NZAID Terms of Reference Guideline
Summary

This tool was revised and approved by the Tools Steering Group on 19 March 08.
Last updated 20/05/08.


        When to apply this document?
This document is a guideline. NZAID Staff are expected to consult and apply this guideline when
developing a Terms of Reference (TOR). Exceptions to this guideline must be discussed with
your manager.



        What does this guideline cover?
This guideline sets out general principles and good practice for the preparation of Terms of
Reference (TOR). It describes the information required, outlines the process for developing TOR
and identifies issues to be considered.

For further guidance on specific assignments see:
Developing Terms of Reference for Reviews and Evaluations
Developing Terms of Reference for MSC and TA


        What will this guideline do?
This guideline helps NZAID staff follow and promote sound principles for developing quality
TOR, and ensuring good development outcomes. The context of each activity/assignment or
task requires careful consideration of the scope, the level of detail. For further assistance, staff
should discuss this with their Team Leader.


        Who is this guideline for?
This guideline is for NZAID staff, our development partners and the contractors engaged to help
us in our work. In developing TOR, the key role of NZAID staff is to ensure a high level of partner
ownership while ensuring NZAID’s own policy, quality assurance, and accountability
requirements are met.




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 2 of 17
Table of Contents


Summary ......................................................................................................................... 2

What are TOR? ............................................................................................................... 4

Terms of Reference – standard format............................................................................ 5

Common requirements in TOR........................................................................................ 6

The process for developing TOR..................................................................................... 9

Annex 1: The TOR process ........................................................................................... 14

Annex 2: Some key points to consider when preparing TOR ........................................ 15

References .................................................................................................................... 17




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                               Page 3 of 17
What are TOR?
Terms of Reference (TOR) state clearly the requirements and expectations of a specific
assignment or contract for services and outline how it is to be implemented.

TOR are an extremely important tool for achieving effective and sustainable development
outcomes. TOR define the scope of work to be undertaken at each stage of the Activity cycle
and it is therefore critical that we get them right from the outset.

It takes time to develop good quality TOR to reflect shared understanding of the context, the
assignment objectives, the approach and the intended development outcome. Stakeholder
engagement is essential in the development of this key document.

The assignment may be undertaken by a contractor, NZAID staff, or a combined team involving
development partners and other donors. NZAID may also be involved in developing TOR for
Activities using our funding but which are to be led and/or managed by our partners. TOR are an
essential component of contract for service documentation and provide a basis for assessing
contractor performance.

TOR can be developed at all stages of the Activity Cycle. Assignments can range from specific
tasks (e.g. assessment of an Activity report) to multi-year management services consultancies.
Although each TOR document is unique, there are a number of common elements in the
information to be included and the process to be followed.

NZAID is a New Zealand public sector agency and as such a number of procurement related
requirements need to be followed in developing TOR. This guideline identifies when and how
they should be applied.




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 4 of 17
Terms of Reference – standard format
This section outlines the standard format expected for NZAID TOR.

Title
The title should be descriptive to people outside of NZAID and contain a “key word” to make a
search easy electronically.

Background (Why?)
A concise and clear statement (1-2 pages) linking the assignment to NZAID’s goal of poverty
elimination, NZAID and partner policy frameworks and the country/regional/sectoral strategy.
The Background should include a brief history of the programme/activity including reference to
any relevant reports/documentation; a summary of other related Activities and/or donor
engagements; any issues or constraints; the rationale for undertaking the current assignment; as
well as outlining Activity governance/management arrangements including the roles of the
partner, post and any governance committee and/or reference group.

Goal (What do we want to achieve?)
A statement providing information on “the bigger picture,” linking the assignment to a
development outcome, and describing the rationale for this.

Objectives (What do we want to know/do?)
Explains why we want to complete this assignment and how this will contribute to the goal. The
objectives (3-4) focus on the issues and/or questions to be addressed in this assignment.

Tasks (What do we need to know/do?)
A number of clearly defined activities to ensure the objective can be achieved. These must
include direction on analysis of mainstreamed and cross-cutting issues, and financial and cost-
benefit analysis.

Methodology (How?)
Describes the approach, reporting relationships and processes required to complete the
assignment.

Team composition, skills and experience (Who?)
Identifies the knowledge, skills, experience of individuals or teams.

Outputs (What and When?)
Assignment outputs reflect the tasks and time frames of the assignment.
E.g. presentations, debriefing, facilitating meetings, written reports


Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 5 of 17
Annexes
Any additional information or documents
Eg correspondence, reports

Drafted by:                                                          Date:
Advice received from:                                                Date:
Approved by:                                                         Date:
Document #:
Comments:                                                            Date:
(eg: content advice comments)




Common requirements in TOR
TOR are developed for a range of different tasks. While most commonly they will guide
assignments to be undertaken by contractors, they also will be required for assignments carried
out by NZAID staff as well as for partner-led, NZAID-funded, Activities. This section of the
Guideline identifies common requirements for NZAID TORs and the key steps the Agency
expects to be followed in the development of TORs.

Level of detail
The level of detail and guidance in the TOR will depend on the scope of the assignment and the
nature of the contract. It is important that lines of communication, expectations by all parties, and
reporting relationships are clear. The TOR must be specific, focused, and agreed by all
stakeholders before the assignment is initiated and any goods and/or services procured.

NOTE: Contractors can only be held accountable for what they have been specifically asked to
do – take time to ensure there are clear links between the goal, the objectives and the tasks.


Approach/methodology
Most TOR include some direction on the preferred approach or methodology expected, although
there will be some exceptions such as for short, task-based assignments. Overly prescriptive
direction on the approach to be followed may also not be appropriate where particularly
technical, specialist expertise is being sought. In general, however, most TOR will need to
ensure that those carrying out the desired tasks:
•   give effect to the overall NZAID goal of poverty elimination,
•   follow specific direction on the integration of mainstreamed and cross-cutting issues
•   use participatory approaches and build partner ownership for the Activity.

If these principles and issues are not explicitly addressed in the TOR, those carrying out the
assignment, particularly external contractors, may fail to adequately consider them and the
desired development outcomes may be compromised.

TOR must ensure that the outcomes sought have a clear poverty elimination focus and are
achieved in ways that advance aid effectiveness according to the Paris Declaration on Aid
Effectiveness.
Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 6 of 17
The Screening Guide for Mainstreamed and Other Cross-cutting Issues should be used to guide
decisions on the particular direction that the TOR should give to ensure that these issues 1 are
appropriately considered. The Screening Guide contains specific questions on each of these
issues.

TOR should also direct attention to ‘value for money’ requiring appropriate financial and/or cost
benefit analysis.

The reporting relationship
The TOR clarify who will manage the contractual and reporting relationships. TOR need to clarify
the roles and responsibilities of the team or individual(s) carrying out the assignment, and to
describe their reporting relationship with those managing any contracts. The TOR state when
and how the assignment team will usually report - to the DPM (Wellington), the NZAID Manager
(in-country), our partners and/or a coordinating committee/ steering group.

TOR should include agreements regarding NZAID and partner commitments in support of this
assignment like participation in field trips, or time frames for feedback on draft reports.

NOTE: It is important not to make any informal commitment regarding contracts or time frames
or outputs before the terms of reference are finalized and the preferred consultants identified.

See Procurement, Contracting & Grant Funding Policy and Managing Consultants for further
information.

Timeframes
TOR need to provide an allocation of time for specific tasks such as:
•  document reading and preparation
•  travel time
•  briefings at Post
•  consultation with stakeholders and organisations
•  report preparation
•  finalisation of a report following debriefing.


