure the long term sustainability of the plant. • There is sufficient capacity to meet the demand most of the day. The concern is the peak demand between 5pm and 9pm. If that can be reduced by as much as 2000MW, the security of electricity supply will be adequate. • Residential customers, particularly those that use geysers, space heating and pool pumps can make the biggest difference by switching off this equipment for 4 hours and will yield more than 2000MW savings. • Eskom has completed a 5 year review of its maintenance requirements to create a sustainable generation fleet. It is committed to doing the maintenance that will ensure a sustainable generation fleet to meet the long term supply requirements for country. • In the short to medium term, this will introduce risks to balancing supply and demand. In order to manage these risks, the country must continue to focus on additional supply options, energy efficiency and some form of mandatory energy conservation schemes. • Eskom is committed to completing the new build programme and is putting the necessary resources in place to do so.
  • 4. 4 Overview • We kept the lights on during summer, as we have done for the past five years • Going into winter, we face new challenges: Eskom cannot do it alone • Our power stations are ageing and are being run hard. Sustained high levels of planned maintenance are needed to ensure reliable performance • The power system has been particularly tight and planned maintenance was impacted during 2013 due to: • The failure of a transmission line from Mozambique due to flooding, which reduced imports from Cahora Bassa – 850 MW • The unplanned outage of Koeberg Unit 1 – 900MW • The need to manage the impact of the strike at Exarro’s coal mines – 1000MW • Volatile power station performance • We kept the lights on in summer using Open Cycle Gas Turbines and demand side measures, but planned maintenance had to be reduced • Eskom usually reduces maintenance to the minimum in winter so that we can meet higher demand. But this winter is different – planned maintenance cannot be deferred • Demand during winter evening peaks can jump by up to 3000 MW in 1 hour, as households switch on lights, heaters and cookers • Please help us Beat the Peak : switch off non-essential appliances from 5-9pm
  • 5. 5 Overview (continued...) • We have reached a point where we cannot continue to defer planned Generation maintenance any longer because this could have severe consequences. • The performance of Eskom’s own Generation fleet is volatile and that of the Cahora Bassa scheme has become unpredictable. • The Multi-Year Price Determination 3 (MYPD3) determination adds to the challenge of managing a tight power system by reducing Eskom’s ability to procure additional demand and supply side levers. • We will implement a Generation maintenance strategy which is based on an 80% Availability; 10% Planned maintenance and 10% Unplanned outages over 5 years to maintain the current fleet, meet environmental requirements and achieve predictable performance from our existing assets. • Much of the planned maintenance will be fixed, providing certainty for planning, while outages will be done to ensure we can comply with Environmental legislation • Additional supply and demand side options must be explored to meet medium term electricity demand.
  • 6. Overview Review of the quarter Outlook for winter Creating a sustainable Generation fleet Conclusion 5/27/2013 6
  • 7. 7 Planned maintenance and unplanned outages Planned % Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 2013 13.07 9.7 9.1 2012 12.57 13.1 13.51 13.81 10.5 7.41 5.45 5.44 5.27 8.74 9.63 13.06 2011 9.96 7.62 8.42 8.66 6.3 4.5 2.9 5.97 8.8 9.56 7.64 15.58 2010 11.91 10.53 10.71 11.57 7.0 2.6 1.72 6.36 10.66 8.54 9.06 12.31 • Reduced Cahora Bassa imports, the Koeberg 1 outage, and high unplanned outages meant less space to do planned maintenance • Power station performance tends to be more volatile in summer • More maintenance needed to improve reliability • Reduction of unplanned outages to 4500 MW by winter 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 MW Date Unplanned Plant Unavailability at Peak Unavailability Winter Allowance Summer Allowance
  • 8. 8 We increased use of open cycle gas turbines to keep the lights on The OCGTs were run harder in January, February and March 2013 than in any month in the last 4 years. Average load factors were close to 20%.
