Graduate Students: Kerry Kreitman, Hemal Patel,
Amir Ghiami Azad
TxDOT Project 0-6719
FERGUSON STRUCTURAL ENGINEERING LABORATORY
Faculty: Michael Engelhardt, Todd Helwig, Rich
Klingner, Eric Williamson
Extending the Life of Steel Girder Bridges
through the Use of Post-Installed Shear
Connectors
TxDOT:
Darrin Jensen, Yuan Zhao, Dingyi Yang, Jamie Farris, Manuel Padron,
Michelle Romage-Chambers, Paul Rollins, Leon Flourney
Develop technique to strengthen existing continuous
multi-span non-composite steel girder bridges
Project Objective
Older Non-composite Bridge
steel girder
concrete deckPost-installed
shear connector
Critical Issue for Practical Application
Minimize number of post-
installed shear
connectors.
Need to employ partial
composite design.
Bridge Deck
Girder Flange
Post-Installed Shear Connector:
Adhesive Anchor
Strengthening Concept
Partially composite Partially compositeNon-composite
Positive moment Positive momentNegative moment
Increased strength Increased strength
Continuous, non-composite girder
YIELD
YIELD
Strengthening Concept:
- Allow yielding in negative moment region / redistribute moment
to positive moment regions
- Strengthen positive moment regions with post-installed shear
connectors using partially composite design
Research Questions
• Is moment redistribution possible for partially composite
girders (i.e., can we develop “shakedown”) ?
• What is the fatigue strength of the adhesive anchor shear
connector ?
• How do we compute the shear connector fatigue
demands for a partially composite girder?
• Can we demonstrate good performance in large-scale
tests?
• Can we develop a straightforward design procedure?
Bridge Survey
7-8’ 7-8’ 7-8’
Compact
W30-W36
shape
6.5” deck
50-100’ 50-100’ 50-100’
Cover plates top and
bottom over piers
2-6 lanes
Typically no skew
or curvature
2-5 span unit
No shear connectors
Constructed 1950-1970
H15 or H20 design loads
0
2
4
6
8
10
12
14
NumberofBridgeUnits
Inventory HS Load Rating
Initial Concept Studies
Existing
Strengthened (30%)
Bridges can be
significantly
strengthened:
Achieve HS 20 rating with
low composite ratios and
minimal redistribution
Exceeds
current
standardsDeficient compared to
current standards
Conduct load rating for 13 bridges
Fatigue Testing
Fatigue Testing
0
10
20
30
40
50
60
1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08
StressRange,σr(ksi)
Number of Cycles at Failure, N
0
0.01
0.02
0.03
0.04
1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08
Avg.SlipRange,sr(in)
Number of Cycles at Failure, N
= 0.66
= 0.86
Stress Range:
Slip Range:
= 101 − 13.6 log ≥ 15	
= 0.0537 − 0.00725 log ≥ 0.008
Fatigue Testing
Key Results:
• Adhesive anchor shear connector has much
better fatigue performance than welded shear
studs.
• Developed fatigue performance predictions
based on both stress-range and on slip-range.
Large-Scale Testing
Girder 1: 84’ long; 30% composite; 56 connectors
Girder 2: 104’ long; 20% composite; 40 connectors
16
17
Testing Program
• Elastic testing
– Before and after installing connectors
• Fatigue and shakedown testing
– In various orders for each span
• Ultimate strength testing
Typical Shakedown Results
Loading Pattern:
0
0.02
0.04
0.06
2 3 4 5 6 7 8
ChangeinDefl.(in)
Cycle Number
Shakedown
criterion
Typical Ultimate Strength Results
0
50
100
150
200
250
0 3 6 9 12 15
Load(k)
Total Deflection at Load Point (in)
Predicted partially
composite limit load
Predicted non-
composite limit
load
Connector
failure
Maximum load
applied in
shakedown
test
Summary of Large-Scale Test Results
Exceeded predicted strengths at all limit states
– Shakedown was observed to occur in partially
composite strengthened girders
– Excellent high cycle fatigue performance
– Fatigue loading did not adversely affect strength
– Ultimate strength developed at predicted levels
with significant ductility
Finite Element Modeling
• ANSYS software
• Extend experimental results
• Evaluate fatigue demands on shear connectors
using slip based approach
Cross section
view
Isometric view
(underside)
Concrete deck
Steel beam
-0.08
-0.06
-0.04
-0.02
0
0.02
0.04
0.06
0.08
0 8 16 24 32 40 48 56 64 72 80
SlipUnder~50kipP2Load(in)
Distance Along Beam (ft)
Slip Profiles
50 kips 50 kips
ANSYS
Parametric Studies
• Recommendations for connector layout:
– Location of connector groups is most influential
– Consider constructability
15% of span length
12” spacing (approx.)
Recommended Design Procedure
Evaluate strength
of existing bridge
Set strengthening
targets
Check negative moment
regions and redistribute
moments as necessary
Design connectors for
positive moment regions
Locate connectors and
check fatigue strength
Research Questions / Answers
• Is moment redistribution possible for partially
composite girders (i.e., can we develop
“shakedown”) ?
YES – Shakedown in possible and predictable
• What is the fatigue strength of the adhesive anchor
shear connector ?
Equations developed (based on exhaustive testing)
to predict fatigue life of shear connectors, based
both on stress-range and slip-range.
Research Questions / Answers
• How do we compute the shear connector fatigue demands for
a partially composite girder?
Compute slip demands on shear connectors under fatigue
truck (can use commercial FEA software or “UT-SLIP.”)
• Can we demonstrate good performance in large-scale tests?
Large-scale specimens showed excellent performance under
all loading conditions.
• Can we develop a straightforward design procedure?
Yes.
Conclusions of Research Study
Efficient strengthening solution
– Avoid load-posting or costly deck replacements
– Significant increase in load rating (up to 90%)
– Excellent structural behavior
– Simple and quick installation process
– Straightforward design process
Implementation
Strengthening technique currently being
implemented on bridge in Lakeport, Texas

