SlideShare ist ein Scribd-Unternehmen logo
1 von 51
MANUAL TESTING
1) Q. Why did you choose testing ?
Ans: 1) Scope of getting the job is very very high.
2) No need of depend upon any technology.
3) Testing is going to be there forever.
4) I want consistence through out my life.
2) Q. What exactly we need to get a job?
Ans: 1) Stuff
2) Communication skills [reading+ writing + speaking+ lesion]
3) Confidence
4) Dynamism
3) Q. Why explicitly the test engineers are been recruiting in to the software
companies?
Ans: 1) Once person cannot perform two tasks efficient at a time.
2) Sentimental attachments.
4) Q. Who can get testing job?
Ans: Any graduate who is creative can get testing job very easily
5) Q. Why explicitly the testing engineers are been recruited into the software
companies?
Ans: 1) One person can’t perform two task efficiently at a time.
2) Sentimental Attachment.
• PROJECT:-
Project is something that is developed based on the particular customers
requirements and used by that particular customers only.
1
• PRODUCT:-
Product is something that is developed base on the companies specification
and used by the multiple customers.
NOTE:- The company will decide the specification by picking the common requirements of
customer.
6) Q.Classical definition of quality?
Ans: Quality is defined has justification of all the requirements of a customer in a product.
NOTE: Quality is not defined in the product it is defined in the customer mind.
• DEFECT: Defect is defined as deviation from the requirements.
7) Q. Latest definition of quality?
Ans: Quality is defined as not only the justification of the requirements but also presence of
the value [value ..means ..user friendly]
8) Q. What is testing?
Ans: Testing is a process in the defects are Identified, Isolated[separately],Subject for
Rectification[sending] Ensure that the product is defect free in order to produce a quality
product in the end and hence customer satisfaction.
9)Q. What is bidding the project?
Ans: Bidding the project is defined as request are proposal, estimation and signing
off(official-agreement).
• KICK OF MEETING:- Kick off meeting is the initial meeting conducted in
the software company soon after the project is signed off in order discuss the
overview of the project once select project manager for that project.
Us ally
• High level management [HLM]
• Project managers [PM]
• Quality managers [QM]
• Technical managers [TM]
• Development leads & Test leads
2
Will be involved in this meeting Apart from them many times customer representations also
Will be involved in this meeting.
NOTE:- Apart from this meeting any other start up meeting in also called as “kick off
meeting”.
• PIN [ Project Initiation Note]:- PIN It is a mail prepared by the project
manager and sent the CEO of software company as well as to all of his core
team members in order to intimate then that they are about to start the actual
project activities.
CEO=Chief Executive Officer
COO=Chief Of Officer
SDLC [Software Development Life Cycle]:-
It contains 6 Phase
• Initial or Requirement Phase
• Analysis Phase
• Designed Phase
• Coding Phase (or) Programming phase
• Testing Phase
• Deliver and maintenance Phase
Initial or Requirement Phase:-
Task:-Interacting with the customer and gathering the requirements.
Roles:- i) Business Analyst [BA]
ii) Engagement manager [EM]
Process:- First of all the Business Analyst can Appointment . from the customer, collects
the template from the company meet the customer an the appointment date gathers the
requirements with the help of the template and come back to the company with the
requirement documentary.
The Engagement manager will go through the requirements document. If at all he
finds any extra requirements hence he will deal with the excess cast of project. If it is any
confession of requirements then the will ask the consult team to develop the prototype he
3
will demonstrates to the customer gather the clean requirements and finally hand over the
requirements document to the business analyst.
Proof:- Proof of this phase is “Requirements Document”.
This document is called with different name in different companies
FRS (Functional Requirements Specification)
CRS (Client or Customer Requirements Specification)
URS (User Requirements Specification)
BDD (Business Design Document)
BD (Business Document)
BRS (Business Requirement Specification)
NOTE:-Some companies may maintains two documents in the initial phase, one is for High
level business flow information and the other in for Detail function information.
But some companies may maintains both the intimation in a single document.
• Template:- Template in a predefined format which is used for preparing the
document easily and perfectly
• Prototype:- Prototype is a roughly and rapidly developed model which is
used is for demonstration to the customer in order to gather the clear
requirement and also to win his confidence of the customer.
Analysis phase:-
Task:-
• Feasibility study
• Tentative planning
• Technology selection & Environment conformation
• Requirement analysis
Roles:-
• System Analyst [SA]
• Project Manager [PM]
• Team &Technical Manager [TM]
4
Process:-
Feasibility study:- (possibility) It is a detailed study conducted on requirement in order to
conform whether all of those requirements are possible with in the given time budget and
resources are not.
Tentative planning (Temporary):- The resource planning as well as scheduling will be
temporary planned section.
Technology selection & Environment conformation:- The list of all the technologies that
are required to accomplish this project successfully will be enlisted as well as the client
environment will be conformed here in this section.
Requirement analysis:- The list of all the requirements that are required by the company
like human resource , software and hardware to accomplish that project ,successful will be
enlisted and mentioned here in this section.
Proof: The proof document if the analysis phase is SRS (System Requirement
Specification )
Designed Phase:-
Task:- i) High Level Designing [HLD]
ii) Low Level Designing [LLD]
Roles:- i) Chief architect (CA) : is responsible for high level designing.
ii) Technical Lead (TA): is responsible for low level designing.
Process:- The chief architect will divided whole project into modules ,by drawing some
diagrams using a language UML(Unified Modeling Language)
 The technical lead will divided the modules into sub modules by drawing some
diagrams using the same UML.
 Apart from this takes GUI design also will be done in this phase.
 Some time pseudo code also will be developed in this phase.
Proof:- The proof document of this phase is TDD (Technical Design Document)
• Pseudo code:-It is set of English statement which used for developing in the
actual code very easily and comfortably.
Coding Phase:-
5
Task:- coding (or) programming
Roles:-Developers (or) programming
Process:- The developers will develop the actual source code with the support of technical
design document as well as by following the coding standards.
Example for coding standards:
 Proper indentation
 Color coding.
 Proper commenting.
Proof:- The proof document of the coding phase SCD (Source Code Document).
Testing phase:-
Task:- Testing
Roles:- Test engineers
Process:-
 Test engineers will receive the requirement document and will start
understanding the requirement.
 While understanding the requirement if at all the get any doubt then they will
list out all the doubt in the requirements clarification note and will send it to
the author of the requirement doubt BA(Business Analyst).
 Once the clarification are given if still more clarification are required then they
will conduct a review meeting and will get all the clarification.
 Once all the requirement are clearly understood then they will take the Test
case template and will write the test cases.
 Once the 1st
Build is released they will execute the test cases.
 If at all any defects are found they will list out then in the defect profile and
will send it to the development department .
 Once the next Build is released they will re execute the required test case.
 If at all any more defect are found they will update the defect profile and will
send it to the development department.
 Once the next Build is released the same process will be continued.
6
 This process will be continued again and again till the product is defect free.
Proof:- The proof the testing phase is Quality Product .
• Test Case:- If is an Idea of test engineer to test something based on the
requirements.
Delivery & Maintains Phase:-
Delivery:-
Task:- Hand overring the application to the client .
Roles:- Deployment Engineers or Installation Engineers
Process:- Deployment engineers will go to the clients place , install the application into the
original customer ,Environment and finally hand over’s the software to the customer.
Proof:- The final official argument made between the company and the customer is the
proof document this phase.
Maintains:- Once the customer start using the application if at all any problem occurs then
that problem will become the task ,based on the task corresponding roles will be appointed
,these roles will define the process, solves the problem and final get the Application latter.
Some customer many request for continuo’s maintenance in that situation the
company will send a team of member to the customer place continuously in order to take care
of that software.
Q. where exactly testing comes in to picture?
Which sort of testing you are expecting?
How many sort or testing are there?
Ans:- They are two sort of testing
i) Un convectional testing.
ii) Convectional testing.
Un convectional testing:- It is a sort of testing in which the quality assurances people. Will
check each and every role in the organization in order to conform weather they are doing
their work according to the companies proper guidelines are not. Right form the staring of the
SDLC to the end of it.
7
Convectional testing:- It is a sort of testing in which the test engineers will check the
developed application (or) its related parts are working according to the expectation or not
from the coding phase to the end of the “SDLC”
Methods of the testing (or) testing techniques:-
Basically there are two methods of testing.
i) Black Box testing.
ii) White Box Testing (or) Glass Box Testing (or) Clear Box Testing
Black Box Testing:- It is a method of testing in which one will perform testing only on the
Functional part of an application with out on the having the knowledge of structural part.
Usually the black box Test engineers will perform it.
White Box Testing:- It is a method of testing in which one will perform testing on the
Structural part of an application .
Usually developers (or) White box testers will perform it.
Gray Box testing:- It is a method of testing in which one will perform testing on both the
functional part as well as the structural part of an application.
Usually the test engineers who have the knowledge of structural part will perform it.
Levels of Testing:-
There are five levels of testing
• Unit level testing.
• Module level testing.
• Integration level testing.
• System level testing.
• User acceptance level testing.
Unit level testing:-
Unit:- Unit is defined as smallest part of an application.(program)
In this stage the white box testing will test each and every developed program
and also the combination of programs.
Module level testing:-
8
Module:- Module is defined as a group of related features to perform a major task in the
application.
In this stage the Black box test engineers will test the functional part of the
module.
Integration level testing:- In this stage the developers of will develop some
interface(linking program) in order to integrate the modules this interface will be tested by
white box testers. Developers will follow any one of the approaches white integration the
module.
 Top down approaches
 Bottom up approaches
 Hybrid approaches (or) Sand rive approached
 Big-Bang approaches
• Top down approaches:- In this approaches the parent modules will be
developed first and then the corresponding child modules will be developed
and integrated.
STUB:- While integrating the modules in top down approach if at all any mandatory
modules are missing then that mandatory modules will be replace with a temporary
program.
9
• Bottom up approach:- In this approached the child modules will be
developed first and will be integrated to the corresponding parent modules.
DRIVER:- While integrating the module in bottom up approached if at all any mandatory
modules is missing then that modules is replaced with a temporary program “DRIVER”
• Hybrid approach (or) San drive approach:- This a mixed approach of Both
top down and bottom up approaches.
10
• Big-Bang approach:- In this approach one will wait till all the modules are
developed and finally will integrate then at a time.
System level testing:-
System:- Once the software application is installed in to an environment then as a whole we
will call it as a system.
In this stage the block box test engineers will conduct many type of testing like
load testing, performance testing, stress testing, comparability testing, system integration
testing……..ect.
• System integration testing:- It is a type of testing in which on will perform
some action on module and check for the reflections in all the related are as of
the application.
11
User acceptance level testing:- In this stage the block box test engineer will perform testing
on the user desired areas in the presence of accept the application happy.
Environment:-
Environment defined as group of hardware compounds with some basic
software (OS) where one can install the Presentation Logic, Business Logic, Data Base
Logic.
[or]
Environment defends as combinations of three layer that is Presentation
Layer, Business Layer, Data Base Layer. Where once can install the Presentation Logic,
Business Logic, Data Base Logic.
Type Of Environment:-
 Stand Alone Environment (or) One Tier Architecture.
 Client Sever Environment (or) Two Tier Architecture.
 Web Based Environment (or) Three Tier Architecture.
 Distributed Environment (or) N-Tier Architecture.
Stand Alone Environment (or) One Tier Architecture:-
In this environment only one tier will be there. Presentation layer, business layer,
data base layer will be present in the same tier.
When ever the application need to be used by single user at time
then environment will be suggested.
12
Client Sever Environment (or) Two Tier Architecture:- In this environment two tier will
be there .one is for client and another is for data base server. Presentation layer and the
business layer will be available is each and every client and the data base player will be
present in data base server.
When ever the application need be used single premises and there is no
problem with the security of the. Business logic as well as the application need accessed very
fast lye then this environment be suggested.
Web Based Environment (or) Three Tier Architecture:- In this environment three tier will
be there one is for clients, the middle is one is for application sever and the other is for data
13
base sever. presentation layer available in the client business layer will be available in the
application server. data base sever.
When ever the application need to be used all over the world by limited
numbers of user and wounds the business logic will be secured and function updaters to be
easily them the in environment can be suggested.
• WEB SERVER:- Web server is a software which provides web services to
the client.
EX:- IIS(Internet Information Services)
Distributed Environment (or) N-Tier Architecture:-This environment is same as web
environment more the one application sever is introduced in separate hers in order to
distributed the load and increase the performance.
When ever the application needs to be use by huge number of user then this
environment can be suggested.
14
• THIN CLIENT:- If at all the client machine is having only the .presentation
logic then it is know as thin client.
• THICK CLIENT:- If at all the client machine is having both presentation
logic as well as business logic then it is known as thick client.
• APPLICATION:- It is a Presentation Layer, Business Layer, Data Base
Layer.
SOFTWARE DEVELOPMENT PROCESS MODELS:-
 Waterfall Model