  • 9. Cahora Bassa availability 2013/05/27 9 • The graph depicts the performance of the HVDC system in terms of its availability • The availability since July 2012 has been poor • This is due to the loss of a smoothing reactor (returned to service 15 November 2012) followed by the loss of one of the lines due to flooding. The line is anticipated to return to service by the end of April 2013. 0 0.5 1 1.5 2 2.5 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1-Jan-12 1-Mar-12 1-May-12 1-Jul-12 1-Sep-12 1-Nov-12 1-Jan-13 1-Mar-13 Date HCB: Energy Availability Factor (EAF) Jan 2012 - April 2013
  • 10. In support of Coal stocks at high levels despite labour unrest 10 Actual Stock days F2008, F2012 vs YTD Actual F2013 25 25 22 20 19 18 17 18 15 12 13 13 40 39 39 36 38 41 41 44 43 41 39 3938 39 40 42 43 44 45 47 47 48 49 47 0 10 20 30 40 50 60 APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR Stockdays Months Actual Stock days F2008,F 2012 vs YTD Actual F2013 2007/8 2011/12 2012/13 • Coal stock days are currently at 47 days (26 March). • Stock days peaked at 49 days at the end of February (the highest ever), but were reduced by the three-week Exxaro strike which impacted Matla, Arnot and Matimba Power stations • The impact of the strike was well-managed – but capacity from affected power stations was reduced by as much as 1000 MW during the day to conserve stockpiles, reducing space for planned maintenance on Eskom’s generation fleet • In support of road safety, trucking operations were halted during the Easter weekend
  • 11. 11 Integrated Demand Management Programme Savings (MW) - Achievement Against MYPD 2 Targets MYPD 2 Cumulative Demand Savings target = 1037MW IDM Achievement (subject to final audit) = 1272MW (123% of MYDP2 target) 289 301 447 345 342 585 0 100 200 300 400 500 600 700 FY 2010/11 - Actual FY 2011/12 - Actual FY 2012/13 - Projection DemandSavings(MW) MYPD 2 IDM Achievement
  • 12. 12 2013 Financial Year – Demand Savings Projection Split by Sector IDM Projection FY 2013 = 585MW Agriculture 6.69 1% Commercial & Corporates 102.45 18% Industrial & Mining 111.17 19% Residential - SWH 20.33 3% Residential & Munics 344.77 59%
  • 13. 0 500 1 000 1 500 2 000 2 500 3 000 3 500 4 000 2005 2006 2007 2008 2009 2010 2011 2012 2013 Demandsavings(MW) Verified MW Eskom Target 1 339 1 422 2 244 1 827 0 500 1 000 1 500 2 000 2 500 2011 2012 2013 Target 2013 Annualisedenergysavings (GWh) The demand side management programme run by Eskom has resulted in over 3 500MW of savings since its inception Cumulative verified demand savings (MW) 13 Energy Savings (GWh) • The accumulated verified demand savings for the combined financial years 2005 to 2013, is 3 586MW • This is almost equivalent to the output of a typical power station
  • 14. In support of Residential programmes on track • Power Alert system consistently achieved a residential evening peak demand reduction of over 320MW, during summer, on worst system constrained days. (>17,7million lights or 107 thousand geysers) • Residential mass rollout programme, phase 1 is complete and achieved a total savings of 218MW. More than 800,000 lower to middle income households were visited (227 direct jobs and 3,018 indirect jobs created) • Residential mass rollout programme, phase 2 was launched in September 2012. The savings target is 80MW and should be completed in early 2014 financial year. The plan is to reach between 150,000 and 180,000 middle income households who will benefit from the retrofit of geyser and pool timers, efficient shower heads and lighting. This phase is expected to generate in excess 800 indirect jobs. • Water heat pump rebate programme continues to grow. A total of 6807 units have been installed to date of which 3962 were installed in the 2013 financial year. 14