Team composition, skills and experience
Most TOR will include a section on team composition, skills and experience.

The success of any assignment is often determined by the degree of ownership by key
stakeholders and by engaging the appropriate contractor(s). During development of the TOR, it
is important to consider:
•    the knowledge, skills, experience and personal attributes required
•    local expertise
•    team composition – gender, off-shore/local balance
•    the involvement of counterparts and/or in-country contractors
•    the need for a reference group.
Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 7 of 17
The majority of assignments will require a team involving partner country participants to confirm
and strengthen partner ownership and leadership. An increasing number of assignments will be
partner led. The range of skills and experience required will depend on the nature of the
assignment. Good local expertise is essential to support effective participatory processes.

Sometimes it may be useful to set up a reference group to provide additional expertise. In these
cases the role of the reference group and the relationship of the contractor need to be clearly
specified in the TOR.

The selection criteria for assignment team members should be specified in the TOR and could
include:

Attributes
•   understanding of NZAID’s goal, policies and operating principles
•   ability to work in a multidisciplinary team
•   commitment to participation of key stakeholders
•   understanding of and commitment to cross-cutting issues.


Skills and experience
•   experience relevant to tasks
•   development knowledge and experience
•   country/regional experience.


Activity planning and management skills
•   analytical and reporting skills
•   facilitation and negotiation skills
•   cross-cultural communication skills
•   institutional strengthening/capacity building skills
•   sector or technical expertise (specific to the assignment)
•   experience in evaluation, research and review.


Team Leader selection
•   wide development experience and knowledge
•   strategic capability
•   previous team leadership experience
•   people management skills
•   demonstrable commitment to NZAID’s policies and principles.

NOTE: During the development of the terms of reference, it is useful to record the date in the
footer to ensure all stakeholders are working with the same version.



Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 8 of 17
Reports
The TOR should state clearly the expected length of the report (usually no more than 20 pages,
excluding appendices) and the timeframes for drafting and finalising the final report.

Written reports are expected to respond to all tasks identified in the TOR.

The written report format might include:
1. Title Page (authors, date, activity, location).
2. Executive Summary (including background, key findings, methodology, recommendations).
3. Main body of the report (description of the background, the stakeholders, results of
   analyses, findings, the key issues, methodology (including who participated, how and at
   what stage), conclusions and recommendations.
4.  Appendices, Glossary, acronyms, Terms of Reference, list of participants and sources of
   data, diagrams, drawings, photographs.

See Structure of Review and Evaluation Reports. See Activity Reporting (in development) for
guidance on report format and content.




The process for developing TOR
There are a number of steps required to initiate, develop and sign off TOR. See diagram in
Annex one: The TOR process.

1. Identify the need
A specific assignment may be initiated by any one of the key stakeholders. Prior to preparing
detailed TOR it is important to discuss and reach agreement between key stakeholders on the
need for the assignment and how best to meet stakeholder expectations.

NZAID staff at post have a key role in managing these preliminary discussions with our partners.
It takes considerable time to clarify and discuss expectations, priorities and the preferred
approach before the detailed terms of reference are drafted on paper. These conversations are
a critical part of the planning process and experience demonstrates that they have a significant
impact on the successful outcomes of the assignment.

2. Initiate discussion with the Programme team
At this planning stage, it is also useful to discuss some of the practical issues like:
•    context and clarity of roles: is the assignment partner- or NZAID-led?
•    the skills required to complete the assignment,
•    any contracting requirements
•    the selection process,
•    how any contracts will be managed,
•    the budget,
•    how the costs will be met,
•    what support is required to ensure the assignment is successful,
Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 9 of 17
•   how responsibility will be shared between post and Wellington,
•   managing risks, and
•   quality assurance.


3. Initiate discussion with all stakeholders
These preliminary meetings can confirm some of the practical issues listed above and agree on:
•  assignment objectives and tasks
•  assignment outputs and milestones
•  contract management
•  reporting relationships
•  team composition

4. Seek advice from Team Leader, SAEG, Contracts
During the drafting stage you are encouraged to seek advice from partners, SAEG advisors,
programme team leaders, and contracts advisors. For workload planning and contract
management advice, Wellington staff are advised to create a draft instruction in Koru during this
preliminary planning stage.

5. Draft TOR
Following these discussions, partners and/or NZAID can draft terms of reference for sign-off in
Wellington. NZAID would encourage our partners to take the lead in developing the TOR and
could support that process by sharing this guideline and adopting a participatory approach to the
drafting task. Take time to work with all stakeholders and agree on the questions, the issues,
and the intended outcomes. A simple, but effective check is to ask if the objectives are:
•   Specific
•   Measurable
•   Achievable
•   Results orientated
•   Time bound

All TOR need to follow the standard format provided in this guideline.

When using the Approved Contractor System, staff are required to follow the templates to
complete Assignment specification and are encouraged to consider the wider issues and
guidance provided in this NZAID tool.

The draft terms of reference can be developed by either the partners and/or NZAID staff. NZAID
encourages our partners to take the lead in developing the TOR and could support that process
by sharing this guideline and adopting a participatory approach to the drafting task.

All stakeholders are expected to actively engage in the drafting process through discussion,
written feedback and drafting text. Investing time to address all issues, resolve concerns, and
pay attention to detail will result in quality terms of reference and satisfactory outcomes. There
are no effective short cuts.

Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 10 of 17
Should the TOR specify that NZAID will purchase goods or services, the Mandatory Rules for
Procurement by Departments, (Ministry of Economic Development, May 2006) apply. These
rules require all NZAID procurement to:
•   enable open and effective competition,
•   encourage full and fair opportunity for potential suppliers,
•   recognize NZ’s international trade obligations and interests
•   result in best value for money.

This requires ensuring that goods or services are specified:
•   in terms of performance and functional requirements, rather than design or descriptive
    characteristics
•   based on international standards, where applicable, or otherwise on national technical
    regulations, recognised national standards, or building codes
•   by using full titles and listing acronyms when they are unavoidable.

Annex 2: Some key points to consider when preparing TOR identifies a number of common
pitfalls in TOR drafting, including those relating to New Zealand public sector procurement rules.

6. Finalise TOR
NOTE: It is advisable and courteous that final drafts of TOR are seen by the advisors involved in
providing advice at step 4.

All stakeholders need to agree on the TOR. In parallel with the development of selection criteria,
the programme team should also have developed weightings to guide the selection process.
These should be agreed by all stakeholders along with the TOR.

The partner government/organisation needs to agree (preferably in writing) with the TOR before
they are finalised and ready for Team Leader approval. This can take considerable time.

NOTE: It is important to plan ahead, to allow adequate time and to maintain ongoing
communication with all stakeholders at every stage of the process from developing terms of
reference through to the conclusion of the assignment.

7. Seek Team Leader Approval
All NZAID managed Terms of Reference are signed off in Wellington. The Team Leader is
responsible for approving all TOR for their direct reports. If the Team Leader is preparing Terms
of Reference then the Director is responsible for approving the TOR.

8. Seek Assistance from your Contracts Adviser
If undertaking a tenders process, arrange a meeting with your Contracts Adviser.

9. Select Contractors




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 11 of 17
10. Negotiate contract and finalise TOR
Amendment of TORs used in supplier selection processes should be avoided. This is because
not all tenderers have had the opportunity to bid against the amended TOR, undermining the
principles of fairness in the process so re-tendering could be required. However, if during
negotiations, minor variations to the TOR (or work plan) are suggested that will better achieve
the objectives of the assignment these may be incorporated into the TOR (or ideally the work
plan).