 Prototype Model
 Evolutionary Model
 Spiral Model
 Fish Model
 V-Model
Waterfall Model:-
Phase Activity Outcome
15
INTIAL
ANALYAIA
DESIGN
CODINGTESTINGDELIVER &
MAINENENCE
BRS
SRS
TDD,GUI
UTR
ITR
MTR
STR
UATR
DELIVERY TO CLIENT
REQ &
GATHERI
NGNG
SYS,
DESIGN
S/W
DESIGN
IMPLIM
ENTATIO
N
BLOCK
BOX
TESTING
UNIT TEST
INT .TEST
MOD TEST
SYS TEST
UAT
Advantages:- It is a simple model and easy to implement.
Project Monterey and maintains is very easily.
Draw Back:- Can’t accept the new requirements in the middle of the process.
Prototype Model:-
16
UN CLEAR REQ.
PROTOTYPE
S/W PROTOTYPE
H/W PROTOTYPE DEMO TO CLIENT
DEMO TO CLIENT
REQ. ARE REFINED
BRS DOC. BASE LINED
CLIENT ENVIRONMENT
CONFORMATION
SRS DOC. BASED LINED
Advantage:- when ever the customer is not clear with his requirement. Them this is best
suitable model
Draw Back:- Is not a compiled develop process model.
It’s a still time consumer model.
Company should where the cost of prototype
User may limit requirement by sticking into the project.
Evolutionary Model:-
17
INITIAL REQ.
DEVELOP
APPLICATION USER
VALEDATION
FEED BACK WITH
NEW REQ.
USER
ACCEP
T
N
O
YE
S
APPLICATION
BASE LINE
Advantage:- when ever the customer is evolution the requirement then this is the Best
suitable model
Draw Back:- time consuming model
Costly model
Deed lines can’t properly define.
No transference.
Project monetary any maintenance is very difficult.
Spiral Model:-
1) DEINING THE OBJECTVES /WORK ANALYSIS/CONSTRAINTS
4)REFINIG &
PLANNING 2) RISK ROOT
FOR THE NEXT CYLE CAUSE
ANALYSIS
ESTIMATION
18
3) IMPLEMENATION CONTINGENCIES
Advantage:- When ever the project highly risk based then this is the best suitable model.
Draw Back:- Time consuming model.
Costly model.
Risk root cause analysis is nota easy task.
Fish Model:-
REQ ANAYSIS DESIGN CODING DELIVERY
MAI-GATHERING SYSTEM Testing Maintan
SRS HLD SCD
BRS REVIEW LLD BLOCK Box Testing
Test S/W
SRS REVIEW TDD REVIEW WHIT BOX TESTING Changes
Advantage:- As both the verification are done the outcome will be a quality product.
Draw Back:- Time consuming.
Costly model.
19
V-Model:-
Verification Validation
INITIAL & BRS PREPARING PROJECT PLANNING
ANALYIS SRS PREPARING TEST PLANNING
DESIGN & TDD DESIGN PHASE TESTING
CODING SCD PROGRAM PHASE TESTING
TESTING S/W BUILD SYSTEM TESTING
TEST MANAGEMT PROCESS
USER ACCEPTANCE TESTING
DEVIVER & PORT TESTING
MANINTENANCE S/W EFFICIENCY DRE= A
TEST S/W CHANGS A+B
A= Defects found by the testing team.
B= Defects raised by the customer.
Advantage:- As both the verification and validation is done and test management process is
maintained. The outcome will be quality product.
Draw Back:- It is time consuming model.
It is a costly model.
• Verification:- Verification is a process of checking whether the product is being
developing in a right manner or not.
• Validation:- Validation is a process of checking whether the develop product is right
or not.
TYPE OF TESTING:-
• Build acceptance testing (or) Build verification testing (or) Sanity
testing
• Regression testing
• Re testing
• Half- testing
• B-testing
20
• Static testing
• Dynamic testing
• Instillation testing
• Compatibility testing
• Exploratory testing
• End-To-End Testing
• Security testing
• Usability testing
• Reliability testing
• Mutation testing
• Adhoc testing
Build acceptance testing (or) Build verification testing (or) Sanity testing:-
It is a type of testing in which one will conduct overall testing one the released build in
order to conform where the proper of not for conducting detailed testing
In this type of testing us ally they check the following.
i) Weather the build can be properly installed in to environment or not
ii) Weather one can navigate to all the pages of the application or not.
iii) Weather all the important feature are available or not.
iv) Weather all the requirement connections are properly established or not.
21
In some company they will call this types of testing as Smoke testing also
but in some companies they say that just before releasing the build the developer will check
weather the build is proper or not i.e. know as Smoke testing.
Once the build is released the testing engineers will once again check weather
the build is proper or not i.e. knows as BAT (or) BVT (or) sanity testing.
Regression testing:- It is a type of testing in which one will perform testing on the ready
testing functionality again and again us allay it is done in two servicers.
i) When even some defects are identified raised to the development department once
the next build is released the testing engineers will check the defect functionality as
well as the related functionality once again.
ii) When ever some new feature are added i.e. the application next build is released to
the testing department then the test engineers will check all the related feature’s of
those new feature’s once again.
NOTE: - Testing new features for the first time not regression testing.
Some companies may do Random testing at the end that also will fall under
regression testing only.
Retesting: - It is a type of testing in which one will perform testing on the same functionality
again and again with multiple sets of data in order come to a conclusion weather the
functionality is working fine or not.
NOTE:-
i) Regression testing starts form the 2nd
build and continue up to the last build.
ii) Re testing starts from the 1st
build and continuous up to the last build.
iii) During regression testing also re testing will be conducted that is the reason
some people even call it as Re and Regression testing.
Half testing: - It is a type of testing user accepting testing conducting in the soft ware
company by the test engineers just before the delivery.
B-testing: - It is a type of testing user accepting testing conducting in the client place either
by the end user (or) by the third party testing experts just before actual implementation of a
application.
22
Static testing: - It is types of testing in which one will perform testing on the application on
its related factors without perform any action.
EX: - GUI testing, Document testing, code--------------ect
Dynamic testing: - It is types of testing in which one will perform testing on the application
on its related factors by perform some action.
EX: - retesting, functionality testing…….ect.
Instillation testing :- It is a type of testing in which one will trey to instillation the
application by following the guide ling provided in the deployment document in order to
conform whether those guidelines really suitable for instillation the application comfortable
(or) not.
Compatibility testing:- It is type of testing in which one will install the application into
multiple environment prepared with different .combation in order to check .whether it is
suitable with those environment (or) not.
Monkey testing: - It is type of testing in which one will intentionally perform some action
in order to check stability of the application.
Port testing: - It is type of testing in which one will install the application into the original
customers environment and check whether it is comprisable with that environment (or) not.
Exploratory testing:- It is type of testing in which Do many expert will check the
functionality of the application which out having the knowledge of requirement just by
parallel exploring the functionality.
• Exploratory: - Have in the base knowledge of some concept doing something and
more about it is knows as exploratory.
End-To-End testing: - It is type of testing in which one will perform testing on all the end to
end sceneries of the application.
Ex:- login
Balance enquiry ----10,000
With draw -------3,000
Balance stmt ----------7,000
Logout
Security testing:- It is type of testing in which one will perform testing on the application in
order to conform whether it is properly protected (or)not.
23
i) Authentication testing : It is a type of security testing in which one will enter
different combination of user names and password .and check whether only
authorized people are able to access the application (or)not.
ii) Direct URL testing: It is type of security testing in which one will enter the direct
URL’s if secured pages and check whether they access (or) not.
URL [Uniform Resource Location]
iii) Fire wall leakage testing (or)User realized testing :- It is type of testing in
which one will enter into the application as a authorized user and will try to access
bye and his limited in order to conform whether he can access (or)not.
Usability testing:- It is type of testing in which one will check the user friendly of the
application.
Reliability testing (or) Socking testing:- It is type of testing in which one will use the
application continues for long period of time in order to set the stability of the application.
Mutation testing:- It is type of testing in which one will perform testing on the application or
its related factors after doing some changes to them.
Adhoc testing:-It is a type of testing in which one will perform testing on the application in
the there own style after understanding requirement very clearly.
Us ally this type of testing will be encouraged after formal testing.
SOFTWARE TESTING LIFY CYCLE (STLC):- STLC contain 6 phase
i) TEST PLANNING
ii) TEST DEVELEPOMENT
iii) TEST EXECUTION
iv) RESULT ANALYSIS
v) BUG TRACKING
vi) REPORT
Test planning:- Test plan is strategic document which contains some information that
describes how to perform testing on that application in a effective ,efficient and optimized
way.
24
• Plan:- Plan is a strategic document which contain some information that describe how
to perform task in a effective, efficient and optimization.
• Optimization:- Optimization is a process are utilizing the available resources to their
level best and getting the maximum possible out put.
Index of test plan (or) Contents of test plan:-
1.0) Introduction
1.1) objective
1.2) reference document
2.0) Coverage testing
2.1) features be testing
2.2) features not be testing
3.0) Test strategic
3.1) levels of testing
3.2) type of testing
3.3) test design techniques
3.4) configuration management
3.5) test metrics
3.6) terminology
3.7) automation plan
3.8) list of automated tools
4.0) Base criteria
4.1) acceptance criteria
4.2) suspension criteria
5.0) Test deliverables
6.0) Test environment
7.0) Resources planning
8.0) Scheduling
25
9.0) Staffing and training
10.0) Risk and consistencies
11.0) Assumption
12.0) Approval information
1.0) INTRODUCTION:-
• Objective: - Purpose of the document will be clearly described here in this
section.
• Reference document:- The list of the document that are referred will
preparing this documents will be listed out here in this section
EX: - SRS, Project plan
2.0) COVERAGE TESTING:-
• Features are tested: - The list of all the features with in the scope which are
to be tested will be listed out here in this section.
• Features not be tested:- The list of all the features that are not planed for
testing will be listed out here in this section.
EX:- i) Out of scope features
ii) Low risk features
iii) Features that are planed to be incorporated in feature
iv) Features that are skipped based on the time constrains.
3.0) TEST STRATEGE:- (defines)
Test strategic is an organization level term which is common for all the
project in that organization.
• Test Plan:- Test plan is a project level term which is specific for that project only.
• Level of testing: - the list of all the levels of testing that are maintained in the
company will be listed out here in this section.
• Type of testing: - The list of all the type of testing that all perform in that company
will be listed out here in this section.
26
• Test design techniques: - The list of all the techniques that used in that company
while designing test cases will be listed out here in this section.
EX: - BVA, ECP
• Configuration management:-
• Test Metrics: - The list of all the metrics that are maintained on the company doing
the test process will be listed out here in this section.
Ex: - Defect Metric
Test case Metric
• Terminology: - The list of all the terms used in that company along with their
meaning will be listed out here in this section.
• Automation plan: - The list of all the areas that are planned for automation in that
company will be listed out here in this section.
• List of automated tools: - The list of all the automated tools that are used in that
company will be listed out here in this section.
4.0) Base criteria:-
• Acceptance criteria: - When to stop testing will be clearly described in this section.
• Suspense criteria: - When to suspense testing will be clearly described here in this
section.
5.0) Test deliverables: - The list of all the document that are to be developed of delivery
doing testing process testing process will be mentioned here on this section.
6.0) Test environment:-The details of environment that is about to be used for testing will be
clearly mentioned here in this section.
7.0) Resource planning:- Who has to do what will be clearly described here in this section.
27
8.0) Scheduling (or) Time planning:- The starting dates and ending dates of each and ever
task will be clearly planed and mention in this section.
9.0)Staffing and training:- To accomplish that project sues fully if at all any staff
requirement and if at all any training requirement then that detailed will be clearly mention
here in this section.
10.0) Risk and Continence:- This list of all the potential risk and continence solution plan
will be clearly mentioned here in this section.
Ex:- Employee may leave the company the middle of the project?
Ans. Employee need to mint on benched.
Unable to de clearly project with in the deadline project?
Ans. Proper plan insurance.
Costumer may impose the deadline?
Ans. What not be tested should planned.
Unable to test all the feature with in the given time?
Ans. Priority based the execution.
11.0) Assumptions: - The listed of all the think that are be assumed by the test engineer will
be clearly mentioned here in this section.
12.0) Approached information:- Who has approval this document when it is approval will
be clearly described in this section.
ii)Test development phase:-
Requirement Documentation
L USE CASES
Use cases:- Use case describes of the functionality of certain application terms of
action response.
28
HLI
L L I
SCREEN
SHORT
Login
i) Functional requirement
ii) Special requirement
Functional requirement:-
 Login screen should contain user name, password connect to fields login, clear, cancel
button.
 Connect fields is not mandatory but it should be allow user to select the data base option
when ever require.
 Upon entering valid user name, password and clicking on login button corresponding
page must be displayed.
 Upon entering in to any of the fields and clicking on clearly button all the fields must be
cleared and courser should he display in the user name.
 Upon clicking on cancel button login screen must be closed.
Special requirement:-
 Initial when ever the login page invoked login and when ever and clear button is
disabled.
 Cancel button must be all ways enable.
 Upon entering some information in to and of the fields clear button must be enabling.
 Upon entering some information in to both user name and password field’s login
button must be enabling.
 Tabbing order must be user name, password, connect to, login, clearer, cancel.
Use case template:-
i) Name of the use case
29
User Name
Password
Login Clear Cancel
ii) Brief description of the use case
iii) Action in valued
iv) Special requirement
v) Pre condition
vi) post condition
Vii)Flow condition
Use Case Document:-
Name of the use case:-
i) Name of the use case: Login use case
ii) Brief description the use case: This use case describes the functionality of all the
features present in the login screen.
iii) Actors involved: Normal user and Add mine user.
iv) Special requirement: two types
 Explicitly requirement
 Implicitly requirement
• Explicitly requirement:- The requirement the explicitly given by the customer are know
as explicitly requirement.
• Implicitly requirement: The requirement that are analyzed by the business analyst which
will add some value to the application with out disturbing any of the original customer
requirements.
Explicitly requirement:-
 Install when ever the login page invoked login and clear button is disables.
 Cancel button must be any way enable.