  • 15. Overview Review of the quarter Outlook for winter Creating a sustainable Generation fleet Conclusion 5/27/2013 15
  • 16. 17 Winter Plan 2013 – Typical Demand Profile Going into winter, demand can spike by more than 3000 MW during evening peak – equivalent to five units of a large power station
  • 17. 18 Outlook for winter • Cahora Bassa is expected to increase its output to 1300 MW by the last week of April 2013 and the final 200 MW is expected to be restored by the third quarter of 2013. • Koeberg Unit 1 is expected to be back in service in mid-April • Planned maintenance outages over the peak winter period (June-July) are approximately 2000 MW. This is maintenance work that cannot be deferred • There is an intense focus on reducing the level of unplanned outages to below 4500 MW • Peak demand this winter is forecast at 36.8 GW, slightly lower than in 2012, but this is the average for an hour – the “peak within the peak” can go as high as 37 GW – 38 GW • We have supply and demand side initiatives in place – but we are concerned about the impact which the NERSA tariff decision could have on our ability to finance the demand side measures needed to manage a tight system • Approximately 2100 MW of Interruptible demand, for up to two hours a week, is available from the BHP Billiton aluminium smelters to help manage the frequency of the power system
  • 18. Levers secured to date – some expire before winter and others by December 2013 19 Short term initiatives (Nov 2011 – Jun 2012) Target capacity (MW) Secured capacity (MW) Operational capacity (MW) Status SupplySide Municipal Base Load Power 515 515 180 Contract until 31 December 2012. Evaluating contract extensions. IPPs and short term base load 230 196 196 Awaiting NERSA licensing for 35 MW Non-Eskom peaking generation 120 40 40 80 MW falls outside pricing mandate. Cross border 93 93 93 Stable Operation DemandSide Power buyback 1000 1010 1010 Contracts conclude 31 May 2013. Evaluating contract extensions. Demand response rewards programme 500 158 158 Programme to be terminated Mandatory ECS - - - Long term initiative Stand-by customer generation 100 11 7 Commercial challenges and pricing Residential Demand Management 1000 300 300 Approval for implementation of 158 MW by end 2013/14 financial year. Supplemental DMP 500 196 196 DMP reduced due to power buybacks
  • 19. 20 Power buybacks • Eskom and large customers, mainly in the ferrochrome and ferroalloy industries entered into a mutually beneficial arrangement in terms of power buybacks.. • Up to 1000MW of power was bought back with a commitment from the customers involved to not compromise contractual commitments with their customers nor incur job losses. • Eskom used this space to continue with its planned maintenance programme. • The current power buyback programme began in November 2012 and comes to an end on 31 May 2013. • Winter tariffs for Eskom’s large industrial and mining customers are implemented in the months of June, July and August and these result in reduced demand.
