• Brief overview of the tool 3P
▫ Key elements………
▫ Methodology………
▫ Importance…………
• Q & A
Typical scenario-1
Typical scenario -2
Design
Quality
Production
Suppliers
Logistics
The Silo Organization
And the result of working in silos !!
What is Production Preparation Process ?
A Cross Functional Team comprising
members from Planning,
Production, Quality, Logistics,
Engineering and Suppliers
understand and evaluate the designed
production process and define
alternatives. Using prototypes or
simple materials, mock up the process
to test the premises and assumptions
before the actual equipment is ordered
and installed.
A proactive and well-organized methodology for designing a LEAN
production process for green -field or brown-field projects
Implementation of this approach
is called as 3P-WORKSHOP
Real Place, Real Parts,
Real Data
Because, reality is
different from theory.
Touch the part and feel
the process would give
much better solutions
All the key stake holders, like
Planner, production manager,
Quality manager, Logistics
Manager- come out from their
silo and align their thought
process and their plans
It defines the basic
standardized work.
Line starts with
standardized work. It
enables the CI
process.
Production Preparation Process WS
Early alignment of key stakeholders at Gemba with mock-up process, leads to
standard process before SoP and sets the foundation for Continuous Improvement
What is Production Preparation Process ?
When to use 3P ?
• New product introduction
• New production line implementation
• Capacity increase / decrease from existing
production line
• New Technology / Equipment Implementation
• Relocate / shifting of Lines
• Re-engineering an existing production line
1. Process Planning
2. Production
3. Quality
4. Logistics
5. Engineering
6. LEAN/ Opex (facilitator)
7. Supplier
8. Process Experts
3P team normally comprise of members from all
key functions
3P Methodology - overview
3P workshop
1. LEAN assessment report
2. Work Station layout
3. Manpower allocation /
Utilization%
4. Work station utilization %
5. Refined Process Planning
6. Tools / equipment design
7. Logistics data / storage bin
details / Kart details
8. Ergonomics Risk
Landscape
9. Standard Job/Work
Instruction Sheets
10. Manufacturability – Open
issues
Planning
3PWorkshops
Process Plan, Tool/ Jigs /Fixture
design, station layout, material
conveying design
Production
Experience, physical resources,
shop floor facility, mock-up
material
Quality
Quality requirements, inspection
plan, check lists, inspection tools,
key characteristics
Logistics
Master list of parts, supply
details, kart designs, line side
storage design,
Engineering
Product design, assembly
drawings, specifications, key
characteristics
Input Output
3P workshop typical outcome
Ergonomics
Line Side
parts Storage
O.H material
handling
facilities
Assembly
Process /
Sequence
Station
Layout
LEAN
requirements
(7 Wastes)
Quality
requirements
3P helps in synchronization of all these features of a
production line, leading to a smooth start of production (SoP)
Major Benefits of the 3P workshops
3P leads to very smooth start of line without any major teething problems.
It avoids rather “Surprises which arise after the line starts
running”(e.g. shifting of some OH facility, rebalancing of the line,
correcting the layout)
The cost, efforts and time necessary for overcoming such surprises are
always higher than the cost of 3P workshops
Alignment of all key stakeholders who are getting an opportunity to
preconceive the process and align themselves effectively
Design issues related to Manufacturability are addressed well before
start of production
Prepared by:
Prabhakaran Kuralnidhi
Consultant, Trainer & Coach
http:/www.cobex.in

Weitere ähnliche Inhalte

Was ist angesagt?

Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
mahawar1987
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
Renee Troughton
 

Was ist angesagt? (20)

13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Spaghetti Diagrams
Spaghetti DiagramsSpaghetti Diagrams
Spaghetti Diagrams
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Update
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 

Ähnlich wie Production preparation process 3P

Erp governance methodology and case studies v rjt
Erp governance methodology and case studies  v rjtErp governance methodology and case studies  v rjt
Erp governance methodology and case studies v rjt
James Sutter
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
Arya Wirabhuana
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
sachin
 

Ähnlich wie Production preparation process 3P (20)

PROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxPROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptx
 
APQP 2nd Edition.ppt
APQP 2nd Edition.pptAPQP 2nd Edition.ppt
APQP 2nd Edition.ppt
 
Erp governance methodology and case studies v rjt
Erp governance methodology and case studies  v rjtErp governance methodology and case studies  v rjt
Erp governance methodology and case studies v rjt
 