 Open entering some information into any the field’s clear button must be enabling.
 Upon entering some information into both user name and password field’s login button
must be enable.
 Tabbing order must be user name password connect to login clear cancel.
Implicitly requirement:-
 Open entering invalid user name valid password and click on login button the following
error message must be displayed. “Invalid user name please try again”.
30
 Upon entering valid user name in valid password and click on login button following error
message must be displayed. ”invalid password please try again”
 Upon entering invalid user name invalid password and click on login button following error
message must be displayed. ”invalid user name and password please try again”
 Initial when ever the login screen is invoked the curser must be display on the user name
fields.
• Precondition:- login screen must available.
• Post condition:- Either home page (or) add mine and error message for invalid user.
Flow of events:- Two types
i) Main flow
ii) Alternative flow
Main flow:-
Action
 Actors invoke the application.
 Actors entrees valid user name valid password and click on login button.
 Actors entrees valid user name valid password select a data base also and click on login
button.
 Actors entrees invalid user name valid password and click on login button.
 Actors entrees invalid password valid user name and click on login button.
 Actors entrees invalid user name invalid password and click on login button.
 Actors entrees some information into any of the field and click on clear button.
 Actors click on cancel button.
31
Response
 Application display the login screen with the following fields user name, password, connect
to, login, clear, cancel.
 Authentication, application display either home page (or)admin page depending upon the
actor entered.
 Authentication, application display either home page (or)admin page depending upon the
actor entered with the mentioned data base connections .
 Go to Alternative flow Table 1 (Invalid user name)
 Go to Alternative flow Table 2 (invalid password)
 Go to Alternative flow Table 3 (invalid user name and password).
 Go to Alternative flow Table 4 (clear click).
 Go to Alternative flow Table 5 (cancel click).
32
Alternative flow Table 1:-
Action
 Actors enters invalid user name valid password and click on login button.
Alternative flow Table 2:-
 Actors enters in valid password valid user name and click on login button.
Alternative flow Table 3:-
 Actors enters invalid user name invalid password and click on login button.
Alternative flow Table 4:-
 Actors enter some information into any of the fields and click on clear button.
Alternative flow Table 1:-
 Actors click on the cancel button.
33
Response
 Authentication, Application displace, the following error message invalid user name please
try again.
 Authentication, Application displace, the following error message invalid password please try
again.
 Authentication, Application displace, the following error message invalid user name and
invalid password please try again.
 Application clears all the fields’ login screen and displaces the cursor in the user name fields.
 Application clicks the login screen.
Guide line to be followed by test engineers soon after the receive the document :-
 Identify the module to which the use case belong to?
Ans: Security module
 Identify the functionality of the use case with respect total functionality ?
Ans : Authentication .
 Identify the functionality point and prepare the functionality point document?
Ans: Where ever user perform some actions on the application that is called functional point.
 Identify the input requirement to perform testing ?
Ans: Valid and invalid user name and password .
 Identify the actors invalid ?
Ans: Normal user and admin user.
 Identify the weather the use case linked with any other use case ?
Ans: Home pager and admin page use case.
34
 Identify the precondition?
Ans: Login screen must be available
 Identify the post condition ?
Ans: Either home page and admin user and error.
 Understand main flow of the application ?
 Understand the alternative of the application?
 Understand the special requirement ?
 Document the test cases for the main flow ?
 Document the test cases for the alternative ?
 Document the test cases of special requirement?
 Prepare the traceability matrix (or) curser reference matrix?
• Functional point :- The point where the user can perform some action in the application is
know as functional point.
Testing process related document:-
Traceability matrix :-It is a document which contains table of linking information used for
traceability back for the reference in any kind of confusion (or)questionable situation.
EX1:- (CTM) Complete Traceability Matrix.
UCID
3
6
20
TPID
4
99
30
TSID
8
86
45
TCID
10
36
55
DID
2
3
4
35
UCD
Use Case
Document
FPD
Functional
Point
Document
TSD
Test
Scenario
Document
DTCD
Detail Test
Case
Document
DTD
Defect Point
Document
EX2:- RTM ( Requirement Traceability Matrix).
TCID
1
2
3
4
5
REQUIREMENT ID
1.0
1.0
2.0
2.0
3.0
EX3:-DTM(Defect Traceability matrix).
Type of test case:- Test case are broadly divided in 3 types.
i) GUI test case
ii) Functional test case (two types)
a) +Ve test case
b) –Ve test case
36
DTD
1
2
3
5
TCID
2.3
4.6
7.5
8.5
iii) Non-Functional test cases
Guide line for the writing GUI test case:-
Any idea a test engineer with which he feels that we can test something with out doing any
action will follow under GUI test case.
EX:-
 Check for the available of all the object .
 Check for the consistence for the object.
 Check for the allayment of the object
 If at all the customer requirement are given.
 Check for the spelling and grammar.
Guide line for the writing the +Ve test case:-
 Test engineer should have +Ve mind set.
 He should consider the +Ve flow of the application
 He must use only the valid input from the point of the functionality.
37
38
Requi
r
ement
Test
case
Id
C001
C002
C003
C004
C005
C006
Cat
ego
ry
+Ve
GUI
GUI
GUI
GUI
GUI
Prere
quisit
e
-NA-
-NA-
-NA-
-NA-
-NA-
-NA-
DescriptionT
est steps
• Invok
e the
applic
ation.
• Check
for the
availa
bility
of all
the
object
ive in
login
screen
as for
the
LOT.
• Check
for the
canoni
stic of
all the
object
in the
login
screen
.
• Check
for the
spellin
g in
the
login
screen
.
• Check
for the
initial
positi
on of
the
cursor
.
• Check
for the
enable
propri
ety of
login,
Expected value
• Login
screen
should be
display
• All the
object
must be
available
login
screen as
for the
LOT.
• All the
Objects
must be
consistent
with each
other.
• All the
spelling
must be
correct.
• Initially
the cursor
must
position in
the user
name.
• Initially
login,
clearly
button
must be
disable
and cancle
button
Test data
LOT
Actual value
• Login screen is
display.
• All the objects
available as per
the LOT
• All the object are
consisted with
each other
• All the spelling
are correct.
• Initially the
cursor position in
the connect to
fields.
• Login, clear,
cancel button are
to enable.
• Clear button is
enable.
Resul
t
Pass
Pass
Pass
Pass
Fail
Fail
LOT(Login Object Table):-
VIT (Valid Input Table )
39
S.No
1
2
3
4
5
6
Object Name
User name
Password
Connect to
Login
Clear
Cancel
Object Type
Text box
Text box
Combo box
Button
Button
Button
S.No
1
2
3
4
5
6
User Name
Suresh
Nag
Chiru
Ntr
Venky
Admin
Password
QTP
Amal
Sridevi
Balakrishna
Illu
Admin
Excepted
Value
Admin page
Home page
Home page
Home page
Home page
Admin page
Actual Value
Admin page
Nag home
page
Chiru home
page
Ntr home
page
Venky home
page
Admin page
Result
Pass
Pass
Pass
Pass
Pass
Pass
IVIT(Invalid Input Table)
S.No
1
2
3
4
User Name
Sure
Chirutha
Ntr
Nag
Password
Qtp
Sridevi
Balakr
Tab
Expected
Page
Invalid user
name plz tray
again
Invalid user
name plz tray
again
Invalid
password plz
tray again
Invalid
password plz
tray again
Actual Value
Admin page
Plz entry
valid user
name
Plz entry
valid
Password
Plz entry
Result
Fail
pass
pass
Pass
40
5
6
Jvreddy
Upendra
JVR
Anu
Invalid
password plz
tray again
Invalid user
name and
password plz
tray again
valid
Password
Plz entry
valid User
name
Invalid
password plz
tray again
Fail
Fail
Guide line for the writing the –Ve test case :-
 Test engineer should have –Ve mind set.
 He should consider the –Ve flow of the application
 He must at list one invalid input in each set of data.
Test execution phase:- In this phase test engineer will do the following.
 He will perform the action as it is described in the description Colum.
 He will observer the actual behavior of the application.
 He will document observer value under the actual value Colum.
Result analysis :- In this phase test engineer will compare the expected value with actual values and
if both are matching they will decide result as pass other wise fail.
If at all the test if not executed then they will decide the result as blocked.
Bug tracking:- Bug tracking is processes which defect are isolate, identify, and managed.
Def
ect
Te
st
ca
se
ID
Issue
descript
ion
Initially
the
Reprod
ucible
B
y
D
at
e
Bu
ild
Vers
ion
41
1
2
3
C0
05
C0
06
C0
11
cursor is
position
ed in the
connect
to filed .
Initially
login
and
clear
button
are
enable
instead
of begin
display.
Upon
clicking
on clear
button
all the
field are
clear but
the
cursor is
nit
position
in the
user
name
filed.
Not
applicab
le
Not
applicab
le.
>Enter
some
informat
ion any
of
fields.
>click
on clear
button.
>observ
e that all
the
fields
are
cleared
but the
cursor is
not
J
v
r
J
v
r
J
v
r
1
1
1
2.3.6
2.3.6
2.3.6
42
4
5
C0
14
C0
15
Upon
entering
user
name,
passwor
d as per
DIVT
and
clicking
on login
button
correspo
nding
error
message
are not
display
as per
the
DIVT.
Upon
entering
some
informat
ion
Only
into
user
display
in the
user
name.
>Enter
user
name
DVIT.
>Enter
the
passwor
d DVIT.
>Click
on login
button
>observ
e that
correspo
nding
error
message
is not
display
the
DVIT.
>Enter
some
only
into user
name
filed
only
into the
passwor
J
v
r
J
v
r
1
1
2.3.6
2.3.6
43
6
C0
16
name
field
(or)
only
into
passwor
d filed
login
button
is
enabled
misted
of
display.
d filed.
>
observe
that
login
button is
enable
instead
of being
display.
J
v
r
1 2.3.6
DIVIT(Defect Invalid Input Table)
S.No
1
2
3
User Name
Suresh
Uma
Uprndra
Password
QTP
Jvr
Anu
Expect
Plz enter valid
user name
Plz enter valid
user name
&password
Plz enter valid
user name
&password
Actual Value
Plz enter valid
user name
Plz enter valid
user name
Plz enter valid
user name
• Defect ID:- The sequence of the defect no will be mentioned her in this section.
44
• Test case ID:- The test case id based on the which defect is found will be mentioned her in
this section.
• Issue Description:- What exactly the defect is will be clearly described here in this section.
• Reproducible stops:- The list of all the step which are followed by the test engineer in
order to identify the feature will be mention here in this section.
• Defection By:- The name of test engineer who has the defect are defect in this section.
• Defection Date:- The date are on which will be mention her in this section.
• Defection Build:- The build number in which the defect will be mention in this section.
Defection Version:- The version number in which the defect is found will be mention in this section.
• Severity:- Severity describes the severity of the defect severity is classified in to 4 types.
• Fatal (or) s1 (or) sev1 (or) 1.
• Major (or) s2 (or) sev2 (or) 2.
• Minor (or) s2 (or) sev3 (or) 3.
• Suggestion (or) s4(or)sev4 (or)4.
Fatal:- It at all the related to the navigational block on available by of main functionality then such
type of problems are treated as fatal defects.
EX:-
Major defect:- If at all the problem are related to the working the major functionality them such type
of problem are treated a major defect.
EX:-
45
Page
1
Page
2
Page
3
Page
4
Not
openi
ng
Val1
Val2
Result
Add
Val 1
Val 2
Result
10
20
-10
Minor Defect :-If at all the problem some related to the and feel of the application then such type of
problem are treated as minor defect.
Ex:-
Suggestion :- If at all the problem are related to the value of the application then such type of
problems are treated as suggestion.
Ex:- +Ve
Not user friendly message
User friendly
message
Priority :- Priority describes the sequence in which defect need to be rectify.
Priority is classified in to 4 types.
i) Critical (or) pri 1(or) p1
ii) High (or) pri 2(or) p2
iii) Medium (or)pri 3(or)p3
iv) Low (or) pri 4(or) p4
46
add
Val 1
Val 2
Result
BAD
$
Invalid entry please tray again
Invalid entry please enter +Ve integer
 Generally the fatal defect will be given critical priority, major defect will be given, high
priority, minor defect will be given medium priority, but dependence on the situation priority
will be changed.
Low severity high priority case:-
When ever there is a customer visit all the look and feel defects will be given highest priority
even though they are less serious.
High severity low priority case:-
When ever some part of model if development, reminding part is testing
department, the test engineer will raise that part is fatal issue but the development will given
low priority given it.
Bug life cycle:-
No
Yes
Build 1 Build 2
Yes No
47
Require
ment
Developer
Application
Is defect
really
rectificati
on
If
defect
Stop the testing
Is it
really a
defect
Rectification
Open
ClosedRe opened
New
Hold
Rejected
As per design
Testing Fixed
YesNo
• New:- When ever the defect is newly identified by the test engineer then the status is new.
• Open:- When ever the developer the accepts then
• Deferred:- When ever the developer the accepts the defect but wants some time for rectifying
the defect the will set the status is deferred.
• Fixed:- When ever the defect is rectified the developer will set the status as fixed.
• Reopened and Close:- Once the next build released the test engineer will check whether
defect is relay rectified (or)not if at all they feel relay rectified then they will set the status as
closed other wise reopened.
• Hold:- When ever the developer is configured to accept or reject the defect they will set the
status is hold.
When ever the defect is hold status as they will be a meeting on that defect (Triage
meeting) and if at all consoled as a defect the developer will open it other wise the tester will closed it.
• Rejected:-When ever the developer is conformed it is not a defect there he will status is
rejected.
When ever the defect is rejected status the test engineer will once again check if at all he
also feels it is a not a defect then he will set the status as closed other he will reopened.
• As per design:- (it is a rare case only)
When ever the developer feels the tester has raised the defect with out having
knowledge of latest requirement then he will check the status as As per design.
When ever the defect in as per design status the test engineer will go to the new
requirement if at all he also feel it is as per design only then he will set the status is closed
other wise reopened.
Reporting phase:-
Classical Bug reporting process :-
Test lead Develop lead
48
Tester Developers
Draw Back:-
 Redundancy
 Time consuming
 No transparency
 No security
Common repository oriented bug repotting process:-
Test lead Common repository Develop lead
Bug tracking tool oriented Bug Reporting process :-
Common repository
49
BTT
Bug tracking tools :- Bug tracking tool is soft ware application which can be accessed only by the
etherized people which provides all the facility for bug tracking tools.
EX:- Bug zilla, issues tracking
Test closer Activity :- This a finely activity done in the process the test summary report which
contain some following information .
No.of cycles execution.
Devotion in of each cycle.
No.of test case are execution in which cycle.
No.of test case are passed are failed .
No.of defect are found in each cycle and extra.
Way of testing:- there or two type.
i) Manual testing.
ii) Automation testing.
Manual testing:- Manual testing is a process in which all the phase of software testing life cycle like
test planning, test development, test execution, result analysis, bug tracking and report or accomplish
successful manually with human efforts.
Draw back of manual testing:-
• Time consuming.
• Less accuracy.
• Tiredness.
• Simulations action are all most impossible .
• Con’t repeat the same task again and again with some interest.
• More no.of human resources are required.
50
51