Weitere ähnliche Inhalte

Was ist angesagt?

EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
Hiroyuki Nakaji
 
Intro sheet DuraForce r7
Intro sheet DuraForce r7Intro sheet DuraForce r7
Intro sheet DuraForce r7
Jason Shipley
 

Was ist angesagt? (20)

Superbolt Solutions for Steel Mills
Superbolt Solutions for Steel MillsSuperbolt Solutions for Steel Mills
Superbolt Solutions for Steel Mills
 
Beam column connections
Beam column connectionsBeam column connections
Beam column connections
 
80m XHD Webinar Slides
80m XHD Webinar Slides80m XHD Webinar Slides
80m XHD Webinar Slides
 
bolts 8.8
bolts 8.8bolts 8.8
bolts 8.8
 
Shaft design MU
Shaft design MUShaft design MU
Shaft design MU
 
final yr project-1
final yr project-1final yr project-1
final yr project-1
 
Roller contact bearing
Roller contact bearingRoller contact bearing
Roller contact bearing
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
 
Testing of 50 year old prestressed concrete railway sleepers
Testing of 50 year old prestressed concrete railway sleepersTesting of 50 year old prestressed concrete railway sleepers
Testing of 50 year old prestressed concrete railway sleepers
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
CE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and TorsionCE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
CE72.52 - Lecture 3b - Section Behavior - Shear and Torsion
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Rolling contact bearings
Rolling contact bearingsRolling contact bearings
Rolling contact bearings
 
Design of bolted connections
Design of bolted connectionsDesign of bolted connections
Design of bolted connections
 
Rolling Contact Bearing theory Prof. Sagar Dhotare
Rolling Contact Bearing theory   Prof. Sagar DhotareRolling Contact Bearing theory   Prof. Sagar Dhotare
Rolling Contact Bearing theory Prof. Sagar Dhotare
 
Difference in Load readings between Strain Gage and Load Cell
Difference in Load readings between Strain Gage and Load CellDifference in Load readings between Strain Gage and Load Cell
Difference in Load readings between Strain Gage and Load Cell
 
