6. Project Plan
Project Plan
Team Leader – Nimantha
Dilhan
Project Reduce GAB Defect level by 25% from current situation in Plant T2
Start Date 15/12/2021 End Date 15/04/2022
Cycle
Activity Week
December January February March April
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
P
Them (Completion of Project
Charters)
Team
Grasp Current Losses
Target Setting and Master
Plan
D
Analysis and Find
Countermeasures
Verify Countermeasures
Implemant KAIZAN
C Analyses Results
A
Standerdizazion
Horizontal Replication
Target
Progress
11. Analysis & Find Countermeasures contd..
Quality of
Coagulant
GAB(Cr)
Former traveling angle
Frequancy of coagulant tank
cleaning
Glove webbing
Improper cleaning of CMT
Latex stability
Drying issues
Material
Wetting level in
CMT
Man
Method
Machine
Vertex in GMT stir
Use of strain
formers.
CMT track line touch
with coagulant
Former temperature
Triton level in CMT
Former vibrasion while
dipping process
Quality
of Latex
Cogulant oven
temperture
Quality of glove
compound
12. Analysis & Find Countermeasures contd..
4/1/2023
NO Causes Actions Responsibility
Completion
Date
1 Former Temperature
Increase Rinse tank 01 & 02
Temperatures Rasanga
18-Mar-22
Apply IR bulbs after CMT
Chathuranga/
Chathura
22-Mar-22
Monitor former temperature variations Nalinda
20-Mar-22
2
Jerk In Track lines (GMT &
CMT)
Smooth the former dipping in GMT &
CMT
Chathuranga/
Chathura
28-Mar-22
3 Webbing in GMT
Implement a mechanism to add bastol
continuously to GMT
Nimantha 18-Mar-22
4 Low wetting in CMT Increase the wetting in CMT Rasanga 20-Mar-22
5 Webbing in CMT Add Anti forming agents to CMT Rasnaga 20-Mar-22
6 Vertex near GMT Stir
Check the GMT stirs and make sure
there is a vertex
Rasanga/
Nimantha
20-Mar-22
7
Former traveling angle Modify the track line after CMT
Chathuranga/
Chathura
28-Mar-22
8 Latex Stability
Study the relationship between latex
stability and GAB
Rasanga/
Nimantha
20-Mar-22
9
2nd Bastol adding
procedure to feed tanks
Confirm the 2nd bastol addition to feed
tanks
Ranga 20-Mar-22
10 Temperature variations T
side the ovens(Act vs Std)
Monitor temperature variations Trainee/Nalinda 20-Mar-22
11
CMT track line touch with
coagulant Correct the track line
Chathuranga/
Chathura
20-Apr-22
16. Further Improvement
4/1/2023
This project was done by Nimantha and I’m looking forward to
further improvement
As an suggestion I’m looking to add stirrer for the bastol tank.
Because without a stirrer, bastol particles are sediment on the
bottom and block the bottom valve.