SlideShare ist ein Scribd-Unternehmen logo
1 von 2
COLLEEN WENZEL
2620 East Birchwood Avenue, Cudahy, WI 53110
(414) 704-7669
wenzelcolleen@att.net
PROFILE
Detail oriented Production Scheduler with 20+ years of proven and transferable experience maximizing
operational efficiency and reducing costs. Effective communicator with interpersonal skills and a strong
understanding of how to develop and maintain internal customer relationships. Committed to improving
the planning and reporting processes and ensuring parts are delivered to customers accurately and timely.
Key areas of expertise include:
Executive Requirements Schedule -- Material Control & Flow – WorkflowPlanning & Scheduling
PROFESSIONAL EXPERIENCE
REXNORD INDUSTRIES, LLC
07/2015 – 06/2016
Production Planner
 Assure on time delivery/shipment of units
 Generate production orders as needed
 Schedule work for production employees
 Communicate directly with Purchasing Department to ensure purchased materials meet delivery
requirements
 Monitor/manage inventory needed for units
 Analyzed bill of materials, sales orders, drawings, routings and procedures in order to ensure
proper control and flow of materials
 Printed new dispatch lists for each machine tool daily
 Confirmed other shops received necessary component parts
BERRY PLASTICS CORPORATION
05/2014 – 06/2015
Production/Inventory Control Coordinator
 Process new orders from customer service
 Schedule work for the plant
 Print out work orders
 Ensure supply/demand balance
CATERPILLAR, INC.
02/1989 – 10/2013
Master Scheduler
 Reviewed, analyzed and negotiated Executive Requirements Schedule with management
 Scheduled workflow from Engineering through the Manufacturing department
 Ensured the routing and blueprints were correct prior to delivery to shop floor
 Analyzed bill of materials, sales orders, drawings, routings and procedures in order to ensure
proper control and flow of materials
 Managed corrective actions required for all rejected shop floor material
 Printed new dispatch lists for each machine tool daily
 Confirmed other shops received necessary component parts
 Attended capacity planning department meetings
 Verified reject tickets were processed daily
 Responsible for maintaining the aftermarket parts inventory
ACCOMPLISHMENTS
 Introduced a plan that reduced cost and increased efficiency by reorganizing the process for
cutting teeth using multiple tools
 Consistently met all established goals related to machine part review and accountability
PROFESSIONAL TRAINING
Milwaukee Area Technical College
Certificate of completion for SPS/Total Quality System
Bucyrus International UWM School of Continuing Education
Certificate for the Completion of Master Scheduling Material Requirements Planning/Shop Floor Control
Workshop/Dedication to Planning and Scheduling Integrity
Certificate of Completion for completion of ISO 9001 Orientation Training
TECHNICAL SKILLS
Proficient in SAP, MRP, Microsoft Excel, and Baan Software
Supply Chain Metrics and Safety Stock
JD Edwards Systems

Weitere ähnliche Inhalte

Was ist angesagt? (19)

Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
Quality
Quality Quality
Quality
 
Mohammad Bahafzalla CV
Mohammad Bahafzalla CVMohammad Bahafzalla CV
Mohammad Bahafzalla CV
 
production engineer
production engineerproduction engineer
production engineer
 
Quality resume
Quality resumeQuality resume
Quality resume
 
Production &Industrial Engineering3
Production &Industrial Engineering3Production &Industrial Engineering3
Production &Industrial Engineering3
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
new sales eng
new sales engnew sales eng
new sales eng
 
UPDATED _ CV_20.11.15
UPDATED _ CV_20.11.15UPDATED _ CV_20.11.15
UPDATED _ CV_20.11.15
 
CV_RRBARTE
CV_RRBARTECV_RRBARTE
CV_RRBARTE
 
Sonia Matos - Resume Octuber 2015
Sonia Matos - Resume Octuber 2015Sonia Matos - Resume Octuber 2015
Sonia Matos - Resume Octuber 2015
 
12
1212
12
 
CV-Vipin Verma.doc
CV-Vipin Verma.docCV-Vipin Verma.doc
CV-Vipin Verma.doc
 
resume_nivedita_planning
resume_nivedita_planningresume_nivedita_planning
resume_nivedita_planning
 
sunil_jan_16
sunil_jan_16sunil_jan_16
sunil_jan_16
 
Stacy Hogan_Resume-1
Stacy Hogan_Resume-1Stacy Hogan_Resume-1
Stacy Hogan_Resume-1
 