Intro sheet DuraForce r7
Intro sheet DuraForce r7Intro sheet DuraForce r7
Intro sheet DuraForce r7
 
Unit 5 Design of Threaded and Welded Joints
Unit 5 Design of Threaded and Welded JointsUnit 5 Design of Threaded and Welded Joints
Unit 5 Design of Threaded and Welded Joints
 
Torque 101 Webinar - How to Choose a Torque Transducer
Torque 101 Webinar - How to Choose a Torque TransducerTorque 101 Webinar - How to Choose a Torque Transducer
Torque 101 Webinar - How to Choose a Torque Transducer
 
AITC Coupling Beam Design Procedure (20151106)
AITC Coupling Beam Design Procedure (20151106)AITC Coupling Beam Design Procedure (20151106)
AITC Coupling Beam Design Procedure (20151106)
 

Ähnlich wie Extending the Life of Steel Girder Bridges through the Use of Post-Installed Shear Connectors

Seismic assessment of earthquake-resilient low-damage steel frames in OpenSees
Seismic assessment of earthquake-resilient low-damage steel frames in OpenSeesSeismic assessment of earthquake-resilient low-damage steel frames in OpenSees
Seismic assessment of earthquake-resilient low-damage steel frames in OpenSees
openseesdays
 
Shear behavior of reinforced concrete slender beams using high strength concrete
Shear behavior of reinforced concrete slender beams using high strength concreteShear behavior of reinforced concrete slender beams using high strength concrete
Shear behavior of reinforced concrete slender beams using high strength concrete
eSAT Journals
 
Portfolio Presentation
Portfolio PresentationPortfolio Presentation
Portfolio Presentation
shanged
 

Ähnlich wie Extending the Life of Steel Girder Bridges through the Use of Post-Installed Shear Connectors (20)

Seismic assessment of earthquake-resilient low-damage steel frames in OpenSees
Seismic assessment of earthquake-resilient low-damage steel frames in OpenSeesSeismic assessment of earthquake-resilient low-damage steel frames in OpenSees
Seismic assessment of earthquake-resilient low-damage steel frames in OpenSees
 
Reliability based Design Optimization of Steel-Concrete Structure
Reliability based Design Optimization of Steel-Concrete StructureReliability based Design Optimization of Steel-Concrete Structure
Reliability based Design Optimization of Steel-Concrete Structure
 
Challenges of Rebar Testing
Challenges of Rebar TestingChallenges of Rebar Testing
Challenges of Rebar Testing
 
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
 
PSC Lecture PPT.pptx
PSC  Lecture PPT.pptxPSC  Lecture PPT.pptx
PSC Lecture PPT.pptx
 
Concept of ‘fatigue’ in welded steel
Concept of ‘fatigue’ in welded steelConcept of ‘fatigue’ in welded steel
Concept of ‘fatigue’ in welded steel
 
Lecture 7 bolted connections-students.pdf
Lecture 7 bolted connections-students.pdfLecture 7 bolted connections-students.pdf
Lecture 7 bolted connections-students.pdf
 
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONSEXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
 
Shear testing of prestressed concrete girders
Shear testing of prestressed concrete girdersShear testing of prestressed concrete girders
Shear testing of prestressed concrete girders
 
Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...Experimental study of shear in reinforced concrete one way slabs subjected to...
Experimental study of shear in reinforced concrete one way slabs subjected to...
 
PSC Design and construction.ppt
PSC Design and construction.pptPSC Design and construction.ppt
PSC Design and construction.ppt
 
Shear connector jakarta 081281000409
Shear connector jakarta 081281000409Shear connector jakarta 081281000409
Shear connector jakarta 081281000409
 
Delving into the Application of Precast Prestressed Concrete buildings in Hig...
Delving into the Application of Precast Prestressed Concrete buildings in Hig...Delving into the Application of Precast Prestressed Concrete buildings in Hig...
Delving into the Application of Precast Prestressed Concrete buildings in Hig...
 