Any amendments to TOR must be agreed (by all stakeholders) in writing and MSG advised. The
amended TOR must be dated and approved by the same Team Leader, attached to the Koru
workflow, and printed for file.

It is important that any amendments are agreed prior to finalising the contract to avoid
unnecessary variations and ensure better understanding and focus with the contractor.

11. Draft Contract and agree milestones
At this stage you will be required to agree milestones and confirm time frames.

Milestones can be any of the assignment outputs. The outputs may include any of the following:
•   meetings with key stakeholders
•   feedback to key stakeholders e.g. through a workshop or meeting prior to completion
•   draft and/or final report
•   workshops
•   manuals
•   draft TORs
•   strategy documents
•   draft agreements between stakeholders
•   debriefing NZAID and key stakeholders
•   presentation of key findings to stakeholders.

12. Finalise Contract


13. Brief contractor
A detailed briefing ensures shared understanding of objectives, methodology and intended
outcomes. The location of this briefing — in Wellington or at post — will depend upon particular
programme management arrangements. Care should be taken to include key staff in both
locations in briefing arrangements.

During the briefing it is important to ensure that non-NZAID assignment team members,
particularly contractors, are made fully aware of:
•   NZAID’s goal, operating principles , and all relevant policies and strategies, particularly
    those that are mainstreamed or cross-cutting
•   NZAID Activity Cycle Management Guideline and other relevant tools
•   how NZAID works (e.g. NZAID structure, roles and relationships; expectations of the nature
    and amount of contact with the Post while in-country),
Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 12 of 17
•    who they should talk to if they have any problems,
•    key people we expect them to meet,
•    information on the political situation, and any sensitive issues.


Note: If the assignment involves field travel, it is helpful ensure that the Post has briefing notes
to ensure a consistent message,


Briefings should outline the expectations of NZAID and partner for each of the key stages in the
assignment:
1.  Gathering information
    -   Briefings with relevant NZAID staff (Wellington or Post) and others e.g. technical
        advisers or the Management Services Contractor (MSC)) prior to commencing work.
    -   Review of documentation. Partner country and NZAID policies, country strategy paper,
        partner government development plans, other donor Activity documentation where
        appropriate.
    -   Meetings with key stakeholders e.g. partner government officials, beneficiary
        communities - both women and men, NGOs including women’s organisations, other
        donors.
    -   Field visits.

2.   Analysing information

3.   Presenting information for discussion and feedback

4.   Finalising report/findings

NOTE: In general it is good practice to have the assignment team present initial findings to key
stakeholders whilst they are in-country. If this proves difficult, an alternative is to ensure the
team leader returns to discuss the final draft report with key stakeholders.

14. Commence assignment




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 13 of 17
Annex 1: The TOR process
Figure 1: Key steps in the NZAID TOR process

                                 TOR | Terms of Reference Process
      INITIATOR OF TOR                         APPROVER OF TOR
    DPM / DPO (Wgtn)                                                               Contracts Team | CT
                                        Team Leader | Wgtn Manager
 NZAID Manager/DPC (Post)

     1. Identification of need


                          2. Initial discussion with
                                   manager


     3. Stakeholder discussion
    between initiator, wgtn/post
        staff, relevant partner
        organisation to agree
       objectives & outcomes
                                                              4. Seek advice (if required)
                                                                 from sector/technical
                                                                manager, advisors and
                                                                    Contracts Team


                                           Check back with
           5. Draft TOR                     Check back with
                                              advisors
                                               advisors
                                                                   Check back with
                                                                    Check back with
                                                                      advisors
                                                                       advisors
                                6. Finalise TOR (After
                                  agreement with all
                                    stakeholders)




                                            7. Manager approves TOR


                                                                                8. Seek assistance from your
                                                                                      contracts advisor

      9. Select contractor(s)




    10. Negotiate Contract and
                                                                                 11. Draft contract and agree
           finalise TOR
                                                                                          milestones
            (if required)




      13. Brief contractor(s)                                                        12. Finalise contract




    14. Commence assignment




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                                 Page 14 of 17
Annex 2: Some key points to consider when preparing TOR
Good TOR are essential to ensure that providers, NZAID and our partners are clear about the
requirements of an assignment, particularly when TOR define contractual agreements. Problems
may arise if the following issues are not adequately covered:

Clarity of purpose
The assignment team should be able to read the TOR and readily understand the required
outcomes without needing to interpret or seek further advice to resolve ambiguous or unclear
meaning. TOR must clearly define the outputs that are required, by when, by what methods, and
to what standard. If contracting is involved, this will also include the price for which outputs are
required. Unclear or ambiguous expression of TOR requirements, particularly for contractors, is
likely to result in a different understanding of the assignment and risk not achieving the desired
outcomes.

Clarity of tasking
Incomplete or unclear TOR are likely to cause delays in starting the assignment, particularly for
TORs involving contracting or other forms of procurement. These will require additional
discussions, negotiations and re-writing the TOR before the procurement process can begin.
Ambiguous TOR for RFTs can also result in proposals that do not address NZAID’s needs,
leading to the possibility of having to re-tender. Delays in establishing a contract can have
financial implications as well as impact upon operations.

Scoping the assignment
Poorly scoped and written TOR may result in a service provider underestimating the work
required. Subsequent discovery that the work is more complex and challenging than expected
creates risk that the provider will not be able to deliver work on time, or that LOVs will need to be
prepared to extend contracts.

Delivery delays can have serious flow-on effects for programme delivery and partnerships.
Delays can also have financial implications — funding allocated for an assignment or
consequent work, in one financial year cannot always be carried to the next if the assignment
has not be undertaken. Poor TOR can therefore impact on budgets for the next financial year.

Determining the appropriate level of direction
TOR which are overly prescriptive, either in terms of specifics of outputs, or how work should be
undertaken, increase the risk of disputes, failure to achieve desired outcomes, and potentially
limit innovation and competition. NZAID expects all its assignments to be carried out according
to our operating principles and policies. Some of this will require reference in the ‘methodology’
section of the TOR. However some procurements will relate to very technical areas of speciality.
Under these circumstances, while there are occasions where it is appropriate to prescribe
specific methodology, recognised good practice is to specify required outcomes only.




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 15 of 17
The importance of milestones and clear payment schedules
In many cases NZAID links scheduled payments to delivery of milestone achievements. These
must be clearly specified, either in the TOR or accompanying payment schedule. Vague
milestones make it difficult to track progress on contracts, and increase the risk that NZAID will
pay providers for carrying out substandard work, or even for work which has not occurred.

TOR guidance to contractor selection
Poor TOR for contracting can result in difficulty in the contractor selection process, because
information required for assessment and scoring may not be present or clear in the proposals or
tenders received. There are legal risks in these situations. Tendering often involves a lot of
unpaid work for contractors and they expect a fair, transparent, and efficient process from us.
Unsuccessful tenderers for contracts frequently seek justification when their proposals are not
accepted, and they have rights of appeal through legal process if they conclude that fair process
was not followed during selection.

NZAID must be able to demonstrate that an objective assessment was conducted when tenders
were selected. Poor quality TOR can hinder this process.

