Housing Development
in South Marston
You are invited to the Village Consultation Drop in Event at the
Mercure Hotel on Tuesday 23 July between 3pm & 8pm
This is the last chance to influence South Marston’s future. The event
will showcase the latest proposalsfor development emerging from:
the planners in Swindon
Borough Council
the developers who control
the land
the Parish Council’s
ExpansionWorking Group
This is a formal consultation event by Swindon Borough Council on how
they see the development taking place east of Swindon. Their proposals
are in the form of two Supplementary Planning documents (SPDs) which
provide the blueprint for developers when submitting planning
applications. After feedback from consultations has been incorporated,
these documents will be assessed by an independent Planning Inspector
in the late autumn.
In the meantime, the developers, who control the land north of the A420,
will be making a planning application for development at South Marston
and Rowborough before the end of the year.The developers will be
showing their initial proposals at the event.
Finally, the Village Expansion Working Group has continued to explore
the more detailed aspects of the development. The working group is
looking at the key factors affecting design of the village centre which will
be generated by the expanded open space.
See the plans, ask questions and contribute your
views to help shape South Marston’s future.
Swindon Borough Council
The Local Plan for Swindon is the document that identifies where, when, and
how development will take place in Swindon Borough up to 2026. It was
widely consulted on during the winter of 2012, and awaits review by an
independent Planning Inspector. This is the document that identifies that
major growth must be accommodated east of the A419, and earmarks South
Marston and Wanborough parishes as those areas that are most suited to
take this development.
The Local Plan makes some top level statements about how that
development takes place. However, it cannot convey sufficient detail to set
out all the constraints and requirements that would have to be met. This is
why there are two supplementary documents – the Eastern Villages and the
South Marston Village SPDs. These two documents are now also
undergoing formal consultation, so they can go, alongside the Local Plan, to
the Examination in Public in the autumn.
The SPDs state approximately how many houses and how much
employment and retail space is needed. They cover requirements for roads,
community facilities and services. The plans acknowledge environmental
and heritage constraints such as flooding, landscape and archaeology.
The Eastern Villages SPD
Expansion east of Swindon covers most of South Marston parish, part of
Wanborough parish and down to Commonhead roundabout. The plans on
display will show the way new villages will be created at Rowborough and
south of the A420, surrounded by landscaped areas and supported by a new
district centre.
The South Marston Village SPD
Expansion at South Marston is the most sensitive, since it will build onto an
existing village community. To reflect this, Swindon Borough agreed with
South Marston Parish Council that a separate blueprint would jointly be
developed to guide how the whole village would develop in the future. This
includes both greenfield and the brownfield site at Crown Timber, and builds
on all the previous consultations undertaken with local residents.
The Village Expansion Working Group
The hardy band of local residents who make up the group have worked
throughout the year to ensure that first the Local Plan and then the two
Supplementary Planning Documents reflect, as far as possible, the
early work and consultation outcomes that were achieved through
previous village events and questionnaires.
Since the last public event in June 2012, Swindon Borough Council has
made the decision, endorsed by the Parish Council, that the school
should be expanded on its existing site, rather than a separate building
or relocated school. This will require a land swap, since the expanded
school footprint needs a narrow strip of additional land from the existing
recreation ground owned by the Parish Council. Plans showing the
footprint of the extended school will be on show at the event.
The compensatory land will be added to the extended recreation
ground behind Bell Gardens which will be acquired by the Parish
Council. Overall, the open space achieved will far exceed the
statutory allowance for the size of development at South Marston.
The Expansion Working Group is now
shaping plans for the expanded village
centre – the facilities we want and the
uses of open space that are viable and
capable of being maintained by the
community. We are keen to have wider
village input into the final design and
want residents to tell us what they like
and don’t like about particular design and
location ideas.
Please bring your children with you if you need to. We have
set aside a small supervised area for them so you can have
the freedom to look around the display boards.
Distributed by the Expansion Working Group of South Marston Parish Council
The Developers
A few years ago, a consortium of developers was formed from all those
construction companies who had interests in developing the land covered
by the local plan expansion area. In recent times, this consortium has
disbanded. However, Hallam and Hannick homes are the two major
developers controlling land north of the A420. They are working together
and their proposals will deliver two of the ‘Eastern Villages’. The Local
Plan proposes an expanded South Marston, with an additional 500 homes
on greenfield sites they control and a new village, Rowborough, of some
1500 houses towards Nightingale Wood and down towards Acorn Bridge.
The developers aim to submit their planning application before the end of
this year. It is likely that South Marston village will be the first location
where development takes place.
Swindon Borough, the Developers and the Expansion Working Group have
had joint meetings to discuss how constraints, such as traffic and flooding,
affect their proposals and have had early discussions on the potential for
community facilities and open space.
The Parish Council Working Group had sight of their initial plan a few days
ago. Although they largely conform to the blueprint put forward in the
Swindon Borough planning documents, there are a number of significant
differences, particularly in the layout of roads. These differences will have
to be negotiated once the planning application is submitted, as part of the
normal planning system processes.
Come and talk to the developers and ask questions
about the proposals and the timing for construction.