Shear behavior of reinforced concrete slender beams using high strength concrete
Shear behavior of reinforced concrete slender beams using high strength concreteShear behavior of reinforced concrete slender beams using high strength concrete
Shear behavior of reinforced concrete slender beams using high strength concrete
 
Shear behavior of reinforced concrete slender beams
Shear behavior of reinforced concrete slender beamsShear behavior of reinforced concrete slender beams
Shear behavior of reinforced concrete slender beams
 
Challenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue PerformanceChallenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue Performance
 
D1 (A3) Viktor Peterson - Evaluation of dynamically tested concrete beams rei...
D1 (A3) Viktor Peterson - Evaluation of dynamically tested concrete beams rei...D1 (A3) Viktor Peterson - Evaluation of dynamically tested concrete beams rei...
D1 (A3) Viktor Peterson - Evaluation of dynamically tested concrete beams rei...
 
PSC Lecture PPT.pdf
PSC  Lecture PPT.pdfPSC  Lecture PPT.pdf
PSC Lecture PPT.pdf
 
CASE STUDY: PERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE DUAL SYST...
CASE STUDY: PERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE DUAL SYST...CASE STUDY: PERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE DUAL SYST...
CASE STUDY: PERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE DUAL SYST...
 
Portfolio Presentation
Portfolio PresentationPortfolio Presentation
Portfolio Presentation
 

Mehr von Center for Transportation Research - UT Austin

Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Center for Transportation Research - UT Austin
 

Mehr von Center for Transportation Research - UT Austin (20)

Flying with SAVES
Flying with SAVESFlying with SAVES
Flying with SAVES
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular FleetsCollaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
 
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
 
UT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering SystemsUT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering Systems
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
 
SAVES general overview
SAVES general overviewSAVES general overview
SAVES general overview
 
D-STOP Overview April 2018
D-STOP Overview April 2018D-STOP Overview April 2018
D-STOP Overview April 2018
 
Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...
 

Kürzlich hochgeladen

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Kürzlich hochgeladen (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 

Extending the Life of Steel Girder Bridges through the Use of Post-Installed Shear Connectors