ASAP_Methodology.pptx
ASAP_Methodology.pptxASAP_Methodology.pptx
ASAP_Methodology.pptx
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturing
 
Project cycle
Project cycleProject cycle
Project cycle
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa
 
Ch 11(spi)relationship pa
Ch 11(spi)relationship paCh 11(spi)relationship pa
Ch 11(spi)relationship pa
 
3 P Sample
3 P Sample3 P Sample
3 P Sample
 
Process planning
Process planningProcess planning
Process planning
 
LeanSigma for IW 2005
LeanSigma for IW 2005LeanSigma for IW 2005
LeanSigma for IW 2005
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
台積電徵才
台積電徵才台積電徵才
台積電徵才
 
Lean Six Sigma - Concept & Application
Lean Six Sigma - Concept & ApplicationLean Six Sigma - Concept & Application
Lean Six Sigma - Concept & Application
 
Training technology transfer training
Training technology transfer trainingTraining technology transfer training
Training technology transfer training
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptx
 
Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)
 
APQP Training presentation
APQP Training  presentationAPQP Training  presentation
APQP Training presentation
 

Kürzlich hochgeladen

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

Production preparation process 3P

  • 1. Production Preparation Process An Introduction Prabhakaran Kuralnidhi Consultant, Trainer & Coach
  • 2. Agenda • Brief overview of the tool 3P ▫ Key elements……… ▫ Methodology……… ▫ Importance………… • Q & A
  • 5. And the result of working in silos !!
  • 6. What is Production Preparation Process ? A Cross Functional Team comprising members from Planning, Production, Quality, Logistics, Engineering and Suppliers understand and evaluate the designed production process and define alternatives. Using prototypes or simple materials, mock up the process to test the premises and assumptions before the actual equipment is ordered and installed. A proactive and well-organized methodology for designing a LEAN production process for green -field or brown-field projects Implementation of this approach is called as 3P-WORKSHOP
  • 7. Real Place, Real Parts, Real Data Because, reality is different from theory. Touch the part and feel the process would give much better solutions All the key stake holders, like Planner, production manager, Quality manager, Logistics Manager- come out from their silo and align their thought process and their plans It defines the basic standardized work. Line starts with standardized work. It enables the CI process. Production Preparation Process WS Early alignment of key stakeholders at Gemba with mock-up process, leads to standard process before SoP and sets the foundation for Continuous Improvement What is Production Preparation Process ?
  • 8. When to use 3P ? • New product introduction • New production line implementation • Capacity increase / decrease from existing production line • New Technology / Equipment Implementation • Relocate / shifting of Lines • Re-engineering an existing production line
  • 9. 1. Process Planning 2. Production 3. Quality 4. Logistics 5. Engineering 6. LEAN/ Opex (facilitator) 7. Supplier 8. Process Experts 3P team normally comprise of members from all key functions
  • 10. 3P Methodology - overview 3P workshop
  • 11. 1. LEAN assessment report 2. Work Station layout 3. Manpower allocation / Utilization% 4. Work station utilization % 5. Refined Process Planning 6. Tools / equipment design 7. Logistics data / storage bin details / Kart details 8. Ergonomics Risk Landscape 9. Standard Job/Work Instruction Sheets 10. Manufacturability – Open issues Planning 3PWorkshops Process Plan, Tool/ Jigs /Fixture design, station layout, material conveying design Production Experience, physical resources, shop floor facility, mock-up material Quality Quality requirements, inspection plan, check lists, inspection tools, key characteristics Logistics Master list of parts, supply details, kart designs, line side storage design, Engineering Product design, assembly drawings, specifications, key characteristics Input Output 3P workshop typical outcome
  • 12. Ergonomics Line Side parts Storage O.H material handling facilities Assembly Process / Sequence Station Layout LEAN requirements (7 Wastes) Quality requirements 3P helps in synchronization of all these features of a production line, leading to a smooth start of production (SoP)
  • 13. Major Benefits of the 3P workshops 3P leads to very smooth start of line without any major teething problems. It avoids rather “Surprises which arise after the line starts running”(e.g. shifting of some OH facility, rebalancing of the line, correcting the layout) The cost, efforts and time necessary for overcoming such surprises are always higher than the cost of 3P workshops Alignment of all key stakeholders who are getting an opportunity to preconceive the process and align themselves effectively Design issues related to Manufacturability are addressed well before start of production
  • 14. Prepared by: Prabhakaran Kuralnidhi Consultant, Trainer & Coach http:/www.cobex.in