Resume
ResumeResume
Resume
 
JO’CASTA NEELEY - Resume
JO’CASTA NEELEY - ResumeJO’CASTA NEELEY - Resume
JO’CASTA NEELEY - Resume
 
kristan2016
kristan2016kristan2016
kristan2016
 

Ähnlich wie COLLEEN WENZEL resume

Ähnlich wie COLLEEN WENZEL resume (20)

Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CV
 
CV DECHAVEZ
CV DECHAVEZCV DECHAVEZ
CV DECHAVEZ
 
Resume
ResumeResume
Resume
 
Devashni Ramcharran CV - Aug 2016
Devashni Ramcharran CV - Aug 2016Devashni Ramcharran CV - Aug 2016
Devashni Ramcharran CV - Aug 2016
 
Allen Racy Resume 082016
Allen Racy Resume 082016Allen Racy Resume 082016
Allen Racy Resume 082016
 
SHANNA B
SHANNA BSHANNA B
SHANNA B
 
Resume Divyesh B. Patel
Resume Divyesh B. PatelResume Divyesh B. Patel
Resume Divyesh B. Patel
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 
Danette Farrar Resume
Danette Farrar ResumeDanette Farrar Resume
Danette Farrar Resume
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
 
New Resume 2016
New Resume 2016New Resume 2016
New Resume 2016
 
Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22
 
Andrew Lazalier 2016 Resume
Andrew Lazalier 2016 ResumeAndrew Lazalier 2016 Resume
Andrew Lazalier 2016 Resume
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
Ashwni CV - CSR
Ashwni CV - CSRAshwni CV - CSR
Ashwni CV - CSR
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Anthony T Jackson Resume 2015
Anthony T Jackson Resume 2015Anthony T Jackson Resume 2015
Anthony T Jackson Resume 2015
 
Erp introduction
Erp introductionErp introduction
Erp introduction
 
Snow Resume
Snow ResumeSnow Resume
Snow Resume
 
Ajaz DC CV Updated
Ajaz DC CV UpdatedAjaz DC CV Updated
Ajaz DC CV Updated
 

COLLEEN WENZEL resume

  • 1. COLLEEN WENZEL 2620 East Birchwood Avenue, Cudahy, WI 53110 (414) 704-7669 wenzelcolleen@att.net PROFILE Detail oriented Production Scheduler with 20+ years of proven and transferable experience maximizing operational efficiency and reducing costs. Effective communicator with interpersonal skills and a strong understanding of how to develop and maintain internal customer relationships. Committed to improving the planning and reporting processes and ensuring parts are delivered to customers accurately and timely. Key areas of expertise include: Executive Requirements Schedule -- Material Control & Flow – WorkflowPlanning & Scheduling PROFESSIONAL EXPERIENCE REXNORD INDUSTRIES, LLC 07/2015 – 06/2016 Production Planner  Assure on time delivery/shipment of units  Generate production orders as needed  Schedule work for production employees  Communicate directly with Purchasing Department to ensure purchased materials meet delivery requirements  Monitor/manage inventory needed for units  Analyzed bill of materials, sales orders, drawings, routings and procedures in order to ensure proper control and flow of materials  Printed new dispatch lists for each machine tool daily  Confirmed other shops received necessary component parts BERRY PLASTICS CORPORATION 05/2014 – 06/2015 Production/Inventory Control Coordinator  Process new orders from customer service  Schedule work for the plant  Print out work orders  Ensure supply/demand balance
  • 2. CATERPILLAR, INC. 02/1989 – 10/2013 Master Scheduler  Reviewed, analyzed and negotiated Executive Requirements Schedule with management  Scheduled workflow from Engineering through the Manufacturing department  Ensured the routing and blueprints were correct prior to delivery to shop floor  Analyzed bill of materials, sales orders, drawings, routings and procedures in order to ensure proper control and flow of materials  Managed corrective actions required for all rejected shop floor material  Printed new dispatch lists for each machine tool daily  Confirmed other shops received necessary component parts  Attended capacity planning department meetings  Verified reject tickets were processed daily  Responsible for maintaining the aftermarket parts inventory ACCOMPLISHMENTS  Introduced a plan that reduced cost and increased efficiency by reorganizing the process for cutting teeth using multiple tools  Consistently met all established goals related to machine part review and accountability PROFESSIONAL TRAINING Milwaukee Area Technical College Certificate of completion for SPS/Total Quality System Bucyrus International UWM School of Continuing Education Certificate for the Completion of Master Scheduling Material Requirements Planning/Shop Floor Control Workshop/Dedication to Planning and Scheduling Integrity Certificate of Completion for completion of ISO 9001 Orientation Training TECHNICAL SKILLS Proficient in SAP, MRP, Microsoft Excel, and Baan Software Supply Chain Metrics and Safety Stock JD Edwards Systems