  • 1. Graduate Students: Kerry Kreitman, Hemal Patel, Amir Ghiami Azad TxDOT Project 0-6719 FERGUSON STRUCTURAL ENGINEERING LABORATORY Faculty: Michael Engelhardt, Todd Helwig, Rich Klingner, Eric Williamson Extending the Life of Steel Girder Bridges through the Use of Post-Installed Shear Connectors TxDOT: Darrin Jensen, Yuan Zhao, Dingyi Yang, Jamie Farris, Manuel Padron, Michelle Romage-Chambers, Paul Rollins, Leon Flourney
  • 2. Develop technique to strengthen existing continuous multi-span non-composite steel girder bridges Project Objective
  • 3.
  • 4. Older Non-composite Bridge steel girder concrete deckPost-installed shear connector
  • 5. Critical Issue for Practical Application Minimize number of post- installed shear connectors. Need to employ partial composite design.
  • 6. Bridge Deck Girder Flange Post-Installed Shear Connector: Adhesive Anchor
  • 7. Strengthening Concept Partially composite Partially compositeNon-composite Positive moment Positive momentNegative moment Increased strength Increased strength Continuous, non-composite girder
  • 8. YIELD YIELD Strengthening Concept: - Allow yielding in negative moment region / redistribute moment to positive moment regions - Strengthen positive moment regions with post-installed shear connectors using partially composite design
  • 9. Research Questions • Is moment redistribution possible for partially composite girders (i.e., can we develop “shakedown”) ? • What is the fatigue strength of the adhesive anchor shear connector ? • How do we compute the shear connector fatigue demands for a partially composite girder? • Can we demonstrate good performance in large-scale tests? • Can we develop a straightforward design procedure?
  • 10. Bridge Survey 7-8’ 7-8’ 7-8’ Compact W30-W36 shape 6.5” deck 50-100’ 50-100’ 50-100’ Cover plates top and bottom over piers 2-6 lanes Typically no skew or curvature 2-5 span unit No shear connectors Constructed 1950-1970 H15 or H20 design loads
  • 11. 0 2 4 6 8 10 12 14 NumberofBridgeUnits Inventory HS Load Rating Initial Concept Studies Existing Strengthened (30%) Bridges can be significantly strengthened: Achieve HS 20 rating with low composite ratios and minimal redistribution Exceeds current standardsDeficient compared to current standards Conduct load rating for 13 bridges
  • 13. Fatigue Testing 0 10 20 30 40 50 60 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 StressRange,σr(ksi) Number of Cycles at Failure, N 0 0.01 0.02 0.03 0.04 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 Avg.SlipRange,sr(in) Number of Cycles at Failure, N = 0.66 = 0.86 Stress Range: Slip Range: = 101 − 13.6 log ≥ 15 = 0.0537 − 0.00725 log ≥ 0.008
  • 14. Fatigue Testing Key Results: • Adhesive anchor shear connector has much better fatigue performance than welded shear studs. • Developed fatigue performance predictions based on both stress-range and on slip-range.
  • 15. Large-Scale Testing Girder 1: 84’ long; 30% composite; 56 connectors Girder 2: 104’ long; 20% composite; 40 connectors
  • 16. 16
  • 17. 17
  • 18. Testing Program • Elastic testing – Before and after installing connectors • Fatigue and shakedown testing – In various orders for each span • Ultimate strength testing
  • 19. Typical Shakedown Results Loading Pattern: 0 0.02 0.04 0.06 2 3 4 5 6 7 8 ChangeinDefl.(in) Cycle Number Shakedown criterion
  • 20. Typical Ultimate Strength Results 0 50 100 150 200 250 0 3 6 9 12 15 Load(k) Total Deflection at Load Point (in) Predicted partially composite limit load Predicted non- composite limit load Connector failure Maximum load applied in shakedown test
  • 21. Summary of Large-Scale Test Results Exceeded predicted strengths at all limit states – Shakedown was observed to occur in partially composite strengthened girders – Excellent high cycle fatigue performance – Fatigue loading did not adversely affect strength – Ultimate strength developed at predicted levels with significant ductility
  • 22. Finite Element Modeling • ANSYS software • Extend experimental results • Evaluate fatigue demands on shear connectors using slip based approach Cross section view Isometric view (underside) Concrete deck Steel beam
  • 23. -0.08 -0.06 -0.04 -0.02 0 0.02 0.04 0.06 0.08 0 8 16 24 32 40 48 56 64 72 80 SlipUnder~50kipP2Load(in) Distance Along Beam (ft) Slip Profiles 50 kips 50 kips ANSYS
  • 24. Parametric Studies • Recommendations for connector layout: – Location of connector groups is most influential – Consider constructability 15% of span length 12” spacing (approx.)
  • 25. Recommended Design Procedure Evaluate strength of existing bridge Set strengthening targets Check negative moment regions and redistribute moments as necessary Design connectors for positive moment regions Locate connectors and check fatigue strength
  • 26. Research Questions / Answers • Is moment redistribution possible for partially composite girders (i.e., can we develop “shakedown”) ? YES – Shakedown in possible and predictable • What is the fatigue strength of the adhesive anchor shear connector ? Equations developed (based on exhaustive testing) to predict fatigue life of shear connectors, based both on stress-range and slip-range.
  • 27. Research Questions / Answers • How do we compute the shear connector fatigue demands for a partially composite girder? Compute slip demands on shear connectors under fatigue truck (can use commercial FEA software or “UT-SLIP.”) • Can we demonstrate good performance in large-scale tests? Large-scale specimens showed excellent performance under all loading conditions. • Can we develop a straightforward design procedure? Yes.
  • 28. Conclusions of Research Study Efficient strengthening solution – Avoid load-posting or costly deck replacements – Significant increase in load rating (up to 90%) – Excellent structural behavior – Simple and quick installation process – Straightforward design process