Wall-to-floor ratios
• Go to unit 9 and download the wall-to-floor ratio ppt

• Read through the ppt and complete the task for building B

• Name your file wall to floor ratio and Submit your ppt to
  moodle unit 9 under the link “Submit wall floor ration ppt
  here”
Wall-to-floor ratios
The following activity asks you to look at the wall-to-floor ratios and form a
financial comparison between two designs. The smaller the ratio the more floor
space is created which in financial terms for a client would be rentable areas.

Building A
Plan area = 35m x 35m
Height = 35m
Storey height = 3.5m



Building B
Plan area = 22.5m x 22.5m

Height               = 24.75m
Storey height = 2.75m

If the floor budget construction cost is £50/m2 and the wall area construction cost £25/m2,
calculate the wall to floor ratio for both buildings.
• Find : The Wall-to-floor ratios



•   Worked example Building A
•   Number of floors = 35/3.5 = 10 floors
•   Total floor area = 10 x 35 x 35 = 12,250m2
•   Total wall area = 35 x 4 x 35 = 4900m2
•   Total wall cost   = 4900 x £25/m2 = £122,500
•   Total floor cost = 12,250 x £50/ m2 = £612,500
•   Wall/floor ratio = £122,500 = 0.20


•   Building B
•   Number of floors = 24.75/2.75 = ? floors
•   Total floor area = 9 x 22.5 x 22.5 = ? m2
•   Total wall area  = 24.75 x 4 x 22.5 = ? m2
•   Total wall cost   = 1114 x £25/m2 = ? £
•   Total floor cost  = 4556 x £50/m2 = ? £
•   Wall/floor ratio  = ? £ = What amount a decinal

Weitere ähnliche Inhalte

Was ist angesagt?

Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)Pang Khai Shuen
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
2) int walls element query sheet
2) int walls element   query sheet2) int walls element   query sheet
2) int walls element query sheetJeanne Hoo
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list Jeanne Hoo
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-queryJeanne Hoo
 
Housing Policies in Malaysia
Housing Policies in Malaysia Housing Policies in Malaysia
Housing Policies in Malaysia Dhanya Pravin
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-listJeanne Hoo
 

Was ist angesagt? (20)

bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
BS Role
BS RoleBS Role
BS Role
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
 
Defects liability
Defects liabilityDefects liability
Defects liability
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
2) int walls element query sheet
2) int walls element   query sheet2) int walls element   query sheet
2) int walls element query sheet
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Site possession
Site possessionSite possession
Site possession
 
8) ext wall-finishes-1-query
8) ext wall-finishes-1-query8) ext wall-finishes-1-query
8) ext wall-finishes-1-query
 
Housing Policies in Malaysia
Housing Policies in Malaysia Housing Policies in Malaysia
Housing Policies in Malaysia
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
ECA form
ECA formECA form
ECA form
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list
 

Mehr von Daniel Ross

Bayes theorem explained
Bayes theorem explainedBayes theorem explained
Bayes theorem explainedDaniel Ross
 
Calculus concrete and decibel calculation
Calculus concrete and decibel calculationCalculus concrete and decibel calculation
Calculus concrete and decibel calculationDaniel Ross
 
Thermal studies U Vlaues
Thermal studies U VlauesThermal studies U Vlaues
Thermal studies U VlauesDaniel Ross
 
Finding an unknown side of a right angled triangle 2012
Finding an unknown side of a right angled triangle 2012Finding an unknown side of a right angled triangle 2012
Finding an unknown side of a right angled triangle 2012Daniel Ross
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
acoustics Sound Fluids Darcy formula
acoustics Sound Fluids Darcy formulaacoustics Sound Fluids Darcy formula
acoustics Sound Fluids Darcy formulaDaniel Ross
 
Baye’s Theorem
Baye’s TheoremBaye’s Theorem
Baye’s TheoremDaniel Ross
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1Daniel Ross
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introductionDaniel Ross
 
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsConstruction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsDaniel Ross
 
Simultaneous Equations Practical Construction
Simultaneous Equations Practical ConstructionSimultaneous Equations Practical Construction
Simultaneous Equations Practical ConstructionDaniel Ross
 

Mehr von Daniel Ross (11)

Bayes theorem explained
Bayes theorem explainedBayes theorem explained
Bayes theorem explained
 
Calculus concrete and decibel calculation
Calculus concrete and decibel calculationCalculus concrete and decibel calculation
Calculus concrete and decibel calculation
 
Thermal studies U Vlaues
Thermal studies U VlauesThermal studies U Vlaues
Thermal studies U Vlaues
 
Finding an unknown side of a right angled triangle 2012
Finding an unknown side of a right angled triangle 2012Finding an unknown side of a right angled triangle 2012
Finding an unknown side of a right angled triangle 2012
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
acoustics Sound Fluids Darcy formula
acoustics Sound Fluids Darcy formulaacoustics Sound Fluids Darcy formula
acoustics Sound Fluids Darcy formula
 
Baye’s Theorem
Baye’s TheoremBaye’s Theorem
Baye’s Theorem
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsConstruction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
 
Simultaneous Equations Practical Construction
Simultaneous Equations Practical ConstructionSimultaneous Equations Practical Construction
Simultaneous Equations Practical Construction
 

measurement wall to floor ratio 2013

  • 2. • Go to unit 9 and download the wall-to-floor ratio ppt • Read through the ppt and complete the task for building B • Name your file wall to floor ratio and Submit your ppt to moodle unit 9 under the link “Submit wall floor ration ppt here”
  • 3.
  • 4.
  • 5.
  • 6. Wall-to-floor ratios The following activity asks you to look at the wall-to-floor ratios and form a financial comparison between two designs. The smaller the ratio the more floor space is created which in financial terms for a client would be rentable areas. Building A Plan area = 35m x 35m Height = 35m Storey height = 3.5m Building B Plan area = 22.5m x 22.5m Height = 24.75m Storey height = 2.75m If the floor budget construction cost is £50/m2 and the wall area construction cost £25/m2, calculate the wall to floor ratio for both buildings.
  • 7. • Find : The Wall-to-floor ratios • Worked example Building A • Number of floors = 35/3.5 = 10 floors • Total floor area = 10 x 35 x 35 = 12,250m2 • Total wall area = 35 x 4 x 35 = 4900m2 • Total wall cost = 4900 x £25/m2 = £122,500 • Total floor cost = 12,250 x £50/ m2 = £612,500 • Wall/floor ratio = £122,500 = 0.20 • Building B • Number of floors = 24.75/2.75 = ? floors • Total floor area = 9 x 22.5 x 22.5 = ? m2 • Total wall area = 24.75 x 4 x 22.5 = ? m2 • Total wall cost = 1114 x £25/m2 = ? £ • Total floor cost = 4556 x £50/m2 = ? £ • Wall/floor ratio = ? £ = What amount a decinal