SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan
Project 3 (Final)
Residential Landscape Project
40% Individual
Submission: 31st July 2015, Friday (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
2
Tasks - Methodology
This is a continuous assignment of Project 2 and an individual project. From the same site that you
were doing for previous Project 2, you are required to design the landscape for the residence/house.
You have to imagine that you are going to present the landscape proposal to the client (who is the
house owner) by preparing ALL drawings needed for every development stages. The development
stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to previous individual component of project 2), develop a bubble
diagram. Bubble diagram is used as a means to show what spaces and activities that you want
to propose at the site. Subsequently, you need to come out with a conceptual diagram.
Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and
bubble diagram which related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor, you should produce a master plan
set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed.. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
(These two topics will be taught by guest lecturer (QS Lecturer) in Week 14).
**Note:
A self-independent study is required on graphic communication particularly on architectural lettering,
sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas
collection and inspirations.
3
Submission Requirement
Each student is required to submit ALL of the following:
1. A3 presentation boards. You can use any type of paper and colour materials as long as it is
pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
2. You need to provide ALL of the following;
- Project Description
- Location Plan & Key Plan
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title
block in every page. The title block will be provided by the lecturer a week before submission.
The overall layout template will be prepared by the lecturer.
4. You are to show your progress of drawing every week during tutorial sessions to your
respective tutors. The progress drawing must be on butter paper, signed by the tutor with
date, to be compiled in A4 plastic cover and to submit together with presentation
boards.
5. All drawings need to be completed manually (hand drawn & hand written) by using
architectural graphic communication. Images can be printed out.
6. All drawings must be coloured. You may choose any medium of colouring technique that
you are master in. It is not compulsory to colour all, it can be a portion or part of the overall
drawings only.
7. Your A3 boards must be binded.
8. You need to submit the complete binded presentation boards with a set of progression drawing
on 31st July 2015 (Friday). Time and venue of submission will be informed.
9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days,
no assessment will be done.
10. You are encouraged to take photo or scan your work for e-portfolio purposes.
4
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progress Drawings 5%
GRAND TOTAL: 40%

Weitere ähnliche Inhalte

Andere mochten auch

Cts project 1 brief
Cts project 1 briefCts project 1 brief
Cts project 1 briefCrystal Chia
 
Substance Abuse Washtenaw, Michigan
Substance Abuse Washtenaw, MichiganSubstance Abuse Washtenaw, Michigan
Substance Abuse Washtenaw, Michiganrecoveryrestart2
 
4 презентация офисные стулья
4 презентация офисные стулья4 презентация офисные стулья
4 презентация офисные стульяkolesikmixer
 
Substance Abuse Gladwin, Michigan
Substance Abuse Gladwin, MichiganSubstance Abuse Gladwin, Michigan
Substance Abuse Gladwin, Michiganrecoveryrestart2
 
ABHINAV SHARMA.resume new updated
ABHINAV SHARMA.resume new updatedABHINAV SHARMA.resume new updated
ABHINAV SHARMA.resume new updatedAbhinav Sharma
 
The Funnel & The Path
The Funnel & The PathThe Funnel & The Path
The Funnel & The PathKyle Kostick
 
Substance Abuse Mason, Michigan
Substance Abuse Mason, MichiganSubstance Abuse Mason, Michigan
Substance Abuse Mason, Michiganrecoveryrestart2
 
10 4 презентациядетского постельного белья
10 4 презентациядетского постельного белья10 4 презентациядетского постельного белья
10 4 презентациядетского постельного бельяkolesikmixer
 
Substance Abuse Delta, Michigan
Substance Abuse Delta, MichiganSubstance Abuse Delta, Michigan
Substance Abuse Delta, Michiganrecoveryrestart2
 
How to make additional clock in your window.
How to make additional clock in your window. How to make additional clock in your window.
How to make additional clock in your window. Richelle Malapit
 
CTS Board Game Process
CTS Board Game ProcessCTS Board Game Process
CTS Board Game ProcessCrystal Chia
 
ArcGIS_Collector_Field_Guide_201411204_
ArcGIS_Collector_Field_Guide_201411204_ArcGIS_Collector_Field_Guide_201411204_
ArcGIS_Collector_Field_Guide_201411204_Sacha Selim
 
18 4 products catalog-2014_gp_sofa
18 4 products catalog-2014_gp_sofa18 4 products catalog-2014_gp_sofa
18 4 products catalog-2014_gp_sofakolesikmixer
 

Andere mochten auch (20)

Cts project 1 brief
Cts project 1 briefCts project 1 brief
Cts project 1 brief
 
Substance Abuse Washtenaw, Michigan
Substance Abuse Washtenaw, MichiganSubstance Abuse Washtenaw, Michigan
Substance Abuse Washtenaw, Michigan
 
CL Project 1
CL Project 1CL Project 1
CL Project 1
 
1
11
1
 
4 презентация офисные стулья
4 презентация офисные стулья4 презентация офисные стулья
4 презентация офисные стулья
 
Substance Abuse Gladwin, Michigan
Substance Abuse Gladwin, MichiganSubstance Abuse Gladwin, Michigan
Substance Abuse Gladwin, Michigan
 
ABHINAV SHARMA.resume new updated
ABHINAV SHARMA.resume new updatedABHINAV SHARMA.resume new updated
ABHINAV SHARMA.resume new updated
 
1002FRCNotebook
1002FRCNotebook1002FRCNotebook
1002FRCNotebook
 
The Funnel & The Path
The Funnel & The PathThe Funnel & The Path
The Funnel & The Path
 
Substance Abuse Mason, Michigan
Substance Abuse Mason, MichiganSubstance Abuse Mason, Michigan
Substance Abuse Mason, Michigan
 
10 4 презентациядетского постельного белья
10 4 презентациядетского постельного белья10 4 презентациядетского постельного белья
10 4 презентациядетского постельного белья
 
Substance Abuse Delta, Michigan
Substance Abuse Delta, MichiganSubstance Abuse Delta, Michigan
Substance Abuse Delta, Michigan
 
How to make additional clock in your window.
How to make additional clock in your window. How to make additional clock in your window.
How to make additional clock in your window.
 