Implications of New Zealand public sector procurement rules
The NZAID Procurement Policy sets out the expectations for all NZAID procurement (establish
link). In respect of TOR, those being managed by NZAID should not:
•    create unnecessary obstacles to international trade or domestic supply (such as referring to
     a particular specific origin, producer or supplier)
•    require trade mark or trade name, patent, design or type, unless there is no other sufficiently
     precise or intelligible way of describing the procurement requirements unless, in such cases,
     words such as “or equivalent” are included in the tender documentation;
•    seek or accept advice to be used in the preparation or adoption of any TOR for a particular
     procurement from a person that may have an interest in that procurement, if to do so would
     prejudice fair competition
•    use jargon – appropriate suppliers may be turned-off by its use
•    be overly prescriptive or, equally, unfocused as they may limit the number of suppliers able
     to comply.




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 16 of 17
References
Acknowledgements
This guideline draws on the guidelines of a number of other agencies, in particular: AUSAID
Activity Management Guidelines, EC Project Cycle Management Guidelines and DFID Tools for
Development.


Endnotes

1
    Human rights, gender, environment, preventing conflict and building peace, and HIV/AIDS




Guideline: Developing Terms of Reference
Effective from 24 April 2008
DocsOpen tor-new-1322966                   Page 17 of 17

Weitere ähnliche Inhalte

Was ist angesagt?

Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Managementcgautam
 
How to make your PMO tool Implementation successful and deliver real busines...
 How to make your PMO tool Implementation successful and deliver real busines... How to make your PMO tool Implementation successful and deliver real busines...
How to make your PMO tool Implementation successful and deliver real busines...Association for Project Management
 
Manage complex projects to success using CMMI, Lean and Scrum
Manage complex projects to success using CMMI, Lean and ScrumManage complex projects to success using CMMI, Lean and Scrum
Manage complex projects to success using CMMI, Lean and ScrumSystematic
 
The Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipThe Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipLitheSpeed
 
Reporting Within a PMO
Reporting Within a PMOReporting Within a PMO
Reporting Within a PMOBoxalln
 
DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...Association for Project Management
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projecDr. Johnson Mavole
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0Wrike
 
The Rules of Lean Project Management
The Rules of Lean Project ManagementThe Rules of Lean Project Management
The Rules of Lean Project ManagementClaude Emond
 
Project Portfolio Management 2015
Project Portfolio Management 2015Project Portfolio Management 2015
Project Portfolio Management 2015Peter Schellinck
 

Was ist angesagt? (20)

Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
How to make your PMO tool Implementation successful and deliver real busines...
 How to make your PMO tool Implementation successful and deliver real busines... How to make your PMO tool Implementation successful and deliver real busines...
How to make your PMO tool Implementation successful and deliver real busines...
 
Manage complex projects to success using CMMI, Lean and Scrum
Manage complex projects to success using CMMI, Lean and ScrumManage complex projects to success using CMMI, Lean and Scrum
Manage complex projects to success using CMMI, Lean and Scrum
 
The Practice of planning and the PMO, John Barben
The Practice of planning and the PMO, John BarbenThe Practice of planning and the PMO, John Barben
The Practice of planning and the PMO, John Barben
 
The Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipThe Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive Leadership
 
Reporting Within a PMO
Reporting Within a PMOReporting Within a PMO
Reporting Within a PMO
 
DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...
 
Governance of project management, 23 March 2017
Governance of project management, 23 March 2017Governance of project management, 23 March 2017
Governance of project management, 23 March 2017
 
PMI Chicago Agile PMO Michael Nir
PMI Chicago Agile PMO Michael NirPMI Chicago Agile PMO Michael Nir
PMI Chicago Agile PMO Michael Nir
 
The Next Generation PMO
The Next Generation PMOThe Next Generation PMO
The Next Generation PMO
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projec
 
To be agile or not to be, that is not the question webinar
To be agile or not to be, that is not the question webinarTo be agile or not to be, that is not the question webinar
To be agile or not to be, that is not the question webinar
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0
 
Lean PMO in everyday agile
Lean PMO in everyday agileLean PMO in everyday agile
Lean PMO in everyday agile
 
Apm body of knowledge 6th edition
Apm body of knowledge 6th editionApm body of knowledge 6th edition
Apm body of knowledge 6th edition
 
The Rules of Lean Project Management
The Rules of Lean Project ManagementThe Rules of Lean Project Management
The Rules of Lean Project Management
 
Changing your ways, APM Enabling Change SIG, 17th November 2015
Changing your ways, APM Enabling Change SIG, 17th November 2015Changing your ways, APM Enabling Change SIG, 17th November 2015
Changing your ways, APM Enabling Change SIG, 17th November 2015
 
The Agile PMO PMI Pittsburgh Michael Nir
The Agile PMO PMI Pittsburgh Michael Nir The Agile PMO PMI Pittsburgh Michael Nir
The Agile PMO PMI Pittsburgh Michael Nir
 
Project Portfolio Management 2015
Project Portfolio Management 2015Project Portfolio Management 2015
Project Portfolio Management 2015
 
The agile PMO - Agile Business Conference 10.2014 London Michael nir
The agile PMO - Agile Business Conference 10.2014 London Michael nir   The agile PMO - Agile Business Conference 10.2014 London Michael nir
The agile PMO - Agile Business Conference 10.2014 London Michael nir
 

Andere mochten auch

Iaf Basic Outline 27 06 04 07 10
Iaf Basic Outline 27 06  04 07 10Iaf Basic Outline 27 06  04 07 10
Iaf Basic Outline 27 06 04 07 10Change Workshop
 
Political Parties In The 21st Century
Political Parties In The 21st CenturyPolitical Parties In The 21st Century
Political Parties In The 21st CenturyChange Workshop
 
Presentation on German Elections Results 2009 by Rainer Heufers
Presentation on German Elections Results 2009 by Rainer HeufersPresentation on German Elections Results 2009 by Rainer Heufers
Presentation on German Elections Results 2009 by Rainer HeufersChange Workshop
 
Property Rights Videos "Street vendors in Jakarta
Property Rights Videos "Street vendors in JakartaProperty Rights Videos "Street vendors in Jakarta
Property Rights Videos "Street vendors in JakartaChange Workshop
 
Political Parties In The 21st Century
Political Parties In The 21st CenturyPolitical Parties In The 21st Century
Political Parties In The 21st CenturyChange Workshop
 
Thailand Peoples Participation Dialogue Final
Thailand Peoples Participation Dialogue FinalThailand Peoples Participation Dialogue Final
Thailand Peoples Participation Dialogue FinalChange Workshop
 

Andere mochten auch (8)

Th Website.Ppt Edited
Th Website.Ppt EditedTh Website.Ppt Edited
Th Website.Ppt Edited
 
Iaf Basic Outline 27 06 04 07 10
Iaf Basic Outline 27 06  04 07 10Iaf Basic Outline 27 06  04 07 10
Iaf Basic Outline 27 06 04 07 10
 
Political Parties In The 21st Century
Political Parties In The 21st CenturyPolitical Parties In The 21st Century
Political Parties In The 21st Century
 
Glossar de eng
Glossar de engGlossar de eng
Glossar de eng
 
Presentation on German Elections Results 2009 by Rainer Heufers
Presentation on German Elections Results 2009 by Rainer HeufersPresentation on German Elections Results 2009 by Rainer Heufers
Presentation on German Elections Results 2009 by Rainer Heufers
 
Property Rights Videos "Street vendors in Jakarta
Property Rights Videos "Street vendors in JakartaProperty Rights Videos "Street vendors in Jakarta
Property Rights Videos "Street vendors in Jakarta
 
Political Parties In The 21st Century
Political Parties In The 21st CenturyPolitical Parties In The 21st Century
Political Parties In The 21st Century
 