Weitere ähnliche Inhalte

Was ist angesagt?

Substantial Amendment to FY 2008 Annual Community Development Action Plan
Substantial Amendment to FY 2008 Annual Community Development Action PlanSubstantial Amendment to FY 2008 Annual Community Development Action Plan
Substantial Amendment to FY 2008 Annual Community Development Action Plan
City of College Station
 
Fort lincoln park community mtg presentation 2019 09 24 final
Fort lincoln park  community mtg presentation 2019 09 24 finalFort lincoln park  community mtg presentation 2019 09 24 final
Fort lincoln park community mtg presentation 2019 09 24 final
RamaChilamkurthy
 
Historic District Overlay Ordinance
Historic District Overlay OrdinanceHistoric District Overlay Ordinance
Historic District Overlay Ordinance
Jonathan Brown
 
Huntington Station Development Strategy
Huntington Station Development StrategyHuntington Station Development Strategy
Huntington Station Development Strategy
Neil Takemoto
 
Petworth playground community meeting 191015 (1)
Petworth playground  community meeting 191015 (1)Petworth playground  community meeting 191015 (1)
Petworth playground community meeting 191015 (1)
RamaChilamkurthy
 
Concept Plan: The Story of Bristol Rising
Concept Plan: The Story of Bristol RisingConcept Plan: The Story of Bristol Rising
Concept Plan: The Story of Bristol Rising
CSPM Group
 
19th lamont meeting presentation 2019.03.28
19th  lamont meeting presentation 2019.03.2819th  lamont meeting presentation 2019.03.28
19th lamont meeting presentation 2019.03.28
RamaChilamkurthy
 

Was ist angesagt? (20)

2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond
 
Substantial Amendment to FY 2008 Annual Community Development Action Plan
Substantial Amendment to FY 2008 Annual Community Development Action PlanSubstantial Amendment to FY 2008 Annual Community Development Action Plan
Substantial Amendment to FY 2008 Annual Community Development Action Plan
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
 
Our Future Valley December 2 Presentation
Our Future Valley December 2 PresentationOur Future Valley December 2 Presentation
Our Future Valley December 2 Presentation
 
Hempstead, NY Master Concept Plan submitted June 2011
Hempstead, NY Master Concept Plan submitted June 2011Hempstead, NY Master Concept Plan submitted June 2011
Hempstead, NY Master Concept Plan submitted June 2011
 
Fort lincoln park community mtg presentation 2019 09 24 final
Fort lincoln park  community mtg presentation 2019 09 24 finalFort lincoln park  community mtg presentation 2019 09 24 final
Fort lincoln park community mtg presentation 2019 09 24 final
 
Historic District Overlay Ordinance
Historic District Overlay OrdinanceHistoric District Overlay Ordinance
Historic District Overlay Ordinance
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies
 
Huntington Station Development Strategy
Huntington Station Development StrategyHuntington Station Development Strategy
Huntington Station Development Strategy
 