Weitere ähnliche Inhalte

Was ist angesagt?

Basic interview questions for manual testing
Basic interview questions for manual testingBasic interview questions for manual testing
Basic interview questions for manual testingJYOTI RANJAN PAL
 
Interview questions
Interview questionsInterview questions
Interview questionssivareddyeda
 
Chapter 2 - Mobile Application Test Types
Chapter 2 - Mobile Application Test TypesChapter 2 - Mobile Application Test Types
Chapter 2 - Mobile Application Test TypesNeeraj Kumar Singh
 
Software Testing Fundamentals | Basics Of Software Testing
Software Testing Fundamentals | Basics Of Software TestingSoftware Testing Fundamentals | Basics Of Software Testing
Software Testing Fundamentals | Basics Of Software TestingKostCare
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notesguest208aa1
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-timeSunil Pandey
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.Vinay Agnihotri
 
Info manual testing questions
Info manual testing questionsInfo manual testing questions
Info manual testing questionsSandeep
 
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Computer Trainings Online
 
Defect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life CycleDefect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life Cyclepavansmiles
 
Bug life cycle
Bug life cycleBug life cycle
Bug life cycleBugRaptors
 
scenario testing in software testing
 scenario testing in software testing scenario testing in software testing
scenario testing in software testingdurgaaarthi
 
What Is Functional Testing?
What Is Functional Testing?What Is Functional Testing?
What Is Functional Testing?QA InfoTech
 
Bug reporting and tracking
Bug reporting and trackingBug reporting and tracking
Bug reporting and trackingVadym Muliavka
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycleNikhil Sharma
 

Was ist angesagt? (20)

Basic interview questions for manual testing
Basic interview questions for manual testingBasic interview questions for manual testing
Basic interview questions for manual testing
 
Manual Testing.
Manual Testing.Manual Testing.
Manual Testing.
 
