1. General Foreman
Candidate Colin Perryman
Current Resides Whiston, Liverpool
Availability Immediate
Contact Number 07444168127
Employment History Murphy & Sons Alfred McAlpine, Amec, Nuttals,
J.Doyle, Wessex Water, Bardon Construction, Morgan, Sindel, Taylor Woodrow,
volker Stevin Lanes Drains, Balfour Beatty
Personal Profile
Entire career spent working in construction industry, starting from labourer and
working up to General Foreman, gaining civils building experience and knowledge of
taking on a greater responsibility.
Have been involved on a variety of projects throughout the UK. Passionate about
Health and Safety on site, Adept at man management. Highly motivated and
professional. Willing to work away from home.
Clean full driving licence.
Key strengths include:
Proactive
Conscientious, motivated and forward thinking
Decisive decision making
Understand employer client needs
Understand budget needs
Good understanding of tech drawings
Programme awareness
Safety awareness
Education and Qualifications
CSCS gold card
IOSH managing safely
2. SWQR
first aid- full
Proprietary Shoring
Slinger/ signaller
Asbestos awareness
Environmental awareness
CRB and disclosure Scotland
SMSTS
Abrasive Wheels
Drugs and alcohol.
Key Responsibilities
Health and safety on site
Supervision of labour on site – both direct and sub contract
Site inductions
Ordering plant and materials
Issuing permits to work
Inspection of workmanship
Completing allocation sheets
Updating F91 register
Site First Aider
Ecological awareness
Site recording
Professional Experience
Date From -
Too
Company Position and Duties
Nov 2014 –
to present.
Balfour Beatty –
MOTT
McDonald JV
A55 – A483
General Foreman (Freelance)
Upgrade of approaches to Junction 33 of A55 and
widening of bridge inclusive of full depth
construction, planning and relaying of wearing
course, demolition of string course (Hydro &
Cutting), drainage upgrade, COMMS work,
overseeing all works including instructions, safety
and quality. Responsible for all night time workings
including traffic management.
April 2013 –
Nov 2014
Taylor Woodrow
Alstom Joint
Venture
(Nottngham
General Foreman (Staff)
Construction of tram line through Nottingham which
included; formation prep work, using various
methods for excavation including planning
3. Tram Net Phase
2 Project Taylor
Woodrow Civils
depending on area. Supervision of all drainage
work and earthworks which also included
supervision of all labour on site; direct and sub
contract.
Constructing programmes and creating and
completing deadlines.
Supervision of installation of multi utilities. Having
jurisdiction of all Health and Safety throughout site.
Many other responsibilities include; ordering plant,
materials and labour, admin work for recording
plant and labour returns.
Jan 2013 –
April 2013
Lanes for Drains
(Rochdale)
Supervisor (Freelance)
Supervision of relining drainage
Oct 2012 –
Jan 2013
Murphys & Sons
Civils
Supervisor (Freelance)
Deep drainage in radioactive contaminated group
under c2 conditions.
HUNTERSTON A-MAGNOX
April 2012 –
Aug 2012
Bardon
Construction
General Foreman (Freelance)
Construction of new cruise terminal-Liverpool,
consisting of crushing and screening. Drainage-
formation- construction of car park. Access road in
roller compacted concrete, contract involved
controlling both in-house and sub-contract labour.
Jan 2012 –
April 2012
Volker - Stevin General Foreman (Freelance)
Flood alleviation, culvert rehabilitation on behalf of
environmental agency.
2008 - 2012 Morgan Sindell General Foreman (Staff)
Project Allenby. Connaught gas contract:
upgrading Army barracks in the Salisbury Plain and
Aldershot areas. Organising sub-contract gangs on
open cut directional drilling and moling.
Working on 2 projects including the Thames Water
contract street works re-instatement and Unitied
Utilities contract: a variety of flood alleviation
schemes, up to £2M in value including deep
drainage, storage shafts, pumping stations, auger
boring TBMs.
2005 - 2006 John Doyle
Civils
Site Foreman (Freelance)
Manchester Nurse’s Teaching Hospital ground-
works, inclusive was all drainage ground,
preparation RC base construction and reinforced
concrete construction using proprietary shuttering
systems driving core system.
2001 - 2005 Amec Civils Section Foremann (Staff)
Construction of A1(m) Darrington to Dishforth,
including earth-works, ground-works, drainage,
formation and blacktop. Responsible for section
with crusher set up.
Construction of Bingley relief road, covering all
aspects of road construction, including substantial
4. cut and fill operations in confined areas with tight
ecological restraints. Construction of major
structures including a viaduct and low level pre-cast
spanning bridge through SSSi area.
1989 - 2001 Alfred McAlpine Ganger/ Foreman (Staff)
Prestatyn Sea Defence – Armour Groynes, R.C
Concrete
Annan Bypass – Earth Works, Formation, Drainage
Manchester Airport – Earth Works, R.C Aprons P.Q
Concrete
Ratcliffe Power Station – Rock cut, Drainage,
Formation
Tamworth by-pass
A34 Manchester Ring Road
M60 Motorway