City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revised
 
Hawksburn Village - Brochure
Hawksburn Village - BrochureHawksburn Village - Brochure
Hawksburn Village - Brochure
 
Petworth playground community meeting 191015 (1)
Petworth playground  community meeting 191015 (1)Petworth playground  community meeting 191015 (1)
Petworth playground community meeting 191015 (1)
 
Ls360 Q1 2010 Status Report
Ls360 Q1 2010 Status ReportLs360 Q1 2010 Status Report
Ls360 Q1 2010 Status Report
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
A5 Form Based Codes
 
Item # 11 - Temporary Bike Park
Item # 11 - Temporary Bike ParkItem # 11 - Temporary Bike Park
Item # 11 - Temporary Bike Park
 
Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
 
Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3
 
Concept Plan: The Story of Bristol Rising
Concept Plan: The Story of Bristol RisingConcept Plan: The Story of Bristol Rising
Concept Plan: The Story of Bristol Rising
 
Forest Hills Initiative Presentation Revised Version
Forest Hills Initiative Presentation   Revised VersionForest Hills Initiative Presentation   Revised Version
Forest Hills Initiative Presentation Revised Version
 
19th lamont meeting presentation 2019.03.28
19th  lamont meeting presentation 2019.03.2819th  lamont meeting presentation 2019.03.28
19th lamont meeting presentation 2019.03.28
 

Andere mochten auch (9)

Swindon Old Peoples Forum newsletter 9
Swindon Old Peoples Forum newsletter 9Swindon Old Peoples Forum newsletter 9
Swindon Old Peoples Forum newsletter 9
 
Museum of Computing Newsletter May 2013
Museum of Computing Newsletter May 2013Museum of Computing Newsletter May 2013
Museum of Computing Newsletter May 2013
 
130514 tower and tap july & august 2013 full pdf
130514 tower and tap july & august 2013 full pdf130514 tower and tap july & august 2013 full pdf
130514 tower and tap july & august 2013 full pdf
 
Newsletter august 2014 v2.pub
Newsletter august 2014 v2.pubNewsletter august 2014 v2.pub
Newsletter august 2014 v2.pub
 
Sevor farm open_day_18.08
Sevor farm open_day_18.08Sevor farm open_day_18.08
Sevor farm open_day_18.08
 
Swindon Old Peoples Forum Open meeting poster oct 2013
Swindon Old Peoples Forum Open meeting poster oct 2013Swindon Old Peoples Forum Open meeting poster oct 2013
Swindon Old Peoples Forum Open meeting poster oct 2013
 
South marston church in touch sep-nov 14
South marston church   in touch sep-nov 14South marston church   in touch sep-nov 14
South marston church in touch sep-nov 14
 
South marston c0f e christmas craft fayre 28 11_14
South marston c0f e christmas craft fayre 28 11_14South marston c0f e christmas craft fayre 28 11_14
South marston c0f e christmas craft fayre 28 11_14
 
New year speech
New year speechNew year speech
New year speech
 

Ähnlich wie Village expansion leafletv2

Informal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 FinalInformal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 Final
David Twigg
 
$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc
David Twigg
 
South Brisbane Riverside Neighbourhood Plan
South Brisbane Riverside Neighbourhood PlanSouth Brisbane Riverside Neighbourhood Plan
South Brisbane Riverside Neighbourhood Plan
ycys
 
Economic Development Lands Planning Pilot Project
Economic Development Lands Planning Pilot ProjectEconomic Development Lands Planning Pilot Project
Economic Development Lands Planning Pilot Project
icablearning
 
cw-planning-guidance-final1
cw-planning-guidance-final1cw-planning-guidance-final1
cw-planning-guidance-final1
David Greenfield
 

Ähnlich wie Village expansion leafletv2 (20)

Informal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 FinalInformal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 Final
 
$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc
 
S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727S out 13_1555-design_and_access_statement-409727
S out 13_1555-design_and_access_statement-409727
 
South marston planning boards
South marston planning boardsSouth marston planning boards
South marston planning boards
 