Thailand Peoples Participation Dialogue Final
Thailand Peoples Participation Dialogue FinalThailand Peoples Participation Dialogue Final
Thailand Peoples Participation Dialogue Final
 

Ähnlich wie Tor New 1322966

Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity ModelNoel Hatch
 
the-outsourcing-handbook-a-guide-to-outsourcing
the-outsourcing-handbook-a-guide-to-outsourcingthe-outsourcing-handbook-a-guide-to-outsourcing
the-outsourcing-handbook-a-guide-to-outsourcingTeam Lead
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process GroupsTechNoleGirl
 
ILO Inception Report Checklist.pdf
ILO Inception Report Checklist.pdfILO Inception Report Checklist.pdf
ILO Inception Report Checklist.pdfBrianBeauttah
 
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Association for Project Management
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guideeuwebsc01
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guideeuwebtc01
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guideeuweben01
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersRudreshSamant
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
about start up for you 5
about start up for you 5about start up for you 5
about start up for you 5aliaalistartup
 
Riskallocationmodel
RiskallocationmodelRiskallocationmodel
RiskallocationmodelMartin Ellis
 
scope-statement-sample.doc
scope-statement-sample.docscope-statement-sample.doc
scope-statement-sample.docAhsanRahman13
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...GlobalSkillup
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract managementRichard Austin
 

Ähnlich wie Tor New 1322966 (20)

Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity Model
 
the-outsourcing-handbook-a-guide-to-outsourcing
the-outsourcing-handbook-a-guide-to-outsourcingthe-outsourcing-handbook-a-guide-to-outsourcing
the-outsourcing-handbook-a-guide-to-outsourcing
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 
ILO Inception Report Checklist.pdf
ILO Inception Report Checklist.pdfILO Inception Report Checklist.pdf
ILO Inception Report Checklist.pdf
 
Scope definition
Scope definitionScope definition
Scope definition
 
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guide
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guide
 
Business Case Guide
Business Case GuideBusiness Case Guide
Business Case Guide
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
about start up for you 5
about start up for you 5about start up for you 5
about start up for you 5
 
Riskallocationmodel
RiskallocationmodelRiskallocationmodel
Riskallocationmodel
 
Ch04
Ch04Ch04
Ch04
 
scope-statement-sample.doc
scope-statement-sample.docscope-statement-sample.doc
scope-statement-sample.doc
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
 
Agile contracting- APM Contracts and Procurement SIG, July 2016
Agile contracting- APM Contracts and Procurement SIG, July 2016Agile contracting- APM Contracts and Procurement SIG, July 2016
Agile contracting- APM Contracts and Procurement SIG, July 2016
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract management
 

Mehr von Change Workshop

Jonathan Gullible (by Ken Schoolland)
Jonathan Gullible (by Ken Schoolland)Jonathan Gullible (by Ken Schoolland)
Jonathan Gullible (by Ken Schoolland)Change Workshop
 
Internal email communication guidelines
Internal email communication guidelinesInternal email communication guidelines
Internal email communication guidelinesChange Workshop
 
Bmz organisationsplan de
Bmz organisationsplan deBmz organisationsplan de
Bmz organisationsplan deChange Workshop
 
Does city planning need a bigger picture?
Does city planning need a bigger picture? Does city planning need a bigger picture?
Does city planning need a bigger picture? Change Workshop
 
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...Change Workshop
 
Strategy of the fnf for its activities abroad
Strategy of the fnf for its activities abroadStrategy of the fnf for its activities abroad
Strategy of the fnf for its activities abroadChange Workshop
 
Iaf Basic Outline 27 06 04 07 10
Iaf Basic Outline 27 06  04 07 10Iaf Basic Outline 27 06  04 07 10
Iaf Basic Outline 27 06 04 07 10Change Workshop
 
Draft Workshop Concept Vs01
Draft Workshop Concept Vs01Draft Workshop Concept Vs01
Draft Workshop Concept Vs01Change Workshop
 
Candidate Schools Objectives And Aims
Candidate Schools Objectives And AimsCandidate Schools Objectives And Aims
Candidate Schools Objectives And AimsChange Workshop
 
Final WZ Referententagung
Final WZ ReferententagungFinal WZ Referententagung
Final WZ ReferententagungChange Workshop
 
German Parliamentary Elections 2009 (Mr. Rainer Heufers)
German Parliamentary Elections 2009 (Mr. Rainer Heufers)German Parliamentary Elections 2009 (Mr. Rainer Heufers)
German Parliamentary Elections 2009 (Mr. Rainer Heufers)Change Workshop
 
Visiting Programme Malaysian Group
Visiting Programme Malaysian Group Visiting Programme Malaysian Group
Visiting Programme Malaysian Group Change Workshop
 
Political System And Party Coalitions In Germany
Political System And Party Coalitions In GermanyPolitical System And Party Coalitions In Germany
Political System And Party Coalitions In GermanyChange Workshop
 
Presentation on Liberal Society
Presentation on Liberal Society Presentation on Liberal Society
Presentation on Liberal Society Change Workshop
 

Mehr von Change Workshop (20)

Jonathan Gullible (by Ken Schoolland)
Jonathan Gullible (by Ken Schoolland)Jonathan Gullible (by Ken Schoolland)
Jonathan Gullible (by Ken Schoolland)
 
Internal email communication guidelines
Internal email communication guidelinesInternal email communication guidelines
Internal email communication guidelines
 
Bmz organisationsplan de
Bmz organisationsplan deBmz organisationsplan de
Bmz organisationsplan de
 
Does city planning need a bigger picture?
Does city planning need a bigger picture? Does city planning need a bigger picture?
Does city planning need a bigger picture?
 
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...
Problems and new trends of land ownership and tenure ( ppt for cau 11 j une 2...
 
Fnf neue broschuere
Fnf neue broschuereFnf neue broschuere
Fnf neue broschuere
 
Strategy of the fnf for its activities abroad
Strategy of the fnf for its activities abroadStrategy of the fnf for its activities abroad
Strategy of the fnf for its activities abroad
 
Iaf Basic Outline 27 06 04 07 10
Iaf Basic Outline 27 06  04 07 10Iaf Basic Outline 27 06  04 07 10
Iaf Basic Outline 27 06 04 07 10
 
Draft Workshop Concept Vs01
Draft Workshop Concept Vs01Draft Workshop Concept Vs01
Draft Workshop Concept Vs01
 
Candidate Schools Objectives And Aims
Candidate Schools Objectives And AimsCandidate Schools Objectives And Aims
Candidate Schools Objectives And Aims
 
Final WZ Referententagung
Final WZ ReferententagungFinal WZ Referententagung
Final WZ Referententagung
 
Freedom.Barometer3
Freedom.Barometer3Freedom.Barometer3
Freedom.Barometer3
 
German Parliamentary Elections 2009 (Mr. Rainer Heufers)
German Parliamentary Elections 2009 (Mr. Rainer Heufers)German Parliamentary Elections 2009 (Mr. Rainer Heufers)
German Parliamentary Elections 2009 (Mr. Rainer Heufers)
 
A Nation Of SMEs
A Nation Of SMEsA Nation Of SMEs
A Nation Of SMEs
 
Bp Malaysia25 June
Bp Malaysia25 JuneBp Malaysia25 June
Bp Malaysia25 June
 
Visiting Programme Malaysian Group
Visiting Programme Malaysian Group Visiting Programme Malaysian Group
Visiting Programme Malaysian Group
 
