PIPELINE ENGINEERING
(3150616)
TOPIC: PIPE LAYING
NAME:CHAUHAN SHAMJI
ENROLLMENT NO:180280106020
SEM 5
DIVISION C , BATCH C2
FACULTY: PROF. N. J. DALAL MA’AM
INTRODUCTION
The laying of conducting pipes underground, as for water, gas, etc.
There are two methods.
1) Onshore methods
Open trench pipe laying
Plowing
Horizontal flush drilling
2) Offshore methods
J – lay process
S – lay process
R- lay process
LAYING OF PIPE LINE
1)Detailed map preparation
2)Centre line marking
3)Unloading
4)Storing
5)Cutting
6)Trenches
7)Laying
8)Back filling and tamping
 Detailed Map Study
Map showing all roads, cables lines,
lanes etc. is prepared.
Pipe line with size and length is marked.
The position of existing pipe lines,
curb lines, sewer lines will also
be marked.
 Center Line Marking
Transformation from map to site.
Stakes driven at 30m interval on
straight line.
Stakes will be 7-15m on curves.
 Unloading
Up to 60kg – 2 persons.
Above 60kg – wagon/truck by holding it in
rope and slides over planks set not steeper
than 45 degree.
One pipe at a time.
It may use carriers or be dragged or rolled
along hard surface.
 Storing
To avoid damage.
It should be stored horizontally.
It should be stored in layer.
 Cutting
Mark with a chalk at the point to cut.
Cut with carpenters saw or hack saw.
It must be a proper uniform cut.
 Trenches
It may be done by either hand or machine.
It must be done with required gradient and
depth.
When it is under a road way min. cover of
1m is recommended.
Width at the base not less than 200mm on
both side of the pipe.
 Laying
Pipes shall be lowered into the trenches
by means of suitable pulley blocks,
shear legs, chains, ropes.
In no case the pipe shall be rolled and
dropped into the trench.
Spigot of one pipe is carefully centered
into the socket of other pipe.
In some clay soil envelope of 10cm
minimum tamped sand shall be made
around the pipe line.
 Back Filling and Tamping
Back filling must be done carefully to
avoid damages in pipe from falling of
boulders, lifting of pipes from sudden
floods.
Soil under and around the pipe line is
tamped to give continuous supports to
the pipe.
It may be done by tamping rod or
water consolidation.
The initial backfill done for 10cm thick.
THANK YOU.

Weitere ähnliche Inhalte

Was ist angesagt?

LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
ANURAG YADAV
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
saibabu48
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
Tulsiram Bhattarai
 
All About Plumbing
All About PlumbingAll About Plumbing
All About Plumbing
vortexcas
 

Was ist angesagt? (20)

23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure23104790 pipeline-laying-proceedure
23104790 pipeline-laying-proceedure
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Watersupply appurtenances
Watersupply appurtenancesWatersupply appurtenances
Watersupply appurtenances
 
sewer appurtenance
sewer appurtenance  sewer appurtenance
sewer appurtenance
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
 
Tube-Wells and their Designs
Tube-Wells and their DesignsTube-Wells and their Designs
Tube-Wells and their Designs
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Maintenance of water supply
Maintenance of water supplyMaintenance of water supply
Maintenance of water supply
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Dewatering by well point system
Dewatering by well point systemDewatering by well point system
Dewatering by well point system
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
All About Plumbing
All About PlumbingAll About Plumbing
All About Plumbing
 
Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]
 
Plumbing and drainage services
Plumbing and drainage servicesPlumbing and drainage services
Plumbing and drainage services
 

Ähnlich wie PIPE LAYING

The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
Adib Ramli
 

Ähnlich wie PIPE LAYING (20)

7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
Hdpe pipe laying  วิธีฝักกลบท่อ hdpeHdpe pipe laying  วิธีฝักกลบท่อ hdpe
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Canales ( ingles) percy
Canales ( ingles) percyCanales ( ingles) percy
Canales ( ingles) percy
 
Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
 
Dewatering
DewateringDewatering
Dewatering
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 
Gwe paper material
Gwe paper materialGwe paper material
Gwe paper material
 
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Method Statement D Wall
 
Road construction
Road constructionRoad construction
Road construction
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Canals
CanalsCanals
Canals
 
Tunneling
Tunneling Tunneling
Tunneling
 
Trabajo final Hcanal ejercicios resueltos
Trabajo final Hcanal ejercicios resueltosTrabajo final Hcanal ejercicios resueltos
Trabajo final Hcanal ejercicios resueltos
 

Kürzlich hochgeladen

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Kürzlich hochgeladen (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

PIPE LAYING

  • 1. PIPELINE ENGINEERING (3150616) TOPIC: PIPE LAYING NAME:CHAUHAN SHAMJI ENROLLMENT NO:180280106020 SEM 5 DIVISION C , BATCH C2 FACULTY: PROF. N. J. DALAL MA’AM
  • 2. INTRODUCTION The laying of conducting pipes underground, as for water, gas, etc. There are two methods. 1) Onshore methods Open trench pipe laying Plowing Horizontal flush drilling 2) Offshore methods J – lay process S – lay process R- lay process
  • 3. LAYING OF PIPE LINE 1)Detailed map preparation 2)Centre line marking 3)Unloading 4)Storing 5)Cutting 6)Trenches 7)Laying 8)Back filling and tamping
  • 4.  Detailed Map Study Map showing all roads, cables lines, lanes etc. is prepared. Pipe line with size and length is marked. The position of existing pipe lines, curb lines, sewer lines will also be marked.
  • 5.  Center Line Marking Transformation from map to site. Stakes driven at 30m interval on straight line. Stakes will be 7-15m on curves.
  • 6.  Unloading Up to 60kg – 2 persons. Above 60kg – wagon/truck by holding it in rope and slides over planks set not steeper than 45 degree. One pipe at a time. It may use carriers or be dragged or rolled along hard surface.
  • 7.  Storing To avoid damage. It should be stored horizontally. It should be stored in layer.
  • 8.  Cutting Mark with a chalk at the point to cut. Cut with carpenters saw or hack saw. It must be a proper uniform cut.
  • 9.  Trenches It may be done by either hand or machine. It must be done with required gradient and depth. When it is under a road way min. cover of 1m is recommended. Width at the base not less than 200mm on both side of the pipe.
  • 10.  Laying Pipes shall be lowered into the trenches by means of suitable pulley blocks, shear legs, chains, ropes. In no case the pipe shall be rolled and dropped into the trench.
  • 11. Spigot of one pipe is carefully centered into the socket of other pipe. In some clay soil envelope of 10cm minimum tamped sand shall be made around the pipe line.
  • 12.  Back Filling and Tamping Back filling must be done carefully to avoid damages in pipe from falling of boulders, lifting of pipes from sudden floods. Soil under and around the pipe line is tamped to give continuous supports to the pipe.
  • 13. It may be done by tamping rod or water consolidation. The initial backfill done for 10cm thick.