3. • brick substrate
• loose, fragmented
material
• this gravel like
material ends up in
sewers
4. • Edison electric vault
impacted by debris
• Inbound traffic to
1515 porous paved
lot would be effected
• 50/50 alley program
would allow porous
paved alley
5. COMMUNITY SAFETY
• 1515 is a very
problematic site
• power pole on
alley/project property
line
6. • single pole with
multiple(3) lines
• no crane load lines
within 20 ft. of any
power line or supports
7. • notice power pole guy
line extends from power
pole through the tree,
across Chicago, well
down opposite alley
• constricted use of
Chicago Av construction
lane?
• crane can only swing
180 degrees west-to-east
8. Building Over Alley
• how does Peak
Construction propose
to build over alley
areas
• brick wall on east
elevation
• scaffold shown 12 ft
to lay brick walls
9. SAFETY QUESTIONS TO PEAK
CONSTRUCTION
Do you have a safety plan at this time?
Who is your safety director? OSHA trained?
When does Peak propose to meet with
community & City to develop 1515 Site
Specific Safety Plan
Has Peak Construction built with a tower
crane in such a constricted site? Where?
10. SAFETY QUESTIONS TO PEAK
CONSTRUCTION
Do you have a safety plan at this time?
Who is your safety director? OSHA trained?
When does Peak propose to meet with
community & City to develop 1515 Site
Specific Safety Plan
Has Peak Construction built with a tower
crane in such a constricted site? Where?