Political System And Party Coalitions In Germany
Political System And Party Coalitions In GermanyPolitical System And Party Coalitions In Germany
Political System And Party Coalitions In Germany
 
Indonesien Wahl 2009
Indonesien Wahl 2009Indonesien Wahl 2009
Indonesien Wahl 2009
 
Presentation on Liberal Society
Presentation on Liberal Society Presentation on Liberal Society
Presentation on Liberal Society
 
Regional Website
Regional WebsiteRegional Website
Regional Website
 

Kürzlich hochgeladen

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Kürzlich hochgeladen (20)

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

Tor New 1322966

  • 1. NZAID Terms of Reference Guideline
  • 2. Summary This tool was revised and approved by the Tools Steering Group on 19 March 08. Last updated 20/05/08. When to apply this document? This document is a guideline. NZAID Staff are expected to consult and apply this guideline when developing a Terms of Reference (TOR). Exceptions to this guideline must be discussed with your manager. What does this guideline cover? This guideline sets out general principles and good practice for the preparation of Terms of Reference (TOR). It describes the information required, outlines the process for developing TOR and identifies issues to be considered. For further guidance on specific assignments see: Developing Terms of Reference for Reviews and Evaluations Developing Terms of Reference for MSC and TA What will this guideline do? This guideline helps NZAID staff follow and promote sound principles for developing quality TOR, and ensuring good development outcomes. The context of each activity/assignment or task requires careful consideration of the scope, the level of detail. For further assistance, staff should discuss this with their Team Leader. Who is this guideline for? This guideline is for NZAID staff, our development partners and the contractors engaged to help us in our work. In developing TOR, the key role of NZAID staff is to ensure a high level of partner ownership while ensuring NZAID’s own policy, quality assurance, and accountability requirements are met. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 2 of 17
  • 3. Table of Contents Summary ......................................................................................................................... 2 What are TOR? ............................................................................................................... 4 Terms of Reference – standard format............................................................................ 5 Common requirements in TOR........................................................................................ 6 The process for developing TOR..................................................................................... 9 Annex 1: The TOR process ........................................................................................... 14 Annex 2: Some key points to consider when preparing TOR ........................................ 15 References .................................................................................................................... 17 Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 3 of 17
  • 4. What are TOR? Terms of Reference (TOR) state clearly the requirements and expectations of a specific assignment or contract for services and outline how it is to be implemented. TOR are an extremely important tool for achieving effective and sustainable development outcomes. TOR define the scope of work to be undertaken at each stage of the Activity cycle and it is therefore critical that we get them right from the outset. It takes time to develop good quality TOR to reflect shared understanding of the context, the assignment objectives, the approach and the intended development outcome. Stakeholder engagement is essential in the development of this key document. The assignment may be undertaken by a contractor, NZAID staff, or a combined team involving development partners and other donors. NZAID may also be involved in developing TOR for Activities using our funding but which are to be led and/or managed by our partners. TOR are an essential component of contract for service documentation and provide a basis for assessing contractor performance. TOR can be developed at all stages of the Activity Cycle. Assignments can range from specific tasks (e.g. assessment of an Activity report) to multi-year management services consultancies. Although each TOR document is unique, there are a number of common elements in the information to be included and the process to be followed. NZAID is a New Zealand public sector agency and as such a number of procurement related requirements need to be followed in developing TOR. This guideline identifies when and how they should be applied. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 4 of 17
  • 5. Terms of Reference – standard format This section outlines the standard format expected for NZAID TOR. Title The title should be descriptive to people outside of NZAID and contain a “key word” to make a search easy electronically. Background (Why?) A concise and clear statement (1-2 pages) linking the assignment to NZAID’s goal of poverty elimination, NZAID and partner policy frameworks and the country/regional/sectoral strategy. The Background should include a brief history of the programme/activity including reference to any relevant reports/documentation; a summary of other related Activities and/or donor engagements; any issues or constraints; the rationale for undertaking the current assignment; as well as outlining Activity governance/management arrangements including the roles of the partner, post and any governance committee and/or reference group. Goal (What do we want to achieve?) A statement providing information on “the bigger picture,” linking the assignment to a development outcome, and describing the rationale for this. Objectives (What do we want to know/do?) Explains why we want to complete this assignment and how this will contribute to the goal. The objectives (3-4) focus on the issues and/or questions to be addressed in this assignment. Tasks (What do we need to know/do?) A number of clearly defined activities to ensure the objective can be achieved. These must include direction on analysis of mainstreamed and cross-cutting issues, and financial and cost- benefit analysis. Methodology (How?) Describes the approach, reporting relationships and processes required to complete the assignment. Team composition, skills and experience (Who?) Identifies the knowledge, skills, experience of individuals or teams. Outputs (What and When?) Assignment outputs reflect the tasks and time frames of the assignment. E.g. presentations, debriefing, facilitating meetings, written reports Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 5 of 17
  • 6. Annexes Any additional information or documents Eg correspondence, reports Drafted by: Date: Advice received from: Date: Approved by: Date: Document #: Comments: Date: (eg: content advice comments) Common requirements in TOR TOR are developed for a range of different tasks. While most commonly they will guide assignments to be undertaken by contractors, they also will be required for assignments carried out by NZAID staff as well as for partner-led, NZAID-funded, Activities. This section of the Guideline identifies common requirements for NZAID TORs and the key steps the Agency expects to be followed in the development of TORs. Level of detail The level of detail and guidance in the TOR will depend on the scope of the assignment and the nature of the contract. It is important that lines of communication, expectations by all parties, and reporting relationships are clear. The TOR must be specific, focused, and agreed by all stakeholders before the assignment is initiated and any goods and/or services procured. NOTE: Contractors can only be held accountable for what they have been specifically asked to do – take time to ensure there are clear links between the goal, the objectives and the tasks. Approach/methodology Most TOR include some direction on the preferred approach or methodology expected, although there will be some exceptions such as for short, task-based assignments. Overly prescriptive direction on the approach to be followed may also not be appropriate where particularly technical, specialist expertise is being sought. In general, however, most TOR will need to ensure that those carrying out the desired tasks: • give effect to the overall NZAID goal of poverty elimination, • follow specific direction on the integration of mainstreamed and cross-cutting issues • use participatory approaches and build partner ownership for the Activity. If these principles and issues are not explicitly addressed in the TOR, those carrying out the assignment, particularly external contractors, may fail to adequately consider them and the desired development outcomes may be compromised. TOR must ensure that the outcomes sought have a clear poverty elimination focus and are achieved in ways that advance aid effectiveness according to the Paris Declaration on Aid Effectiveness. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 6 of 17