City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22
 
Strategic Community Plan 2012-22
Strategic Community Plan 2012-22Strategic Community Plan 2012-22
Strategic Community Plan 2012-22
 
North Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationNorth Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentation
 
Preferred growth strategy summary presentation
Preferred growth strategy   summary presentationPreferred growth strategy   summary presentation
Preferred growth strategy summary presentation
 
Newsletter draft 5c
Newsletter draft 5cNewsletter draft 5c
Newsletter draft 5c
 
Garden towns and villages in the South West
Garden towns and villages in the South WestGarden towns and villages in the South West
Garden towns and villages in the South West
 
Planning Brochure
Planning BrochurePlanning Brochure
Planning Brochure
 
South Brisbane Riverside Neighbourhood Plan
South Brisbane Riverside Neighbourhood PlanSouth Brisbane Riverside Neighbourhood Plan
South Brisbane Riverside Neighbourhood Plan
 
Draft Hawksburn Village Structure Plan
Draft Hawksburn Village Structure PlanDraft Hawksburn Village Structure Plan
Draft Hawksburn Village Structure Plan
 
Selected Projects
Selected ProjectsSelected Projects
Selected Projects
 
2015_Bridge_Road
2015_Bridge_Road2015_Bridge_Road
2015_Bridge_Road
 
the-haven-south-mdp
the-haven-south-mdpthe-haven-south-mdp
the-haven-south-mdp
 
Economic Development Lands Planning Pilot Project
Economic Development Lands Planning Pilot ProjectEconomic Development Lands Planning Pilot Project
Economic Development Lands Planning Pilot Project
 
cw-planning-guidance-final1
cw-planning-guidance-final1cw-planning-guidance-final1
cw-planning-guidance-final1
 
Draft Hawksburn Village Structure Plan
Draft Hawksburn Village Structure PlanDraft Hawksburn Village Structure Plan
Draft Hawksburn Village Structure Plan
 
Supporting Document - Discussion Paper
Supporting Document - Discussion PaperSupporting Document - Discussion Paper
Supporting Document - Discussion Paper
 

Mehr von Donald Jones

South Marston tower & tap july & august 2014
South Marston tower & tap july & august 2014South Marston tower & tap july & august 2014
South Marston tower & tap july & august 2014
Donald Jones
 
1 byron court 115261 proof 1
1 byron court 115261 proof 11 byron court 115261 proof 1
1 byron court 115261 proof 1
Donald Jones
 
Sopf open meeting note and agm 2013 minutes
Sopf open meeting note and agm 2013 minutesSopf open meeting note and agm 2013 minutes
Sopf open meeting note and agm 2013 minutes
Donald Jones
 
Sopf newsletter 10
Sopf newsletter 10Sopf newsletter 10
Sopf newsletter 10
Donald Jones
 
S out 13_1555-location_plan_scale_1_2500-410719
S out 13_1555-location_plan_scale_1_2500-410719S out 13_1555-location_plan_scale_1_2500-410719
S out 13_1555-location_plan_scale_1_2500-410719
Donald Jones
 
130515 tower and tap november 2013 web version
130515 tower and tap november 2013 web version130515 tower and tap november 2013 web version
130515 tower and tap november 2013 web version
Donald Jones
 
130514 tower and tap june 2013
130514 tower and tap june 2013130514 tower and tap june 2013
130514 tower and tap june 2013
Donald Jones
 
Agenda (pc) -_21.05.13
Agenda (pc) -_21.05.13Agenda (pc) -_21.05.13
Agenda (pc) -_21.05.13
Donald Jones
 
Agm agenda -_21.05.13
Agm agenda -_21.05.13Agm agenda -_21.05.13
Agm agenda -_21.05.13
Donald Jones
 
130421 tower and tap may 2013
130421 tower and tap may 2013130421 tower and tap may 2013
130421 tower and tap may 2013
Donald Jones
 
130323 tower and tap april 2013 4
130323 tower and tap april 2013 4130323 tower and tap april 2013 4
130323 tower and tap april 2013 4
Donald Jones
 

