1. Activity : Discipline:
Contractor/Subcontractor :
S.No. Document Description Document No. Rev. Status Remarks
1 General
Project QA/QC Plan
Project HSE Plan
Others( as applicable - Specify)
2 Material Approvals
3 Method Statement
4 Inspection & Test Plan (ITP)
5 IFC Drawings
6 Shop drawings
7 RFIs
8 Material Inspections
9 Testing Agencies
10 Design Calculations(if applicable)
11
Pre-
Qualification(Vendor/Subcontractor)
12 Any other Documents (applicable)
Discipline Engineer :
Name
Signature
Date
PROJECT TITLE
PRE-CONSTRUCTION CHECKLIST
Date :
Notes :
Contractor's
Logo
Page 1 of 1