  • 7. The Screening Guide for Mainstreamed and Other Cross-cutting Issues should be used to guide decisions on the particular direction that the TOR should give to ensure that these issues 1 are appropriately considered. The Screening Guide contains specific questions on each of these issues. TOR should also direct attention to ‘value for money’ requiring appropriate financial and/or cost benefit analysis. The reporting relationship The TOR clarify who will manage the contractual and reporting relationships. TOR need to clarify the roles and responsibilities of the team or individual(s) carrying out the assignment, and to describe their reporting relationship with those managing any contracts. The TOR state when and how the assignment team will usually report - to the DPM (Wellington), the NZAID Manager (in-country), our partners and/or a coordinating committee/ steering group. TOR should include agreements regarding NZAID and partner commitments in support of this assignment like participation in field trips, or time frames for feedback on draft reports. NOTE: It is important not to make any informal commitment regarding contracts or time frames or outputs before the terms of reference are finalized and the preferred consultants identified. See Procurement, Contracting & Grant Funding Policy and Managing Consultants for further information. Timeframes TOR need to provide an allocation of time for specific tasks such as: • document reading and preparation • travel time • briefings at Post • consultation with stakeholders and organisations • report preparation • finalisation of a report following debriefing. Team composition, skills and experience Most TOR will include a section on team composition, skills and experience. The success of any assignment is often determined by the degree of ownership by key stakeholders and by engaging the appropriate contractor(s). During development of the TOR, it is important to consider: • the knowledge, skills, experience and personal attributes required • local expertise • team composition – gender, off-shore/local balance • the involvement of counterparts and/or in-country contractors • the need for a reference group. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 7 of 17
  • 8. The majority of assignments will require a team involving partner country participants to confirm and strengthen partner ownership and leadership. An increasing number of assignments will be partner led. The range of skills and experience required will depend on the nature of the assignment. Good local expertise is essential to support effective participatory processes. Sometimes it may be useful to set up a reference group to provide additional expertise. In these cases the role of the reference group and the relationship of the contractor need to be clearly specified in the TOR. The selection criteria for assignment team members should be specified in the TOR and could include: Attributes • understanding of NZAID’s goal, policies and operating principles • ability to work in a multidisciplinary team • commitment to participation of key stakeholders • understanding of and commitment to cross-cutting issues. Skills and experience • experience relevant to tasks • development knowledge and experience • country/regional experience. Activity planning and management skills • analytical and reporting skills • facilitation and negotiation skills • cross-cultural communication skills • institutional strengthening/capacity building skills • sector or technical expertise (specific to the assignment) • experience in evaluation, research and review. Team Leader selection • wide development experience and knowledge • strategic capability • previous team leadership experience • people management skills • demonstrable commitment to NZAID’s policies and principles. NOTE: During the development of the terms of reference, it is useful to record the date in the footer to ensure all stakeholders are working with the same version. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 8 of 17
  • 9. Reports The TOR should state clearly the expected length of the report (usually no more than 20 pages, excluding appendices) and the timeframes for drafting and finalising the final report. Written reports are expected to respond to all tasks identified in the TOR. The written report format might include: 1. Title Page (authors, date, activity, location). 2. Executive Summary (including background, key findings, methodology, recommendations). 3. Main body of the report (description of the background, the stakeholders, results of analyses, findings, the key issues, methodology (including who participated, how and at what stage), conclusions and recommendations. 4. Appendices, Glossary, acronyms, Terms of Reference, list of participants and sources of data, diagrams, drawings, photographs. See Structure of Review and Evaluation Reports. See Activity Reporting (in development) for guidance on report format and content. The process for developing TOR There are a number of steps required to initiate, develop and sign off TOR. See diagram in Annex one: The TOR process. 1. Identify the need A specific assignment may be initiated by any one of the key stakeholders. Prior to preparing detailed TOR it is important to discuss and reach agreement between key stakeholders on the need for the assignment and how best to meet stakeholder expectations. NZAID staff at post have a key role in managing these preliminary discussions with our partners. It takes considerable time to clarify and discuss expectations, priorities and the preferred approach before the detailed terms of reference are drafted on paper. These conversations are a critical part of the planning process and experience demonstrates that they have a significant impact on the successful outcomes of the assignment. 2. Initiate discussion with the Programme team At this planning stage, it is also useful to discuss some of the practical issues like: • context and clarity of roles: is the assignment partner- or NZAID-led? • the skills required to complete the assignment, • any contracting requirements • the selection process, • how any contracts will be managed, • the budget, • how the costs will be met, • what support is required to ensure the assignment is successful, Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 9 of 17
  • 10. how responsibility will be shared between post and Wellington, • managing risks, and • quality assurance. 3. Initiate discussion with all stakeholders These preliminary meetings can confirm some of the practical issues listed above and agree on: • assignment objectives and tasks • assignment outputs and milestones • contract management • reporting relationships • team composition 4. Seek advice from Team Leader, SAEG, Contracts During the drafting stage you are encouraged to seek advice from partners, SAEG advisors, programme team leaders, and contracts advisors. For workload planning and contract management advice, Wellington staff are advised to create a draft instruction in Koru during this preliminary planning stage. 5. Draft TOR Following these discussions, partners and/or NZAID can draft terms of reference for sign-off in Wellington. NZAID would encourage our partners to take the lead in developing the TOR and could support that process by sharing this guideline and adopting a participatory approach to the drafting task. Take time to work with all stakeholders and agree on the questions, the issues, and the intended outcomes. A simple, but effective check is to ask if the objectives are: • Specific • Measurable • Achievable • Results orientated • Time bound All TOR need to follow the standard format provided in this guideline. When using the Approved Contractor System, staff are required to follow the templates to complete Assignment specification and are encouraged to consider the wider issues and guidance provided in this NZAID tool. The draft terms of reference can be developed by either the partners and/or NZAID staff. NZAID encourages our partners to take the lead in developing the TOR and could support that process by sharing this guideline and adopting a participatory approach to the drafting task. All stakeholders are expected to actively engage in the drafting process through discussion, written feedback and drafting text. Investing time to address all issues, resolve concerns, and pay attention to detail will result in quality terms of reference and satisfactory outcomes. There are no effective short cuts. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 10 of 17
  • 11. Should the TOR specify that NZAID will purchase goods or services, the Mandatory Rules for Procurement by Departments, (Ministry of Economic Development, May 2006) apply. These rules require all NZAID procurement to: • enable open and effective competition, • encourage full and fair opportunity for potential suppliers, • recognize NZ’s international trade obligations and interests • result in best value for money. This requires ensuring that goods or services are specified: • in terms of performance and functional requirements, rather than design or descriptive characteristics • based on international standards, where applicable, or otherwise on national technical regulations, recognised national standards, or building codes • by using full titles and listing acronyms when they are unavoidable. Annex 2: Some key points to consider when preparing TOR identifies a number of common pitfalls in TOR drafting, including those relating to New Zealand public sector procurement rules. 6. Finalise TOR NOTE: It is advisable and courteous that final drafts of TOR are seen by the advisors involved in providing advice at step 4. All stakeholders need to agree on the TOR. In parallel with the development of selection criteria, the programme team should also have developed weightings to guide the selection process. These should be agreed by all stakeholders along with the TOR. The partner government/organisation needs to agree (preferably in writing) with the TOR before they are finalised and ready for Team Leader approval. This can take considerable time. NOTE: It is important to plan ahead, to allow adequate time and to maintain ongoing communication with all stakeholders at every stage of the process from developing terms of reference through to the conclusion of the assignment. 7. Seek Team Leader Approval All NZAID managed Terms of Reference are signed off in Wellington. The Team Leader is responsible for approving all TOR for their direct reports. If the Team Leader is preparing Terms of Reference then the Director is responsible for approving the TOR. 8. Seek Assistance from your Contracts Adviser If undertaking a tenders process, arrange a meeting with your Contracts Adviser. 9. Select Contractors Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 11 of 17