Mehr von Donald Jones (20)

South Marston tower & tap july & august 2014
South Marston tower & tap july & august 2014South Marston tower & tap july & august 2014
South Marston tower & tap july & august 2014
 
tower & tap may 2014 full
tower & tap may 2014 fulltower & tap may 2014 full
tower & tap may 2014 full
 
1403 tower & tap april 2014 full
1403 tower & tap april 2014 full1403 tower & tap april 2014 full
1403 tower & tap april 2014 full
 
1 byron court 115261 proof 1
1 byron court 115261 proof 11 byron court 115261 proof 1
1 byron court 115261 proof 1
 
1402 South Marston tower & tap february 2014 pdf
1402 South Marston tower & tap february 2014 pdf1402 South Marston tower & tap february 2014 pdf
1402 South Marston tower & tap february 2014 pdf
 
Rftwigs wassail
Rftwigs wassailRftwigs wassail
Rftwigs wassail
 
Sopf open meeting note and agm 2013 minutes
Sopf open meeting note and agm 2013 minutesSopf open meeting note and agm 2013 minutes
Sopf open meeting note and agm 2013 minutes
 
Sopf newsletter 10
Sopf newsletter 10Sopf newsletter 10
Sopf newsletter 10
 
S out 13_1555-location_plan_scale_1_2500-410719
S out 13_1555-location_plan_scale_1_2500-410719S out 13_1555-location_plan_scale_1_2500-410719
S out 13_1555-location_plan_scale_1_2500-410719
 
130515 tower and tap november 2013 web version
130515 tower and tap november 2013 web version130515 tower and tap november 2013 web version
130515 tower and tap november 2013 web version
 
Christmas gift fair_advert_2013-1
Christmas gift fair_advert_2013-1Christmas gift fair_advert_2013-1
Christmas gift fair_advert_2013-1
 
Bags 2 school
Bags 2 schoolBags 2 school
Bags 2 school
 
130515 tower and tap october 2013 pdf
130515 tower and tap october 2013 pdf130515 tower and tap october 2013 pdf
130515 tower and tap october 2013 pdf
 
130514 tower and tap september 2013 single page view pdf
130514 tower and tap september 2013 single page view pdf130514 tower and tap september 2013 single page view pdf
130514 tower and tap september 2013 single page view pdf
 
130514 tower and tap june 2013
130514 tower and tap june 2013130514 tower and tap june 2013
130514 tower and tap june 2013
 
Sopf newsletter 8
Sopf newsletter 8Sopf newsletter 8
Sopf newsletter 8
 
Agenda (pc) -_21.05.13
Agenda (pc) -_21.05.13Agenda (pc) -_21.05.13
Agenda (pc) -_21.05.13
 
Agm agenda -_21.05.13
Agm agenda -_21.05.13Agm agenda -_21.05.13
Agm agenda -_21.05.13
 
130421 tower and tap may 2013
130421 tower and tap may 2013130421 tower and tap may 2013
130421 tower and tap may 2013
 
130323 tower and tap april 2013 4
130323 tower and tap april 2013 4130323 tower and tap april 2013 4
130323 tower and tap april 2013 4
 