  • 20. 21 Winter Plan 2013 – System Outlook • April 2013 to 31 July 2013, the system will be extremely tight • This winter will be different to previous winters as Eskom will have to perform long duration planned maintenance during the coldest months • There will be an intense focus on managing the unplanned outage level (UCLF) to below 4500MW in April and May • There is some flexibility to defer maintenance but this would increase the maintenance backlog. • An Energy Conservation Scheme is needed to protect the system This represent one hour with highest peak demand in a week 6500/4500 MW Unplanned Plant Unavailability Date UCLF Planned Forecast Shortfall Including Operating Reserves and Gas 22-Apr-13 Mon 6500 3944 31862 29-Apr-13 Mon 6500 5302 32026 06-May-13 Mon 6500 4810 32714 13-May-13 Mon 6500 4560 33020 20-May-13 Mon 6500 3738 33495 27-May-13 Mon 6500 3738 33698 03-Jun-13 Mon 4500 2450 34867 10-Jun-13 Mon 4500 2450 35216 17-Jun-13 Mon 4500 2564 35167 24-Jun-13 Mon 4500 2084 35344 01-Jul-13 Mon 4500 2579 35989 08-Jul-13 Mon 4500 2579 36510 15-Jul-13 Mon 4500 1986 36885 22-Jul-13 Mon 4500 1411 36574 29-Jul-13 Mon 4500 1240 36583
  • 21. In support of “Beat the Peak” - Four Hours, Four Steps • Saving electricity reduces pressure on the grid and cuts your electricity bill and South Africa’s carbon emissions • Evening peak is between 5 pm and 9 pm – four steps to beat the peak 1. Switch off all geysers and pool pumps during peak 2. Switch off all non-essential lighting 3. Find alternative to electrical heaters • Dress warmly, and use space heaters less • Insulate ceilings to keep the heat in • Invest in thermostatically controlled heaters (fan heaters are ideal for quick heat; oil heaters for longer periods) • Consider gas heaters and hot water bottles 4. Respond to the Power Alert messages by switching off all appliances that are not being used • Switch to energy efficient technologies: take advantage of solar water and water heating pump rebates and the residential mass rollout programme, which provides a range of free products 22
  • 22. Overview Review of the quarter Outlook for winter Creating a sustainable Generation fleet Conclusion 5/27/2013 23
  • 23. The need for a sustainable Generation fleet • Our power stations are ageing and needs focus to maintain and improve performance. • Planned maintenance has often had to be shifted or deferred to ensure we have the capacity available to meet demand and keep the lights on. • This approach is not sustainable – it is essential that planned maintenance be done to enable predictable and sustainable performance from Eskom’s power stations. • Eskom has put in place a five year strategy for Generation sustainability which includes a firm commitment not to postpone critical maintenance. • We will implement a programme which will allow for better resource planning and more effective use of contractor capacity as well as improved internal skills and processes. 24
  • 24. 64% of Eskom’s current installed base load capacity plants are past their midlife 25Source: Medium-Term Outlook January 2013; Gx Maintenance team 909 1,860 KomatiGrootvlei 1,092 Camden 1,448 Hendrina 1,865 Arnot 2,160 Kriel 2,850 Duvha 3,450 Matla 3,450 Tutuka 3,510 Lethabo 41,930 Peaking plants 4,405 Koeberg 3,558 Matimba 3,690 Kendal 3,840 Majuba 3,843 Total 50 86 73797071 625656 4643453939 Ø 58 Sent out capacity by station MW Useful life completed Percent Coal Nuclear Peaking Stations more than half way through their operating lifecycle Based on Coal Fleet Target Life = 60 years as per Life of Plant Plan Coal Stations Design Life = 35 yrs (7 stations past design life) without capital investment
  • 25. Achieving a Sustainable Generation Business requires us to accommodate all major types of maintenance 26Source: Maintenance Strategy team Major projects ▪ Sustainability projects refurbish plant condition back to useful life ▪ Enhancement projects improve station performance (e.g. LifeEx) Environmental ▪ Upgrades to plant to reduce the environmental impact of operating the plant, e.g., reduce emissions or water usage Design-based Maintenance ▪ Preventive maintenance intended to keep the plant in working order. The maintenance is carried out at regular, predetermined intervals (e.g. inspection every 18 months) Statutory and Safety ▪ Statutory maintenance is required by law ▪ Safety maintenance ensures a safe operating environment Short-term/ Emergent Work ▪ Short-term is work done on weekends and other short duration maintenance opportunities ▪ Emergent maintenance is reactive to addresses arising signs of existing or imminent failure Essential Design-based maintenance has been backlogged with Statutory/Environ. given preference Breakdown of FY2012 PCLF Percent 1.9 2.0 8.7 0.5 EmergentExecuted PCLF Design -based Statutory and Safety 2.2 Short term 2.1 Outage extension Small proportion of PCLF executed was actual plant philosophy (needs to be 6%) Plant