  • 12. 10. Negotiate contract and finalise TOR Amendment of TORs used in supplier selection processes should be avoided. This is because not all tenderers have had the opportunity to bid against the amended TOR, undermining the principles of fairness in the process so re-tendering could be required. However, if during negotiations, minor variations to the TOR (or work plan) are suggested that will better achieve the objectives of the assignment these may be incorporated into the TOR (or ideally the work plan). Any amendments to TOR must be agreed (by all stakeholders) in writing and MSG advised. The amended TOR must be dated and approved by the same Team Leader, attached to the Koru workflow, and printed for file. It is important that any amendments are agreed prior to finalising the contract to avoid unnecessary variations and ensure better understanding and focus with the contractor. 11. Draft Contract and agree milestones At this stage you will be required to agree milestones and confirm time frames. Milestones can be any of the assignment outputs. The outputs may include any of the following: • meetings with key stakeholders • feedback to key stakeholders e.g. through a workshop or meeting prior to completion • draft and/or final report • workshops • manuals • draft TORs • strategy documents • draft agreements between stakeholders • debriefing NZAID and key stakeholders • presentation of key findings to stakeholders. 12. Finalise Contract 13. Brief contractor A detailed briefing ensures shared understanding of objectives, methodology and intended outcomes. The location of this briefing — in Wellington or at post — will depend upon particular programme management arrangements. Care should be taken to include key staff in both locations in briefing arrangements. During the briefing it is important to ensure that non-NZAID assignment team members, particularly contractors, are made fully aware of: • NZAID’s goal, operating principles , and all relevant policies and strategies, particularly those that are mainstreamed or cross-cutting • NZAID Activity Cycle Management Guideline and other relevant tools • how NZAID works (e.g. NZAID structure, roles and relationships; expectations of the nature and amount of contact with the Post while in-country), Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 12 of 17
  • 13. who they should talk to if they have any problems, • key people we expect them to meet, • information on the political situation, and any sensitive issues. Note: If the assignment involves field travel, it is helpful ensure that the Post has briefing notes to ensure a consistent message, Briefings should outline the expectations of NZAID and partner for each of the key stages in the assignment: 1. Gathering information - Briefings with relevant NZAID staff (Wellington or Post) and others e.g. technical advisers or the Management Services Contractor (MSC)) prior to commencing work. - Review of documentation. Partner country and NZAID policies, country strategy paper, partner government development plans, other donor Activity documentation where appropriate. - Meetings with key stakeholders e.g. partner government officials, beneficiary communities - both women and men, NGOs including women’s organisations, other donors. - Field visits. 2. Analysing information 3. Presenting information for discussion and feedback 4. Finalising report/findings NOTE: In general it is good practice to have the assignment team present initial findings to key stakeholders whilst they are in-country. If this proves difficult, an alternative is to ensure the team leader returns to discuss the final draft report with key stakeholders. 14. Commence assignment Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 13 of 17
  • 14. Annex 1: The TOR process Figure 1: Key steps in the NZAID TOR process TOR | Terms of Reference Process INITIATOR OF TOR APPROVER OF TOR DPM / DPO (Wgtn) Contracts Team | CT Team Leader | Wgtn Manager NZAID Manager/DPC (Post) 1. Identification of need 2. Initial discussion with manager 3. Stakeholder discussion between initiator, wgtn/post staff, relevant partner organisation to agree objectives & outcomes 4. Seek advice (if required) from sector/technical manager, advisors and Contracts Team Check back with 5. Draft TOR Check back with advisors advisors Check back with Check back with advisors advisors 6. Finalise TOR (After agreement with all stakeholders) 7. Manager approves TOR 8. Seek assistance from your contracts advisor 9. Select contractor(s) 10. Negotiate Contract and 11. Draft contract and agree finalise TOR milestones (if required) 13. Brief contractor(s) 12. Finalise contract 14. Commence assignment Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 14 of 17
  • 15. Annex 2: Some key points to consider when preparing TOR Good TOR are essential to ensure that providers, NZAID and our partners are clear about the requirements of an assignment, particularly when TOR define contractual agreements. Problems may arise if the following issues are not adequately covered: Clarity of purpose The assignment team should be able to read the TOR and readily understand the required outcomes without needing to interpret or seek further advice to resolve ambiguous or unclear meaning. TOR must clearly define the outputs that are required, by when, by what methods, and to what standard. If contracting is involved, this will also include the price for which outputs are required. Unclear or ambiguous expression of TOR requirements, particularly for contractors, is likely to result in a different understanding of the assignment and risk not achieving the desired outcomes. Clarity of tasking Incomplete or unclear TOR are likely to cause delays in starting the assignment, particularly for TORs involving contracting or other forms of procurement. These will require additional discussions, negotiations and re-writing the TOR before the procurement process can begin. Ambiguous TOR for RFTs can also result in proposals that do not address NZAID’s needs, leading to the possibility of having to re-tender. Delays in establishing a contract can have financial implications as well as impact upon operations. Scoping the assignment Poorly scoped and written TOR may result in a service provider underestimating the work required. Subsequent discovery that the work is more complex and challenging than expected creates risk that the provider will not be able to deliver work on time, or that LOVs will need to be prepared to extend contracts. Delivery delays can have serious flow-on effects for programme delivery and partnerships. Delays can also have financial implications — funding allocated for an assignment or consequent work, in one financial year cannot always be carried to the next if the assignment has not be undertaken. Poor TOR can therefore impact on budgets for the next financial year. Determining the appropriate level of direction TOR which are overly prescriptive, either in terms of specifics of outputs, or how work should be undertaken, increase the risk of disputes, failure to achieve desired outcomes, and potentially limit innovation and competition. NZAID expects all its assignments to be carried out according to our operating principles and policies. Some of this will require reference in the ‘methodology’ section of the TOR. However some procurements will relate to very technical areas of speciality. Under these circumstances, while there are occasions where it is appropriate to prescribe specific methodology, recognised good practice is to specify required outcomes only. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 15 of 17
  • 16. The importance of milestones and clear payment schedules In many cases NZAID links scheduled payments to delivery of milestone achievements. These must be clearly specified, either in the TOR or accompanying payment schedule. Vague milestones make it difficult to track progress on contracts, and increase the risk that NZAID will pay providers for carrying out substandard work, or even for work which has not occurred. TOR guidance to contractor selection Poor TOR for contracting can result in difficulty in the contractor selection process, because information required for assessment and scoring may not be present or clear in the proposals or tenders received. There are legal risks in these situations. Tendering often involves a lot of unpaid work for contractors and they expect a fair, transparent, and efficient process from us. Unsuccessful tenderers for contracts frequently seek justification when their proposals are not accepted, and they have rights of appeal through legal process if they conclude that fair process was not followed during selection. NZAID must be able to demonstrate that an objective assessment was conducted when tenders were selected. Poor quality TOR can hinder this process. Implications of New Zealand public sector procurement rules The NZAID Procurement Policy sets out the expectations for all NZAID procurement (establish link). In respect of TOR, those being managed by NZAID should not: • create unnecessary obstacles to international trade or domestic supply (such as referring to a particular specific origin, producer or supplier) • require trade mark or trade name, patent, design or type, unless there is no other sufficiently precise or intelligible way of describing the procurement requirements unless, in such cases, words such as “or equivalent” are included in the tender documentation; • seek or accept advice to be used in the preparation or adoption of any TOR for a particular procurement from a person that may have an interest in that procurement, if to do so would prejudice fair competition • use jargon – appropriate suppliers may be turned-off by its use • be overly prescriptive or, equally, unfocused as they may limit the number of suppliers able to comply. Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 16 of 17
  • 17. References Acknowledgements This guideline draws on the guidelines of a number of other agencies, in particular: AUSAID Activity Management Guidelines, EC Project Cycle Management Guidelines and DFID Tools for Development. Endnotes 1 Human rights, gender, environment, preventing conflict and building peace, and HIV/AIDS Guideline: Developing Terms of Reference Effective from 24 April 2008 DocsOpen tor-new-1322966 Page 17 of 17