Village expansion leafletv2

  • 1. Housing Development in South Marston You are invited to the Village Consultation Drop in Event at the Mercure Hotel on Tuesday 23 July between 3pm & 8pm This is the last chance to influence South Marston’s future. The event will showcase the latest proposalsfor development emerging from: the planners in Swindon Borough Council the developers who control the land the Parish Council’s ExpansionWorking Group This is a formal consultation event by Swindon Borough Council on how they see the development taking place east of Swindon. Their proposals are in the form of two Supplementary Planning documents (SPDs) which provide the blueprint for developers when submitting planning applications. After feedback from consultations has been incorporated, these documents will be assessed by an independent Planning Inspector in the late autumn. In the meantime, the developers, who control the land north of the A420, will be making a planning application for development at South Marston and Rowborough before the end of the year.The developers will be showing their initial proposals at the event. Finally, the Village Expansion Working Group has continued to explore the more detailed aspects of the development. The working group is looking at the key factors affecting design of the village centre which will be generated by the expanded open space. See the plans, ask questions and contribute your views to help shape South Marston’s future. Swindon Borough Council The Local Plan for Swindon is the document that identifies where, when, and how development will take place in Swindon Borough up to 2026. It was widely consulted on during the winter of 2012, and awaits review by an independent Planning Inspector. This is the document that identifies that major growth must be accommodated east of the A419, and earmarks South Marston and Wanborough parishes as those areas that are most suited to take this development. The Local Plan makes some top level statements about how that development takes place. However, it cannot convey sufficient detail to set out all the constraints and requirements that would have to be met. This is why there are two supplementary documents – the Eastern Villages and the South Marston Village SPDs. These two documents are now also undergoing formal consultation, so they can go, alongside the Local Plan, to the Examination in Public in the autumn. The SPDs state approximately how many houses and how much employment and retail space is needed. They cover requirements for roads, community facilities and services. The plans acknowledge environmental and heritage constraints such as flooding, landscape and archaeology. The Eastern Villages SPD Expansion east of Swindon covers most of South Marston parish, part of Wanborough parish and down to Commonhead roundabout. The plans on display will show the way new villages will be created at Rowborough and south of the A420, surrounded by landscaped areas and supported by a new district centre. The South Marston Village SPD Expansion at South Marston is the most sensitive, since it will build onto an existing village community. To reflect this, Swindon Borough agreed with South Marston Parish Council that a separate blueprint would jointly be developed to guide how the whole village would develop in the future. This includes both greenfield and the brownfield site at Crown Timber, and builds on all the previous consultations undertaken with local residents.
  • 2. The Village Expansion Working Group The hardy band of local residents who make up the group have worked throughout the year to ensure that first the Local Plan and then the two Supplementary Planning Documents reflect, as far as possible, the early work and consultation outcomes that were achieved through previous village events and questionnaires. Since the last public event in June 2012, Swindon Borough Council has made the decision, endorsed by the Parish Council, that the school should be expanded on its existing site, rather than a separate building or relocated school. This will require a land swap, since the expanded school footprint needs a narrow strip of additional land from the existing recreation ground owned by the Parish Council. Plans showing the footprint of the extended school will be on show at the event. The compensatory land will be added to the extended recreation ground behind Bell Gardens which will be acquired by the Parish Council. Overall, the open space achieved will far exceed the statutory allowance for the size of development at South Marston. The Expansion Working Group is now shaping plans for the expanded village centre – the facilities we want and the uses of open space that are viable and capable of being maintained by the community. We are keen to have wider village input into the final design and want residents to tell us what they like and don’t like about particular design and location ideas. Please bring your children with you if you need to. We have set aside a small supervised area for them so you can have the freedom to look around the display boards. Distributed by the Expansion Working Group of South Marston Parish Council The Developers A few years ago, a consortium of developers was formed from all those construction companies who had interests in developing the land covered by the local plan expansion area. In recent times, this consortium has disbanded. However, Hallam and Hannick homes are the two major developers controlling land north of the A420. They are working together and their proposals will deliver two of the ‘Eastern Villages’. The Local Plan proposes an expanded South Marston, with an additional 500 homes on greenfield sites they control and a new village, Rowborough, of some 1500 houses towards Nightingale Wood and down towards Acorn Bridge. The developers aim to submit their planning application before the end of this year. It is likely that South Marston village will be the first location where development takes place. Swindon Borough, the Developers and the Expansion Working Group have had joint meetings to discuss how constraints, such as traffic and flooding, affect their proposals and have had early discussions on the potential for community facilities and open space. The Parish Council Working Group had sight of their initial plan a few days ago. Although they largely conform to the blueprint put forward in the Swindon Borough planning documents, there are a number of significant differences, particularly in the layout of roads. These differences will have to be negotiated once the planning application is submitted, as part of the normal planning system processes. Come and talk to the developers and ask questions about the proposals and the timing for construction.