Interview questions
Interview questionsInterview questions
Interview questions
 
Chapter 2 - Mobile Application Test Types
Chapter 2 - Mobile Application Test TypesChapter 2 - Mobile Application Test Types
Chapter 2 - Mobile Application Test Types
 
Software Testing Fundamentals | Basics Of Software Testing
Software Testing Fundamentals | Basics Of Software TestingSoftware Testing Fundamentals | Basics Of Software Testing
Software Testing Fundamentals | Basics Of Software Testing
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notes
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-time
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.
 
Manual testing ppt
Manual testing pptManual testing ppt
Manual testing ppt
 
Info manual testing questions
Info manual testing questionsInfo manual testing questions
Info manual testing questions
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
 
Defect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life CycleDefect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life Cycle
 
Software Testing or Quality Assurance
Software Testing or Quality AssuranceSoftware Testing or Quality Assurance
Software Testing or Quality Assurance
 
Testing Metrics
Testing MetricsTesting Metrics
Testing Metrics
 
Bug life cycle
Bug life cycleBug life cycle
Bug life cycle
 
scenario testing in software testing
 scenario testing in software testing scenario testing in software testing
scenario testing in software testing
 
What Is Functional Testing?
What Is Functional Testing?What Is Functional Testing?
What Is Functional Testing?
 
Bug reporting and tracking
Bug reporting and trackingBug reporting and tracking
Bug reporting and tracking
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 

Ähnlich wie Manual testing good notes

Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@umaUma Sapireddy
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing conceptssatyatwrmca
 
Testing material (1).docx
Testing material (1).docxTesting material (1).docx
Testing material (1).docxKVamshiKrishna5
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdfKhushal Chate
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxssusere4c6aa
 
21UCAE65 Software Testing.pdf(MTNC)(BCA)
21UCAE65 Software Testing.pdf(MTNC)(BCA)21UCAE65 Software Testing.pdf(MTNC)(BCA)
21UCAE65 Software Testing.pdf(MTNC)(BCA)ssuser7f90ae
 
General technical interview questions
General technical interview questionsGeneral technical interview questions
General technical interview questionsKevalkumar Shah
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manualVivek Kumar Sinha
 
Software engineering jwfiles 3
Software engineering jwfiles 3Software engineering jwfiles 3
Software engineering jwfiles 3Azhar Shaik
 
Test Driven Development
Test Driven DevelopmentTest Driven Development
Test Driven Developmentnikhil sreeni
 
Sivareddy 0000000000000000
Sivareddy 0000000000000000Sivareddy 0000000000000000
Sivareddy 0000000000000000sivareddyeda
 
Analysis concepts and principles
Analysis concepts and principlesAnalysis concepts and principles
Analysis concepts and principlessaurabhshertukde
 
Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx14941
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )eshtiyak
 

Ähnlich wie Manual testing good notes (20)

Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@uma
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
Manual testing
Manual testing Manual testing
Manual testing
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing concepts
 
Manual Testing
Manual TestingManual Testing
Manual Testing
 
Testing material (1).docx
Testing material (1).docxTesting material (1).docx
Testing material (1).docx
 
MOM on BA
MOM on BAMOM on BA
MOM on BA
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdf
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
 
21UCAE65 Software Testing.pdf(MTNC)(BCA)
21UCAE65 Software Testing.pdf(MTNC)(BCA)21UCAE65 Software Testing.pdf(MTNC)(BCA)
21UCAE65 Software Testing.pdf(MTNC)(BCA)
 
Software_Testing.pptx
Software_Testing.pptxSoftware_Testing.pptx
Software_Testing.pptx
 
General technical interview questions
General technical interview questionsGeneral technical interview questions
General technical interview questions
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Software engineering jwfiles 3
Software engineering jwfiles 3Software engineering jwfiles 3
Software engineering jwfiles 3
 
Test Driven Development
Test Driven DevelopmentTest Driven Development
Test Driven Development
 
Sivareddy 0000000000000000
Sivareddy 0000000000000000Sivareddy 0000000000000000
Sivareddy 0000000000000000
 
Analysis concepts and principles
Analysis concepts and principlesAnalysis concepts and principles
Analysis concepts and principles
 
Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 

Kürzlich hochgeladen

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 

Kürzlich hochgeladen (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

Manual testing good notes

  • 1. MANUAL TESTING 1) Q. Why did you choose testing ? Ans: 1) Scope of getting the job is very very high. 2) No need of depend upon any technology. 3) Testing is going to be there forever. 4) I want consistence through out my life. 2) Q. What exactly we need to get a job? Ans: 1) Stuff 2) Communication skills [reading+ writing + speaking+ lesion] 3) Confidence 4) Dynamism 3) Q. Why explicitly the test engineers are been recruiting in to the software companies? Ans: 1) Once person cannot perform two tasks efficient at a time. 2) Sentimental attachments. 4) Q. Who can get testing job? Ans: Any graduate who is creative can get testing job very easily 5) Q. Why explicitly the testing engineers are been recruited into the software companies? Ans: 1) One person can’t perform two task efficiently at a time. 2) Sentimental Attachment. • PROJECT:- Project is something that is developed based on the particular customers requirements and used by that particular customers only. 1
  • 2. • PRODUCT:- Product is something that is developed base on the companies specification and used by the multiple customers. NOTE:- The company will decide the specification by picking the common requirements of customer. 6) Q.Classical definition of quality? Ans: Quality is defined has justification of all the requirements of a customer in a product. NOTE: Quality is not defined in the product it is defined in the customer mind. • DEFECT: Defect is defined as deviation from the requirements. 7) Q. Latest definition of quality? Ans: Quality is defined as not only the justification of the requirements but also presence of the value [value ..means ..user friendly] 8) Q. What is testing? Ans: Testing is a process in the defects are Identified, Isolated[separately],Subject for Rectification[sending] Ensure that the product is defect free in order to produce a quality product in the end and hence customer satisfaction. 9)Q. What is bidding the project? Ans: Bidding the project is defined as request are proposal, estimation and signing off(official-agreement). • KICK OF MEETING:- Kick off meeting is the initial meeting conducted in the software company soon after the project is signed off in order discuss the overview of the project once select project manager for that project. Us ally • High level management [HLM] • Project managers [PM] • Quality managers [QM] • Technical managers [TM] • Development leads & Test leads 2
  • 3. Will be involved in this meeting Apart from them many times customer representations also Will be involved in this meeting. NOTE:- Apart from this meeting any other start up meeting in also called as “kick off meeting”. • PIN [ Project Initiation Note]:- PIN It is a mail prepared by the project manager and sent the CEO of software company as well as to all of his core team members in order to intimate then that they are about to start the actual project activities. CEO=Chief Executive Officer COO=Chief Of Officer SDLC [Software Development Life Cycle]:- It contains 6 Phase • Initial or Requirement Phase • Analysis Phase • Designed Phase • Coding Phase (or) Programming phase • Testing Phase • Deliver and maintenance Phase Initial or Requirement Phase:- Task:-Interacting with the customer and gathering the requirements. Roles:- i) Business Analyst [BA] ii) Engagement manager [EM] Process:- First of all the Business Analyst can Appointment . from the customer, collects the template from the company meet the customer an the appointment date gathers the requirements with the help of the template and come back to the company with the requirement documentary. The Engagement manager will go through the requirements document. If at all he finds any extra requirements hence he will deal with the excess cast of project. If it is any confession of requirements then the will ask the consult team to develop the prototype he 3
  • 4. will demonstrates to the customer gather the clean requirements and finally hand over the requirements document to the business analyst. Proof:- Proof of this phase is “Requirements Document”. This document is called with different name in different companies FRS (Functional Requirements Specification) CRS (Client or Customer Requirements Specification) URS (User Requirements Specification) BDD (Business Design Document) BD (Business Document) BRS (Business Requirement Specification) NOTE:-Some companies may maintains two documents in the initial phase, one is for High level business flow information and the other in for Detail function information. But some companies may maintains both the intimation in a single document. • Template:- Template in a predefined format which is used for preparing the document easily and perfectly • Prototype:- Prototype is a roughly and rapidly developed model which is used is for demonstration to the customer in order to gather the clear requirement and also to win his confidence of the customer. Analysis phase:- Task:- • Feasibility study • Tentative planning • Technology selection & Environment conformation • Requirement analysis Roles:- • System Analyst [SA] • Project Manager [PM] • Team &Technical Manager [TM] 4
  • 5. Process:- Feasibility study:- (possibility) It is a detailed study conducted on requirement in order to conform whether all of those requirements are possible with in the given time budget and resources are not. Tentative planning (Temporary):- The resource planning as well as scheduling will be temporary planned section. Technology selection & Environment conformation:- The list of all the technologies that are required to accomplish this project successfully will be enlisted as well as the client environment will be conformed here in this section. Requirement analysis:- The list of all the requirements that are required by the company like human resource , software and hardware to accomplish that project ,successful will be enlisted and mentioned here in this section. Proof: The proof document if the analysis phase is SRS (System Requirement Specification ) Designed Phase:- Task:- i) High Level Designing [HLD] ii) Low Level Designing [LLD] Roles:- i) Chief architect (CA) : is responsible for high level designing. ii) Technical Lead (TA): is responsible for low level designing. Process:- The chief architect will divided whole project into modules ,by drawing some diagrams using a language UML(Unified Modeling Language)  The technical lead will divided the modules into sub modules by drawing some diagrams using the same UML.  Apart from this takes GUI design also will be done in this phase.  Some time pseudo code also will be developed in this phase. Proof:- The proof document of this phase is TDD (Technical Design Document) • Pseudo code:-It is set of English statement which used for developing in the actual code very easily and comfortably. Coding Phase:- 5
  • 6. Task:- coding (or) programming Roles:-Developers (or) programming Process:- The developers will develop the actual source code with the support of technical design document as well as by following the coding standards. Example for coding standards:  Proper indentation  Color coding.  Proper commenting. Proof:- The proof document of the coding phase SCD (Source Code Document). Testing phase:- Task:- Testing Roles:- Test engineers Process:-  Test engineers will receive the requirement document and will start understanding the requirement.  While understanding the requirement if at all the get any doubt then they will list out all the doubt in the requirements clarification note and will send it to the author of the requirement doubt BA(Business Analyst).  Once the clarification are given if still more clarification are required then they will conduct a review meeting and will get all the clarification.  Once all the requirement are clearly understood then they will take the Test case template and will write the test cases.  Once the 1st Build is released they will execute the test cases.  If at all any defects are found they will list out then in the defect profile and will send it to the development department .  Once the next Build is released they will re execute the required test case.  If at all any more defect are found they will update the defect profile and will send it to the development department.  Once the next Build is released the same process will be continued. 6
  • 7.  This process will be continued again and again till the product is defect free. Proof:- The proof the testing phase is Quality Product . • Test Case:- If is an Idea of test engineer to test something based on the requirements. Delivery & Maintains Phase:- Delivery:- Task:- Hand overring the application to the client . Roles:- Deployment Engineers or Installation Engineers Process:- Deployment engineers will go to the clients place , install the application into the original customer ,Environment and finally hand over’s the software to the customer. Proof:- The final official argument made between the company and the customer is the proof document this phase. Maintains:- Once the customer start using the application if at all any problem occurs then that problem will become the task ,based on the task corresponding roles will be appointed ,these roles will define the process, solves the problem and final get the Application latter. Some customer many request for continuo’s maintenance in that situation the company will send a team of member to the customer place continuously in order to take care of that software. Q. where exactly testing comes in to picture? Which sort of testing you are expecting? How many sort or testing are there? Ans:- They are two sort of testing i) Un convectional testing. ii) Convectional testing. Un convectional testing:- It is a sort of testing in which the quality assurances people. Will check each and every role in the organization in order to conform weather they are doing their work according to the companies proper guidelines are not. Right form the staring of the SDLC to the end of it. 7
  • 8. Convectional testing:- It is a sort of testing in which the test engineers will check the developed application (or) its related parts are working according to the expectation or not from the coding phase to the end of the “SDLC” Methods of the testing (or) testing techniques:- Basically there are two methods of testing. i) Black Box testing. ii) White Box Testing (or) Glass Box Testing (or) Clear Box Testing Black Box Testing:- It is a method of testing in which one will perform testing only on the Functional part of an application with out on the having the knowledge of structural part. Usually the black box Test engineers will perform it. White Box Testing:- It is a method of testing in which one will perform testing on the Structural part of an application . Usually developers (or) White box testers will perform it. Gray Box testing:- It is a method of testing in which one will perform testing on both the functional part as well as the structural part of an application. Usually the test engineers who have the knowledge of structural part will perform it. Levels of Testing:- There are five levels of testing • Unit level testing. • Module level testing. • Integration level testing. • System level testing. • User acceptance level testing. Unit level testing:- Unit:- Unit is defined as smallest part of an application.(program) In this stage the white box testing will test each and every developed program and also the combination of programs. Module level testing:- 8
  • 9. Module:- Module is defined as a group of related features to perform a major task in the application. In this stage the Black box test engineers will test the functional part of the module. Integration level testing:- In this stage the developers of will develop some interface(linking program) in order to integrate the modules this interface will be tested by white box testers. Developers will follow any one of the approaches white integration the module.  Top down approaches  Bottom up approaches  Hybrid approaches (or) Sand rive approached  Big-Bang approaches • Top down approaches:- In this approaches the parent modules will be developed first and then the corresponding child modules will be developed and integrated. STUB:- While integrating the modules in top down approach if at all any mandatory modules are missing then that mandatory modules will be replace with a temporary program. 9
  • 10. • Bottom up approach:- In this approached the child modules will be developed first and will be integrated to the corresponding parent modules. DRIVER:- While integrating the module in bottom up approached if at all any mandatory modules is missing then that modules is replaced with a temporary program “DRIVER” • Hybrid approach (or) San drive approach:- This a mixed approach of Both top down and bottom up approaches. 10
  • 11. • Big-Bang approach:- In this approach one will wait till all the modules are developed and finally will integrate then at a time. System level testing:- System:- Once the software application is installed in to an environment then as a whole we will call it as a system. In this stage the block box test engineers will conduct many type of testing like load testing, performance testing, stress testing, comparability testing, system integration testing……..ect. • System integration testing:- It is a type of testing in which on will perform some action on module and check for the reflections in all the related are as of the application. 11
  • 12. User acceptance level testing:- In this stage the block box test engineer will perform testing on the user desired areas in the presence of accept the application happy. Environment:- Environment defined as group of hardware compounds with some basic software (OS) where one can install the Presentation Logic, Business Logic, Data Base Logic. [or] Environment defends as combinations of three layer that is Presentation Layer, Business Layer, Data Base Layer. Where once can install the Presentation Logic, Business Logic, Data Base Logic. Type Of Environment:-  Stand Alone Environment (or) One Tier Architecture.  Client Sever Environment (or) Two Tier Architecture.  Web Based Environment (or) Three Tier Architecture.  Distributed Environment (or) N-Tier Architecture. Stand Alone Environment (or) One Tier Architecture:- In this environment only one tier will be there. Presentation layer, business layer, data base layer will be present in the same tier. When ever the application need to be used by single user at time then environment will be suggested. 12
  • 13. Client Sever Environment (or) Two Tier Architecture:- In this environment two tier will be there .one is for client and another is for data base server. Presentation layer and the business layer will be available is each and every client and the data base player will be present in data base server. When ever the application need be used single premises and there is no problem with the security of the. Business logic as well as the application need accessed very fast lye then this environment be suggested. Web Based Environment (or) Three Tier Architecture:- In this environment three tier will be there one is for clients, the middle is one is for application sever and the other is for data 13
  • 14. base sever. presentation layer available in the client business layer will be available in the application server. data base sever. When ever the application need to be used all over the world by limited numbers of user and wounds the business logic will be secured and function updaters to be easily them the in environment can be suggested. • WEB SERVER:- Web server is a software which provides web services to the client. EX:- IIS(Internet Information Services) Distributed Environment (or) N-Tier Architecture:-This environment is same as web environment more the one application sever is introduced in separate hers in order to distributed the load and increase the performance. When ever the application needs to be use by huge number of user then this environment can be suggested. 14
