2. INDEX
1. Project fiche
2. Motivation
3. Technical approach
4. Objectives
5. Work Plan
6. Consortium
7. Contact – More info
2
SEC-2011.5.3-2
285069
3. PROJECT FICHE
• Topic
– SEC-2011.5.3-2 Operational Data Exchange
• Full Name
– DISASTER: Data Interoperability Solution At Stakeholders
Emergencies Reaction
• Duration
– 36 Months: February 2012 – January 2015
• Budget
– Total: 3,456,000 € / Requested Contribution: 2,783,970 €
3
SEC-2011.5.3-2
285069
4. MOTIVATION
• Non-interoperable data among first-responders in
emergency management sector:
– Technical interoperability (protocols, data format/ data model).
– Cultural / linguistic differences.
– Legal aspects and normative of application.
– First-responders pre-existing knowledge (background, know-how,
context related issues).
– From international to regional context.
4
SEC-2011.5.3-2
285069
7. OBJECTIVES
The project target outcome is an integrative and modular ontology for
establishing a common knowledge structure between all the first responders
involved in an emergency, but being compliant with legacy international data
formats exchanged in the European Union as long as being seamlessly
integrated within current SOA-based Emergency Management Systems.
• Detailed S/T objectives:
– O1: Architecture to solve interoperability problems in current SOA-
based Emergency Management Systems, at a European level.
– O2: Modular interoperable data model.
• O2.1: Core Framework data model.
• O2.2: Transversal (spatial, temporal) & Vertical (domain-specific)
models.
– O3: Mediation components (transparent integration in legacy
systems).
– O4: Integrated system prototype.
7
SEC-2011.5.3-2
285069
8. WORK PLAN
• Work Packages
– WP1: Project management & coordination
– WP2: Requirement compilation & technical approach
– WP3: Ontology design & development
– WP4: Techniques for data mediation
– WP5: Integrated system design
– WP6: Prototype, use cases and validation
– WP7: Dissemination, standardisation and exploitation
• Objectives / Work Packages
– O1 WP2
WP3
– O2 WP3
WP2 WP5 WP6
– O3 WP4
– O4 WP5 WP6 WP4
8
SEC-2011.5.3-2
285069
9. CONSORTIUM
• Treelogic (Coordinator)
• Cologne University of Applied Sciences (Tech. Manager)
• Fundación CTIC (Quality Manager)
• Danish Institute of Fire and Security Technology
• AIMTech consulting limited
• Veiligheidsregio Kennemerland
• antwortING Ingenieurbüro
9
SEC-2011.5.3-2
285069
10. CONSORTIUM
• Roles
– Treelogic – Danish Institute of Fire and
• Coordinator Security Technology
• Data Model Developer • Fire fighting data expert
• System Integrator • Dissemination coordinator
– Cologne University of Applied – AIMTech consulting limited
Sciences • Police and security data expert
• Technical Manager – Veiligheidsregio Kennemerland
• Emergency Management expert • End-user
• Global perspective • Actual scenario provider
• Validation
– Fundación CTIC
– antwortING
• Quality Manager
• EMS expert
• Data Model designer • Research moderator
• Standardization • Science to business network
10
SEC-2011.5.3-2
285069
11. CONTACT – MORE INFO
• Project website
– http://www.disaster-fp7.eu
• Twitter
– http://twiter.com/disaster_fp7
• LinkedIn group
– http://www.linkedin.com/groups/Disaster-Project-4327860
• Slideshare
– http://www.slideshare.net/disaster-fp7
• Contact
– info@disaster-fp7.eu
11
SEC-2011.5.3-2
285069