CTS Board Game Process
CTS Board Game ProcessCTS Board Game Process
CTS Board Game Process
 
rmarshall_pm
rmarshall_pmrmarshall_pm
rmarshall_pm
 
Michael Themba Thapelo Portfolio
Michael Themba Thapelo PortfolioMichael Themba Thapelo Portfolio
Michael Themba Thapelo Portfolio
 
Health management presentation
Health management presentationHealth management presentation
Health management presentation
 
ENBE Booklet
ENBE BookletENBE Booklet
ENBE Booklet
 
ArcGIS_Collector_Field_Guide_201411204_
ArcGIS_Collector_Field_Guide_201411204_ArcGIS_Collector_Field_Guide_201411204_
ArcGIS_Collector_Field_Guide_201411204_
 
18 4 products catalog-2014_gp_sofa
18 4 products catalog-2014_gp_sofa18 4 products catalog-2014_gp_sofa
18 4 products catalog-2014_gp_sofa
 

Ähnlich wie Project 3 residential landscape

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape projectchristinelee1996
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectstactixzz97
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891yongzsoh
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectchuenmin
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape projectSongKit96
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectLeon Lim
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape projectGynie
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectZheng Chee Cham
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectAmelisa Collins
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectLee Fong Yen
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectJian Leo
 
CL Project 2B Brief
CL Project 2B BriefCL Project 2B Brief
CL Project 2B BriefTamZhaoWei
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectSolomonTangerine
 

Ähnlich wie Project 3 residential landscape (16)

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
2B
2B2B
2B
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
CL Project 2B Brief
CL Project 2B BriefCL Project 2B Brief
CL Project 2B Brief
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 

Mehr von Crystal Chia

Mehr von Crystal Chia (20)

itd object 2
itd object 2itd object 2
itd object 2
 
itd object 1
itd object 1itd object 1
itd object 1
 
Project 2 itd brief
Project 2 itd briefProject 2 itd brief
Project 2 itd brief
 
enbe photo model
enbe photo modelenbe photo model
enbe photo model
 
Enbe final brief
Enbe final briefEnbe final brief
Enbe final brief
 
Journal ASDFGHJKKL
Journal ASDFGHJKKLJournal ASDFGHJKKL
Journal ASDFGHJKKL
 
ENBE Journal Brief
ENBE Journal BriefENBE Journal Brief
ENBE Journal Brief
 
Enbe project 1 presentation
Enbe project 1 presentationEnbe project 1 presentation
Enbe project 1 presentation
 
Enbe project 1 brief
Enbe project 1 briefEnbe project 1 brief
Enbe project 1 brief
 
Cts final project brief
Cts final project briefCts final project brief
Cts final project brief
 
CTS Project 1
CTS Project 1CTS Project 1
CTS Project 1
 
IDJ 4
IDJ 4IDJ 4
IDJ 4
 
IDJ 3
IDJ 3 IDJ 3
IDJ 3
 
IDJ 2
IDJ 2IDJ 2
IDJ 2
 
CTS
CTSCTS
CTS
 
ICI Final project march 2015
ICI Final project march 2015ICI Final project march 2015
ICI Final project march 2015
 
ICI Project 1B
ICI Project 1BICI Project 1B
ICI Project 1B
 
Ici&itd 2015 project 1
Ici&itd 2015 project 1Ici&itd 2015 project 1
Ici&itd 2015 project 1
 
ICI Project 1 Brief
ICI Project 1 BriefICI Project 1 Brief
ICI Project 1 Brief
 
CL Project 3
CL Project 3CL Project 3
CL Project 3
 

Kürzlich hochgeladen

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 

Kürzlich hochgeladen (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 

Project 3 residential landscape

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan Project 3 (Final) Residential Landscape Project 40% Individual Submission: 31st July 2015, Friday (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. 2 Tasks - Methodology This is a continuous assignment of Project 2 and an individual project. From the same site that you were doing for previous Project 2, you are required to design the landscape for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to previous individual component of project 2), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose at the site. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor, you should produce a master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed.. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. (These two topics will be taught by guest lecturer (QS Lecturer) in Week 14). **Note: A self-independent study is required on graphic communication particularly on architectural lettering, sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas collection and inspirations.
  • 3. 3 Submission Requirement Each student is required to submit ALL of the following: 1. A3 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board. 2. You need to provide ALL of the following; - Project Description - Location Plan & Key Plan - Bubble Diagram - Conceptual Plan - Schematic Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title block in every page. The title block will be provided by the lecturer a week before submission. The overall layout template will be prepared by the lecturer. 4. You are to show your progress of drawing every week during tutorial sessions to your respective tutors. The progress drawing must be on butter paper, signed by the tutor with date, to be compiled in A4 plastic cover and to submit together with presentation boards. 5. All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication. Images can be printed out. 6. All drawings must be coloured. You may choose any medium of colouring technique that you are master in. It is not compulsory to colour all, it can be a portion or part of the overall drawings only. 7. Your A3 boards must be binded. 8. You need to submit the complete binded presentation boards with a set of progression drawing on 31st July 2015 (Friday). Time and venue of submission will be informed. 9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. 10. You are encouraged to take photo or scan your work for e-portfolio purposes.
  • 4. 4 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progress Drawings 5% GRAND TOTAL: 40%