  • 15. • THIN CLIENT:- If at all the client machine is having only the .presentation logic then it is know as thin client. • THICK CLIENT:- If at all the client machine is having both presentation logic as well as business logic then it is known as thick client. • APPLICATION:- It is a Presentation Layer, Business Layer, Data Base Layer. SOFTWARE DEVELOPMENT PROCESS MODELS:-  Waterfall Model  Prototype Model  Evolutionary Model  Spiral Model  Fish Model  V-Model Waterfall Model:- Phase Activity Outcome 15 INTIAL ANALYAIA DESIGN CODINGTESTINGDELIVER & MAINENENCE BRS SRS TDD,GUI UTR ITR MTR STR UATR DELIVERY TO CLIENT REQ & GATHERI NGNG SYS, DESIGN S/W DESIGN IMPLIM ENTATIO N BLOCK BOX TESTING
  • 16. UNIT TEST INT .TEST MOD TEST SYS TEST UAT Advantages:- It is a simple model and easy to implement. Project Monterey and maintains is very easily. Draw Back:- Can’t accept the new requirements in the middle of the process. Prototype Model:- 16 UN CLEAR REQ. PROTOTYPE S/W PROTOTYPE H/W PROTOTYPE DEMO TO CLIENT DEMO TO CLIENT REQ. ARE REFINED BRS DOC. BASE LINED CLIENT ENVIRONMENT CONFORMATION SRS DOC. BASED LINED
  • 17. Advantage:- when ever the customer is not clear with his requirement. Them this is best suitable model Draw Back:- Is not a compiled develop process model. It’s a still time consumer model. Company should where the cost of prototype User may limit requirement by sticking into the project. Evolutionary Model:- 17 INITIAL REQ. DEVELOP APPLICATION USER VALEDATION FEED BACK WITH NEW REQ. USER ACCEP T N O YE S
  • 18. APPLICATION BASE LINE Advantage:- when ever the customer is evolution the requirement then this is the Best suitable model Draw Back:- time consuming model Costly model Deed lines can’t properly define. No transference. Project monetary any maintenance is very difficult. Spiral Model:- 1) DEINING THE OBJECTVES /WORK ANALYSIS/CONSTRAINTS 4)REFINIG & PLANNING 2) RISK ROOT FOR THE NEXT CYLE CAUSE ANALYSIS ESTIMATION 18
  • 19. 3) IMPLEMENATION CONTINGENCIES Advantage:- When ever the project highly risk based then this is the best suitable model. Draw Back:- Time consuming model. Costly model. Risk root cause analysis is nota easy task. Fish Model:- REQ ANAYSIS DESIGN CODING DELIVERY MAI-GATHERING SYSTEM Testing Maintan SRS HLD SCD BRS REVIEW LLD BLOCK Box Testing Test S/W SRS REVIEW TDD REVIEW WHIT BOX TESTING Changes Advantage:- As both the verification are done the outcome will be a quality product. Draw Back:- Time consuming. Costly model. 19
  • 20. V-Model:- Verification Validation INITIAL & BRS PREPARING PROJECT PLANNING ANALYIS SRS PREPARING TEST PLANNING DESIGN & TDD DESIGN PHASE TESTING CODING SCD PROGRAM PHASE TESTING TESTING S/W BUILD SYSTEM TESTING TEST MANAGEMT PROCESS USER ACCEPTANCE TESTING DEVIVER & PORT TESTING MANINTENANCE S/W EFFICIENCY DRE= A TEST S/W CHANGS A+B A= Defects found by the testing team. B= Defects raised by the customer. Advantage:- As both the verification and validation is done and test management process is maintained. The outcome will be quality product. Draw Back:- It is time consuming model. It is a costly model. • Verification:- Verification is a process of checking whether the product is being developing in a right manner or not. • Validation:- Validation is a process of checking whether the develop product is right or not. TYPE OF TESTING:- • Build acceptance testing (or) Build verification testing (or) Sanity testing • Regression testing • Re testing • Half- testing • B-testing 20
  • 21. • Static testing • Dynamic testing • Instillation testing • Compatibility testing • Exploratory testing • End-To-End Testing • Security testing • Usability testing • Reliability testing • Mutation testing • Adhoc testing Build acceptance testing (or) Build verification testing (or) Sanity testing:- It is a type of testing in which one will conduct overall testing one the released build in order to conform where the proper of not for conducting detailed testing In this type of testing us ally they check the following. i) Weather the build can be properly installed in to environment or not ii) Weather one can navigate to all the pages of the application or not. iii) Weather all the important feature are available or not. iv) Weather all the requirement connections are properly established or not. 21
  • 22. In some company they will call this types of testing as Smoke testing also but in some companies they say that just before releasing the build the developer will check weather the build is proper or not i.e. know as Smoke testing. Once the build is released the testing engineers will once again check weather the build is proper or not i.e. knows as BAT (or) BVT (or) sanity testing. Regression testing:- It is a type of testing in which one will perform testing on the ready testing functionality again and again us allay it is done in two servicers. i) When even some defects are identified raised to the development department once the next build is released the testing engineers will check the defect functionality as well as the related functionality once again. ii) When ever some new feature are added i.e. the application next build is released to the testing department then the test engineers will check all the related feature’s of those new feature’s once again. NOTE: - Testing new features for the first time not regression testing. Some companies may do Random testing at the end that also will fall under regression testing only. Retesting: - It is a type of testing in which one will perform testing on the same functionality again and again with multiple sets of data in order come to a conclusion weather the functionality is working fine or not. NOTE:- i) Regression testing starts form the 2nd build and continue up to the last build. ii) Re testing starts from the 1st build and continuous up to the last build. iii) During regression testing also re testing will be conducted that is the reason some people even call it as Re and Regression testing. Half testing: - It is a type of testing user accepting testing conducting in the soft ware company by the test engineers just before the delivery. B-testing: - It is a type of testing user accepting testing conducting in the client place either by the end user (or) by the third party testing experts just before actual implementation of a application. 22
  • 23. Static testing: - It is types of testing in which one will perform testing on the application on its related factors without perform any action. EX: - GUI testing, Document testing, code--------------ect Dynamic testing: - It is types of testing in which one will perform testing on the application on its related factors by perform some action. EX: - retesting, functionality testing…….ect. Instillation testing :- It is a type of testing in which one will trey to instillation the application by following the guide ling provided in the deployment document in order to conform whether those guidelines really suitable for instillation the application comfortable (or) not. Compatibility testing:- It is type of testing in which one will install the application into multiple environment prepared with different .combation in order to check .whether it is suitable with those environment (or) not. Monkey testing: - It is type of testing in which one will intentionally perform some action in order to check stability of the application. Port testing: - It is type of testing in which one will install the application into the original customers environment and check whether it is comprisable with that environment (or) not. Exploratory testing:- It is type of testing in which Do many expert will check the functionality of the application which out having the knowledge of requirement just by parallel exploring the functionality. • Exploratory: - Have in the base knowledge of some concept doing something and more about it is knows as exploratory. End-To-End testing: - It is type of testing in which one will perform testing on all the end to end sceneries of the application. Ex:- login Balance enquiry ----10,000 With draw -------3,000 Balance stmt ----------7,000 Logout Security testing:- It is type of testing in which one will perform testing on the application in order to conform whether it is properly protected (or)not. 23
  • 24. i) Authentication testing : It is a type of security testing in which one will enter different combination of user names and password .and check whether only authorized people are able to access the application (or)not. ii) Direct URL testing: It is type of security testing in which one will enter the direct URL’s if secured pages and check whether they access (or) not. URL [Uniform Resource Location] iii) Fire wall leakage testing (or)User realized testing :- It is type of testing in which one will enter into the application as a authorized user and will try to access bye and his limited in order to conform whether he can access (or)not. Usability testing:- It is type of testing in which one will check the user friendly of the application. Reliability testing (or) Socking testing:- It is type of testing in which one will use the application continues for long period of time in order to set the stability of the application. Mutation testing:- It is type of testing in which one will perform testing on the application or its related factors after doing some changes to them. Adhoc testing:-It is a type of testing in which one will perform testing on the application in the there own style after understanding requirement very clearly. Us ally this type of testing will be encouraged after formal testing. SOFTWARE TESTING LIFY CYCLE (STLC):- STLC contain 6 phase i) TEST PLANNING ii) TEST DEVELEPOMENT iii) TEST EXECUTION iv) RESULT ANALYSIS v) BUG TRACKING vi) REPORT Test planning:- Test plan is strategic document which contains some information that describes how to perform testing on that application in a effective ,efficient and optimized way. 24
  • 25. • Plan:- Plan is a strategic document which contain some information that describe how to perform task in a effective, efficient and optimization. • Optimization:- Optimization is a process are utilizing the available resources to their level best and getting the maximum possible out put. Index of test plan (or) Contents of test plan:- 1.0) Introduction 1.1) objective 1.2) reference document 2.0) Coverage testing 2.1) features be testing 2.2) features not be testing 3.0) Test strategic 3.1) levels of testing 3.2) type of testing 3.3) test design techniques 3.4) configuration management 3.5) test metrics 3.6) terminology 3.7) automation plan 3.8) list of automated tools 4.0) Base criteria 4.1) acceptance criteria 4.2) suspension criteria 5.0) Test deliverables 6.0) Test environment 7.0) Resources planning 8.0) Scheduling 25
  • 26. 9.0) Staffing and training 10.0) Risk and consistencies 11.0) Assumption 12.0) Approval information 1.0) INTRODUCTION:- • Objective: - Purpose of the document will be clearly described here in this section. • Reference document:- The list of the document that are referred will preparing this documents will be listed out here in this section EX: - SRS, Project plan 2.0) COVERAGE TESTING:- • Features are tested: - The list of all the features with in the scope which are to be tested will be listed out here in this section. • Features not be tested:- The list of all the features that are not planed for testing will be listed out here in this section. EX:- i) Out of scope features ii) Low risk features iii) Features that are planed to be incorporated in feature iv) Features that are skipped based on the time constrains. 3.0) TEST STRATEGE:- (defines) Test strategic is an organization level term which is common for all the project in that organization. • Test Plan:- Test plan is a project level term which is specific for that project only. • Level of testing: - the list of all the levels of testing that are maintained in the company will be listed out here in this section. • Type of testing: - The list of all the type of testing that all perform in that company will be listed out here in this section. 26
  • 27. • Test design techniques: - The list of all the techniques that used in that company while designing test cases will be listed out here in this section. EX: - BVA, ECP • Configuration management:- • Test Metrics: - The list of all the metrics that are maintained on the company doing the test process will be listed out here in this section. Ex: - Defect Metric Test case Metric • Terminology: - The list of all the terms used in that company along with their meaning will be listed out here in this section. • Automation plan: - The list of all the areas that are planned for automation in that company will be listed out here in this section. • List of automated tools: - The list of all the automated tools that are used in that company will be listed out here in this section. 4.0) Base criteria:- • Acceptance criteria: - When to stop testing will be clearly described in this section. • Suspense criteria: - When to suspense testing will be clearly described here in this section. 5.0) Test deliverables: - The list of all the document that are to be developed of delivery doing testing process testing process will be mentioned here on this section. 6.0) Test environment:-The details of environment that is about to be used for testing will be clearly mentioned here in this section. 7.0) Resource planning:- Who has to do what will be clearly described here in this section. 27
  • 28. 8.0) Scheduling (or) Time planning:- The starting dates and ending dates of each and ever task will be clearly planed and mention in this section. 9.0)Staffing and training:- To accomplish that project sues fully if at all any staff requirement and if at all any training requirement then that detailed will be clearly mention here in this section. 10.0) Risk and Continence:- This list of all the potential risk and continence solution plan will be clearly mentioned here in this section. Ex:- Employee may leave the company the middle of the project? Ans. Employee need to mint on benched. Unable to de clearly project with in the deadline project? Ans. Proper plan insurance. Costumer may impose the deadline? Ans. What not be tested should planned. Unable to test all the feature with in the given time? Ans. Priority based the execution. 11.0) Assumptions: - The listed of all the think that are be assumed by the test engineer will be clearly mentioned here in this section. 12.0) Approached information:- Who has approval this document when it is approval will be clearly described in this section. ii)Test development phase:- Requirement Documentation L USE CASES Use cases:- Use case describes of the functionality of certain application terms of action response. 28 HLI L L I SCREEN SHORT
  • 29. Login i) Functional requirement ii) Special requirement Functional requirement:-  Login screen should contain user name, password connect to fields login, clear, cancel button.  Connect fields is not mandatory but it should be allow user to select the data base option when ever require.  Upon entering valid user name, password and clicking on login button corresponding page must be displayed.  Upon entering in to any of the fields and clicking on clearly button all the fields must be cleared and courser should he display in the user name.  Upon clicking on cancel button login screen must be closed. Special requirement:-  Initial when ever the login page invoked login and when ever and clear button is disabled.  Cancel button must be all ways enable.  Upon entering some information in to and of the fields clear button must be enabling.  Upon entering some information in to both user name and password field’s login button must be enabling.  Tabbing order must be user name, password, connect to, login, clearer, cancel. Use case template:- i) Name of the use case 29 User Name Password Login Clear Cancel
  • 30. ii) Brief description of the use case iii) Action in valued iv) Special requirement v) Pre condition vi) post condition Vii)Flow condition Use Case Document:- Name of the use case:- i) Name of the use case: Login use case ii) Brief description the use case: This use case describes the functionality of all the features present in the login screen. iii) Actors involved: Normal user and Add mine user. iv) Special requirement: two types  Explicitly requirement  Implicitly requirement • Explicitly requirement:- The requirement the explicitly given by the customer are know as explicitly requirement. • Implicitly requirement: The requirement that are analyzed by the business analyst which will add some value to the application with out disturbing any of the original customer requirements. Explicitly requirement:-  Install when ever the login page invoked login and clear button is disables.  Cancel button must be any way enable.  Open entering some information into any the field’s clear button must be enabling.  Upon entering some information into both user name and password field’s login button must be enable.  Tabbing order must be user name password connect to login clear cancel. Implicitly requirement:-  Open entering invalid user name valid password and click on login button the following error message must be displayed. “Invalid user name please try again”. 30
