Project report on THDC Hydrop Power Plant Summer Training
1. Tehri Hydro Power Plant
Summer Training Presentation
Charu Kandpal
110970105019
Electrical Engineering
Department of Electrical Engineering
THDC Institute of Hydropower Engineering
and Technology
3. Introduction
TEHRI HYDRO DEVELOPMENT CORPORATION, or
THDC, is a joint venture of the Central
Government and Uttar Pradesh State Government
(Now Uttarakhand Government).
The Tehri Dam is a multi-purpose rock and earth-
fill embankment dam at the confluence of
Bhagirathi and Bhilangna River at Tehri in
Uttarakhand, India. Tehri Hydro Power Projects
comprises of three phases.
THDC IHET16/12/2014
4. 16/12/2014 THDC IHET
Phases of Tehri Hydro Plant
Phases
Phase 1 Phase 2 Phase 3
Tehri HEP
(4X250MW) was
completed in
2006.
Koteshwar HEP
(4X100MW) was
completed in 2012.
(4X250MW)
Pumped storage
Plant of
hydroelectricity
generation is
under
construction.
6. 16/12/2014 THDC IHET
Tehri HEP System Classification
Systems of
HEP
Generation System
Braking System
GIS System Tehri Excitation System
7. THDC IHET
Power Generation
Four Francis Turbines
Through BVC
Four Penstocks
Feeds Four
Turbines
Turbine Rotates Excited Rotor
Water Rotates Turbine Blades
One HRT = Two Penstocks
Water Flows Through HRTs
16/12/2014
According To Faraday’s Law
9. Need of an Excitation System
The basic principle of power generation is when a
magnetic field is moved across a stationary conductor,
Voltage gets induced in the conductor.
Voltage will be induced even if conductor is rotated and
magnetic field is kept stationary .
16/12/2014 THDC IHET
10. THDC IHET
Need of an Excitation System
1
Intensity of the
flux in rotating
magnetic field.
This can be
varied by DC
current
applying to the
electromagnet.
2 3
Length of the
conductor. This
can’t be varied
due to
manufacturing
reasons.
Generator output voltage is affected by the following factors:
Rate at which
flux lines cut
by the
conductor.
This can’t be
changed due
to the const.
speed
16/12/2014
12. THDC IHET
Gas Insulated Switchyard
Power Grid Transmission
Generation
Transformer
GIS
Power Grid
Step Up 15.75 KV into
400 KV
Passed through GIS
Generation occurs at
15.75 KV