  • 26. With constrained capacity (maintenance space and ability to execute), four primary technical levers exist in defining the pathway to sustainability 27 1. Flexibility of the supply – demand relationship (e.g. how many demand reducing levers to pull, Residential Mass Roll-out, demand response options, accelerated new capacity options and energy conservation scheme) 2. Delaying the clearance of the growing maintenance backlog (smooth over 5 years – currently total 10% backlog ) 3. Prioritising some maintenance types over others (e.g. philosophy over Life extension or other major projects) 4. Targeting the overall health of the entire fleet and/or a set of prioritised stations (e.g. All maintenance at some stations while only some maintenance activity at others: Plant prioritisation done on Remnant Life, Cost of Production and Recent Plant Performance) SOURCE: Maintenance strategy team
  • 27. Strategy to ensure a sustainable Generation fleet • We have chosen a maintenance strategy for the next five years which will ensure that Eskom’s Generation fleet is sustainable for the long term • This is based on an 80:10:10 principle – that is, on average, an Energy Availability Factor of 80%, planned maintenance of 10% and a projected unplanned outage ratio of 10% • About 8% of the planned maintenance will be made up of maintenance which will fixed in terms of its schedule. The other 2% will be short term maintenance. This will allow for certainty in planning and executing the maintenance outages. Outages to achieve compliance to Environmental legislation, where no exemptions have been obtained, will be done. • Any improvement in unplanned outages will be used to create space for planned maintenance • A minimum of 9 units will undergo planned maintenance this winter, because they have reached technical or statutory limits. This cannot be rescheduled. 28
  • 28. Overview Review of the quarter Outlook for winter Creating a sustainable Generation fleet Conclusion 5/27/2013 29
  • 29. 30 Conclusions • The power system has been very tight during summer because of reduced imports and high levels of unplanned outages, including Koeberg Unit 1, and this has meant less space to do the maintenance work we had planned • Going into winter, Eskom will for the first time plan to do extensive maintenance work, even during the coldest months, to improve reliability • Our teams are preparing contingency plans to manage the impact of any severe weather events – as they did last winter • We urge all customers to reduce demand, particularly over evening peak from 5pm-9pm • We have done a comprehensive review of the five year maintenance plan required to ensure our power stations can deliver more sustainable performance • We have put initiatives in place on the supply and demand side – but are concerned about the impact of the tariff decision on these • An Energy Conservation Scheme or similar measures is needed as a safety net • We are determined to keep the lights on for South Africa – but Eskom cannot do it alone

Hinweis der Redaktion

  1. During winter 2011, KIC responded to the higher winter tariff and dropped off significant load During Dec 2011, Eskom started off with the first power buy-back program and significant demand reduction was contracted with 2 customersThis continued into 2012 with various contracts signed until March 2012. During April and May 2012, 963MW of PBB were activeCustomers kept significant load of the system through winter 2012 after the power buy back deals concluded in May 2012. Customers picked up their load post winter 2012Eskom began the 2nd power buy back program during Nov 2012 and this ramped up to just over 1000MW of demand reduction by march 2013
  2. The coal stations have been designed for a 35 year life from the onset, however we have extended this 50 years expected life over time and have now incorporated a 60 year target life in all our Life of plant Plans for purposes of Lifex consideration
  3. To be sustainable, Gx has to undertake all major types of maintenance with the emphasis on philosophy based maintenance. We have only been able to accommodate 2.2% PCLF in this area when a healthy fleet requires about 6% for sustainability
  4. Given that the requirement for the base case is quite high, there is a need to consider look at levers that can be pulled to arrest current performance. Flexibility of supply/demand options being reviewed by KLO recovery team. For Gx, the smoothing of clearance time of backlog is an option but comes with continued risk and slow recovery. In addition, should this not be sufficient, trade-offs as far as maintenance types can be considered as well as choices between fleet wide versus plant priority strategies need to be considered