  • 31.  Upon entering valid user name in valid password and click on login button following error message must be displayed. ”invalid password please try again”  Upon entering invalid user name invalid password and click on login button following error message must be displayed. ”invalid user name and password please try again”  Initial when ever the login screen is invoked the curser must be display on the user name fields. • Precondition:- login screen must available. • Post condition:- Either home page (or) add mine and error message for invalid user. Flow of events:- Two types i) Main flow ii) Alternative flow Main flow:- Action  Actors invoke the application.  Actors entrees valid user name valid password and click on login button.  Actors entrees valid user name valid password select a data base also and click on login button.  Actors entrees invalid user name valid password and click on login button.  Actors entrees invalid password valid user name and click on login button.  Actors entrees invalid user name invalid password and click on login button.  Actors entrees some information into any of the field and click on clear button.  Actors click on cancel button. 31
  • 32. Response  Application display the login screen with the following fields user name, password, connect to, login, clear, cancel.  Authentication, application display either home page (or)admin page depending upon the actor entered.  Authentication, application display either home page (or)admin page depending upon the actor entered with the mentioned data base connections .  Go to Alternative flow Table 1 (Invalid user name)  Go to Alternative flow Table 2 (invalid password)  Go to Alternative flow Table 3 (invalid user name and password).  Go to Alternative flow Table 4 (clear click).  Go to Alternative flow Table 5 (cancel click). 32
  • 33. Alternative flow Table 1:- Action  Actors enters invalid user name valid password and click on login button. Alternative flow Table 2:-  Actors enters in valid password valid user name and click on login button. Alternative flow Table 3:-  Actors enters invalid user name invalid password and click on login button. Alternative flow Table 4:-  Actors enter some information into any of the fields and click on clear button. Alternative flow Table 1:-  Actors click on the cancel button. 33
  • 34. Response  Authentication, Application displace, the following error message invalid user name please try again.  Authentication, Application displace, the following error message invalid password please try again.  Authentication, Application displace, the following error message invalid user name and invalid password please try again.  Application clears all the fields’ login screen and displaces the cursor in the user name fields.  Application clicks the login screen. Guide line to be followed by test engineers soon after the receive the document :-  Identify the module to which the use case belong to? Ans: Security module  Identify the functionality of the use case with respect total functionality ? Ans : Authentication .  Identify the functionality point and prepare the functionality point document? Ans: Where ever user perform some actions on the application that is called functional point.  Identify the input requirement to perform testing ? Ans: Valid and invalid user name and password .  Identify the actors invalid ? Ans: Normal user and admin user.  Identify the weather the use case linked with any other use case ? Ans: Home pager and admin page use case. 34
  • 35.  Identify the precondition? Ans: Login screen must be available  Identify the post condition ? Ans: Either home page and admin user and error.  Understand main flow of the application ?  Understand the alternative of the application?  Understand the special requirement ?  Document the test cases for the main flow ?  Document the test cases for the alternative ?  Document the test cases of special requirement?  Prepare the traceability matrix (or) curser reference matrix? • Functional point :- The point where the user can perform some action in the application is know as functional point. Testing process related document:- Traceability matrix :-It is a document which contains table of linking information used for traceability back for the reference in any kind of confusion (or)questionable situation. EX1:- (CTM) Complete Traceability Matrix. UCID 3 6 20 TPID 4 99 30 TSID 8 86 45 TCID 10 36 55 DID 2 3 4 35 UCD Use Case Document FPD Functional Point Document TSD Test Scenario Document DTCD Detail Test Case Document DTD Defect Point Document
  • 36. EX2:- RTM ( Requirement Traceability Matrix). TCID 1 2 3 4 5 REQUIREMENT ID 1.0 1.0 2.0 2.0 3.0 EX3:-DTM(Defect Traceability matrix). Type of test case:- Test case are broadly divided in 3 types. i) GUI test case ii) Functional test case (two types) a) +Ve test case b) –Ve test case 36 DTD 1 2 3 5 TCID 2.3 4.6 7.5 8.5
  • 37. iii) Non-Functional test cases Guide line for the writing GUI test case:- Any idea a test engineer with which he feels that we can test something with out doing any action will follow under GUI test case. EX:-  Check for the available of all the object .  Check for the consistence for the object.  Check for the allayment of the object  If at all the customer requirement are given.  Check for the spelling and grammar. Guide line for the writing the +Ve test case:-  Test engineer should have +Ve mind set.  He should consider the +Ve flow of the application  He must use only the valid input from the point of the functionality. 37
  • 38. 38 Requi r ement Test case Id C001 C002 C003 C004 C005 C006 Cat ego ry +Ve GUI GUI GUI GUI GUI Prere quisit e -NA- -NA- -NA- -NA- -NA- -NA- DescriptionT est steps • Invok e the applic ation. • Check for the availa bility of all the object ive in login screen as for the LOT. • Check for the canoni stic of all the object in the login screen . • Check for the spellin g in the login screen . • Check for the initial positi on of the cursor . • Check for the enable propri ety of login, Expected value • Login screen should be display • All the object must be available login screen as for the LOT. • All the Objects must be consistent with each other. • All the spelling must be correct. • Initially the cursor must position in the user name. • Initially login, clearly button must be disable and cancle button Test data LOT Actual value • Login screen is display. • All the objects available as per the LOT • All the object are consisted with each other • All the spelling are correct. • Initially the cursor position in the connect to fields. • Login, clear, cancel button are to enable. • Clear button is enable. Resul t Pass Pass Pass Pass Fail Fail
  • 39. LOT(Login Object Table):- VIT (Valid Input Table ) 39 S.No 1 2 3 4 5 6 Object Name User name Password Connect to Login Clear Cancel Object Type Text box Text box Combo box Button Button Button
  • 40. S.No 1 2 3 4 5 6 User Name Suresh Nag Chiru Ntr Venky Admin Password QTP Amal Sridevi Balakrishna Illu Admin Excepted Value Admin page Home page Home page Home page Home page Admin page Actual Value Admin page Nag home page Chiru home page Ntr home page Venky home page Admin page Result Pass Pass Pass Pass Pass Pass IVIT(Invalid Input Table) S.No 1 2 3 4 User Name Sure Chirutha Ntr Nag Password Qtp Sridevi Balakr Tab Expected Page Invalid user name plz tray again Invalid user name plz tray again Invalid password plz tray again Invalid password plz tray again Actual Value Admin page Plz entry valid user name Plz entry valid Password Plz entry Result Fail pass pass Pass 40
  • 41. 5 6 Jvreddy Upendra JVR Anu Invalid password plz tray again Invalid user name and password plz tray again valid Password Plz entry valid User name Invalid password plz tray again Fail Fail Guide line for the writing the –Ve test case :-  Test engineer should have –Ve mind set.  He should consider the –Ve flow of the application  He must at list one invalid input in each set of data. Test execution phase:- In this phase test engineer will do the following.  He will perform the action as it is described in the description Colum.  He will observer the actual behavior of the application.  He will document observer value under the actual value Colum. Result analysis :- In this phase test engineer will compare the expected value with actual values and if both are matching they will decide result as pass other wise fail. If at all the test if not executed then they will decide the result as blocked. Bug tracking:- Bug tracking is processes which defect are isolate, identify, and managed. Def ect Te st ca se ID Issue descript ion Initially the Reprod ucible B y D at e Bu ild Vers ion 41
  • 42. 1 2 3 C0 05 C0 06 C0 11 cursor is position ed in the connect to filed . Initially login and clear button are enable instead of begin display. Upon clicking on clear button all the field are clear but the cursor is nit position in the user name filed. Not applicab le Not applicab le. >Enter some informat ion any of fields. >click on clear button. >observ e that all the fields are cleared but the cursor is not J v r J v r J v r 1 1 1 2.3.6 2.3.6 2.3.6 42
  • 43. 4 5 C0 14 C0 15 Upon entering user name, passwor d as per DIVT and clicking on login button correspo nding error message are not display as per the DIVT. Upon entering some informat ion Only into user display in the user name. >Enter user name DVIT. >Enter the passwor d DVIT. >Click on login button >observ e that correspo nding error message is not display the DVIT. >Enter some only into user name filed only into the passwor J v r J v r 1 1 2.3.6 2.3.6 43
  • 44. 6 C0 16 name field (or) only into passwor d filed login button is enabled misted of display. d filed. > observe that login button is enable instead of being display. J v r 1 2.3.6 DIVIT(Defect Invalid Input Table) S.No 1 2 3 User Name Suresh Uma Uprndra Password QTP Jvr Anu Expect Plz enter valid user name Plz enter valid user name &password Plz enter valid user name &password Actual Value Plz enter valid user name Plz enter valid user name Plz enter valid user name • Defect ID:- The sequence of the defect no will be mentioned her in this section. 44
  • 45. • Test case ID:- The test case id based on the which defect is found will be mentioned her in this section. • Issue Description:- What exactly the defect is will be clearly described here in this section. • Reproducible stops:- The list of all the step which are followed by the test engineer in order to identify the feature will be mention here in this section. • Defection By:- The name of test engineer who has the defect are defect in this section. • Defection Date:- The date are on which will be mention her in this section. • Defection Build:- The build number in which the defect will be mention in this section. Defection Version:- The version number in which the defect is found will be mention in this section. • Severity:- Severity describes the severity of the defect severity is classified in to 4 types. • Fatal (or) s1 (or) sev1 (or) 1. • Major (or) s2 (or) sev2 (or) 2. • Minor (or) s2 (or) sev3 (or) 3. • Suggestion (or) s4(or)sev4 (or)4. Fatal:- It at all the related to the navigational block on available by of main functionality then such type of problems are treated as fatal defects. EX:- Major defect:- If at all the problem are related to the working the major functionality them such type of problem are treated a major defect. EX:- 45 Page 1 Page 2 Page 3 Page 4 Not openi ng Val1 Val2 Result Add Val 1 Val 2 Result 10 20 -10
  • 46. Minor Defect :-If at all the problem some related to the and feel of the application then such type of problem are treated as minor defect. Ex:- Suggestion :- If at all the problem are related to the value of the application then such type of problems are treated as suggestion. Ex:- +Ve Not user friendly message User friendly message Priority :- Priority describes the sequence in which defect need to be rectify. Priority is classified in to 4 types. i) Critical (or) pri 1(or) p1 ii) High (or) pri 2(or) p2 iii) Medium (or)pri 3(or)p3 iv) Low (or) pri 4(or) p4 46 add Val 1 Val 2 Result BAD $ Invalid entry please tray again Invalid entry please enter +Ve integer
  • 47.  Generally the fatal defect will be given critical priority, major defect will be given, high priority, minor defect will be given medium priority, but dependence on the situation priority will be changed. Low severity high priority case:- When ever there is a customer visit all the look and feel defects will be given highest priority even though they are less serious. High severity low priority case:- When ever some part of model if development, reminding part is testing department, the test engineer will raise that part is fatal issue but the development will given low priority given it. Bug life cycle:- No Yes Build 1 Build 2 Yes No 47 Require ment Developer Application Is defect really rectificati on If defect Stop the testing Is it really a defect Rectification Open ClosedRe opened New Hold Rejected As per design Testing Fixed YesNo
  • 48. • New:- When ever the defect is newly identified by the test engineer then the status is new. • Open:- When ever the developer the accepts then • Deferred:- When ever the developer the accepts the defect but wants some time for rectifying the defect the will set the status is deferred. • Fixed:- When ever the defect is rectified the developer will set the status as fixed. • Reopened and Close:- Once the next build released the test engineer will check whether defect is relay rectified (or)not if at all they feel relay rectified then they will set the status as closed other wise reopened. • Hold:- When ever the developer is configured to accept or reject the defect they will set the status is hold. When ever the defect is hold status as they will be a meeting on that defect (Triage meeting) and if at all consoled as a defect the developer will open it other wise the tester will closed it. • Rejected:-When ever the developer is conformed it is not a defect there he will status is rejected. When ever the defect is rejected status the test engineer will once again check if at all he also feels it is a not a defect then he will set the status as closed other he will reopened. • As per design:- (it is a rare case only) When ever the developer feels the tester has raised the defect with out having knowledge of latest requirement then he will check the status as As per design. When ever the defect in as per design status the test engineer will go to the new requirement if at all he also feel it is as per design only then he will set the status is closed other wise reopened. Reporting phase:- Classical Bug reporting process :- Test lead Develop lead 48
  • 49. Tester Developers Draw Back:-  Redundancy  Time consuming  No transparency  No security Common repository oriented bug repotting process:- Test lead Common repository Develop lead Bug tracking tool oriented Bug Reporting process :- Common repository 49 BTT
  • 50. Bug tracking tools :- Bug tracking tool is soft ware application which can be accessed only by the etherized people which provides all the facility for bug tracking tools. EX:- Bug zilla, issues tracking Test closer Activity :- This a finely activity done in the process the test summary report which contain some following information . No.of cycles execution. Devotion in of each cycle. No.of test case are execution in which cycle. No.of test case are passed are failed . No.of defect are found in each cycle and extra. Way of testing:- there or two type. i) Manual testing. ii) Automation testing. Manual testing:- Manual testing is a process in which all the phase of software testing life cycle like test planning, test development, test execution, result analysis, bug tracking and report or accomplish successful manually with human efforts. Draw back of manual testing:- • Time consuming. • Less accuracy. • Tiredness. • Simulations action are all most impossible . • Con’t repeat the same task again and again with some interest. • More no.of human resources are required. 50
  • 51. 51